ML20080T343
| ML20080T343 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/13/1983 |
| From: | Cooney M PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20080T346 | List: |
| References | |
| NUDOCS 8310200257 | |
| Download: ML20080T343 (1) | |
Text
. -
PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 121SI O414000 October 13, 1983 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
SUBJECT:
Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:
Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of September, 1983 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.
In addition, we are attaching revised report sheets for July and August which reflects correction of Peach Bottom Unit 2 outage number 18 from " Scheduled" outage classification to
" Forced" outage classification.
We regret any inconvenience this may cause.
V truk yours,
/d (b'/d-
. Cooney S
erintendent clear Generation Division RML:lm Attachment cc:
Dr. T. E. Murley, NRC Mr.
A. R. Blough, NRC Site Inspector Mr. Stan P. Mangi, Dept. of Envir. Resources Mr. P. A. Ross, NRC INPO Records Center 0310200257 831013 f
PDR ADOCK 05000277 R
pop
...