Revised Monthly Operating Rept for Jul 1991 for Millstone Unit 2
ML20082S719
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/31/1991
From: Neron G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20082S712 List:
References
NUDOCS 9109170255
Download: ML20082S719 (1)


Text

- - _ _ _ _ _ _ - _ - _ _ _ _ _ _ . __

4  %

^ '

OPERATING DATA REPORT i

REVISED DATA DOCKET NO. 50-136 DATE G4/05/91 COMPLETED BY G. Neron TELEP110NE (203) 447-1791 EXT, .4417 OPERATING STATUS Notes: Items 21 and 22

1. Unit Name: Millstope Unit 2 cumulative are weighted
2. Reporting Period: July 1991_ averages. Unit operated
3. Licensed Thermal Power (MWt): 2700 at 2560 MWTil prior to its
4. Nameplate Rating (G oss MWe): 9.09 uprating to the current
5. Design Electrical Rating (Net MWe): 870 2700 MWTil power level.
6. Maximum Dependable Capacity (Gross MWe): 893.88
7. Maximum Dependable Capacity (Net MWe): 862.88
8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. er Level To Which Restricted, If any (Net MWe); N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-To-Date Cumulative
11. Hours In Reporting Period 744.0 5087.0 136727.0
12. Number Of Ilours Reactor Was Critical 617.1 3417.2 100329.8
13. Reactor Reserve Shutdown llours 0.0 0.0 2205.5 14 llours Cencrator on-Line 560.1 3289.6 95633.4
15. Unit Rese W e Shutdown Hours 0.0 0.0 468.2
16. Cross Thermal Energy Generated (MWH) 1352310.0 8544461.0 263600525.4
17. Cross Electrical Energy Generated (MWH) 444249.0 2835255.0 80274954.5
18. Net Electrical Energy Generated (MWH) 423931_0 2716398.0 77017447.5
19. Unit Service Factor 75.3 64J 69.9
20. Unit Availability Factor 75.3 64.7 70.3
21. Unit Capacity Factor (Using MDC Net) 66.0 61.9 66.1
22. Unit Capacity Factor (Using DER Net) 65.5 6LIr 64.9
23. Unit Forced Outage Rate
  • 20.8
  • 34.9 14.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Unit Shutdown At End Of Report Pariod. Estimated Date of Startup: N/A 26.-Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

  • REVISED DATA VALUES DUE TO CALCUIATION ERROR c109170255 910910 PDR ADOCK 0500033/-