3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION 3.0.1 Limiting Conditions for Operation and. ACTION requirements shall be applicable during the OPERATIONAL MODES or other conditions specified for each Specification.
3.0.2 Adherence to the requirements of the Limiting Condition for Operation and/or associated ACTION within the specified time interval shall constitute compliance with the Specification.
In the event the Limiting Condition for Operation is restored prior to expiration of the specified time interval, completion of the ACTION statement is not required.
3.0.3 In the event a Limiting Condition for Operation and/or associated ACTION requirements cannot be satisfied because of circumstances in excess of those addressed in the Specification, within one hour ACTION shall be initiated to place the unit in a MODE in which the Specification does not apply by placing it, as applicable, in:
1.
At least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, 2.
At least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and 3.
At least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Where corrective measures are completed that permit operation under the ACTION requirements, the ACTION may be taken in accordance with the specified time limits as measured from the time of failure to meet the Limiting Condition for Operation.
Exceptions to these requirement 3 are stated in the individual Specifications.
3.0.4 Entry into an OPERATIONAL MODE or other specified applicability condition shall not.be made unless the conditions for the Limiting Condition for Operation are met without reliance on provisions contained in the ACTION statements unless otherwise excepted.
This provision shall not prevent passage through OPERATIONAL MODES as required to comply with ACTION statements.
l-3.0.5 When a system, subsystem, train, component or device is determined to l
be inoperable solely because its emergency power source is inoperable or solely because its normal power source is inoperable, it may be considered OPERABLE for the purpose of satisfying the requirements of its applicable j
Limiting Condition for Operation, provided: (1) its corresponding normal or emergency power source is OPERABLE; and (2) all of its redundant system (s),
subsystem (s),
train (s),
component (s),
and device (s) are
- OPERABLE, or I
likewise satisfy the requirements of this Specification.
Unless both conditions (1) and (2) are satisfied, the unit shall be placed in at least HOT l
STANDBY within i hour, in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,' and l
in at least COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
This Specification is not applicable in MODES 5 or 6.
I 8312200459 831215 PDR ADOCK 05000338 P
PDR NORTH ANNA - UNIT 1 3/4 0-1
--_g,-
cm
+8 4_
_p
---4 M2 J
AJ.$
s e
4b 2,.,o
___A
_m
.-.__+s 4-ii-4.
-3/4.0 APPLICABILITY r
BASES The specifications of this section provide the general requirements _ applicable to each of the Limiting Conditions-for Operation and Surveillance Requirements
~
within Section 3/4.
3.0.1 This specification defines the applicability of each specification in terms ' of defined OPERATIONAL MODES or other specified conditions and is
.provided to delineate specifically when each specification is applicable.
3.0.2 This specification defines those conditions necessary to constitute l
compliance with the terms of an _ individual Limiting Condition for Operation and associated ACTION requirement.
3.0.3 This specification delineates'the ACTION to,be taken for circumstances not directly provided for in the ACTION statements and whose occurrence vould violate the intent of the specification.
For exarple, Specification 3.5.1 calls for each Reactor Coolant System accumulator to be OPERABLE and provides explicit ACTION requirements when one accumulator is inoperable.
Under the 4
terms of Specification 3.0.3., ' if more than one accumulator is inoperable, within one hour measures must be initiated to place the unit in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
As a further example, Specification 3.6.2.1 requires two Containment Quench Spray Systems to be OPERABLE and provides explicit ACTION requirements if one spray system is inoperable. Under the terms of Specification 3.0.3, if both.of the ' required Containment Quench Spray Systems are inoperable, within one hour measures must be initiated to place the unit in at least HOT STANDBY j
within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN in the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
3.0.4 This specification provides that entry into an OPERATIONAL MODE or other specified applicability condition must be made with (a) the full complement of
~
required systems, equipment or components OPERABLE and (b) all other parameters as specified in the Limiting Conditions for Operation being met without regard for allowable deviations and out of service provisions contained in the ACTION statements.
The intent of this provision is to insure that facility operation is not 3
~ or systems inoperable or other initiated with either required equipment j
specified limits being exceeded.
. Exceptions to this provision have been provided for a limited number of specifications when startup with ~ inoperable equipment would not affect plant i
safety.
These exceptions are stated in the ACTION ~ statements of the appropriate specifications.
i NORTH ANNA - UNIT 1 B 3/4 0-1
4 4
l ATTACmfENT 2 l
i t
I l
r t
A
~
3/4 LIMITING CONDITIONS FOR 0PERATION AND SURVEILLANCE REQUIREMENTS 3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION 3.0.1 Compliance with the Limiting Conditions for Operation contained in the succeeding Specifications is required. during the OPERATIONAL MODES or other conditions.specified ~ therein; except that upon failure to meet the Limiting Cunditions for Operation, the associated ACTION requirements shall be met.
3.0.2 Noncompliance with a Specification shall exist when the requirements of the Limiting Condition for Operation and associated ACTION requirements are not met within the specified time intervals.
If the Limiting Condition for Operation is restored prior to expiration of the specified time intervals,
- completion of the ACTION requirements is not required.
3.0.3 In the event a Limiting Condition for Operation and/or associated ACTION requirements cannot be satisfied because of circumstances in excess of those addressed in the Specification, within one hour ACTION shall be initiated to place the unit in a MODE in which the Specification does not apply by placing it, as applicable, in:
4
,1.
At least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, 2.'
At least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and 3.
At least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
l Where corrective measures are completed that permit operation under the ACTION requirements, the ACTION may be taken in accordance with the specified time
- limits as measured from the time of failure to meet the Limiting Condition for Operation.
Exceptions to these requirements are stated in the individual Specifications.
I 3.0.4' Entry into an OPERATIONAL MODE or other specified condition shall not
- be made unless the conditions for the Limiting Condition for Operation are met without reliance on provisions contained in the ACTION requirements.
This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements.
Exceptions to these requirements are stated in the individual Specifications.
3.0.5 When a system, subsystem, train, component or device is determined to be inoperable solely because its emergency power source is inoperable, or solely because its normal power source is inoperable, it may be considered OPERABLE for the purpose of satisfying the - requirements of its applicable Limiting Condition for Operation, provided: (1) its corresponding normal or i
emergency power source is OPERABLE; and (2) all of its redundant system (s),
subsystem (s),
train (s),
component (s),
and device (s) are
- OPERABLE, or likewise satisfy the requirements of this Specification.
Unless both conditions (1) and (2) are satisfied, the unit shall be placed in at least' HOT STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
This Specification is not applicable in MODES 5 or 6.
NORTH ANNA - UNIT 2 3/4 0-1
~3/4.0 APPLICABILITY BASES The specifications of this section provide the general requirements applicable to each of the Limiting conditions for Operation and Surveillance Requirements
-within Section 3/4.
3.0.1 This specification defines the applicability.of each specification in terms of defined OPERATIONAL MODES or other specified conditions and is provided to delineate specifically when each specification is applicable..
3.0.2 This specification defines those conditions necessary _ to constitute
' compliance with the terms of an individual Limiting Condition for Operation and associated ACTION requirement.
3.0.3 This specification delineates the ACTION to be taken for circumstances
.ot directly provided for in the ACTION statements and whose occurrence would violate the intent of the specification.
For escample, Specification 3.5.1 requires each Reactor Coolant System accumulator to be OPERABLE and provides explicit ACTION requirements if one accumulator is inoperable.
Under the terms of Specification 3.0.3., if more than one accumulator is inoperable, within one hour measures must be initiated to place the unit in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 2
hours. As a further example, Specification 3.6.2.1 requires two Quench Spray Systems to be OPERABLE and provides explicit ACTION requirements if one spray system is inoperable. Under the terms of Specification 3.0.3, if both of the required Quench Spray Systems are inoperable, within one hour measures must be initiated to place the unit in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN in the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
l 3.0 64 This specification provides that entry into an OPERATIONAL MODE or other i
specified applicability condition must be made with (a) the full complement of required' systems, equipment. or. components OPERABLE and (b) all other j
parameters as specified in the Limiting Conditions fot Operation being met
(
without regard. for allowable deviations and out of service provisions contained in the ACTION statements.
The intent of this provision is to insure that facility operation is not initiated with either required equipment or systems inoperable or other l'
specified limits being exceeded.
NORTH ANNA - UNIT 2 B 3/4 0-1
9 6
9 4
ATTACHMENT 3 I
I I
I
~
i e
l I
-DISCUSSION OF PROPOSED TECHNICAL SPECIFICATION CHANGES Currently, North Anna 1 Technical Specification 3.0.3 partially states, "In the event a Limiting Condition for Operation and/or associated ACTION require-ments cannot be satisfied. because of circumstances in excess of those addressed in the specification, the unit shall be placed in at least HOT
- STANDBY within I hour. at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in
- at least COLD ' SHUTDOWN.. within the~ following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> unless corrective measures are completed that permit operation under the permissible ACTION statements for the specified time interval as measured from initial discovery or until the reactor is placed in a MODE in which the specification is not applicable."
In Amendment No. 48 to the North Anna 1 Operating License, which does not become effective until January 1,
1984, Technical Specification 3.0.3 was revised. to partially read. "When a Limiting Condition for Operation is not met, except as provided in the associated ACTION requirements, the unit shall be placed in a MODE in which the Specification does not apply by placing it, b.
as applicable, in:
1.
At least HOT STANDBY within I hour; 2.
At least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and l~
- 3. -At least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />."
Currently, North. Anna 2 Technical Specification 3.0.3 partially states, "When a Limiting Condition for Operation is not met, except as provided in the j
associated ACTION requirements, the unit shall be placed in a MODE'in which the specification does not apply by placing it, as applicable, in:
t
.1.
At least HOT STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; 2.
At least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; and 3.
At least COLD SHUTDOWN within the following ',0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />."
The proposed changes to Technical Specification 3.0.3, for North Anna 1 and 2, l
will partially state, '.'In the event a Limiting condition for Operation and/or associated ACTION requirements cannot be satisfied because of circumstances in p
excess'of those addressed in the Specification, within one hour ACTION shall l
be initiated to place'the unit in a MODE in which the Specification does not l
apply by placing it, 'as applicable. in:
- 1.. At least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; 2.
At least HOT SHUTDOWN within-the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; and
- 3. -At least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />."
In addition -the Technical Specification Bases has been revised to provide consistency with the changes to Technical Spec Hication 3.0.3.
6 These proposed changes to North Anna 1 and 2 Technical Specification 3.0.3 and Bases are needed to provide consistency in relation to the time requirements of the Standardized Technical Specifications for Westinghouse Pressurized Water Reactors, Revision 4 issued Summer,1980, NUREG 0452, Revision 4.
I
The proposed changes do not pose a significant hazards consideration as stated in the Federal Register, dated April 6, 1983 Page L4870 Example (vii); a change to make a license conform to changes in the regulations, where the license change results in very minor changes to facility operations clearly in
~
keeping with the regulations.
The probability of occurrence or the consequences of a malfunction of equipment important to safety and previously evaluated in the UFSAR is not significantly increased, the possibility of a different type of accident or malfunction than was previously evaluated in the UFSAR has not been created and the margin of safety as described in the BASES section of any part of the Technical Specifications is not significantly reduced because the proposed changes are being made to keep North Anna Units 1 and 2 within regulations.