S~-Voo CP&L O/
c.,eiie ee-e, a tie ce-on act er.
19 s
P. O.13ox 101, New 11111, N. C. 27562 October 19,1983 Mr. James P. O'Itcilly NitC-132 United States Nuclear llegulatory Commission Itegion 11 101 Marietta Street, Northwest (Suite 2000)
Atlanta, Georgia 30303 CAltOLINA POWEll & LIGilT COMPANY SilEAltON ll Altit!S NUCLEAll POWElt PLANT 1986 900,000 KW - UNITS 1 & 2 UNM AltKED IlOLTS, ITEM 14G
Dear Mr. O'lteilly:
On September 23, 1983, Mr. N. J. Chiangi notified the NItC (Mr. A. Ilardin) of a potentially reportable item per the provisions of 10CFil50.55(c) and 10CFit, Part 21. The NitC was informed that bolts procured under site order 11-42307 and site contract NPCD-80-10 were received and installed without the ASTM A-307 Grade A marking requirement.
CP&L has established a sampling plan to randomly select the affected bolts throughout the power block. Once the sampling plan is completed, the bolts will be destructively tested. In order to complete our sampling plan and the required testing, we will require until January 5,1984 for submitting a report on the reportability of this item.
Thank you for your consideration in this matter.
Yours very truly, 7;V/fM:A
- 1. M. Parsons Project General Manager Shearon llarris Nuclear Power Plant ItMP/sh ec:
Messrs. G. Maxwell /It. Prevatte (NitC-SIINPP)
Mr. it. C. DeYoung (NitC)
OFFICI AL col'Y w
8311010162 83101' i 0-PDR ADOCK 05000400 8