ML20080T356

From kanterella
Jump to navigation Jump to search
Revised Rept Sheets for Monthly Operating Rept for Aug 1983
ML20080T356
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 08/26/1983
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20080T346 List:
References
NUDOCS 8310200264
Download: ML20080T356 (2)


Text

ulALLTuMB EUuu UULM3T DOCKET No. 50 - 277 DATE SEPTEBBER 12, 1983 Revised 8/26/83 COMPLETED BY PHILADELPHIA ELECTRIC COMPANI W.E.ALDEN E NGIN EER-IN-CH A RGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS

1. UNIT NAME: PEACH BOTT05 UNIT 2 i NOTES: UNIT 2 CONTINUED FORCED l

g g

2. REPORTING PERIOD:

AUGUST, 1983 l

IGSCC PIPE INSPECTION AND l

g

3. LICENSED THERBAL POWER (BWT) :

3293 l

REPAIR OUTAGE.

[

g g

4 NAMEPLATE RATING (GROSS BUE):

1152 l

l I

l

==

5. DESIGN ELECTRICAL RATING CEET BEE):

1065 l

l g

g

6. HAIIBU5 DEPENDABLE CAPACITY ' (GROSS BWE) : 1098 l

l g

7. HAII505 DEPENDABLE CAPACITY (NET BWE):

1051 l

l

8. IF CHANGES OCCUB IN CAPACITY RATINGS (ITEMS NUBBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET HUE):
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS BONTH YB-TO-DATE CUBULATIVE

11. BOURS IN REPORTING PERIOD 744 5,831 80,279
12. NU5BER OF HOURS REACTOR WAS CRITICAL 0

3,918,1 595007.8

13. REACTOR RESERVE SHUTDOWN BOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 0.0 3,834.b 57,383.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERNAL ENERGY GENERATED (BWH) 0 12,187,155 168,696,127

~

17. GROSS ELECTRICAL ENEEGY GENERATED (HWB) 0 45b29,130

~~55,549,640

18. NET ELECTRICAL ENERGY GENERATED (BWH)

-6,554 3,873,418 53,258,557

==

=_

19. UNIT SERVICE FACTOR 0.0 65.8 71.5
20. UNIT AVAILABILITY FACTOR 0.b 65.8 71.5
21. UNIT CAPACITY FACTOR (USING BDC NET) 0.0 63.2 63.1
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 62.4 62.3
23. UNIT FORCED OUTAGE BATE 100.0 31I7 9.8

==

24. SHUTDOWNS SCHEDULED OVER NEIT 6 50NTHS (TY PE, DATE, AND DUR ATION OF EACH) :

REFUELING /BAINTENANCE OUTAGE BEGINNING 2/04/84 FOR 20 WEEKS.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTI5ATED DATE OF STARTUP: 10/3/83
26. UNITS IN TEST STATUS (PRIOR TO COMBERCIAL OPERATIONS :

FORECAST ACHIEVED INITIAL CRITICALITY l

INITIAL ELECTRICITY l

COMMERCIAL OPERATION r3102OO264 831013 FOR CONSISTENCY WITH FEDERAL ENERGY REGULATORY COMMISSION REPORTS.

PDR ADDCK 05000277 R

PDR

1 l

1 i

^

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277

_=

UNIT NAME PEACH BOTTOR DNIT 2 DATE SEPTEMBER 12, 1983 Revised 8/26/83 REPORT HONTH AUGUST, 1983 COaPLETED BY PHILADELPHIA ELECTRIC CORPANY N.R.ALDEN ENGINEEE-IN-CHARGE LICENSING SECTION GENERATION DITISION-NUCLEAR TELEPHONE (215) 841-5022 l

l l

l l METHOD OF l LICENSEE ISYSTERl COMPONENT l CAUSE AND CORRECTIVE 4

l lTYPElDURATIONl REASON l SHUTTING DOWNl EVENT l CODE l CODE l ACTION TO N0.l DATE l (1) l (HOURS) l (2) l REACTOR (3) l REPORT e l (4) l (5) l PREVENT RECUERENCE i

l l

1 1

I I

l l

1 j

18 l 830801 l F l 744.0 l

B l 1

l NA l CF l PIPEII l CONCINDATION OF BULLETIN 83-02 IGSCC PIPE l

l l

l l

l l

l l INSPECTION AND REPAIR IMPLE8ENTATION.

i 1

l 1

I I

i 1

1 1

l l 744.0 l

l l

l l

l t -

v.

(1)

(2)

(3)

(4)

F - FORCED REASON HETHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILUBE (EIPLAIN) 1 - MANUAL FOR PREPARATION OF DATA 1

B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAR.

ETENT REPORT {LER)

D - REGUL ATORY RESTRICTION 4 - OTHER (EIPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE BIARINATION l

F - ADMINISTRATIVE (5) i G - OPERATIONAL ERROR (EIPLAIM)

H - OTHER (EIPLAIN)

EIBIBIT I - SARE SOURCE

~

4 i

i

--