Text

_ _ _ _ - _ _ _ _ _ _ - _ - -

- EP-202

    • . - yoyz,3 C9;.y. Page 1 of 9, pyg,yg Rev. ,5 E

C C' ?.S <!I) 3 10 ",

w:3 . c, .

w .a 4,,m M Oldtv~. PHIIADELPHIA ELK:TRIC CCNPANY C- \ r/; - Tc! ~*"

~ PEACH BOI'KH UNITS 2 AND 3 Cr# "' P' INEME(.N PIAN IMPIREffI!G PROCEDURE e p r . . ... .. .-

g ,,

g$$ w L-- -

EP-202 - Ooerations Sucoort Centers (OSC) Activation PURPOSE

'Ib define the actions required by the Operations Support Center Coordinators for activating, manning and managirq the Operations Support Centers (OSC).

PEFERDCES

1. Peach Bottom Atomic Power Station Dnergency Plan
2. Nureg 0654 Criteria for Preoaration and Evaluation of Radiological Dnergency Response Plans and Preparedness in Support of Nuclear Power Plants.
3. Nureg 0696 Functional Critaria for Energency Resnonse Facilities.

) 4. 10 CFR 20 APPd.' DIX r2-202-1 Operator OSC Phone C.O.L. ,

EP-202-2 Aux. OSC Phone C.O.L.

EP-202-3 Operator OSC Assignment Status Board EP-202-4 Operator OSC Plant Status Board EP-202-5 Aux. OSC Assignment Status Board l EP-202-6 OSC Habitability Guidelines

/CfION LEVEL Activate the Operations Suoport Centers when an event has been classified as an Alert, Site Eaergency or General

. anergency.

PRhrAUTIONS

1. Maintain an official log of pertinent actions using the designated OSC's log books.
2. Verify habitability of Operations Supoort Centers in accoccance with Apoendix EP-202-6. Initiate air s u pling u n activation of facilities.
3. Two Operations Succort Centers exist.

8311210387 831110 PDR ADOCK 05000277 F PDR

Page 2 of 9, Rev. 5 l A. OSC at elevation 135' Turbine Bldg. mans shif t coerators.

B. Aux OSC at elevation H6' Turbine Bldg. mans HPGC oersonnel.

{ Perscnnel shan log in and out of the Operations 4.

Support Centers in order to Inaintain personnel ')

accountability.

5. The Ooerations Support Centers shan contain controlled copies of the Ehergency Procedures.

IFtEDL1TE ACTIONS 1.0 Interim Ehergency Director shan:

1.1 Assign operator as the OSC Coordinator. If available, an coerator with supervisory experience (SSV or Shif t. Suot. tvoe) should be used or caned in per Appendix P of EP-209 can list to man this position.

2.0 Radiation Protection Team Leader shall:

2.1 Assign HP as Aux OSC Coordinator and ensure Aux OSC is manned with Health Physics personnel.

3.0 operations Support Center Coordinators or designees shall:

3.1 Assign an individual the duties of Ooerations Suoport Center Cmmunicator and Status Board Keeper. Ensure that a log is available

(, for the comunicator's use.

3.2 Direct the Operations Sucoort Center Ccanunicator and Status Board Keeper to verify operability of the cornunication systems as outlined in the attached Apoendices. (See Atx:endix EP-202-2 for Aux. OSC and Apoendix EP-202-1 for the Shif t 09C) .

3.3 Notify the Control Room when their resoective Operations Support Center is manned and that ccrrunications are satisfactory or unsatisfactory.

3.4 Procure equipnent and supolies necessary to assist in mitigating the j energency.

3.5 Assign an individual to periodically verify habitability of their respective Operations Support Center adhering to the guidelines in Appendix EP-202-6. Report results of this verificationn to the Shift Stperintendent.

1 4.0 Operations Support Center Comunicator and Status Board I Keepers shall:

4.1 Verify comunication capabilities exist in their resoective operations Support Centers by ccmoleting the attached ohone C.O.L.

appendices. Report results to OSC Coordinator.

L -

1

. . . . . . ~ . . - . . . . . . . _ _ - _ . . . . . ..

I

. EP-202 Paga 3 c4 9, Rev. 5 4.2 Man the status board posted ty/ the OSC Coordinator to ensure

( personnel and plant status is maintained in each 03C. (See l Appendices for status boards) .

4.3 Iog all certinent actions in the designated log book to maintain a formal record of all events pertinent to the OSC. Refer to OSC l Coordinator for guidance on what to log.

  • FOIliAHJP ACTIOt4S 1.0 Operaticns Support Center Coordinators or designees shall:

1.1 Remain in contact with the Control Room or the Technical Supoort Center in order to provide assistance as needed by formulation of thergency Teams.

1.2 Direct personnel entering and leavim their respective coerations supoort Center to log in usim the official log or the status boards.

1.3 Coordinate activities of their respective OSC. The coerator OSC should coordinate with the Control Room and designated maintenance personnel to ensure local permits are promptly ccupleted to allow repair work if necessary. The Aux. 09C should coordinate with the TSC, Control Room, and all energency team oersonnel to ensure procer HP sucoort for all activities in the plant. In these cases, the HP will serve as the R.W.

( l.4 Upon leaving their respective Ooerations Supoort Center for any reason, delegate his duties to the remaining senior coerator or technician.

1.5 Itaintain working knowledge of radiation exoosure each member of their respective OSC is receiving in order to maintain AIARA conceots during the emergency.

2.0 Operations Support Center eersonnel shall:

2.1 Upon entering and leaving their respective coerations supoort center log in and out in the designated log or on the status board.

2.2 Ensure proper self-monitoring of their own pocket dosimeters when performing tasks during the emergency.

e 1

l

- EP-202 Page 4 of 9, Rev. 5 APPDIDIX EP-202-1 6 0.L.

(-

Test Ring Down Phones Initials -

Control Room '

Aux. OSC 1

Test Dial Phones for Dial Tone 4369

. 4690 Discrepancies:

l

(

s e

i I

4 i -

L I

l l

L l

t. .

. EP-202 Page 5 of 9, Rev. 5 l

- l APPDIDIX EP-202-2 .

AUX OSC PHOtlE C.O.L.

Test Rirn Down Phcnes Initials Technical Support Center Operator OSC IIealth Physics Network Phone

(*22 'Ibuch Tone) to NPC IIeadquarters Test Dial Phcnes for Dial Tone 4262 4263 4691 4495 Discrepancies:

(

O e

- EP-2GB Page 6 of 9, Rev. 5 APP M IX EP-202-3 SHIET OPERATIONS SUPPORT CENIER ASSIGENT STA'IUS BOARD

(-

Time Job Description Ooerators Sent Maintenance Called Est. Return T:

\

l .

l l

l

~3 , . EP-202

- - Page 7 of 9, Rev. 5 3

APPD3 DIX EP-202-4 3 ,, - OPERATOR OSC PIRfr STN1fS BOARD i

?

UNIT TP4E:

13 KV Bus 1: 2: HPCI:

. ') Cond A: B: C: RCIC:_

Recirc At B: SU2: SU3:

1 4 KV Bus El: E2: E3: E4:

> Diesel A: B: C: D:

RHR A: B: C: D:

)

HPSW A: B: C: D:

Core Spray A: B: C: D:

y ESW A: ,

B: ECW:

CTO At B:

(~

')

SBIf A: B:

SDGT A SBGP Filter Fans A: B: C: B SBGT Filter O

O e

^)

l

(

-I

. . . . .. - ..- - = -- :-- - -

ElP-202

).. ' ' Page 8 of 9, Rev. 5 n ,

7 .\

" APPDIDIX EP-202-5 .

NJX OSC Assignment Status Board 3

s Time Job Description HP's Sent' ICA Problems t. Return TLme

)

. 1

.')

('

)

9 k

l I s g k

\ s

  1. g O

\.

s

)

J C

e e

  • ,d>

w . *

, m O tP 4.Ud-O UpeldL10 tad ddppli1 LO14 Lei s saouALCAAAL) uu1&A11avd ** #

t RM 16 Air Sanples (initiate upon activation)

Ganma 4 25 mR/hr N/A -

," - 12 hr shifts prior to reaching 300 mR daily limit

>25 mR/hr .

Notify Emergency Director. '

/

- Operators evacuate to Control Rom / ,

- HPs evacuate to HP office on 2nd .

floor Vendor Bldg.

" -6 Xe N/A 12 x 10 uCi/cc 10% of maxim e MPC value.

131M ,

8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> stay time.

-6

> 2 x 10 uCi/cc

(

/ , ,

Notify Bnergency Director.

- Operators evacuate to Control Rom ,

- HPs evacuate to HP office on 2nd "

- t floor Vendor Bldg.

-8 Beta N/A 5.1 x 10 uCi/cc 10% of maxinzn MPC value.

8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> stay time.

> 1 x 10 -8 uCi/cc $"o4@

Notify Bnergency Director. *N

- Operators evacuate to Control Room Q

- HPs evacuate to HP office 2nd w floor Vendor Bldg. '

W 4

-9

  • Il31 ,

. N/A S 9 x 10 uCi/cc 10% of maximum MPC value. m 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> stay time.

> 9 x 10 -9 uCi/cc Notify Bnergency Director.

- Operators evacuate to Control Rom.

- HPs evacuate to HP office 2nd floor Vendor b1dg. i

_ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ . _ _ - -