ML20080T352
| ML20080T352 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 08/26/1983 |
| From: | Alden W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20080T346 | List: |
| References | |
| NUDOCS 8310200263 | |
| Download: ML20080T352 (2) | |
Text
DOCKET NO. 50 - 277
==-
__=-
DATE AUGUST 22, 1983 Rgvistd 8/26/83 COBPLETED BY PHILADELPHIA ELECTRIC COMPANY
)
W.H.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 2 l NOTES: UNIT 2 EXPERIENCED l
g g
- 2. REPORTING PERIOD:
JULY, 1983 l
ONE FORCED l
g
- 3. LICENSED THERNAL POWER (BUT) :
3293 i
SHUTDOWN.
l l
l
- 4. N15EPLATE RATING (GROSS HWE) :
1152 l
l g
g
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065 l
l g
g
- 6. M11IK05 DEPENDABLE CAPACITY (GROSS BRE) : 1098 3
l g
- 7. 51I15U5 DEPENDABLE CAPACITY (NET BWE):
1051 l
l
- 8. IF CH ANGES OCCUR IN CAPACITY BATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET BWE) :
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS EONTH YB-TO-DATE CUMULATITE
- 11. HOURS IH REPORTING PERIOD 744 5,087 79,535
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 93.3 3,918.1 59,007.8
- 13. REACTOR RESERTE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 91.0 3,834.8 57,383.7
- 15. UNIT RESERTE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 274,704 12,187,155 168,696,127
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 96,800 4,029,130 55,549,640
- 18. NET ELECTRICAL ENERGY GENERATED (MWB) 86,990 3,879,972 53,265,121
- 19. UNIT SERVICE FACTOR 12.2 75.4 72.1
- 20. UNIT AVAILABILITY FACTOR 12.2 75.4 72.1
- 21. UDIT CAPACITY FACTOR (USING MDC NET) 11.1 72.6 63.7
- 22. UNIT CAPACITY. FACTOR (USING DER NET).
_ 11.0
.71.6-.
62.9
- 23. UNIT FORCED OUTAGE RATE 87.8 21.3 8.7
_=-_
- 24. SHUTDOWNS SCHEDULED OVER NEIT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
REFUELING-MAINTEN ANCE OUTAGE BEGINNING 2/04/84 FOR 13 WEEKS.
- 25. IF S30TDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 9/12/83
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECLST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8310200263 831013 PDR ADOCK 05000277 R
s b
s
)
UNIT SHUTDONNS AND PONER REDUCTIONS DOCKET NO. 50 - 277 UNIT MARE PEACH BOTT05 UNIT 2 DATE AUGUST 22, 1983 Revised 8/26/83 REPORT MONTH JULY, 1983 COMPLETED BY PHILADELPHIA ELECTRIC COEPANY l
E.H.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 l
l l
l l
l l NETHOD OF l LICENSEE l SYSTEM lCORPONENTI CAUSE AND CORRECTIVE l
ITYPEl DURATION l REASON l SHUTTING DOWNl EVENT l CODE I CODE I ACTION TO N3.l DATE l (1) l (HOURS) [
g2) l REACTOR (3) l BEPORT # l (4) l (5) l PREVENT RECURRENCE 1
I I
i 1
1 I
l i
18 l 830704 i F l 653.0 l
B l 1
l NA l CF l PIPEXX l BULLETIN 83-02 IGSCC PIPE IhSPECTION l
l l
l l
l l
l l AND REPAIR IMPLEMENTATION.
I 1
l l
1 I
i 1
l I
1 l 653.0 l
l l
l 1
l (1)
(2)
(3)
(4)
F - FORCED REASON METHOD EIHIBIT C - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EIPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - HAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - ARTonATIC SCRAR.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EIPLAIN)
FILE (NUR EG-0161)
E - OPER& TOR TRAINING + LICENSE EIAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EIPLAIN)
H - OTHER (EIPLAIN)
EIBIBIT I - SAME SOURCE wI
- - - - - - -