Monthly Operating Rept for Feb 1984
ML20081C863
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/29/1984
From: Lempges T, Roman T
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NMP-8137, NUDOCS 8403150051
Download: ML20081C863 (5)


Text

.

.y s

OPERATING DATA REPORT DOCKET NO. 50-220 DATE 3/5/84 COMPLETED BY TW Roman,

TELEPilONE 315-349-242 OPERATING STATUS U

1. Unit Name:
2. Reporting Period:

2/1/84 - 2/29/84

3. Licensed Thermal Power (MWt):

1850

4. Nameplate Rating (Gross MWe):

640

5. Design Electrical Rating (Net MWe):

630

6. Maximum Dependable Capacity (Gross MWe):

620

7. Maximum Dependable Capacity (Net MWe):

610

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

4

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Month '

Yr..to-Date Cumulatise h

11. Ilours In Reporting Period 696 1440
12. Number Of flours Reactor Was Critical 696 125,616.2 1440 87741.7
13. Reactor Resette Shutdown liours 0

0 1204.2

14. Ilours Generator On-Line 696.0 1440 84928.3 IS. Unit Reserve Shutdown Hours 0

0 20.4

16. Gross Thermal Energy Generated (MWH) 1145253.0 2473242.0 140,567,682.0
17. Gross Electrical Energy Generated (MWH) 385718.0 837348.0 46,469,129.0
18. Net Electrical Energy Generated (MWH).

373706.0,_

811557.0 45,006,316.0

19. Unit Senice Factor 100.0%

100.0%

69.8%

20. Unit Availability Factor 100.0%

100.0%

67.6%

21. Unit Capacity Factor (Using MDC Net) 88.0%

92.4%,

58.7%

22. Unit Capacity Factor (Using DER Net) 86.6%

90.9%

57.8%

23. Unit Forced Outage Rate 0

0 17.1%

24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Eacht:

Biennial refuel and overhaul March 16 -1984 - 8 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operationi:

Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY 1

COMMERCIA L OPERATION k

.8403150051 840229 gDRADOCK 05000220 PDR

gof77,

i AVER ACE DAsty t. NIT PohER LEVEL l

DOCKET NO.

50-220 UNIT. 9 Afi le

  • Pt. #1 DATE

_m CO\\lPLETED BY TW Roman g[

'/

TELErilONE C3151349-?a?9 AIONTH - Februarv 1934 DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL IMWe NitI 3

575 -

(MWc Neti 575 544 37 Is 543 1

570 19 539 4

430 5

518 1

0 6

562 7

564

' 8 23 526 8

564 9

560 10 560

~

26 528 l

Il 558

~

12 552; 513

, g3

. 55T

- - ~

~~

2S i

29 513 14 552 IS

'55i 16 547 INSTRUCTIONS On sliis to,mai.fis si,,3,eraec dails-the nearest winele mepwass,"

' " P""'## I#'#I "' \\I"'Ncf 8r s'Ali 4 is: A 9.g mg I

i (9t**g a

a

}

ll Pa UNITSilUIDOWNS AND POWER REDUCTIONS I"f DOCKET NO.

50-220 UNIT NAME 9 Mile Pt. Unit #1 fl DATE

-)/ b/ 64 O#

REPORT MONTil _ Februarv 1984 il COAfPLETED By FW Roman A ge, C TELEPilONE _ (.3151349-2422 i

to 1

h.

'5 u 2 5

c en Date 1

i:!

3$$

p E4 Ie Ii

'"" A Correcilve n

.c 2 e Event y

E P

Acisun su

$5 E

f ig c Repurl =

N0 j 'o Prevens Recurrence 9

y I

l,l u

u i

}[

84-4 2/4/84 S

LoaOreductionto70.5*topullcontrol rods.

84-5 2/25/84 S

11 Loa'd reduction to 73'.3f. to pul'1 control

~

rodp,.

'- 4}

re f

5 ;

l n'

l la h,

I f

1 N.

I 2

l '$

3

)

F: Forced Reason:

i' 4

f Methed:

S: Scheduled ih A Equiprnent Failuse(Explain) 1 Manual s y.

for Preparailun of Data

-[

Exhibit:C Instruciluns B Maintenance or Test 2 Msnual Scram.

  • j,

Entry Sheets for Licensee f.

A C Refueling

3. Automatic Scram.

t.

Event Report (LER) File (NUREG.

,D Regulatory Restrieilu i 4 Othc5 (Explain) 0161) f

  • f E-Operatur Training A licrnse Examination e

F-Administrailve G Operallunal Estor (Empirin) 5 j'1 Exhibit;l Same Sourec l.',,

14/7.7) il Other (Explain)

.jp A

NIAGARA M0llAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE February 1984 Nine Mile Point Unit 1 operated during the conth of February 1984 with an availability factor of 100.0% and a net design electrical capacity factor (DER) cf 56.6%.

Capacity factor losses were due to the following:

On February 4, load was reduced to pull flux shaping control rods.

On February 20, recire pump #13 was removed from service due to high seal leakage and the plant continued to operate with 4 loops at 100% flow.

On February 25, the load was reduced to pull the remaining control rods bringing Nine Mile to all rods out.

On February 29, plant output had coasted down to approximately 83%.

CLASS I WORK - INSTRUMENTATION 6 CONTROL - FEBRUARY 1984 KR a24424 - Rx lli 111 Press. Inst. Reading low. (Recalibrated all units - quarterly cal.)

CLASS I WORK - MAINTENANCE - FEBRUARY 1984 WR #24407 - System valve 201.7.04 leaking air. Tighten air operator diaphrams bolts.

WR #24509 - Liq. Poison valve 42.07, temp repair of stem.

WR #24524 issued for outage repair.

WR #21435 - Reinstall air operator on valve 80-40 Containment Spray.

WR #21436 - Reinstall air operator on valve 80-41 Containment Spray.

WR #21438 - Reinstall air operator on valve 80-45 Containment Spray.

WA #21437 - Reinstall air operator on valve 80-44 Containment Spray.

WR #24536

  1. 12 FWP warmup line BV FW-42, Furmanite valve.

KR #23506

  1. 12 IA Blowdown valve, could not isolate, added valve to drain-piping.

CLASS I KORK - ELECTRICAL MAINTENANCE - FEBRUARY 1984 N1-MST-M1 - 125 VDC batteries, cell specific gravities and battery voltage.

50 2131

- Rx. Prot. Sys. MG Set Alarms.

MO 3405

- Remote shutdown panel.

NAIP-8137 NIAGARA MOHAWK POWER CORPORATION NIAGARA MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE. N. Y.13202 Kfarch 10, 1984 Director Office of Inopection and Enforcement i

U.S. Nuclear Regulatory Commission k

Washington, DC 20555

)

ATTN:

Document and Control Desk Re: Docket No. 50-720 DPR-63

Dear Sir:

Subm tted herewith is the Report af Operating Statistics and Shutdown Experience for February 1984 for the Nine klike Point Nuclear Station Unit H1 l

Also included is a narrative report of Operating Experience for February 1984 Sincerely, l

w j1 Thomas E. Lempges Vice President f

Nuclear Generation TEL/to Attachments cc: Director, Office of 16E (10 copics) 4S

~

&