y ENCLOSURE 4 BRUASWICK STEAM ELECTRIC PLANT, UNIT 1 AND 2 NRC DOCKETS 50-325 & 50-324 OPERATING LICENSES DPR-71 & DPR-62 REQUEST FOR LICENSE AMENDMENTS ADDITION OF TS 3.0.4 EXEMPTION TO TS 3/4.8.1.1 MARKED-UP TECHNICAL SPECIFICATION PAGES - UNIT 1

'i J

9504060091 950331 PDR ADOCK 05000324 P

PDR

4 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATINC.

LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the follouing A.C. electrical power sources shall be OPERABLE:

Two physically independent circuits, per unit, between the offsite 3

a.-

transmission network and the onsite Class IE distribution system, and b.

Four separate and independent diesel generators, each with:

1.

A separate engine-mounted fuel tank containing a minimum of 100 gallons of fuel, 2.

A separate day fuel tank containing a minimum of 22,650 gallons of fuel, and 3.

A separate fuel transfer pump.

c.

A plant fuel storage tank containing a minimum of 74,000 gallons of fuel.

APPLICAfsILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION With one of fsite circuit of the above required A.C. electrical pog a.

p sources not capable of supplying the Class 1E distribution system:

)

i 1.

Demonstrate the OPERABILITY of the remaining A.C. of fsite source by performing Surveillance Requirement 4.8.1.1.1.4 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; 2.

Demonstrate the OPERABILITY of the diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafteri 3.

Restore the inoperable offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next '12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

With Unit 2 in OPERATIONAL CONDITION 4 or 5 and one of the required 4

Unit 2 offsite power circuits not capable of supplying the Unit 2

(

Class 1E distribution system, either restore the inoperable Unit 2 -

offsite circuit to OPERABLE status within 45 days or place Unit 1 4

in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD I

+

SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. the provisions of ACTIONS

)

3.8.1.1.a.1, 3.8.1.1.a.2, and 3.8.1.1

.3 are not applicable.

p 4p (A5 ei Ace b 3 0 1 1

l 3/4 8-1 Amendment No. N9' BRUNSWICK - UNIT 1

~ '

..g

.\\

s

.l ENCLOSURES

~

BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 AND 2 NRC DOCKETS 50-325'& 50-324.

3

.,q-OPERATING LICENSES DPR-71 & DPR-62 2

i.-

REQUEST FOR LICENSE AMENDMENTS '

ADDITION OF.TS 3.0.4 EXEMPTION TO TS 3/4.8.1.1 MARKED UP TECHNICAL SPECIFICATION PAGES - UNIT 2 3

ef*s C! '<

e-1

-ns--

e,--

.,b..

.~

d

..m y--..

.--n,..

~

,,v o

-w--~

---m-

i

)

3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATING LIMITINC CONDITION F'OR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

i Two physically independent circuits, per unit, between the offsite a.

transmission network and the onsite Class 1E distribution system, and b.

Four separate and independent diesel generators, each with:

1.

A separate engine-mounted fuel tank containing a minimum of 100 gallons of fuel, 2.

A separate day fuel tank containing a minimum of 22,650 gallons of fuel, and 3.

A separate fuel transfer pump.

c.

A plant fuel storage tank containing a minimum of 74,000 gallons of fuel.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

l ACTION 1

With one offsite circuit of the above requi ed A.C. electrical powg 4

a.

sources not capable of supplying the Class distribution system:

'/

1.

Demonstrate the OPERABILITY of the remaining A.C. offsite source by performing Surveillance Requirement 4.8.1.1.1.a within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereaftert 2.

Demonstrate the OPERABILITY of the diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter; 3.

Restore the inoperable offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

With Unit 1 in OPERATIONAL CONDITION 4 or 5 acd one of the required Unit 1 offsite power circuits not capable of supplying the Unit 1 Class 1E distribution system, either restore the inoperable Unit 1 offsite circuit to OPERABLE status within 45 days or place Unit 2 in at least HOT. SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the followi.ng

)

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

e provi sions of ACTIONS 3.8.1.1.a.1, 3.8.1.1.a.2, and pi 3.8.1.1.

3 are not applicable.

h.

p dr#,

\\anol Spec.ihMn 3.0 'i BRUNSWICK - UNIT 2 3/4 8-1 Amendment No. tfe-

-3 n=1

'~

.qc -

1 Y

~

ENCLOSURE 6--

BRUNSWICK ST5AM ELECTRIC PLANT, UNIT 1 AND 2 NRC DOCKETS 50 325 & 50-324 OPERATING LICENSES DPR 71 &.DPR REQUEST.FOR LICENSE AMENDMENTS ADDITION OF TS 3.0.4 EXEMPTION TO TS 3/4.8.1.1 -

TYPED TECHNICAL' SPECIFICATION PAGES - UNIT 1 iz

-1

,t,-

lj

  • 3J, ',

4 i

1

.,7.

3/4.8 ELECTRICAL POWER SYSTEMS 3/4L8.I'A.C. SOURCES OPERATINS LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a.

-Two physically inde)endent circuits, per unit, between the offsite transmission networc and the onsite Class 1E distribution system, and b.

Four separate and independent diesel generators, each with:

1.

A separate engine-mounted fuel tank containing a minimum of 100 gallons of fuel.

2.

A separate day fuel tank containing a minimum of 22.650 gallons of fuel, and 3.

A separate fuel transfer pump.

c.

A plant fuel storage tank containing a minimum of 74.000 gallons of fuel.-

APPLICABILITY: OPERATIONAL CONDITIONS 1. 2. and 3.

ACTION a.

With one offsite circuit of the above required A.C. electrical power i

sources not capable of supplying the Class 1E distribution system:**

1.

Demonstrate the OPERABILITY of the remaining A.C. offsite source by performing Surveillance Requirement 4.8.1.1.1.a within 2 t-hours and at least once~per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter:

4-2.

Demonstrate the OPERABILITY of the diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least-once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter:

j 3.

Restore the inoperable offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

With Unit 2 in OPERATIONAL CONDITION 4 or 5 and one of the required Unit 2 offsite power circuits not capable of supplying the Unit 2 Class 1E distribution system. either restore the ino]erable Unit 2 offsite circuit to OPERABLE status within 45 days or place Jnit 1 in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following'2 6

  • hours.

For Unit 1. the provisions of ACTIONS 3.8.1.1.a.1, 3.8.1.l.a.2.

I and 3.8.1.1.a.3 and Specification 3.0.4 are not applicable.

I BRUNSWICK - UNIT 1 3/4 8-1 Amendment No.

t 4

h ENCLOSURE 7 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 AND 2 NRC DOCKETS 50-325 & 50-324 OPERATING LICENSES DPR-71 & DPR-62 REQUEST FOR LICENSE AMENDMENTS ADDITION OF TS 3.0.4 EXEMPTION TO TS 3/4.8.1.1 TYPED TECHNICAL SPECIFICATION PAGES - UNIT 2 lt J

4

N 3/4.8 ELECTRICAL' POWER' SYSTEMS 3/4.8.1

~A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION i

3.8.-l.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a.

Two physically inde)endent circuits.-per unit, between the offsite transmission networc and the onsite Class'1E distribution system.. and.

b.

Four separate and independent diesel generators, each with:

1.

A separate engine-mounted fuel tank containing a minimum of 100 gallons of fuel.

2.

A separate day fuel tank containing a minimum of 22.650 gallons of fuel, and 3.

A separate fuel transfer pump.

c.

A plant fuel storage tank containing a minimum of 74.000 gallons of-4 fuel.

APPLICABILITY: OPERATIONAL CONDITIONS 1. 2. and 3.

ACTION i

a.

With one offsite circuit of the above required A.C. electrical power sources not capable of supplying the Class IE distribution system:** 1 1.

Demonstrate the OPERABILITY of the remaining A.C. offsite source by performing Surveillance Requirement 4.8.1.1.1.a within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter:

2.

Demonstrate the OPERABILITY of the diesel-generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter:

3.

Restore the inoperable offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

With Unit 1 in OPERATIONAL CONDITION 4 or 5 and one of the required Unit 1 offsite power circuits not capable of-supplying the Unit 1 Class 1E distribution system, either restore the inoperable Unit 1 offsite circuit to OPERABLE status within 45 days or place Unit 2 in at least HOT SHUIDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24" hours.

For Unit 2. the provisions of ACTIONS 3.8.1.1.a.1. 3.8.1.1.a.2.

I and 3.8.1.1.a.3 and Specification 3.0.4 are not applicable.

I BRUNSWICK - UNIT 2 3/4 8-1 Amendment No.