OPERATING DATA REPORT i
REVISED DATA DOCKET NO.
50-136 DATE G4/05/91 COMPLETED BY G.
Neron TELEP110NE (203) 447-1791
- EXT,
.4417 OPERATING STATUS Notes: Items 21 and 22 1.
Unit Name:
Millstope Unit 2 cumulative are weighted 2.
Reporting Period:
July 1991_
averages. Unit operated 3.
Licensed Thermal Power (MWt):
2700 at 2560 MWTil prior to its 4.
Nameplate Rating (G oss MWe):
9.09 uprating to the current 5.
Design Electrical Rating (Net MWe):
870 2700 MWTil power level.
6.
Maximum Dependable Capacity (Gross MWe):
893.88 7.
Maximum Dependable Capacity (Net MWe):
862.88 8.
If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
er Level To Which Restricted, If any (Net MWe);
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr.-To-Date Cumulative
- 11. Hours In Reporting Period 744.0 5087.0 136727.0
- 12. Number Of Ilours Reactor Was Critical 617.1 3417.2 100329.8
- 13. Reactor Reserve Shutdown llours 0.0 0.0 2205.5 14 llours Cencrator on-Line 560.1 3289.6 95633.4
- 15. Unit Rese W e Shutdown Hours 0.0 0.0 468.2
- 16. Cross Thermal Energy Generated (MWH) 1352310.0 8544461.0 263600525.4
- 17. Cross Electrical Energy Generated (MWH) 444249.0 2835255.0 80274954.5
- 18. Net Electrical Energy Generated (MWH) 423931_0 2716398.0 77017447.5
- 19. Unit Service Factor 75.3 64J 69.9
- 20. Unit Availability Factor 75.3 64.7 70.3
- 21. Unit Capacity Factor (Using MDC Net) 66.0 61.9 66.1
- 22. Unit Capacity Factor (Using DER Net) 65.5 6LIr 64.9
- 23. Unit Forced Outage Rate 20.8 34.9 14.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Unit Shutdown At End Of Report Pariod. Estimated Date of Startup:
N/A 26.-Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
- REVISED DATA VALUES DUE TO CALCUIATION ERROR c109170255 910910 PDR ADOCK 0500033/-