o 9
$D ~ t/O O
~
%)/
e, v Q.
COAL
~
i );j ',,
(
Carolina Power & Light Company U8 M
cmc.m ?.=::x2:r m r:C'rl 't:2 40'S5 P. O. Box 101, New 11i11, N. C. 275G2 September 23,1983 Mr. James P. O'Iteilly NltC-120 United States Nuclear Itegulatory Commission Itegion 11 101 Marietta Street, Northwest (Suite 2900)
Atlanta, Georgia 30303 CAllOLINA POWElt & LIGilT COMPANY SiiEAllON liAltitlS NUCLEAll POWEll PLANT 1986 900,000 KW - UNITS 1 & 2 WELDING DEFICIENCIES IN CLASS lE AUXILIAltY CONTitOL PANEL, PUltCIIASE OltDElt NY-435190, ITEM 125
Dear Mr. O'Iteilly:
Attached is our third interim report on the subject item which was deemed reportable per the - ovisions of 10CFil50.55(e) on April 26,1983. CP&L is pursuing this matter, and it is currently projected that corrective action and submission of the final report will be accomplished by December 15,1983.
Thank you for your consideration in this matter.
Yours very truly, 9??
c f : Ja
- 11. M. Parsons Project General Manager Shearon liarris Nuclear Power Plant itMP/sh Attachment ec:
Messrs. G. Maxwell /It. Prevatte (NitC-SIINPP)
Mr.11. C. DeYoung (NitC) 1 ON VysciM'C L
O 6 5Y 8309300342 030923 th PDR ADDCK 05000400 S
\\
l l
I CAROLINA POWER 6 LIGHT COMPANY SIIEARON llARRIS NUCLEAR POWER PLANT UNIT NO. 1 INTERIM REPORT NO. 3 AUXILIARY CONTROL PANEL ITEM No. 125 SEPTEMBER 22, 1983 REPORTABLE UNDER 10CFR50.55(e)
SUBJECT:
Shearon liarris Nuclear Power Plant Unit 1 10CFR50.55(e) reportable deficiency in the Auxiliary Control Panel supplied under Purchase Order NY-435190 ITEM:
St ruttural welding SUPPLIED BY:
Reliance Electric Company, Stone Mountain, Georgia NATURE OF DEFICIENCY:
The subject Unit i equipment has been received at the site.
Several welding deficiencies were noted when the equipment was inspected as compared to the vendor drawings.
DATE PROBLEM OCCURRED:
The problem was identified during receipt inspection on March 17, 1983.
DATE PROBLEM REPORTED:
On April 1, 1983, CP&L (Mr. K. V. Hate') notified the NRC (Mr. A. Hardin) that this item was potentially reportable
(
under 10CFR50.55(e).
On April 26, 1983, CP&L (Mr. N. J. Chiangi) notified the NRC (Mr. A. Ibrdin) that this item was reportable under 10CFR50.55(e).
SCOPE OF Ph0BLEM:
The equipment was manufactured in three (3) sections.
It will be bolted together and installed as a single unit.
Deficient welds were identified in each section; eight (8) welds, total.
SAFETY IMPLICATIONS: Seismic qualification of the subject panel is required to assure structural integrity during a seismic event.
Safety-related components are located in the cabinet; thus, structural failure would jeopardize operation of the safety-related equipment.
REASON DEFICIENCY IS REPORTABLE: Welding inspection at the site was done using the vendor's QA manual (QCP 5.3).
Deficient welds did not adhere to the manual.
I
CORRECTIVE ACTION:
CP&L originated a Field Change Request (FCR-AS-2879) to have the welds repaired by site personnel.
The welds have been repaired.
The vendor has been given a copy of the weld deficiency report, the rework done, and has been requested to provide comment and an analysis.
CP&L letter with this information and request is 110-83158 dated May 9, 1983.
PREVENTATIVE ACTION:
The vendor has been instructed to rigorously follow his QA manual for Unit 2 equipment.
FINAL REPORT:
In our July 25, 1983 interim report, we projected the vendor to be complete with their analysis by August 31, 1983 and a final report issued by September 23, 1983.
Since this report, the vendor's external analyst facility has requested additional information for completion of the analysis.
Completion is now scheduled for November 16, 1983.
A final report will be issued af ter CP&L review.
Scheduled report date is December 15, 1983.
.