y ENCLOSURE 4 BRUASWICK STEAM ELECTRIC PLANT, UNIT 1 AND 2 NRC DOCKETS 50-325 & 50-324 OPERATING LICENSES DPR-71 & DPR-62 REQUEST FOR LICENSE AMENDMENTS ADDITION OF TS 3.0.4 EXEMPTION TO TS 3/4.8.1.1 MARKED-UP TECHNICAL SPECIFICATION PAGES - UNIT 1
'i J
9504060091 950331 PDR ADOCK 05000324 P
4 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATINC.
LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the follouing A.C. electrical power sources shall be OPERABLE:
Two physically independent circuits, per unit, between the offsite 3
a.-
transmission network and the onsite Class IE distribution system, and b.
Four separate and independent diesel generators, each with:
1.
A separate engine-mounted fuel tank containing a minimum of 100 gallons of fuel, 2.
A separate day fuel tank containing a minimum of 22,650 gallons of fuel, and 3.
A separate fuel transfer pump.
c.
A plant fuel storage tank containing a minimum of 74,000 gallons of fuel.
APPLICAfsILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION With one of fsite circuit of the above required A.C. electrical pog a.
p sources not capable of supplying the Class 1E distribution system:
)
i 1.
Demonstrate the OPERABILITY of the remaining A.C. of fsite source by performing Surveillance Requirement 4.8.1.1.1.4 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; 2.
Demonstrate the OPERABILITY of the diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafteri 3.
Restore the inoperable offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next '12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
With Unit 2 in OPERATIONAL CONDITION 4 or 5 and one of the required 4
Unit 2 offsite power circuits not capable of supplying the Unit 2
(
Class 1E distribution system, either restore the inoperable Unit 2 -
offsite circuit to OPERABLE status within 45 days or place Unit 1 4
in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD I
+
SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. the provisions of ACTIONS
)
3.8.1.1.a.1, 3.8.1.1.a.2, and 3.8.1.1
.3 are not applicable.
p 4p (A5 ei Ace b 3 0 1 1
l 3/4 8-1 Amendment No. N9' BRUNSWICK - UNIT 1
~ '
..g
.\\
s
.l ENCLOSURES
~
BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 AND 2 NRC DOCKETS 50-325'& 50-324.
3
.,q-OPERATING LICENSES DPR-71 & DPR-62 2
i.-
REQUEST FOR LICENSE AMENDMENTS '
ADDITION OF.TS 3.0.4 EXEMPTION TO TS 3/4.8.1.1 MARKED UP TECHNICAL SPECIFICATION PAGES - UNIT 2 3
ef*s C! '<
e-1
-ns--
e,--
.,b..
.~
d
..m y--..
.--n,..
~
,,v o
-w--~
---m-
i
)
3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATING LIMITINC CONDITION F'OR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:
i Two physically independent circuits, per unit, between the offsite a.
transmission network and the onsite Class 1E distribution system, and b.
Four separate and independent diesel generators, each with:
1.
A separate engine-mounted fuel tank containing a minimum of 100 gallons of fuel, 2.
A separate day fuel tank containing a minimum of 22,650 gallons of fuel, and 3.
A separate fuel transfer pump.
c.
A plant fuel storage tank containing a minimum of 74,000 gallons of fuel.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
l ACTION 1
With one offsite circuit of the above requi ed A.C. electrical powg 4
a.
sources not capable of supplying the Class distribution system:
'/
1.
Demonstrate the OPERABILITY of the remaining A.C. offsite source by performing Surveillance Requirement 4.8.1.1.1.a within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereaftert 2.
Demonstrate the OPERABILITY of the diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter; 3.
Restore the inoperable offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
With Unit 1 in OPERATIONAL CONDITION 4 or 5 acd one of the required Unit 1 offsite power circuits not capable of supplying the Unit 1 Class 1E distribution system, either restore the inoperable Unit 1 offsite circuit to OPERABLE status within 45 days or place Unit 2 in at least HOT. SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the followi.ng
)
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
e provi sions of ACTIONS 3.8.1.1.a.1, 3.8.1.1.a.2, and pi 3.8.1.1.
3 are not applicable.
h.
p dr#,
\\anol Spec.ihMn 3.0 'i BRUNSWICK - UNIT 2 3/4 8-1 Amendment No. tfe-
-3 n=1
'~
.qc -
1 Y
~
ENCLOSURE 6--
BRUNSWICK ST5AM ELECTRIC PLANT, UNIT 1 AND 2 NRC DOCKETS 50 325 & 50-324 OPERATING LICENSES DPR 71 &.DPR REQUEST.FOR LICENSE AMENDMENTS ADDITION OF TS 3.0.4 EXEMPTION TO TS 3/4.8.1.1 -
TYPED TECHNICAL' SPECIFICATION PAGES - UNIT 1 iz
-1
,t,-
lj
- 3J, ',
4 i
1
.,7.
3/4.8 ELECTRICAL POWER SYSTEMS 3/4L8.I'A.C. SOURCES OPERATINS LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:
a.
-Two physically inde)endent circuits, per unit, between the offsite transmission networc and the onsite Class 1E distribution system, and b.
Four separate and independent diesel generators, each with:
1.
A separate engine-mounted fuel tank containing a minimum of 100 gallons of fuel.
2.
A separate day fuel tank containing a minimum of 22.650 gallons of fuel, and 3.
A separate fuel transfer pump.
c.
A plant fuel storage tank containing a minimum of 74.000 gallons of fuel.-
APPLICABILITY: OPERATIONAL CONDITIONS 1. 2. and 3.
ACTION a.
With one offsite circuit of the above required A.C. electrical power i
sources not capable of supplying the Class 1E distribution system:**
1.
Demonstrate the OPERABILITY of the remaining A.C. offsite source by performing Surveillance Requirement 4.8.1.1.1.a within 2 t-hours and at least once~per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter:
4-2.
Demonstrate the OPERABILITY of the diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least-once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter:
j 3.
Restore the inoperable offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
With Unit 2 in OPERATIONAL CONDITION 4 or 5 and one of the required Unit 2 offsite power circuits not capable of supplying the Unit 2 Class 1E distribution system. either restore the ino]erable Unit 2 offsite circuit to OPERABLE status within 45 days or place Jnit 1 in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following'2 6
- hours.
For Unit 1. the provisions of ACTIONS 3.8.1.1.a.1, 3.8.1.l.a.2.
I and 3.8.1.1.a.3 and Specification 3.0.4 are not applicable.
I BRUNSWICK - UNIT 1 3/4 8-1 Amendment No.
t 4
h ENCLOSURE 7 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 AND 2 NRC DOCKETS 50-325 & 50-324 OPERATING LICENSES DPR-71 & DPR-62 REQUEST FOR LICENSE AMENDMENTS ADDITION OF TS 3.0.4 EXEMPTION TO TS 3/4.8.1.1 TYPED TECHNICAL SPECIFICATION PAGES - UNIT 2 lt J
4
N 3/4.8 ELECTRICAL' POWER' SYSTEMS 3/4.8.1
~A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION i
3.8.-l.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:
a.
Two physically inde)endent circuits.-per unit, between the offsite transmission networc and the onsite Class'1E distribution system.. and.
b.
Four separate and independent diesel generators, each with:
1.
A separate engine-mounted fuel tank containing a minimum of 100 gallons of fuel.
2.
A separate day fuel tank containing a minimum of 22.650 gallons of fuel, and 3.
A separate fuel transfer pump.
c.
A plant fuel storage tank containing a minimum of 74.000 gallons of-4 fuel.
APPLICABILITY: OPERATIONAL CONDITIONS 1. 2. and 3.
ACTION i
a.
With one offsite circuit of the above required A.C. electrical power sources not capable of supplying the Class IE distribution system:** 1 1.
Demonstrate the OPERABILITY of the remaining A.C. offsite source by performing Surveillance Requirement 4.8.1.1.1.a within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter:
2.
Demonstrate the OPERABILITY of the diesel-generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter:
3.
Restore the inoperable offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
With Unit 1 in OPERATIONAL CONDITION 4 or 5 and one of the required Unit 1 offsite power circuits not capable of-supplying the Unit 1 Class 1E distribution system, either restore the inoperable Unit 1 offsite circuit to OPERABLE status within 45 days or place Unit 2 in at least HOT SHUIDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24" hours.
For Unit 2. the provisions of ACTIONS 3.8.1.1.a.1. 3.8.1.1.a.2.
I and 3.8.1.1.a.3 and Specification 3.0.4 are not applicable.
I BRUNSWICK - UNIT 2 3/4 8-1 Amendment No.