Final Deficiency Rept,Item 144 Re Loose Attachment Nuts Mfg by Gould Ite Between MCC Base Channel & Unit.Initially Reported on 830907.Units Reworked
ML20081M466
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/03/1983
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-137 10CFR-050.55E, 10CFR-50.55E, 144, NUDOCS 8311170264
Download: ML20081M466 (4)


Text

1 gb t16e w/

C9&L Carolina Power & Light Company 83 NOV 14CP2P09======

P. O. Box 101, New Hill, N. C. 27562 November 3,1983 Mr. James P. O'Reilly NRC-137 United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900)

Atlanta, Georgia 30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 LOOSE NUTS ON MCC's, ITEM 144 Dcar Mr. O'Reilly:

Attached is the final report on the subject item which was deemed reportable per the provisions of 10CFR50.55(e), on October 5,1983. With this report, Carolina Power & Light Company considers this matter closed.

If you have any questions regarding this matter, please do not hesitate to contact me.

Yours very truly, Pff W" R. M. Parsons Project General Manager Sheaton Harris Nuclear Power Plant RMP/sh Attachment ec:

Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)

Mr. R. C. DeYoung Oh ofhjjjgo PDR 5

/

CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1 FINAL REPORT LOOSE NUTS ON MCC's ITEM 144 November 3,1983 REPORTABLE UNDER 10CFR50.55(e)

3..

SUBJECT:

Shearon Harris Nuclear Power Plant, Unit ~ 1, 10CFR50.55(e)

Reportable-Deficiency in Motor Control Cabinets supplied under Purchase Order NY-435143.

ITEM: -

Loose attachment nuts SUPPLIED BY:

Gould ITE, West Minster, Maryland NATURE OF DEFICIENCY: -

' The subject Unit 1 equipment-has been received at the site. Loose attachment nuts between the MCC base channel and the MCC unit were found.

l DATE PROBLEM OCCURRED:

The problem was identified during a CP&L and NRC field -

inspection at the site on August 23,1983.

DATE PROBLEM REPORTED:

On September 7,1983, CP&L (N. J. Chiangi) notified the NRC (A.

(Hardin) that this -item was potentially reportable per the provisions of 10CFR50.55(e). On October 5,1983, CP&L (N..'J.

Chiangi) notified the NRC (P. Bemis) that this item was reportable per provisions of 10CFR50.55(e).

SCOPE OF

- PROBLEM:

The deficiency involved the following motor control cabinets supplied under Purchase Order NY-435143: 1A 35-SA, IB35-SB.

SAFETY IMPLICATIONS:

Seismic qualification of these cabinets is required to assure structural integrity during a seismic event.

Safety-related f

components are located in the cabinets; thus, structural failure would jeopardize operation of safety-related equipment.

REASONS I

DEFICIENCY IS REPORTABLE:

These cabinets had been installed and inspected prior to the discovery of this deficiency. HPES. evaluated this condition and determined this to be significant to the structural integrity of the equipment.

l l

CORRECTIVE

' ACTION:

1.

The two subject MCC units have been reworked by field personnel and reinspected.

2.

All motor control cabinets under this purchase order installed in the field have been reinspected for this condition and reworked as ' necessary.

In addition, MCC units (under Regulatory Guide 1.29) installed in the field have been reworked and reinspected also.

PREVENTIVE MEASURES:

NPCD has issued a change to the Work Procedure WP-105 in order for this item to be checked and verified during the equipment installation.