Text
.
s ATTACIIMENT TECIINICAL SPECIFICATION PAGE CIIANGES UNIT 1 3/4 3-22 3/4 3-24 IJHIT 2 3/4 3-22 3/4 3-24 l58'A888R!s888?i7 PDR
^
~
TABLE 4.3-2 i
ENGliiEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS g
'~
CHANNEL MODES IN milch g
CHANNEL CitANNEL FUNCTIONAL SURVEILLANCE
~
p FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED 1.
SAFETY INJECT 11N (SIAS) a.
Manual (Trip buttons)
N.A.
N.A.
R N.A.
b.
Containment Pressure - High 5
R H
1, 2, 3
)
5 c.
Pressurizer Pressure - Low S
R 1, 2, 3 c.
M(1)I(3) }
1,2,3 l
]
d.
Automatic Actuation logic N.A.
N.A.
(
2.
(O Manual (Tr.ip buttons)
N.A.
N.A.
R N.A.
a.
b.
Containment Pressure-High 5
R H
1, 2, 3 l
c.
Automatic Actuation Logic N.A.
N.A.
M(1)(6) 1, 2, 3 U
^
^
3.
CONTAINMENT ISOLATION (CIS)f Y
a.
Manual CIS (Trip buttons)
N.A.
N.A.
R N.A.
N b.
Containment Pressure-High 5
R H
1,2,3 c.
Automatic Actuation Logic N.A.
N.A.
M(1)(4) 1, 2, 3 4.
MAIN STEAM LINE ISOLATION (SGIS) a.
Manual SGIS (l1SIY Hand Switches and Feed Head Isolation Hand Switches)
N.A.
N.A.
R N.A.
b.
Steam Generator Pressure-Low 5
R M
1,2,3 g
c.
Automatic Actuation Logic N.A.
N.A.
M(1)(5) 1, 2, 3 3
E R
E
- Containment isolation of non-essential penetrations is also initiated by SIAS (functional units 1.a g
and 1.c).
U
TABLE 4.3-2 (Continued)
TABLE NOTATION (1)
The logic circuits shall be tested manually at least once per 31 days.
(3)
SIAS logic circuits A-5d B 5&fG-end-B40-may-se) exempted from testing during operation; however, these logic circuits shall be tested at least once per la months during shutdo.<n. '
are (4)
CIS logic circuits. A-5 and B-5 fmar-t>e) exempted from testing during i
operation; however, these logic circuits shall be tested at least once per 18 months during shutdown, are (5)
SGIS logic circuits A-1 and B-1(4w-F6 exempted from testing during l
operation; however, these logic circuits shall be tested at least -
once per 18 months during shutdown.
cwe (6)
CSAS logic circuits A-3 and B-3(my-belexempted from testing during
\\
operation; however, these logic circuits shall be tested at least once per 18 months during shutdown.
- ~-
1 (2)
SIAS logic circuits A-10 and B-10 shall be tested monthly with the exception of the Safety Injection Tank isolation valves.
The SIAS logic circuits for those valves are exempted from testing during operation; however, these logic circuits shall be tested at least once per 18 months during shutdown.
f
( ~ ~ ~
~
,~
~
d 9
CALVERT CLIFFS - UNIT 1 3/4 3-24 Amendment No. 3, 3
3 TABLE 4.3-2
~
ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTA10N SURV M
.i?
- n CHANNEL MODES IN WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED 7
'e 1.
SAFETY INJECTION (SIAS)
Manual (Trip Buttons)
N.A.
N.A.
R N.A.
a.
E b.
Containment Pressure - High 5
R H
c.
PreL.;urizer Pre:sure' - Low S
R M __
1, 2, 3 1
_,3 m
d.
Automatic Actuation' Logic N.A.
M.A.
M(1)(3) 1, 2, 3 l
- 2.. CONTAINMENT SPRAY (CSAS)
@)
a.
Manual (Trip Suttons)
N.A.
N.A.
R N.A.
b.
Containment Pressure --
High 5
R H
1,2,3 Automatic Actuation Logic N.A.
N.A.
M(1)(6) 1, 2, 3 c.
3.
CONTAINMENT ISOLATION (CIS) f y
a.
Manual CIS (Trip Buttons)
N.A.
N.A.
R N.A.
y b.
. Containment Pressure - High S
R H
1,2,3 Automatic Actuation Logic H.A.
N.A.
M(1)(4) 1, 2, 3 c.
4.
MAIN' STEAM LINE ISOLATION (SGIS) a.
l Manual SGIS (MSIY Hand F
Switches and Feed Head' 3
Isolation Hand Switches)
N.A.
N.A.
R N.A.
i' b.
Steam Generator Pressure - Low S R
M 1,2,3 Automatic Actuation Logic N.A.
H.A.
M(1)(5) 1, 2, 3 g
c.
E i
w
- Containment isolation of non-essential penetrations is also initiated by SIAS (functional units 1.a and 1.c).
.M
+
S 4
- +.,
~,. - -
e w.
e
-+.
- -, - - - - - +,
~,m._s-
~-o--,A
TABLE 4.3-2 (Continued)
TABLE NOTATION (1) The logic circuits shall be tested manually at least once per 31 days.
ond v
a re SIAS logic circuits A 5 B 5fLbnd (3) testing during operation; however, tfies:e-10 mor-b6 exemptcJ from e logic circuits shall be tested at le&st once per 18 months during shutdown.
are (4) CIS logic circuits A-5 and B-5 (uy-t@ exempted from testing during l
operation; however, these logic circuits shall be testea at least once per 18 months during shutdown.
tut.
(5) SGIS logic circuits A-1 and B-1 A exempted from testing during l
operation; however, these logic circuits shall be tested at least once per 18 months during shutdown.
ctAE.
(6) CSAS logic circuits A-3 and B-3 A exempted from testing during l
operation; however, these logic circuits shall be tested at least once per 18 months during shutdown.
-~~,v (2)
SIAS logic circulta A-10 and B-30 shall be tested monthly with the excoption of the Safety Injection Tank I
isolation valves.
The SIAS logic circu'its for thosc valves are exempted from testing during operation; however, these logic circuits shall be tested at least
)
once per 18 months during shutdown.
[
~-~
~
~-
CALVERT CLIFFS - UNIT 2 3/4 3-24 Amendment No. 3, teV