Monthly Operating Repts for Feb 1995 for Catawba Nuclear Station
ML20081E631
Person / Time
Site: Catawba  
Issue date: 02/28/1995
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20081E627 List:
References
NUDOCS 9503210378
Download: ML20081E631 (10)


Text

.p; r

. ;;( -- -

l(;.j[ T-M y d'

1 3

w

,.j; x+

^

O M

.w i

. OPERAi!NG DATA REPDRI-DOCKET NO 50-413 m

DATE March 15. 1995

.0PERATING STATUS.

COMPLETEDBY' R.A;Willians TELEPHONE 704-382-5346 l Unit Nase: Catawba 1 2.ReportingPeriod: February 1,1995-February 28,1995 4

4

' 3.-Licensed Thersal P9wer (MWils..

3411.

34. Naseplate Rating (Stoss Nels 1305e

' Notes eNaseplate Rating

5. Design Electrical Rating (Net Melt.

1145 (6ross Mel' calculated as:

G.MuisusDependableCapacity(Bross.He):- 1192 1450.000 MVA x.90 power

7. fiatinus Dependable Capacity (Net Me):

s il27 -

.NURE6-0020.

factor per Page ill, 8.ilf Changes Occur in Capacity Ratings (Iteas Nusber 3 Through 7) Since Last

-Report;BlveReasons:

9. Power Level To Which Restricted, if Any (Net M e):

~

'10. Reason For Restrictions, If any -

ThisMo'th' Yr.~to-Date. 'Cuaulative n

'!!. Hours in Reporting Period 672'.0 1416.0-84769'.0

12. Number of Hours Reactor Was Critical 265.6 1009.6 65521.2
13. Reactor Reserve Shutdown Hours

--0 4

'- - - 14. Hours Generator On-Line 239.3 983.3 64358.8-IL'UnitReserveShutdownHours

--0--

--0--

16. Gross Thernal Energy Generated (MWH) 774931-3268357 209411788,
17. Bross Electrical Energy Generated (MWH) 279339 1179549 73963299
18. Net Electrical Energy Generated ( MH) 261788'.s 1116374

'69439836 19.UnitServiceFactor 35.6 69.4 75.9

20. Unit Availability Factor 35.6 69.4 75.9 3
21. Unit Capacity Factor (Using MDC Net) 34.5 69.8 72.3 e
22. Unit Capacity Factor (Using DER Net)

.34.0 68.9-71.5

23. Unit Forced Outage Rate 0.0.

0.0 8.9

24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of E'achl Current 1v Refueling
25. If Shut Down At End Of Report Period. Estisated Date of Startup March 26. 1995
26. Units In Test Status (Prior to Cessercial Operation):

Forecast Achieved IN!i!AL CRITICALITY l

IN!!!AL ELECTRIC 11Y

)

COMMERCIA(,OPERAi!0N 9503210378 950315 PDR ADOCK 05000413 R

PDR

f' ~

G OPERATIN8DATAREPORT DOCKET NO 50-413 UNIT Catawba 1 DATE l' arch 15. 1995 COMPLETED BY R.A. Willias_1 TELEPHONE 704-382-53 %

h0 NTH February.1995 QQ AVERABE DAILY F0WER LEVEL

RAJ, AVERABE DAILY POWER LEVEL (Milt-Neti (MWe-Neti I

1150 17 0

2 1147 18 0

3 1147 19 0

4 1149 20 0-5 1151 21 0

6 1152 22 0

7 1152 23 0

8 1096 24 0

9 1069 25 0

10 821 26 0

11 0

27 0

12 0

28 0

13 0

14 0

15 0

16 0

i

UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET-NO.

50-413 UNIT NAME-unawan 1 DATE vailsf wp_ _.,

4 REPORT MONTH February 1995 COMPLETED BY' n.

a. w11Alame TELEPHONE tivej-Jue-sJeo.

(1) 2)

3 (4)

(5)

E HOD T

A OF LICENSE N

Y S-SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 1

95-2-10 S

432.70 C

1 RC FUELXX END-OF-CYCLE 8 REFUELING OUTAGE i

4 4

i Forced eason-ethod:

ibit G - Instructions S Scheduled A-Equipment Failure-(Explain).

1-Manual.

for Preparation of Data.

B-Maintenance or test

'2-Manual Scram Ent W Sneets For Licensee C-Refueling 3-Automatic Scram Event Re rt D-Regulatory R9striction 4-Other (Explain)

File (

-0161))

(LER E-Operator Training Ec License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I --Same Source-H-Other (Explain) 4 T

T w

-C-

--s

1---

m

--m u

A

y.<.

ED

?

  1. i

' DOCKET: 50-413.

UNIT: ' Catawba 1 Dates.03/15/95 t

NARRATIVE

SUMMARY

s e

MONTHr February 1995 Catawba Unit 1 began the month of February operating at 100% full power. The unit operated at or near 100% full. power until.02/08/95 at 0300, when the unit decreased to 95% to perform main steam safety valve testing. The unit decreaed to 92% power to correct T-AVG /T-REF deviation on 02/09/95 at.1451 and held from 1812 to 02/10/95 at 1500 when the unit started decreasing power to begin end-of-cycle 08 refueling outage. The unit was taken off-line 02/10/95 at 2318 for end-of-cycle 08 refueling outage. The unit.was in the refueling outage the remainder of the month.

4 Prepared by: R. A. Williams-Telephone: (704)-382-5346 e

'i

e MONTHLY REFUELING INFORMATION REQUEST

1. ' Facility names Catawba.

Unit 1 L

2.

Scheduled'next refueling shut'down: Currently Refuelino i

3.

Scheduled restart following refueling: March 1995

.THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

1 7.

Number of Fuel assemblies (a) in the cores lil (b) in the spent fuel pool: 560 J

8. Present licensed fuel pool capacity: 13]&

l Size of req",ested or planned increase:

9. Projected date of last refueling which can be accommodated by present licensed capacity: Seotember 2009 j

j DUKE POWER COMPANY DATE: March 15. 1995 Ntme of

Contact:

R.

A. Williams Phone:

(704)-382-5346 i

l i

1 i

]

j s

h OPERATING DATA REPORT

+

DOCKET NS 50-414 DATE March 15. 1995-

. OPERATING STATUS COMPLETED BY R.A. Willians TELEPHONE 704-382-5346

l. Unit Nase Catawba 2
2. Reporting Period: February 1, 1995-February 2B, 1995

. 3. Licensed There.al Power (MWt):

3411

4. Nameplate Rating (Bross MWels 1305e

' Notes

  • Nameplate Rating 3.DesignElectricalRating(NetMWels 1145 (6 toss MWe) calculated as
6. Maxieus Dependable Capacity (Srcss MWe):

1192 1450.000 MVA x.90 pcuer 7, Maxisus Dependable Capacity (Net hWels'

!!29 factor per Page lit, 0.'If Changes Occur in Capacity Ratings Gtens Number 3 Through 71 Since Last

.NUREB-0020.

Report. Give Reasons:

l

9. Power Level To Which Restricted, If Any (Net MWel
10. Reason For Restrictions, If any _,

This Month Yr.-to-Date

'Cusulative

11. Hours In Reporting Period 672.0' 1416.0 74785.0-
12. Nuaber Of Hours Reactor Was Critical 502.2 1246.2 58255.4-
13. Reactor Reserve Shut: lown Hours

- -0--

- 10. Hours Generatar On-Line 501.9 1245.9 57307.3

15. Unit Reserve Shutdoma Hours

--0--

--0--

--0--

16. Gross Thereal Energy Generated (MWH) 1710144 42%BBB 183943771

.17. Gross Electrical Energy Generated (MW91 608390' 1513385 65212765

18. Net Electrical Energy Benerated (MWH1

'571249 1431611 61397164

19. Unit Service factor 74.7 88.0 76.6
20. Unit Availability factor 74.7 88.0 76.6
21. Unit Capacity Factor (Using MDC Net) 75.3 89.6 72.6
22. Unit Capacity Factor (Using DER Net) 74.2 68.3 71.7 23.UnitForcedOutageRate 25.3 12.0 8.9 M. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Netu

23. If Shut Down At End Of Report Period. EsUsated Date of Startup:_ March 03 1995
26. Units In Test Status (Prior to teasercial Operetion):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CO S ERCIAL OPERATION

-y

.i i

t i

GPERATINS DATA REPORT DOCKET NO

'50-414 t%IT Cataba E DATE March 15,1995 COMPLETLi BV R.A. Willians TELEPHONE-704-382-5346' MONTH February. 1995 LA1 AVERA6:E DAILY POWER LEVEL DE AVERAGE DAILY POWER LEVEL

,MWe-Net)

(MWe-Net) 1 1150 17 1150 2

!!51 18 1125 3

1127 19 1153

,4

!!27 20 1152 5

1160 21 1048 6

1159 22 0'

7

!!59 23 0

8

!!59 24 0

9 1150 25 0

10 1130 26 0

1151 27 0

12 1154 20 0

13

!!56 j

14 1154

't 15

!!53 16

!!51

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-414 UNIT NAME uravina z DATE ua/is/sp__.

REPORT MONTH February 1995 COMPLETED BY x.

. r.. w1111ams TELEPHONE T7ii%i -aaz-saea (1) 2)

3 (4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 1

95-2-21 F

26.60 A

3 HB VALVEX REACTOR TRIP DUE TO CLOSURE OF STEAM GENERATOR

'B' MAIN STEAM-ISOLATION VALVE 2

95-2-23 F

23.25 A

HH HTEXCH CONDENSER COOLING WATER PIPE LEAK HB VALVEX CLOSURE OF STEAM GENERATOR.'B' MAIN 3

95-2-23 F

120.25 A

STEAM ISOLATION VALVE (1)

(2)

(3)

(4)

F Forced Reason

  • Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram EntW Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NNEG-0161) )

D-Regulatory Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain) i

.. ~...

1 +';

'i e

DOCKET :50-414' s

UNIT - Catawba 2 Da'te:

03/15/95

.i i

NARRATIVE

SUMMARY

-MONTH: February 1995 Catawba Unit 2 began the month of February operating at 100% full-power. On02/21/95 at:2154-the unit experienced a reactor / turbine trip due to closure of steam' generator

'B' main steam isolation valve caused by a bad optical isolator. On 02/23/95 at 0030 a condenser cooling water leak became critical path until 02/25/95

at 2345, when the closure of steam generator

'B' main steam isolation valve resumed as critical path. The unit did not return to service during the month of February, 1995.

i l

. 1

)

i 1

i

'l l

]

j i

Prepared by: R. A. Williams Telephone: (704)-382-5346

~'

c.

ne :

T c

MONTHLY REFUELING INFORMATION REOUEST l~.-.' Facility names gatawba, Unit 2 2.

scheduled next refueling shutdown: ' October 1995 3.'

scheduled restart following refueling: November'1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S..

CHANGE OR LICENSE AMENDMENT. THEREFORE,- QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

N111 refueling or resumption of operation thereafter require a

-technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design'and core. configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s).for. submitting proposed licensing action and supporting information.

6.

-Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core 121 (b) in the spent fuel pools 111

8. Present licensed fuel pool capacity: lill Size of requested or planned increases ---
9. Projected date of last refueling which can be accommodated'by present licensed capacity: Sootember 2011 DUKE POWER COMPANY DATE: March 15, 1995 Name of

Contact:

R. A. Williams Phone 1,7041-382-5346