Monthly Operating Rept for Aug 1991 for Millstone Unit 2
ML20082S714
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/31/1991
From: Gibson J
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20082S712 List:
References
NUDOCS 9109170254
Download: ML20082S714 (4)


Text

. - - _ _ - _ _ - - - _

^'

OPERATING DATA REPORT DOCKET NO.

_50-336 DATE _09/05/91 CO.PLETED BY J. Gibson TELEPHONE (203) 447-1791

EXT, 4431

' OPERATING STATUS Notes: Items 21 and 22

1. _ Unit Name:

Millstone Unit 2 cumulative are weighted 2.

Reporting Period:

August 1991 averages. Unit operated

.3.

-Licensed Thermal Power (MWt):

2700 at 2560 MWTH prior to its 4.

Nameplate Rating-(Gross MWe):

909 uprating to the current 5.- Design Electrical Rating (Net MWe):

870 2700 MWTH power level.

6.

Maximum Dependable Capacity 1(Gross MWe):

893.88 7.

Maximum Dependable Capacity (Net MWe):

862.88 8.

If Changes occur in Capacity Ratings (Items Number 3 ThrouSh 7) Since Last Jeport, Give-Reasons:

N/A' 9.

Power Level To Which Restricted, If any (Net MWe):

N/A

10. Reasons.For Restrictions, If Any:

N/A This Month Yr.-To Date Cumulative

'11. Hours In Reporting Period _

270.4 3 6 8 7_ f.,

100600.2 744.0 5831.0 137471.0 12'. Number Of Hours Reactor Was Critical

13. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5
16. Hours Generator on-Line 226.4 3516.0 95859.8
15. Unit Reserve Shutdown Hours 0.0 0.Q 468.2 7

16i-Gross' Thermal Erergy Generated (MWH) 540061.0 9084522.0 264140586.4

17. Gross Electrical Energy Generated (MWh) 180034.5

_3015289.5 80454989.0

_18. Net Electrical Energy Generated (MWH) 164064.5 2880462.5 77181512.0 19.: Unit Service Factor 30.4 60.3 69.7 20.; Unit Availability Factor-30.4 60.3 70.1 l'

21.TUnit. Capacity Factor (Using MDC Net).

25.6-

-57.2 65.9; 22.' Unit Capacity Factor (Using DER Net) 25.1 56.8 64.7 23.' Unit Forced Outage Rate 69.6 39.3

-14.5

24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):

N/A l.

l

25. If Unit Shutdown At End Of Report Period. Estimated _Date of Startup: Sept. 10. 1991

'26. Units In Test Status (Prior to Commercial Operation):

s Forecast Achieved INITIAL CRITICALITY N/A

_ N/A INITIAL ELECTRICITY N/A N/A l

COMMERCIAL OPERATION N/A N/A I

9109170254 910910 PDR ADOCK 05000336 R

PDR

9 g

AVERACE DAILY UNIT POVER LEVEL DOCKET NO.

50-336 UNIT:

Millstone Unit 2 DATE:

09/05/91 COMPLETED BY:

J. Gibson TELEPHONE:

(203)447-1791 EXT:

4431 I

l MCNTH: AUGUST 1991 DAY AVG. DAILY POWER LEVEL DAY AVC. DAILY POWER LEVEL (MVe-Net)

(MWe-Net) 1 870 17 0

2 870 18 0

3 872 19 0

4 872 20 179 5

872 21 649 6

627 22 865 7

0 23 528 8

0 24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

INSTRUCTIONS On this format, list the average daily unit power level in MVe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

1 1

UNIT SHUTDOVWS AND POWER PEDUCTIONS

' UNIT NAME-Millstone'2 DOCKET NO.,

50-336

~

DATE 09/05/91'

_t COMPLETED BY' J.'Cibson:

l

. TELEPHONE-(203) 447-1791 REPORT MONTH AUGUST 1991' EXT.

4431 4

l 2

No.

Date Type Duration Reason Method'of License

'Systgm Compgnent Cause & Corrective'

'(Hours)

Shutting

Event, Code

'Ccde Action to Down Reactor Report #

Prevent Recurrence 3

I 07 910806 F.

318.7 A

1 N/A N/A d/A Unit was shutdown from 100 percent power after testing ravealed a Main Turbine Stop and Intercept valve failed to operate

-The i

Turbine EHC system was flushed'and cleaned to remove contaminants. The reactor was started i

on August 18. The reactor was shutdown'on the Morning of August 19 in anticipation of hur-ricano " BOB".

The unit.was re-stcrted cn August 19.

{

08 910823 F

198.9 A

1 91-009 EK DG Unit was shutdown from 100 percent power after t

determining both emergency diesels to be in-operative.

The. outage to repair the diesels is on-going.at the end of the report period.

See LER for details.

I: Forced Reason:

Method Exhibit G - Instructions 2

3 0

F S: Scheduled A-Equipment Failure'(Explain) 1-Manual.

for. Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for License C-Refueling 3-Automatic Scram-Event Report (LER) File D-Regulatory Restriction 4-Continued froie (NUREG-0161)

E-Operator Training & License Examination Previous month 5 Exhibit: 1 - Same ' Source F-Administrative 5-Power Reduction G-Operational Error (Explain)

(Duration -0)

'H-Other (Explain) 6-Other (Explain)

REFUELING INFOB}JATION REOUES_T 1.

Name of facility:

Millstone 2 2.

Scheduled date for next refueling shutdown:

ArIJ1 1992 3.

Scheduled date for restart Lollowing refueling:

_LUA 4.

Will refueling or resumptica of operation thereafter require a technical specification change or other license amendment?

None at this time 5.

Scheduled date(s) for submitting licensing action and supporting information:

Hone 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Mil 1 stone 2 will be replaqiua the Steam Generator sub-assemblies durana the unco _mina End of Cycle 11 refuelina outane.

It is antacinated this will be qccomplished under_10CFR 50.59.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

In Core:

(a) 112 In Spent Fuel Pool:

(b) 212 NOTE:

These numbers represent the total fuel assemblies and consolidated fuel storace boxes in tiese two (2) Ltem Control Areas t

8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel ass'mblies:

Currently 1277 9.

The projected date of the last refue31ng that can be discharged to the spent fuel pool assuming the present licenced capacity:

1994. Spent Fuel Eqol Eull, core off load capacity is reached (with

-out consolidation).

1998. Core Full. Spent Fuel Pool Full 2009. Spent Fuel Pool Full. core off load capacity is reached-contincent upom full scale storage of consolidated fuel in the Spent Fuel Pool.