CP&L Caroliria Power & Light Company 04 Mj2PWgpM" P. O. Box 101, New Hill, N. C. 27562 March 5,1984 Mr. James P. O'Reilly NRC-191 United States Nuclear Regulatory Commission Region II

.101 Marietta Street, Northwest (Suite 2900)

Atlanta. Georgia 30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 - 900,000 KW - UNIT 1 ENGINEERING REVIEW OF COMPLETED PHASE II PIPE HANGERS, ITEM 148

Dear Mr. O'Reilly:

On September 30,1983, Mr. N. 3. Chiangi notified the NRC (Mr. A. Hardin) of a potentially reportable item per the provisions of 10CFR50.55(e). The NRC was informed that of 235 pipe hangers which have been completed and accepted through Phase II, an engineering review of 99 of the pipe hangers completed indicates that various quality characteristics are indeterminate.

As a result of the engineering review, the hanger program has been revised to prevent similar reoccurrences.

The 99 hangers have been reinspected, however the determination for reportability has not been completed. Due to the extensive amount of evaluation involved, we will require until May 7,1984 for submitting a final report on the reportability of this item.

Thank you for your consideration in this matter.

Yours very truly, 7PJ

= = =

R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/dh cc:

Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)

Mr. R. C. DeYoung (NRC) hh0C O

DR OFFICIAL COPY

=

J/n I 0 1