Forwards Monthly Operating Rept for Aug 1991 for Millstone Unit 2 & Revised Rept for Jul 1991,consisting of Operating Data Rept Sheet
ML20082S710
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/10/1991
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082S712 List:
References
MP-91-730, NUDOCS 9109170253
Download: ML20082S710 (1)


Text

-

e l

s

  • l s

1 a

NORTHEAST UTILITIES Oenmi On.ce.. seeen si,ee een.n. conn ci,cui 4

uw x; s we. n4,-,

l

.m...v wu n u a c.+ "~

P O BOX 270 w 3i.m o:*'" ""'

H ARTFORD. CONNECTICUT 06141-0270 k

k J N[C22.C',

(203) 665-5000 September 10, 1991 Mp-91-730 Re:

10CFR50.71(a)

U.S. Nuclear Regulatory Commission

-Document Control Desk Washington, D. C. 20555

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336

Dear Sir:

This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 2 for the month of August, 1991, in accordance with Appendix A Techrical Specifications, Section 6.9.1.6.

One additional copy of the report is enclosed. Also enclosed is a revised copy of the July, 1991, Operating Data Report Sheet.

Very truly yours, NORTilEAST NUCLEAR ENERGY COMPANY bj L+f cc w

,' Stephen E'.

Scace Station Director Millstone Nuclear Power Station SES/JG cc: T. T. Martin, Region I Administrator G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1,2&3 9109170253 910910 ggp DR ADOCK 0500f 6

///