ML20081F219
| ML20081F219 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 10/27/1983 |
| From: | Parsons R CAROLINA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| CON-NRC-133 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8311020388 | |
| Download: ML20081F219 (1) | |
Text
60-YoO S*
Cp&L hhOf[jf ag 3I Carolina Power & Light Company P. O. Box 101, New Hill, N. C. 27562 October 27,1983 Mr. James P. O'Reilly NRC-133 United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900)
Atlanta, Georgia 30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 ENGINEERING REVIEW OF COMPLETED PHASE II PIPE HANGERS, ITEM 148 Dcar Mr. O'Reilly:
On September 30, 1983, Mr. N. J. Chiangi notified the NRC (Mr. A. Hardin) of a potentially reportable item per the provisions of 10CFR50.55(e). The NRC was informed that of 235 pipe hangers which have been completed and accepted through Phase II, an engineering review of 99 of the pipe hangers completed indicates that various quality characteristics are indeterminate.
The hangers in q.nestion will be reinspected and a determination will be made for reportability. Modifications to our hanger program are in progress in order to prevent similar occurrences in the future. In order to complete our reinspection and evaluation, we will require until March 5,1984 for submitting a report on the reportability of this item.
Thank you for your consideration in this matter.
Yours very truly, fff R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh ec:
Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)
Mr. R. C. DeYoung (NRC) 8311020388 831027 CO -
\\hb PDR ADOCK 05000400 S
PDR O@ gr' fl? b I b i