ML20080T343

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Sept 1983 & Revised Rept Sheets for Jul & Aug 1983 for Unit 1
ML20080T343
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/13/1983
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20080T346 List:
References
NUDOCS 8310200257
Download: ML20080T343 (1)


Text

. -

PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 121SI O414000 October 13, 1983 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention:

Document Control Desk

SUBJECT:

Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:

Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of September, 1983 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.

In addition, we are attaching revised report sheets for July and August which reflects correction of Peach Bottom Unit 2 outage number 18 from " Scheduled" outage classification to

" Forced" outage classification.

We regret any inconvenience this may cause.

V truk yours,

/d (b'/d-

. Cooney S

erintendent clear Generation Division RML:lm Attachment cc:

Dr. T. E. Murley, NRC Mr.

A. R. Blough, NRC Site Inspector Mr. Stan P. Mangi, Dept. of Envir. Resources Mr. P. A. Ross, NRC INPO Records Center 0310200257 831013 f

PDR ADOCK 05000277 R

pop

...