Forwards Leak Rate Test Results,Per 761117 Telcon Request. Results Taken Directly from Integrated Primary Containment Leak Rate Test Repts Performed During 1976
ML20082H116
Person / Time
Site: 05000000, Quad Cities
Issue date: 11/18/1976
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: Barker J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20082H066 List:
References
FOIA-83-384 NJK-76-428, NUDOCS 8312010030
Download: ML20082H116 (24)


Text

6~4 44j

's '

Camm
nw2

'1 Edisin 4

Ouad-Cities Nov. ear Power Station Post Off.cc Box 216 Cordova, Hhnois 61242 Telephone 309/654-2241 NJK-76-428 November 18, 1976 Mr. James Barker Region iII U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Elyn, IL 60137

SUBJECT:

Local and integrated Leak Ratt Test Results at Quad-Cities Nuclear Power Station Enclosed are the leak rate test results requested by you from M. Flasch via telephone on November 17, 1976.

The enclosed attachments are taken directly from Integrated Primary Contain-ment Leak Rate Test reports performed on Units One and Two during 1976.

Local leak rate test results are given for each test performed since the pre-operational iLRT.

In addition, the ILRT results are as follows:

Pre-Operational 1976 Acceptance ILRT ILRT Criterlon Unit One 0.111 wt%/ Day (4/71) 0.495 wt%/ Day (3/76) 0.750 wt%/ Day Unit Two 0.099 wt%/ Day (9/71) 0.308 wt%/ Day (10/76) 0.750 wtt/ Day Please contact us if you require further information.

Very truly yours, COMMONWEALTH EDl SON COMPANY QUAD CITIES NUC AR POWER,-JTATION f

. g- / / N f/

N. J. Ka ivianakis Station Superintendent NJK/MPF/s1 8312010030 830825 PDR FOIA COGOL83-384 PDR l 50-L q Attachments NOV 2 21976

//,[ 8C

',r APPENDIX A TYPE B AND T'/PE C TESTS Presented herein are the results of local leak rate tests conducted on all testable penetrations, gasketed seals, doors and isolation valves since immediately preceding the pre-operational li.RT in 1971.

All isolatiori valves with leakage in excess of the individual valve Icakage limit were restored to an acceptable leak tightness prior to the resumption of power operation.

Total leakage for double gasketed seals and total leakage for all other pene-trations and isolation valves following repairs satisfied the Technical Specification limits.

These.results are listed in Table A-1.

I a

b 6

i l

I

(

[

~

-/d M k

-- +

s TABLE A-1 TYPE B AND TYPE C TEST RESULTS VALVE (S) OR TEST MEASURED LEAK RATE (SCFH)

PENETRATION VOLUME AS FOUND - D' ATE

{

AS LEFT - DATE A0 203-1A Main Steam Line 8.3 12/31/70 8.3 12/31/}0 2.75 4/1/74 2 75 4/1/74 isolation 0.288 1,/3/76 0.288 1/3/76 A0 203-2A Valves 0.0 12/31/70 0.0 12/31/70,

2.75 4/1/74 2.75 4/1/74 j

0.288 1/3/76 0.288 1/3/76 A0 203-1B 3.74 12/31/70 3.74 12/31/70 52.4 4/27/73 3.25 5/1/73 5.15 5/13/74 5.15 5/13/74 !

21.n 1/3/76 6.51 1/i'/76 A0 203-2D 1.0 12/31/70 1.0 12/31/70 10.95 5/13/74 10.95 5/13/74 I 10.10 1/3/76 3.86 1/3/76 A0 203-1C 1.94 12/31/70 1.94 12/31/70 i 0.0 5/13/74 0.0 5/13/74 l 70.88 1/3/76 1.74 1/3/76 1

A0 203-2C 0.468 12/31/70, 0.463 12/31/73.

216 5/13/74 8.64 7/14/74 1,72 1/3/76 1 72 1/3/76 A0 203-lD 1 92 12/31/70 1.92 12/31/70 17.35 6/3/74 5.76 6/3/74 1 94 1/3/76 1.94 1/3/76 A0 203-2D 0.0 12/31/70 0.0 12/31/70 i

17.35 6/3/74 0.0 7/8/74 I

9 59 1/3/76 9.59 1/3/76 l

i I

l, Ao

aDe

.~

TABLE A-1 (CONT)

VALVE (S) OR TEST.

MEASUl;ED LEAK RATE (SCFH PENETRAT10ti VOLUME AS FOUND - DATE AS LEFT - DATE MO 220-1 Main Steam Line 0.24 12/31/70 0.24 12/31/70 MO 220-2 Drains 4.02 5/28/74 4.02 5/28/74 4.28 2/10/75 4.28 2/10/75 47.70 1/3/76 5 75 3/3/76 i

A0 220-44 Primary Sample 0.0 12/31/70 0.0 12/31/70 A0 220-45

-0 70 6/6/74 0.70 6/6/74 0.0 1/26/76 0.0 1/26/76 CV 220-58A Fcedwater inlet 4.14 12/31/70 4.14 12/31/70 Loop "A" inboard 646.5 4/25/74 1.49 7/13/74 0.896 1/17/76 0.896 1/i7n6 CV 220-62A Feedwater In!ct 1.48 12/31/70 1.48 12/31/70 '

Loop "A" Outboard 0.0 7/14/74 0.0 7/14/74 378.0 1/17/76 0.834 2/6/76 I

CV 220-58B Feedwater Inlet 2.49 12/31/70 2.49 12/31/70 '

Loop "B" Inboard 888.2 4/25/74 2.99 6/25/74 3026.0 1/8/76 5.38 1/12/76 13.44 3/8/76 13.44 3/8/76 CV 220-62D I

rco.h.;;. tar I..I c.t 5.63 12/31/70 5.63 12/.11/70 Loop "B" Outboard 1332.0 4/25/74 11.10 6/25/74 3040.0 1/10/76 14.46 2/4/76 MO 1001-20 RHRS to Radwaste 0.0 6/1/74 0.0 6/1/74 HD 1001-21 0.0 1/30/76 0.0 l,/30/76 110 1001 -23A RHRS Containment 0.079 12/31/70 0.079 12/3!/7^.

M0 1001-26A Spray - Loop "A" 2.50 4/9/74 2.50 4/9/74 1.12 1/14/76 1.12 1/14/76 t

H0 1001-23B RHRS Containment 0.0 12/31/70 0.0 12/31/7C l

MO 1001-263 Spray - Loop "B" 0.0 4/22/74 0.0 4/22/74

~

l.55 1/13/76 1.55 1/13/76 M0 1001-29A RHRS Return - Loop 0.0 4'/11/74 0.0 4/11/74 "A"

23 1/14/76 2.3 1/14/76.

M0 1001-298 RHRS Return - Loop 1.54 4/25/74-1.54 4/25/74 "B"

0.0 1/14/76 0.0 1/14/75

b'.

gle[

8/4/__.-.

l TABLE A-1 (CONT)

- i VALVE (S) OR TEST MEASURED LEAK RATE (SCFH)

PENETRATION VOLUME AS FOUND - DATE j

AS LEFT - DATE MO 1001-34A RHRS Suppression 0.824 12/31/70 0.824 12/31/70 MO 1001-36A Chamber Spray -

11.34 4/9/74 11.34 4/9/74 M0 1001-37A Loop "A" 249 0 1/14/74 6.05 1/27/74 M0 1001-34B P.HR Suppression 0.935 12/31/70 0.935 12/31/70 M0 1001-36B Chamber Spray -

3.51 4/22/74 3.51 4/22/74 M0 1001-37n Loop "B" 3 34 1/14/76 3 34 1/14/76 MO 1001-47 RHRS Shutdcwn 7.80 7/11/74 7.80 7/11/74 MO 1001-50 Cooling Suction 4.68 1/14/76 4.68 1/14/76 I

M0 1001"60 RilRS !! cad Spray 0.0 7/11/74 i

0.0 7/11/74 u

MO 1001-63 0.0 1/13/76 0.0 1/13/76 MO 1701-2 Clean-up System 0.033 12/31/70 0.033 12/31/70 MO 1201-5 Suction 9.10 7/14/74 9.10 7/14/74 2.48 1/26/76 2.48 1/26/76 MO 1201-80 Clean-up System 0.0 7/16/74 0.0 7/16/74 Return 0.0 1/26/76 0.0 1/26/76 l

r;0 1301-16 RCIC Steam Supply 0.0 12/31/70 0.0 12/31/70 MO 1301-17 0.0 5/22/74 0.0 5/22/74 O.0 1/16/76 0.0 1/16/76 CY 1301-41 RCIC Turbine 6.4 5/9/74 6.4 5/9/74 Exhaust 0.0 1/4/76 0.0 1/4/76 CV 1301-40 RCIC Condensate 1.55 12/31/70 1.55 12/31/70 Drain 2.45 4/15/74 2.45 4/15/74 1.25 1/4/76 1.25 1/4/76 A0 1601-21 Drywell and 0.069 12/31/70 0.069 12/31/70 A0 1601-22 Suppression 99 0 4/16/73 6.5 4/16/73 A0 1601-55 Chamber Purge 15.0 5/5/73 15.0 5/5/73 A0 1601-56 12.86 6/26/74 12.86 6/26/74 197.1 1/4/76 10.32 1/9/76 A0 1601-20A Suppression Chamber 1.08 12/31/70 1.08 12/31/70l CV 1601-31A Vent Lines #1 0.00 4/30/73 0.00 4/30/73 )

3.10 5/20/74 3.10 5/20/74 0.00 1/5/76 0.00 1/5/76 A0 1601-208 sappression Chamber 0.035 12/31/70 0.035 12/31/70,

CY 1601-31B Vent Lines #2 0.00 4/30/73 0.00 4/30/73 3 34 5/21/74 3 34 5/21/74 i

1.33 1/5/76 1.33 1/5/76 I

~ -

~i TABLE A-1 (CONT).

[

  • " ".. *.E.

-o VALVE (S).OR TEST MEASURED LEAK RATE (SCFH)

PENETRATION VOLUME AS FOUND - DATE AS LEFT - DATE A0 1601-57 Drywell and 0.38 12/31/70 0 38 12/31/70 A0 1601-58 Suppression Chamber 0 90 5/4/73 0 90 5/4/73 A0 1601-59 Supply Air Purge 0 37 1/4/76 0 37 1/4/76 A0 1601-23 Drywell and 0 38 12/31/70 0.38 12/31/70 l

A0 1601-24 Suppression Chamber 5.50 4/20/73 5.50 4/20/73 A0 1601-60 Exhaust 5.50 4/22/74 5.50 4/22/74 i A0 1601-61 5.40 1/5/76 5.40 1/5/76 A0 1601-62 A0 1601-63 A0 2001-3 Drfwell Floor-0.497 12/31/70 0.497 12/31/70 A0 2001-4 Drain St.np 4.00 4/12/74 4.00 4/12/74 Discharge 8.85 1/5/76 8.85 1!'5/76 A0 2001-15 Drywell Equipment 0.522/0.572 12/31/70 3.522/0 572 12/31/70 A0 2001-16 Drain Sump 1.34 5/3/74 1.34 5/3/74

+

3 Discharge 10 37 1/5/76 10.37 1/5/76 i

M0 2301-4 HPCI Steam Supply 0.15 12/31/79 0.15 12/31/70 +

no 2301-5 1.43 5/24/74 1.43 5/24/74 4.03 1/15/76 4.03 1/15/76 ;

i CV 2301-45 HPCI Steam Exhaust 0.83 12/31/70 0.83 12/31/70 -

4.03 4/16/74 4.03

-4/16/74 ;

84.42 1/4/76 12.86 1/4/76 CY 230!-34 HPCI Condensate 0.191 12/31/70 0.191 12/31/70 Drain 0.41 4/15/74 0.41 4/15/74 0.26 1/4/76 0.26 1/4/76 I

i A0 4720 Drywell Pncematic 0.40 1/10/76 0.40 1/10/76 l Suction A0 4721 0 90 1/10/76 T.90 1/10/76 I

i A0 8801A 02 0.28 5/25/74 0.28 5/25/74 '

0.18 1/4/76

').18 1/4/76 Analyzer l

A0 8802A 2.05 5/25/74 2.05 5/25/74 Suction 1.99 1/4/76 1.99 1/4/76 A0 8801B 0.09 5/25/74 0.09 5/25/74 0.17 1/4/76 0.17 1/4/76 A0 8802B 6.58 4/16/74 6.58 4/16/74 25.92 1/4/76 0.02 2/20/76 '

A0 8801C 0.38 5/25/74 0.38 5/25/74 0.47 1/4/76 0.47 1/4/76

/

hill -

p.

-s TABLE A-1 (CONT)

VALVE (S). 0R TEST MEASURED LEAK RATE (SCFH)

Y PENETRATION VOLUME AS FOUf'D - DATE

[

AS LEFT - DATE A0 8802C 02 Analyzer 0.40 5/25/74 0.40 5/25/74 Suction (cont'd) 1 92

,1/4/76 1.92 1/4/76 A0 8801D

'O.095 6/27/74 0.095.

6/27/74 1.77 1/4/76 1 77 1/4/76 A0 8802D 0.662 6/27/74 0.662 6/27/74 2.06 1/4/76 2.06 1/4/76 A0 8803 02 1.175 6/28/74 1.175 6/28/74 0.65 1/5/76 0.65 1/5/76 Analyzer A0 880's 0.98 6/28/74' O.9S 6/28/74 Return 1.50 1/5/76 1.50 1/5/76 X-1 Equipment Hatch 0.183 7/8/70 0.183 7/8/70 t'

600' 1800 i

0.150 5/5/73 0.03 5/7/73 1.20 6/18/73 1.20 6/18/73 0.00 9/28/73 0.00 9/28/73 0.70 7/17/74 0.70 7/17/74 1

0.00 10/6/74 0.00 10/6/74 1.48 10/17/74 1.48 10/17/74 0.85 4/2/75 0.85 4/2/75 0.45 4/23/75 0.45 4/23/75 '

O.93 1/3/76 0.93 1/3/76 X-2 Drywell Personnel 0.0703 12/2/70 0.0703 12/2/70 Airlock 0.00 5/18/74 0.00 5/18/74 0.00 1/9/76 0.00 1/9/76 X-4 Drywell Head 1.0 5/4/74 1.0 5/4/74 Access Hatch 0.0 1/25/75 0.0 1/25/75 e

39.2-2/2/76 17.66 2/5/76 X-6 CRD Removal Hatch 0.021 7/8/70 0.021 7/8/70 uS91' 196o 0.00 4/30/74 0.00 4/30/74 0.15 10/6/74 0.15 10/6/74 0.00 10/17/74 0.00 10/17/74 0.05 4/21/75 0.05 4/21/75 0.00 1/3/76 0.00 1/3/76

. - ~,. -

.---r

---,.-m..e.

..,a, a

ee...w-,-m.---..,.-

,.,-en.-w.

---.n+n>

-,-w-.

-..,.s--

e

~

) g}g p-,

6

/.'

TABLE A-1 (CONT)

VALVE (S) OR TEST HEASURED LEAK RATE (SCFH)

PENETRATION VOLUME AS FOUND - DATE A5 LEFT - DATE X-35A TIP 0.0 4/20/74 0.0 4/20/74 0.0 1/7/76 0.0 1/7/76 FLUX X-35B 0.0 4/20/74 0.0 4/20/74 HON.

0.0 1/7/76 0.0 1/7/76 X-35C FLANGE 0.0 4/20/74 0.0 4/20/74 0.0 1/7/76 0.0 1/7/76 592' 25-45 X-35D 0.6 4/20/74 0.6 4/20/74 0.0 1/7/"

0.0 1/7/76 X-35E 0.0 4/20/74 0.0 4/20/74 0.0 1/7/76 0.0 1/7/76 X-35F 0.0 4/20/74 0.0 4/20/74 O.0 1/7/76 0.0 1/7/76 X-35G 0.0 4/20/74 0.0 4/20/74 0.0 1/7/76 0.0 1/7/76 X-200A Torus Access Hatch 0.026 11/16/70 0.026 11/16/70 582' 1200 (North) 0.008 9/28/72 0.008 9/28/72 0.00 12/30/72 0.00 12/30/72 0.00 5/5/73 0.00 5/5/73 0.00 5/7/73 0.00 5/7/73 0.85 9/30/73 0.85 9/30/73 0.00 7/18/74 0.00 7/18/74 0.00 4/1/75 0.00 4/1/75 0.00 '

1/3/76 0.00 1/3/76 i

l X-2008 Torus Access Hatch 0.00398 11/30/70 0.00398 11/30/70 582' 240 (south) 0.00 9/28/72 0.00 9/28/72 0.00 12/30/72 0.00 12/30/72 0.00 12/31/72 0.00 12/31/72 l

0.00 2/9/73 0.00 2/9/73 0.00 5/5/73 0.00 5/5/73 0.00 8/5/73 0.00 8/5/73 0.00 9/30/73 0.00 9/30/73 0.00 7/18/74 0.00 7/18/74 0.23 4/1/75 0.23 4/1/75 0.57 4/24/75 0.57 4/24/75 0.80 4/29/75 0.80 4/29/75 0.00 1/3/76 0.00 1/3/76 Drywell Drywell Head 0.0 12/31/70 0.00 12/31/70 Head Flange 4.73 7/15/74 4.73 7/15/74 0.00 4/18/75 0.00 4/18/75 0.00 1/3/76 0.00 1/3/76

T. -

TADLE A-1 (C0flT) l VALVE (S) OR TEST ttEASURED LEAK RATE (SCFH) j PENETRATIO!J VOLUME AS F 0'310 - DATE AS LEFT - DALE SL-1 Shear Lug 0.0 10/22/70 0.0 10/22/70 0.0 5/21/74 0.0 5/21/74 Inspection 0.0 1/20/76 0.0 1/20/76 SL-2 Hatches 0.0 10/22/70 0.0 10/22/70 0.0 5/21/74 0.0 5/21/74 0.0 1/20/76 0.0 1/20/76 SL-3 0.0 10/22/70 0.0 10/22/70 0.0 5/21/74 0.0 5/21/74 0.0 1/20/76 0.0 1/20/76 SL-4 0.0 10/22/70 0.0 10/22/70 0.0 5/21/74 0.0 5/21/74 0.0 1/20/76 0.0 1/.20/76 j

v SL-5 0.0 10/23/70 0.0 10/23/70

?! -

0.0 5/21/74 0.0 5/21/74

?

0.0 1/20/76 0.0 1/20/76 i'

SL-6 0.0 10/23/70 0.0 10/23/70 i

0.0 5/21/74 0.0 5/21/74 0.0 1/20/76 0.0 1/20/76 r.L -7 0.0 10/22/70 0.0 10/27/70 0.0 5/21/74 0.0 5/21/74 0.0 1/20/76 0.0 1/20/76 SL-8 0.0 10/23/70 0.0 10/23/70 0.0 5/21/74 0.0 5/21/74 f

0.0 1/20/76 0.0 1/20/76 r

i I

X-7A Primary Steam 0.1 5/2/73 0.1 5/2/73 I

595' 6o 0.0 1/4/76 0.0 1/4/76 X-78 Primary Steam 0.15 5/2/73 0.15 5/2/73 595' 15 0.00, 1/4/76 0.00 1/4/76 X-7C Primary Steam 0.0 5/1/73 0.0 5/1/73 l

595' 345 0.0 1/3/76 0.0 1/3/76 I

l X-7D Primary Steam 0.0 5/1/73 0.0 5/1/73 I

595' 3550 0.0 1/3/76 0.0 1/3/76 l

l X-8 Primary Steam Drain 0.0 5/1/73 0.0 5/1/73 Line 592' 00 0.0 1/3/76 0.0 1/3/76 l

e

\\

~

~

TABLE A-1 (CONT)

M

~ ~ '

/.

~

g e

VALVE (S) OR TEST MEASt! RED LEAK RATE (SCFil)

PENETRATION VOLUME AS F0'JMD - DATE AS LEFT - DATE X-9A Reactor Feedveater 0.0 5/2/73 0.0 5/2/73 598' So 0.0 1/4/76 0.0 1/4/76 X-9B Reactor Feedwater 0.0 5/1/73 0.0 5/1/73 598' 3500 0.0 1/3/76 0.0 1/3/76 l

l 1

i X-10 Steam to RCIC 0.0 5/2/73 0.0 5/2/73 605' 60 0.0 1/4/76 0.0 1/4/76 i'

X-11 HPCI Stearc Supply 0.1 5/2/73 0.1 5/2/73 O.0 1/4/76 0.0 1/4/76

~

X-12 RHRS Supply 0.0 5/1/73 0.0 5/1/73 605' 343 0.0 1/3/76 0.0 1/3/76 X-13A RHRS Return 0.2 5/2/73 0.2 5/2/73 591' 85 0.0 1/4/76 0.0 1/4/76 X-13B RiiRS Return 0.4 5/4/73 0.4 5/4/73 591' 2650 0.0 1/3/76 0.0 1/3/76 i

I X-14 clean-up Supply 0.0 6/1/73 0.0 6/1/73 625' 270 0.0 1/3/76 0.0 1/3/76 l

l X-23 Cooling Vater supply.

0.1 5/2/73 0.1 5/2/73 591' 50 0.0 1/4/76 0.0 1/4/76 l

l X-24 Cooling Vater Return 0.1 5/2/73 0.1 5/2/73 588' 50 0.0 1/4/76 0.0 1/4/76 i

X-25 Vent From Drywell 0 30 5/2/73 0 30 5/7/73 l

649' 213 0.00 1/3/76 0.00 1/3/76 X-26 Vent to Drywell 0.45 5/4/73 0.45 5/4/73 5918 232 0.00 1/3/76 0.00 1/3/76 l-l X-368 CRD Hyd Sys Return 0.0 5/2/73 0.0 5/2/73 618' 1950 0.0 1/3/76 -

0.0 1/3/76 I

X-47 Standby Liquid Con-1.6 5/1/73 1.6 5/1/73 trol 641' 298 0.0 1/3/76 0.0 1/3/76 l

r

~

~

~

e, TABLE A-1 (CONT)

M

^4

~^

~

VALVE (S) OR TEOT HEASURED LEAK RATE (SCFH)

PENETRATION VOLUME AS FOUND - DATE l

AS LEFT - DATE X-17 P.cactor Vessel Head 0.05 5/2/73 0.05 5/2/73 Spray 605'0" 0.00 1/7/76 0.00 1/7/76 X-16A Core Spray Inlet 0.0-5/2/73 0.0 5/2/73 642' 200 0.0 1/4/76 0.0 1/4/76 X-16B Core spray inlet 0.0 9/30/70 0.0 9/30/70 642' 155 0.2 5/2/73 0.2 5/2/73 0.0 1/4/76 0.0 1/4/76 X-100A CRD Position in-0.0 10/15/70 0.0 10/15/70 dication 611' 400

' 0. 0 4/20/74 0.0 4/20/74 0.0 1/7/76 0.0 1/7/76' X-100B Power 0.0 10/15/70 0.0 10/15/70 611' 45 0.0 4/20/74 0.0 4/20/74 0.0 1/7/76 0.0 1/7/76 X-100C Neutron Monitor 0.0 10/13/70 0.0 10/13[70 609' 1600 0.0 5/2/73 0.0 5/2/73 0.0 1/6/76 0.0 1/6/76 X-100D Neutron Monitor 0.0 10/16/70 0.0 10/16/70 611' 1700 0.0 5/2/73 0.0 5/2/73 0.0 1/6/76 0.0 1/6/76 X-100E Heutron Monitor 0.0 10/16/70 0.0 10/16/70 611' 2200 0.0 5/2/73 0.0 5/2/73 0.0 1/6/76 0.0 1/6/76 X-lC0F CRD Position in-0.0 10/13/70 0.0 10/13/70 dication 610' 3220 0.0 5/2/73 0.0 5/2/73 0.0 1/4/76 0.0 1/4/76 X-100G Power 0.0 10/13/70 0.0 10/13/79 610' 330 0.0 5/2/73 0.0 5/2/73 0.0 1/4/76 0.0 1/4/76 X-101A CRD Position in-0.0 10/16/70 0.0 1/16/70 dication 609' 1420 0.0 5/4/73 0.0 5/4/73 0.0 1/7/76 0.0 1/7/76 5

O TABLE A-1 (CONT)

N s

VALVE (S) OR TEST MEASUI ' LEAK RATE (SCFH)

PENETRATION VOLUl1E AS FOUL 40 - De E AS LEFT - DATE X-101B CRD Position in-0.0 10/14/70 0.0 10/14/70 dication 609' 147 0.0 5/2/73 0.0 5/2/73 0.0 1/7/76 0.0 1/7/76 X-101D Recirc Pump Power 0.0 10/13/70 0.0 10/13/70 609' 1270 0.0 5/2/73 0.0 5/2/73 0.0 1/6/76 0.0 1/6/76 X-102A Recirc Pump Power 0.0 11/6/70 0.0 11/6/70 609' 1270 0.0 5/4/73 0.0 5/4/73 0.0 1/7/76 0.0 1/7/76 X-103 Thermocouple 0.0 10/19/70 0.0 10/19/70 609' 130o 0.0 5/4/73 0.0 5/4/73 0.0 1/7/76 0.0 1/7/76 X-104B CRD Position in-0.0 10/15/70 0.0 10/15/70 dication 611' 300 0.0 4/20/74 0.0 4/20/74 0.0 1/6/76 0.0 1/6/76 t

X 104C Recirc Pump Power 0.0 10/13/70 0.0 10/13/70 609' 1250 0.0 5/4/73 0.0 5/4/73 0.0 1/7/76 0.0 1/7/76 X-104F Power 0.0 -

10/13/70 0.0 10/13/70 610' 337o 0.0 5/2/73 0.0 5/2/73 0.0 1/4/76 0.0 1/4/76 X-105A Power 0.0 10/15/70 0.0 10/15/75 611' 52o 0.0 1/7/76 0.0 1/7/7o X-105B Power Drive Modules 0.0 10/16/70 0.0 10/16/70 611' 20 0.0 5/2/73 0.0 5/2/73

~~

0.0 4/20/74 0.0 4/20/74 0.0 1/6/76 0.0 1/6/76 X-105C CP.D Position in-0.0 10/16/70 0.0 10/16/70 dication 611' 205 0.0 5/2/73 0.0 5/7/73 0.0 1/6/76 0.0 1/6/76 es

~

I' g

TABLE A-1 (CONT)

Mo

/M

=

y VALVE (S) OR TEST PENETRATION VOLUME HEASURED LEAK P. ATE (S_CFil)

AS FOUND - DATE AS LEFT - DATE X-105D Recirc Pump Power 0.0 10/13/70 0.0 10/13/70 611' 300o 0.0 5/2/73 0.0 5/2/73 0.0 1/6/76 0.0 1/6/76 X-107A Neutron Monitor 0.0 10/16/70 0.0 10/16/70 611' 215o 0.0 5/2/73 0.0 5/2/73 0.0 1/6/76 0.0 1/6/76 4

- : -.y,.

4

< a e

4tw e eemap e

- /W %

APPENDIX A TYPE B AND TfFE C TESTS Presented herein are the results of local leak rate tests conducted on all testable penetrations, gasketed seals, doors and isolation valves since imediately preceding the Unit Two pre-operational lLRT in 1971.

All isolation valves with leakage in excess of the individual valve leakage limit were restored to an acceptable leak tightness prior to the resumption of power operation.

Total leakage for double-gasketed seals and total leakage for all other penetrations and isolation valves following repairs satisfied the Technical Specification limits. These results are listed in Table A-1.

W.O j.

e t

, ~.,,..

._,-,n,

- A

(4)G TABIE A-1 TYPE B AND TYPE C TEST RESULTS VALVE (S) OR TEST MEASURED EAK RATE (SCF7I)

PE!ETRATION VOLUIG AS FOUND - DATE AS EPT - DATE Ao 203-1A Main Steam Line 1.4 8-27-71 1.4 8-27-71 155 5 12-26-74 0.0 4-18-75 Isolation 0.0 9-11-76 1.15 10-26-76 Ao 203-2A Valves 0.o 8-27-71 0.0 8-27-71 155 5 12-26-74 0.0 4-11-75 42.62 9-11-76 1.15 10-26-76 Ao 203-1B 1 75 8-27-71 1 75 8-27-71 26.2 4-20-73 1.625 4-29-73 41 75 12-27-74 0.00 3-10-75 0 575 9-11-76 0 575 9-11-76 A0 203-2B 1.75 8-27-71 1 75 8-27-71 26.2 4-20-73 1.625 4-29-73 41 75 12-27-74 o.00 3-10-75 0 575 9-11-76 o.575 9-11-76 Ao 203-1C 2 35 8-27-71 2 35 8-27-71 19.45 12-27-74 6.6 12-29-74 3.455 9-11-76 3 455 9-11-76 Ao 203-2C 2 35 8-27-71 2 35 8-27-71 19.45 12-27-74 0.00 3-10-75 3 455 9-11-76 3 455 9-11-76 Ao 203-1D 4.4 8-27-71 4.4 8-27-71 3.45 12-26-74 3.45 12-26-74 4 32 9-11-76 4 32 9-11-76 Ao 203-2D 4.4 8-27-71 4.4 8-27-71 3.45 12-26-74 3 45 12-26-74 4 32 9-11-76 4 32 9-11-76

3.

TABLE A-1 (Co?Tf)

V VALVE (S)OR TEST IDETRATION VoIUME MEASURED LEAK RATE (SCFH)

AS FoUND - DATE AS 1EPT - DATE No 220-1 Main Steam Line 0.00 7-26-71 0.00 7-26-71 FD 220-2 Drains 0.00 1-18-75 0.00 1-18-75 1 70 10-17-75 1.70 10-17-75 5.42 9-11-76 5.42 9-11-76 Ao 220-44 Primary Sa=ple 0.25 7-21-71 0.25 7-21-71 A0 220-45 0.65 2-8-75 0.65 2-8-75 0.00 10-11-76 0.00 10-11-76 cv 220-58A Feedwater Inlet 4.60 7-13-71 4.60 7-13-71 14op "A" Inboard 97.0 12-30-74 8.80 2-8-75 17 10-12-76 17 10-12-76 0.0

.10-19-76 0.0 10-?9-76 cv 220-62A Feedwater Inlet 4.0 7-14-71 4.0 7-14-71 Loop "A" outboard 472.0 12-30-74 0.0 3-17-75 271.0 10-12-76 5 16 10-22-76 cv 220-58B Feedwater Inlet 10.00 8-19-71 10.00 8-19-71 Loop "B" Inboard 2016.0 12-30-74 10 30 1-18-75

/

1207.0 9-14-76 1 52 10-n-76 cv 220-62B Feedwater Inlet 7 50 8-21-71 7 50 8-21-76 Loop "B" outboard 2647.0 12-30-74 1 36 2-18-75 811.0 9-14-76 6.78 10-11-76 J.

Mo 1001-20 RHRS to Radwaste 0.0 2-19-75 0.0 2-19-75 Mo 1001-21 05 10- 3-76 05 lo-3-76 Mo lool-23A RHRS containment 1.43 7-23-71 1.43 7-23-71 FD lool-26A Spray - Loop "A" 1 39 12-31-74 1 39 12-31-74 i

0.o(26A) 9-27-76 0.o(26A) 9-27-76 1.2(23A)10- 1-76 1.2(23A)10- 1-76 Mo lool-23B RHRS Contairrnent 7.70 7-28-71 7 70 7-28-71 Mo lool-26B Spray - Icop "B" 16.431 4-17-73 16.431 4-17-73 25.o 9-20-76 5.0 10-13-76 Ho lool-29A RHRS Return - Loop o.80 7-21-71 0.80 7-21-71 "A"

3 75 1-18-75 3 75 1-18-75 0.0 lo-1-76 0.0 10- 1-76 M0 lool-29B RHRS Return - Loop 4.0 7-21-71 4.0 7-21-71 "B"

o.0 2-5-75 0.0 2-5-75 0.0 9-20-76 0.0 9-20-76

~

TABG A-1 (COVP)

[/o

'[Eqp 8.

VALVE (S)OR TEST F"2ASURED EAK RATE (SCFH)

PENETRATION V0wME AS FVUND - DATE AS EPP - DATE FD 1001-34A RHRS Suppression 0 50 7-21-71 0 50 7-21-71 o

MO 1001-36A Chamber Spray -

0.00 12-31-74 0.00 12-31-74 to 1001-37A Icop "A" 6.08 10- 2-76 6.08 10- 2-76 l

FD 1001-34B RHR Suppression 0.95 8-27-71 0 95 8-27-71 FD 1001-36B Chamber Spray -

9.09 12-28-74 9.09 2-28-75 MO 1001-37B loop "B"

.14.6 9-20-76 14.6 9-20-76 MO 1001 47 RHRS Shutdown 0.00 2-7-75 0.00 2-7-75 to 1001-50 Cooling Suetion 14.812 10- 1-76 14.812 10- 1-76 MO 1001-60 RHRS Head Spray 0.00 1-18-75 0.00 1-18-75 FD 1001-63 0 70(60)10- 1-76 0.70(60)10-1-76 0.46(63)10- 1-76 0.46(63)10-1-76 MO 1201-2 Clean-up System 0.00 7-28-71 0.00 7-28-71 Mo 1201-5 Suction 6.54 1-19-75 6.54 1-19-75 300.0 10-11-76 1 30 10-12-76 MD 1201-80 Clean-up System 6.12 2-25-75 6.12 2-25-76 Return No longer tested Ref. QCOSR 76-23 MO 1301-16 RCIC Steam Supply 2.10 7-26-71 2.10 7-26-71 MD 1301-17 5 90 2-19-75 5 90 2-19-75 7 38(16) 9-11-76 7 38(16) 9-11-76 12 30(17) 9-11-76 12 30(17) 9-11-76 CY 1301-41 RCIC Turbine 0.49 8-27-71 0.49 8-27-71 Exhaust 16.0 12-30-74 16.0 12-30-74 257.0 9-13-76 0 38 10-15-76 CV 1301 40 RCIC Condensate 8.50 8-27-71 8.50 8-27-71 Drain 2 72 12-30-74 2 72 12-30-74 8.0 9-11-76 8.0 9-11-76 A0 1601-21 Drywell and 6.70 8-21-71 6.70 8-21-71 A0 1601-22 Suppression 15 5 8-23-72 15 5 P S3-72 l

A0 1601-55 Chamber Purge 6 50 4-19-73 6.50 4-19-73 AC 1601-56 14.4 5 4-73 14.4 5-4-73 14.4 10-17-73 14.4 10-17-73 61.22 9-15-76 11 75 10-11-76 A0 1601-20A Suppression Chamber 6.60 8-22-71 6.d0 8-22-71 CV 1601-31A Vent Lines #1 0.637 4-16-73 0.637 4-16-73 l

0.00 10-17-73 0.00 10-17-73 3 50 1-28-75 3 50 1-28-75 l

30 53 9-12-76 12 94 9-30-76 A0 1601-20B Suppression Chamber 0.08 8-19-71 0.08 8-19-71 CY 1601-31B Vent Lines #2 1 91 4-16-73 1 91 4-16-73 0.00 10-17-73 0.00 10-17-73 0.00 1-28-75 c.00 1-28-75 2.29 9-12-76 2.29 9-12-76 1

l

. TABLE A-1 (CONT)

. [/-,

[m7) t VALVE (S) OR TEST FEASURED LEAK RATE (SCMI)

PENETRATION Vo11F2 AS FOUND - DATE AS IEPP - DATE Ao 1601-57 Drywell and 1.8o 8-22-71 1.80 8-22-71 Ao 1601-58 Suppression Chamber 1,35 4-17-7 3 1 35 4-17-73 Ao 1601-59 Supply Air Purge 0 30 9-16-76 0 30 9-16-76 Ao 1601-23 Drywell and 3 20 8-24-71 3 20 8-24-71 Ao 1601-24 Suppression Chamber o.70 8-22-72 0 70 8-22-72 Ao 1601-60 Exhaust 11.25 4-16-73 11.25 4-16-73 Ao 1601-61 4.55 10-18-73 4.55 10-18-73 Ao 1601-62 0.00 10- 3-76 0.00 lo-3-76 1

Ao 1601-63 Ao 2001-3 Drywell Floor 1 70(3) 8-2-71 1.70(3) 8-2-71 A0 2001-4 Drain Sump 1.20(4) 8-2-71 1.20(4) 8-2-71 Discharge 9 70(3) 1-28-75 9 7o(3) 1-28-75 0.195(4) 1-28-75 0.195(4)1-28-75 0.61 9-12-76 0.61 9-12-76 Ao 2001-15 Drywell Equi 1rer.t o.06(15) 7-30-71 0.06(15)7-30-71 Ao 2001-16 Drain Sump o.63(16) 7-30-71 0.63(16)?-30-71 Discharge o.162(15)1-28-75 0.162(15)1-28-75 0.165(16)1-28-75 0.165(16)1-28-75 0.26 9-12-76 0.26 9-12-76 No 2301-4 HPCI Steam Supply 1.00 7-27-71 1.00 7-27-71 Mo 2301-5 5 75 4-17-73 5 75 4-17-73 25 92 9-11-76 1.15 9-15-76 CV 2301-45 HPCI Steam Exhaust 2.20 7-27-71 2.20 7-27-71 rc o.40 1-30-75 0.40 1-30-75 57.23 9-13-76 0.00 10-13-76 CY 2301-34 HPCI Condensate 5.00 7-28-71 5.00 7-28-71 Drain o.87 12-30-74 0.87 12-30-74 11.0 9-11-76 11.0 9-11-76 Ao 4720 Drywell Pneumatic o.59 12-30-74 o.59 12-30-74 Suetion 0.00 9-22-76 0.00 9-22-76 Ao 4721 0.65 12-30-74 0.65 12-30-74 0.00 9-22-76 0.00 4-22-76 Ao 8801A o

0 745 1-2-75 0 745 1-2-75 2

0 30 9-16-76 0 30 9-16-76 Ao 8802A o.745 1-2-75 0 745 1-2-75 Suction o.10 9-16-76 0.10 9-16-76 Ao 8801B 2.16 1-2-75 2.16 1-2-75 0.20 9-16-76 0.20 9-16-76 Ao 8802B 2.16 1-2-75 2.16 1-2-75 o.15 9-16-74 0.15 9-16-76 Ao 8801C o.745 1-2-75 0 745 1-2-75 1.20 9-16-76 1.20 9-16-76

TABG A-1 (CONT)

[

%g f

VALVE (S)OR TEST MEASURED EAK RATE (SCMI)

PSETRATION VOLUME AS FOUND - DATE AS LEFT - DATE Ao 8802C o Analyzer 0 745 1-2-75 0 745 1-2-75 S8ction (cont'd) 13 0 9-16-76 13 0 9-16-76 i;

Ao 8801D 0.00 12-27-74 0.00 12-27-74 0 50 9-16-76 0 50 9-16-76 Ao 8802D o.oo 12-27-74 0.00 12-27-74 0.20 9-16-76 0.20 9-16-76 Ao 8803 0

1 935 1-28-75 1 935 1-28-75 2

0.00 9-27-76 0.00 9-27-76 Analyzer Ao 8804 1 935 1-28-75 1.935 1-28-75 Return 4.00 9-27-76 4.00 9-27-76 I-1 Equipnent Hatch o.00 8-27-71 0.00 8-27-71 600' 180*

o.co 1-13-73 0.00 1-13-73

~

o.00 4-29-73 0.00 4-29-73 0.60 10-19-73 0.60 10-19-73 0 50 3-26-74 0 50 3-26-74 0 70 2-19-75 0 70 2-19-75 0.00 4-19-75 0.00 4-19-75 1.20 5-4-75 1.20 5-4-75 1 30 7-23-75 1 30 7-23-75 1.45 8-24-75 1.45 8-24-75 0.45 11-5-75 0.45 11-5-75 o.oo 9-10-76 0.00 9-10-76 0 50 10-19-76 0 50 10-19-76 I-2 Drywell Personnel o.00 8-27-71 0.00 8-27-71 Airlock o.00 1-25-75 0.00 1-25-75 7.00 lo-5-76 7.00 lo-5-76 I-4 Drywell Head 0.00 8-21-71 0.00 8-21-71 Access Hatch 0.00 12-30-74 0.00 12-30-74 0 33 2-20-75 0 33 2-20-75 4.50 9-21-76 4.50 9-21-76 I-6 CRD Re:noval Hatch o.00 8-25-71 0.00 8-25-71 5915 196*

o.oo 5-4-75 0.00 5-4-75 0.00 2-8-76 0.00 2-8-76 0.00 3-22-76 0.00 3-22-76 0.00 9-10-76 0.00 9-10-76 F

I I

l I

TABM A-1 (CONT)

VALVE (S) OR M

c PEIETRATION TEST

[g VOLUIE

!EASURED GAK RATE (SCFH)

AS FoUND - DATE I-35A TIP AS 1 EFT - DATE I

o.00 8-26-71 0.00 FLUI 0.00 4-20-73 8-26-71 o.co 0.00 I-35B 9-21-76 4-20-73 0.00 9-21-76 MON.

o.co 8-26-71 0.00 0.00 4-20-73 8-26-71 0.00 4-20-73 0.00 I-350 9-21-76 0.00 FLANGE 9-21-76 o.00 8-26-71 0.00 0.00 4-20-73 8-26-71 0.00 I-35D 592' 25-45' 9-21-76 4-20-73 0.00 0.00 9-21-76 o.00 8-26-71 0.00 O.oo 4-20-73 8-26-71 0.00 4-20-73 0.00 I-35E 9-21-76 0.00 9-21-76 0,00 8-26-71 0.00 4-20-73 8-26 71 0.00 0.00 4-20-73 0.00 I-35P 9-21-76 0.00 9-21-76 o.00 8-26-71 0.00 8-26-71 0.00 4-20-73 o.00 I-350 9-21-76 4-20-73 0.00 0.00 9-21-76 0.00 8-26-71 0.00 4-20-73 8-26-71 0.00 0.00 I-200A 9-21-7 4-20-73 0.00 0.00 Torus Access Hatch 9-21-76 0.00 582' 120' (North) 8-26-71 0.00 8-26-71 0.00 10-14-72 0.00 0.00 4-29-73 10-14-72 0.00 4-29-73 0.00 2-22-76 0.00 0.00 i

I-200B 9-10-76 2-22-76 0.00 Torus Access Hatch 10-19-76 o.00 582' 240' (South) 8-25-71 0.00 10-14-72 8-25-71 0.00 0.00 0.00 12-19-72 10-14-72 0.00 12-19-72 0.00 1-13-73 0.00' 0.00 1-14-73 2-24-73 0.00 o,00 4-29-73 2-24-73 0.00 0.00 3-26-74 4-29-75 0.00 3-26-74 0 57 4-24-75 0.80 4-29-75 1.14 10-29-75 1.14 10-29-75 0.00 9-10-76 0.00 o.00 Drywall 10-26-76 10-19-76 0.00 10-26-76 H;ad Drywell Head Flerge 0.00 8-27-71 0.00 8-27-71 o.652 10-13-72 0.652 10-13-72 1.40 11-5-75 1.40 11-5-75 o.o 9-10-76 1.60 10-19-76 i

i

_--"*~

TABU: A-1 (CONT)

/

[&f) 5 n.

VALVE (S) oR TEST MEASURED LEAK RATE (SCFH)

PDETRATION VoDJME AS FOUND - DATE AS LEPT - DATE SL-1 Shear Lug o.o 8-25-71 0.0 8-25-71 b

o.o 12-28-74 0.0 12-28-74 Inspection o.0 9-29-76 0.0 9-29-76 SL-2 Eatches o.0 8-25-71 0.0 8-25-71 0.0 12-28-74 0.0 12-28-74 0.o 9-29-76 0.0 9-29-76 SL-3 0.0 8-25-71 0.0 8-25-71 0.0 12-28-74 0.0 12-28-74 0.0 9-29-76 0.0 9-29-76 SL-4 o.o 8-25-71 0.o 8-25-71 o.o 12-28-74 0.0 12-28-74 0.0 9-29-76 0.0 9-29-76 SL-5 0.0 8-25-71 o.o 8-25-71 0.0 12-28-74 0.0 12-28-74 0.0 9-29-76 0.0 9-29-76 SL-6 0.0 8-25-71 0.0 8-25-71 0.0 12-28-74 0.0 12-28-74 0.0 9-29-76 0.0 9-29-76 SL-7 oo 8-25-71 0.0 8-25-71 0.0 12-28-74 0.0 12-28-74 0.0 9-29-76 0.c 9-29-76 SL-8 0.0 8-25-71 0.0 8-25-71 0.0 12-28-74 0.0 12-28-74 0.0 9-29-76 0.0 9-29-76 I-7A Primary Steam o.oo 5-5-71 0.00 5-5-71 595' 6*

o.00 4-17-73 0.00 4-17-73 0.00 9-16-76 0.00 9-16-76 X-7B Primary Steam o.00 5-5-71 0.00 5-5-71 595' 15' O.oo 4-17-73 0.00 4-17-73 0.00 9-16-76 0.00 9-16-76 l

X-7C Primary Steam 0.00 5-5-71 0.00 5-5-71 595' 345' O.oo 4-18-73 0.00 4-18-73 0.40 9-16-76 0.40 9-16-76 X-7D Primary Steam 0.00 5-5-71 0.00 5-5-71 1

595' 355' O.oo 4-18-73 0.00 4-18-73 o.60 9-16-76

.o.60 9-16-76 X-8 Primary Steam Drain o.00 5-5-71 0.00 5-5-71 Line 592' o*

o.05 4-17-73 0.05 4-17-73 0.10 9-16-76 0.10 9-16-76 L

TABLE A-1 (Co3T)

G'.

VALVE (S)oR TEST BEASURED 1EAK RATE (SCFH)

PEITTRATION VollRE AS FDUND - DATE AS LEFT - DATE I-9A Reactor Feedwater 0.00 5-5-71 0.00 5-5-71 598' 9'

O.oo 4-17-73 0.00 4-17-73 L

o.00 9-16-76 0.00 9-16-76 f

I-9B Reactor Feedwater o.oo 5-5-71 0.00 5-5-71 598' 350*

o.35 4-18-73 o.35 4-18-73 0.60 9-16-76 0.60 9-16-76 I-lo Steam to RCIC o.co 5-5-71 0.00 5-5-71 605' 6*

o.20 4-18-73 0.20 4-18-73 0.60 9-16-76 0.60 9-16-76 I-11 HPCI Steam Supply 0.00 5-5-71 0.00 5-5-71 591' 95*

o.00 4-18-73 0.00 4-18-73 0.00 9-16-76 0.00 9-16-76 I-12 RHRS Supply 0.00 5-5-71 0.00 5-5-71 605' 343' o.oo 4-18-73 0.00 4-18-73 0.01 9-16-76 0.01 9-16-76 I-13A RHRS Return o.00 5-5-71 0.00 5-5-71 591' 85*

o.oo 4-17-73 0.00 4-17-73 0.00 9-16-76 0.00 9-16-76 I-13B RHRS Return o.00 5-5-71 0.00 5-5-71 591' 265*

0,10 4-18-73 0.10 4-18-73 0.00 9-16-76 0.00 9-16-76 2-14 Clean-up Supply 0.00 7-8-71 0.00 7-8-71 625' 270*

o.25 4-17-73 0.25 4-17-73 1.10 9-16-76 1.10 9-16-76 I-23 Cooling Water Supply 0.00 7-8-71 0.00 7-8-71 591' So*

o.oo 4-18-73 0.00 4-18-73 0.10 9-16-76 0.10 9-16-76 I-24 Cooling Water Return 0.00 7-8-71 0.00 7-8-71 588' 50' O.co 4-18-73 0.00 4-18-73 0.10 9-16-76 0.10 9-16-76 I-25 vent From Drywell o.00 5 4-71 0.00 5-4-71 649' 213' 3 00 4-17-73 3 00 4-17-73 2.40 9-16-76 2.40 9-16-76

I-26 YenttoDrywell o.00 5-5-71 0.00 5-5-71 591' 232' o.50 4-17-73 0 50 4-17-73 0 35 9-16-76

, 0 35 9-16-76 I-36 CRD Hyd Sys Return o.00 5 4-71 0.00 5-4-71 618' 195*

o.00 4-18-73 0.00 4-18-73 o.40 9-16-76 o.40 9-16-76 l

I-47 Standby Liquid con-0.00 5-4-71 0.00 5-4-71 trol 641' 298*

1.80 4-18-73 1.80 4-18-73 0.00 9-16-76 0.00 9-16-76

\\

TABLE A-1 (CONT)

/d

[w

~

~

VALVE (S)OR TEST MEASURED RATE (SCFH)

PD EIRATION VoLibE AS FVUND - DA'IE AS LEPT - DATE I-17 Reactor Vessel Head 0.00 5-4-71 0.00 5 4-71 Spray 605'o" o.co 4-17-73 0.00 4-17-73 0.20 9-16-76 0.20 9-16-76 I-16A Core Spray Inlet o.00 7-13-71 0.00 7-13-71 642' 20' 5 75 4-17-73 5 75 4-17-73 5 00 9-16-76 5 00 9-16-76 I-16B Core Spray Inlet o.00 5-4-71 0.00 5 4-71 642' 155' O.oo 4-17-73 0.00

& 17-73 3 50 9-16-76 3 50 9-16-76 4

X-100B CRD Position Indic.

o.oo 7-2-71 0.00 7-2 71 610' 45' O.oo 4-19-73 0.00 4-19-73 0.00 9-16-76 0.00 9-16-76 I-100c sRM/IRM Drives o.00 7-6-71 0.00 7-6-71 611' 160*

o.00 4-19-73 0.00 4-19-73 o.00 9-17-76 0.00 9-17-76 X-100E

~ 611' 205*

o.00 7-6-71 0.00 7-6-71 0.00 4-19-73 0.00 4-19-73 0.00 9-17-76 0.00 9-17-76 I-loof Power o.00 7-6-71 0.00 7-6-71 611' 315' o.00 4-20-73 0.00 4-20-73 0.00 9-21-76 0.00 9-21-76 j

X-looG Power 0.00 7-6-71 0.00 7-6-71 611' 315' O.co 4-20-73 0.00 4-20-73 0.00 9-21-76 0.00 9-21-76 i

X-lolA CRD Position Indi-0.00 7-2-71 0.00 7-2-71 cation 609' 135' O.00 4-19-73 0.00 4-19-73 0.00 9-17-76 0.00 9-17-76 h

./

~

M'.

~

TABLE A-1 (CONP)

//g.

[tv(/

.)

VALVE (S) OR TEST IGASURED IEAK RATE (SCFH)

PENETRAT1oN VOIBME AS FDUND - DATE AS LEFT - DATE I-loob Recire. Pump o.00 7-2-71 0.00 7-2-71 609' 135' O.c0 4-19-73 0.00 4-19-73 0.00 9-17-76 0.00 9-17-76 I-looD Power o.00 7-6-71 0.00 7-6-71 609' 315*

o.oo 4-20-73 0.00 4-20-73 0.00 9-21-76 0.00 9-21-76 X-lo2B Neutron Monitors 0.00 7-2-71 0.00 7-2-71 609' 135' O.00 9-17-76 0.00 9-17-76 X-103 Neutron Monitors 0.00 7-2-71 0.00 7-2-71 609' 150' O.00 9-17-76 0.00 9-17-76 I-104B Diywell Coolers 0.00 7-6-71 0.00 7-6-71 610' 45*

o.00 9-16-76 o.00 9-16-76 x-lo4C cRD Position Indic.

0.00 7-6-71 0.00 7-6-71 609' 155' O.oo 4-19-73 0.00 4-19-73 0.00 9-16-76 0.00 9-16-76 X-104D CRD Position Indic.

o.00 7-6-71 0.00 7-6-71 610' 165*

o.00 4-20-73 0.00 4-20-73 l

0.00 9-21-76 0.00 9-21-76 X-104F Power 0.00 7-6-71 0.00 7-6-71 611' 315*

o.oo 4-20-73 0.00 4-2c-73 o.00 9-21-76 0.00 9-21-76 I-lo5C Neutron Monitors 0.00 7-6-71 0.00 7-6-71 l

611' 45' O.oo 4-19-73 0.00 4-19-73 0.00 9-17-76 o.00 9-17-76 r-lo6A CRD Position Indic.

o 00 7-2-71 0.00 7-2-71 610' 45' O.oo 4-19-73 0.00 4-19-73 0.00 9-16-76 0.00 9-16-76 X-106B Thermocouples o.00 7-2-71 0.00 7-2-71 610' 135*

o.oo 9-16-76 0.00 9-16-76 X-lo7A Neutron Monitor 0.00 7-6-71 0.00 7-6-71 612' 220*

o.00 4-19-73 0.00 4-19-73 l

o.co 9-16-76 0.00 9-16-76 I-107B Recire Pump Power 0.00 7-6-71 0.00 7-6-71 611' 320*

o.00 4-20-73 0.00 4-20-73 0.00 9-21-76 0.00 9-21-76 l