ML20082J143
| ML20082J143 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/22/1991 |
| From: | FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20082J137 | List: |
| References | |
| NUDOCS 9108270187 | |
| Download: ML20082J143 (1) | |
Text
.
-,[
DEFINITIONS-
".
- E REPORTABLE EVENT:
17 AL REPORTABLE-EVENT shall be_ one of those conditions specified in-
-Section 50.73 to 10 CFR Part 50.
CONTAINMENT'lNTEGRITY:-
- 1. _8 CONTAINMENT INTEGRITY shall exist when:
a.
. All penetrations required to be closed during accident conditions are.either:
1.=
Capable of being closed by an OPERABLE containment-automatic isolation system,- or 2.-
Closed by manual valves, blind flanges, or deactivated automatic valves secured _in their closed positions, cxcept those approved to be opened under administrative
- controls, b.
All-equipment hatches are closed and sealed, c.
Each airlock is OPERABLE pursuant to Specification 3.6.1.3,
- d.-
The containment leakage rates are within the limits of Specification 3.6.1.2, and e.
The sealing mechanism associated with each penetration (e.g.,
welds, bellows.or _0-rings) is OPERABLE.
CHANNEL CALIBRATlQH
'l.9 -
A CHANNEL CALIBRATION shall be the adjustment,'as necessary, of the channel output such that it responds with necessary range and
' accuracy. to known values of the parameter which-the. channel monitors.
TheJ CHANNEL _ CAllBRATION shall _.cncompass the entire channel including the sensor and alarm and/or trip functions, and shall include the CHANNEL FUNCTIONAL TEST, CHANNEL CAllBRATION may.be performed by any series of sequential, overlapping or total channel steps-such that the entire channel is calibrated.-
lr
- Calibration of instrument channels with ' resistance temperature L
g-detectors (RTD).or : thermocouple sensors shall_
consist - of u
-verification of functional capability of the sensing element, and normal calibration of the : remaining adjustable devices-in _ the
_g
. ggy channel.
- Not
=$8 CHANNEL--CHECK mn
,? -
1.10 A CHANNEL-CHECK shall be the qualitative assessment of channel H.y behavior during operation by observation. This determination shall include, where possible, comparison of the channel indication and/or
-o
'R@.
status with other indications and/or status derived from independent
}j instrument channels measuring the same parameter.
R no 1-2 Arendment No.
(CRYSTAL RIVER UNIT _3 l:
~-
_;,.._._._._.- _...._ _,_ _,_._ _____._ _ _.~._.__._,_.,_,_