Text

.

s ATTACIIMENT TECIINICAL SPECIFICATION PAGE CIIANGES UNIT 1 3/4 3-22 3/4 3-24 IJHIT 2 3/4 3-22 3/4 3-24 l58'A888R!s888?i7 PDR

^

~

TABLE 4.3-2 i

ENGliiEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS g

'~

CHANNEL MODES IN milch g

CHANNEL CitANNEL FUNCTIONAL SURVEILLANCE

~

p FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED 1.

SAFETY INJECT 11N (SIAS) a.

Manual (Trip buttons)

N.A.

N.A.

R N.A.

b.

Containment Pressure - High 5

R H

1, 2, 3

)

5 c.

Pressurizer Pressure - Low S

R 1, 2, 3 c.

M(1)I(3) }

1,2,3 l

]

d.

Automatic Actuation logic N.A.

N.A.

(

2.

CONTAINMENT SPRAY (CSAS)

(O Manual (Tr.ip buttons)

N.A.

N.A.

R N.A.

a.

b.

Containment Pressure-High 5

R H

1, 2, 3 l

c.

Automatic Actuation Logic N.A.

N.A.

M(1)(6) 1, 2, 3 U

^

^

3.

CONTAINMENT ISOLATION (CIS)f Y

a.

Manual CIS (Trip buttons)

N.A.

N.A.

R N.A.

N b.

Containment Pressure-High 5

R H

1,2,3 c.

Automatic Actuation Logic N.A.

N.A.

M(1)(4) 1, 2, 3 4.

MAIN STEAM LINE ISOLATION (SGIS) a.

Manual SGIS (l1SIY Hand Switches and Feed Head Isolation Hand Switches)

N.A.

N.A.

R N.A.

b.

Steam Generator Pressure-Low 5

R M

1,2,3 g

c.

Automatic Actuation Logic N.A.

N.A.

M(1)(5) 1, 2, 3 3

E R

E

  1. Containment isolation of non-essential penetrations is also initiated by SIAS (functional units 1.a g

and 1.c).

U

TABLE 4.3-2 (Continued)

TABLE NOTATION (1)

The logic circuits shall be tested manually at least once per 31 days.

(3)

SIAS logic circuits A-5d B 5&fG-end-B40-may-se) exempted from testing during operation; however, these logic circuits shall be tested at least once per la months during shutdo.<n. '

are (4)

CIS logic circuits. A-5 and B-5 fmar-t>e) exempted from testing during i

operation; however, these logic circuits shall be tested at least once per 18 months during shutdown, are (5)

SGIS logic circuits A-1 and B-1(4w-F6 exempted from testing during l

operation; however, these logic circuits shall be tested at least -

once per 18 months during shutdown.

cwe (6)

CSAS logic circuits A-3 and B-3(my-belexempted from testing during

\\

operation; however, these logic circuits shall be tested at least once per 18 months during shutdown.

- ~-

1 (2)

SIAS logic circuits A-10 and B-10 shall be tested monthly with the exception of the Safety Injection Tank isolation valves.

The SIAS logic circuits for those valves are exempted from testing during operation; however, these logic circuits shall be tested at least once per 18 months during shutdown.

f

( ~ ~ ~

~

,~

~

d 9

CALVERT CLIFFS - UNIT 1 3/4 3-24 Amendment No. 3, 3

3 TABLE 4.3-2

~

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTA10N SURV M

.i?

n CHANNEL MODES IN WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED 7

'e 1.

SAFETY INJECTION (SIAS)

Manual (Trip Buttons)

N.A.

N.A.

R N.A.

a.

E b.

Containment Pressure - High 5

R H

c.

PreL.;urizer Pre:sure' - Low S

R M __

1, 2, 3 1

_,3 m

d.

Automatic Actuation' Logic N.A.

M.A.

M(1)(3) 1, 2, 3 l

2.. CONTAINMENT SPRAY (CSAS)

@)

a.

Manual (Trip Suttons)

N.A.

N.A.

R N.A.

b.

Containment Pressure --

High 5

R H

1,2,3 Automatic Actuation Logic N.A.

N.A.

M(1)(6) 1, 2, 3 c.

3.

CONTAINMENT ISOLATION (CIS) f y

a.

Manual CIS (Trip Buttons)

N.A.

N.A.

R N.A.

y b.

. Containment Pressure - High S

R H

1,2,3 Automatic Actuation Logic H.A.

N.A.

M(1)(4) 1, 2, 3 c.

4.

MAIN' STEAM LINE ISOLATION (SGIS) a.

l Manual SGIS (MSIY Hand F

Switches and Feed Head' 3

Isolation Hand Switches)

N.A.

N.A.

R N.A.

i' b.

Steam Generator Pressure - Low S R

M 1,2,3 Automatic Actuation Logic N.A.

H.A.

M(1)(5) 1, 2, 3 g

c.

E i

w

  1. Containment isolation of non-essential penetrations is also initiated by SIAS (functional units 1.a and 1.c).

.M

+

S 4

- +.,

~,. - -

e w.

e

-+.

- -, - - - - - +,

~,m._s-


~-o--,A

TABLE 4.3-2 (Continued)

TABLE NOTATION (1) The logic circuits shall be tested manually at least once per 31 days.

ond v

a re SIAS logic circuits A 5 B 5fLbnd (3) testing during operation; however, tfies:e-10 mor-b6 exemptcJ from e logic circuits shall be tested at le&st once per 18 months during shutdown.

are (4) CIS logic circuits A-5 and B-5 (uy-t@ exempted from testing during l

operation; however, these logic circuits shall be testea at least once per 18 months during shutdown.

tut.

(5) SGIS logic circuits A-1 and B-1 A exempted from testing during l

operation; however, these logic circuits shall be tested at least once per 18 months during shutdown.

ctAE.

(6) CSAS logic circuits A-3 and B-3 A exempted from testing during l

operation; however, these logic circuits shall be tested at least once per 18 months during shutdown.

-~~,v (2)

SIAS logic circulta A-10 and B-30 shall be tested monthly with the excoption of the Safety Injection Tank I

isolation valves.

The SIAS logic circu'its for thosc valves are exempted from testing during operation; however, these logic circuits shall be tested at least

)

once per 18 months during shutdown.

[

~-~

~

~-

CALVERT CLIFFS - UNIT 2 3/4 3-24 Amendment No. 3, teV