Text

- - -

NUREG-0580 Vol.12, No. 8 i

REGULATORY LICENSING STATUS

SUMMARY

REPORT l

NUCLEAR POWER PLANTS DATA FOR DECISIONS LBLUE BOOK?

AUGUST 1 - AUGUST 31,1983 1,

UNITED STATES NUCLEAR REGULATORY COMMISSION p m, khk) u l

~"~

l l

w W

E 4

W WO EO N

4M WW 4

WO p

D ZMN k

won E

WLo OZ gyn a

Ewe O

wao DOO O

O4N r

O O

N HW gg

~a o

OO 04 m

M OZ WOO E

A MO s1 Ee ZJ og.

Om W e OZ ggo a W MO O

MO m

J WW L

DW ~

4

<t Z Q-I ZZ a m y

Z OA g

g OWO "U

OEW m

4 o

ZZH oc L

WWO WMZ M

q O

PEZ Iww N

ZZM EE o

HMZ 00 p I mwm y

NWW mad Z

W>#

OA3 LO3 3

g4 DO O

pa O

NH g

E4 g

4 4

W>

NUREG-0580 Vol.12, No.8 REGULATORY LICENSING STATUS

SUMMARY

REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOK)

AUGUST 1 - AUGUST 31,1983 d

5'te $'oSilEefTe'p'teNe'I'f9 3 Prepared for. OFFICE OF NUCLEAR REACTOR REGULATION U.. NUC GU TORY M SiON WASHINGTON, D.C. 20555 y' ~s.,,

Y

F0REWDRD THIS MANAGEMENT REPORT, REGUL ATOPY LICENSING ST Alc3

SUMMARY

REPORT, IS DESIGNED TO PROVIDE THE NECESSARY INFORMATION FOR CONTROLLING THE PROGRESS OF REVIEW PROCESSES FOR CENTRAL STATION NUCLEAR REACTOR APPLICATIONS. IT UTILIZES DATA COLLECTED FROM THE OFFICE OF NUCLEAR REACTOR REGULATION, OFFICE OF THE EXECUTIVE LEGAL DIRECTOR, 0FFICE OF INSPECTION 8 ENFORCEMENT, AND THE N4TIONAL LABORATORIES, AND ANALYZED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE IMPLEMENTATION OF THE REGULATORY INFORMATION SYSTEM.

SECTION I 0F THIS EDITION CONSISTS OF THE THREE

SUMMARY

OF ACCOMPLISHMENTS, THE NEW APPLICATION FORECAST FOR OL'S AND CP'S, AND AN ABBREVIATION KEY.

SECTION II REPRESENTS THE MAIN BouY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATION. ALL OL'S ARE LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGN REVIEWS, OTHER REVIEWS, AND FINALLY, A NON-POWER REACTOR

SUMMARY

EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTONES IN THE REVIEW.

LICEN$ING 0F MUCLEAR REACT 0RS THE U.S. NUCLEAR REGULATORY COMMISSION REQUIRES TWO SEPARATE LICENSES - ONE TO BUILD THE FACILITY AND ANOTHER

)

TO OPERATE IT.

LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND DPERATING l

LICENSE.

l

.nE UTILITY SUBMITS A FORMAL APPLICATI0H DESCRIBING THE DESIGN, LOCATION, AND ENVIRONMENTAL IMPACT OF THE PROPOSED PLANT AND THE SAFEGUARDS TO BE PROVIDED. THE APPLICATI0H ALSO COVERS THE UTILITY'S FINANCIAL QUALIFICATIONS.

THE NRC MAKES COPIES OF THE APPLICATION AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM.

TECHNICAL EXPERTS ANALYSE THE APPLICATI0H, AND PREPARE A SAFETY EVALUATION AND AN ENVIRONMENTAL IMPACT STATEMENT. THESE DOCUMENTS ARE ALSO MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.

THE STAFF'S ANALYSIS IS SUBMITTED TO THE NRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS A COMMITTEE OF INDEPENDENT EXPERTS. ACRS STUDIES THE APPLICATI0H IN DETAIL AND HOLDS CONFERENCES WITH THE APPLICANT. THE LICENSING STAFF AND OTHERS.

THE ACRS FINDINGS ARE REPORTED TO THE NRC AND MADE PUBLIC.

l A PUBLIC HEARING IS HELD, USUALLY HEAR THE PROPOSED SITE, BY AH NRC APPOINTED ATOMIC SAFETY 8 LICENSING BOARD. PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS, AND COMMUNITY GROUPS MAY PARTICIPATE.

AFTER REVIEWING THE HEARING RECORD INCLUDING THE NRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAINST GRANTING A CONSTRUCTION PERMIT.

THE BOARD'S DECISION IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPE4L BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBER NUCLEAR REGUL ATORY COMMISSION.

IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTION PERMIT. THE DIRECTOR OF THE DIVISION OF LICENSING WILL ISSUE A CONSTRUCTION PERMIT. AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITA3LE BY THE NRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS. CONSTRUCTION IS SUBJECT TO INSPECTION BY THE OFFICE OF INSPECTION AND ENFORCEMENT.

AS CONSTRUCTION PROGRESSES, ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE NRC FOR AN OPERATING LICENSE. THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE NRC IN DECIDING WHETHER OR HOT TO ISSUE THE OPERATING LICENSE.

IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED. CONTRASTED WITH THE CONSTRUCTION PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED. FINAL ISSUANCE OF AN OPERATING PERMIT IS SUBJECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THE DIVISIDH OF LICENSING AND OF THE COMMISSION.

s

=

TABLE OF C0NTENTS PRINTED IN THE ORDER LISTED 5ECTION I

SUMMARY

OF ACCOMPLISNMENTS OL

SUMMARY

OF ACCOMPLISHMENTS CP

SUMMARY

OF ACCOMPLISHMENTS COMBINED NUMERICAL

SUMMARY

OF ACCOMPLISNMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICENSES IN THE NEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTION PERMITS IN THE NEXT FIVE YEARS NEW APPLICATION FORECAST OPERATING LICENSE REVIEWS SPECIAL REVIEWS COMMON ABBREVIATIONS USED WITHIN THE PUBLICATION SECfION II PROJECT INDEX OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS HON-POWER REACTORS SECTION III EXAMPLE REVIEW

1 Z

O M

H U

kJ r

P' OL SUMMA;RY 0F ACC0MPLISHMENTS AS OF AUGUST 31, 1983 AUGUST FISCAL YEr.2 TO DATE FACILITY 1CHEDULED ACTUAL FACILITY SCHEDULED ACTUAL SER 'S SER LIMERICK 1 &2 08/30/83 CATAWBA 1 82 02/06/83 02/09/83C LIMERICK 1 82 08/30/83 SEABROOK 1 82 01/12/83 03/07/83C

'SSER ' S SSER ' S DIABEG-ChHYOH 1 8 2

' 08/01/83 BYROM 1 82 12/10/82 01/31/83C LASALLE z '

08/17/83C CALLAWAY 1 06/28/83 06/28/83C SHOREHAM 08/30/83 CATAWBA 1 82 05/02/83 05/02/83C WOLF CREEK 1 08/26/83 08/26/83C CLINTON 1 82 05/20/83 05/27/83C COMANCHE PEAK 1 82 03/11/83C DIABLO-CANYON 1 82 08/01/83 ENRICO FERMI 2 02/04/83C GRAND GULF 1 42 05/31/83C LASALLE 2 07/00/83 08/17/83C MCGUIRE 1 82 02/14/83 02/28/83C MIDLAND 1 8 2 10/06/82 10/06/82C PALO VERDE 1,2,3 03/15/83 03/15/83C PEP.RY 1 82 12/29/82 01/19/83C PERRY 1 82 04/22/83 04/25/83C SEABROOK 1 8 2 03/07/83 04/29/83C SEABROOK 1 42 06/30/83 06/30/83C SHOREHAM 01/15/83 02/04/83C SHOREHAM 08/30/83 ST LUCIE 2 04/06/83 04/06/83C SUMMER 1 11/12/82 11/12/82C SUSQUEHANNA 1 03/01/83 SUSQUEHANNA 2 03/01/83 11/12/82C SUSQUEHANNA 2 03/31/83 03/29/83C WASHINGTON NUCLEAR 2 12/21/82 12/21/82C WASHINGTON NUCLEAR 2 05/20/83 05/20/83C WATERFORD 3 10/22/82 10/29/82C WATERFORD 3 02/28/83 07/08/83C i

WOLF CREEK 1 05/27/83 06/17/83C i

WOLF CREEK 1 08/26/83 08/26/83C DES ' S DES

'S NOME HARRIS 1 82 04/00/83 04/00/83C LIMERICK 1 82 06/24/83 06/24/83C l

l l

1Il jl l

\\

g s'

CC CCCC 32 3322 L

88 8888 A

//

////

U 78 7022 T

00 2111 C

' /

////

A 12 5611 01 0011

+

+

D e-E E

32 332 3 T

L 88 888 8 A

U

//

/// /

D D

78 702 8

E 00 211 0

O H

//

/// /

T C

12 561 5

S 01 001 0

R A

E Y

L s

A T

Ci s

N lf E

4

~.

D M

I T

2 E

H I

2 2

1 L

U S

I 8

A3 C

1 S

2 N ND I

A 1

1 F

K 5

E1AR L

AO EI HO BO I

RCREF P 3 WR IUEUR 6

S AB ULMQE M 9 TA G MST 1

AE S

CTUUA

'O CS MSSSW S

C 1

3 E

L C

T F

0 A S

,\\

UG

=

U i

F A 0 F N

O S

Y A L

R A

U A

T C

M A

M U

s S

J F

L

~

U L

D E

D H

C s

T S S

U G

U A

.m.

M D

Y T

E I

l L

U

\\*

I C

S g

A F

S

'A I

R E

S E

E W

M N

O O

S O

P W

M S

L L

E L

UF F

0 N

C CCC 3

332 L

8 888 A

/

///

U 1

200 T

1 023 C

/

///

A 3

552 4

001 D

E E

3 332 T

L 8

888 A

U

/

///

D D

1 200 E

1 023 O

H

/

///

T C

3 551 S

0 001 R

A E

Y S

L A

T C

S N

I F

2 E

8 1

D M

Y T

D E

H I

R L

R RRO U

5 I

E EEF C

V VVN S

I A

I IIA F

R RRH S

L

/

H S

HHT I

P 3 C

CCI 8

S N

NNG S

E S

E E

M 9 I

IIA M

M N

1 L

R LLK O

O S

O 0

C CCS H

H M

R E

S S

C 1

3 E

S E

E P

C T

S S

D F

C A S UG U

F A 0 F O

S Y A L

R A

U A

T C

M A

M U

D E

L U

P D

E C

H C

T S S

UG U

A D

Y T

E I

L U

I C

A F

S S

I S

E E

S E

S E

E M

M M

M M

O R

O O

O S

O N

N H

H N

R E

5 S

E E

E P

S D

F C

f

illllll

)

8_

A U

T2 1

6 3 2 0 2 C 4

0 C

2 A

D E

L EU TD3 1

6 3

2 0

2 O

4 0

A E

2 DH C

OS T

R A

E Y

S L

u T

A D D C

N S

)

)

E E 1

E 1

)

1 L

P

)

)

)

)

U U M

L P 0 C L P L P S S H

0 C

(

(

0 C 0 C S S S

(

(

S S

(

C

(

C I

I I

S S S S S S e

3 L

8 R R S S 9

P 1

R R E E S S S S M

E E

$ S E E E E L

P 1

0 3 S 5 5 S D D F F 0 C C T S

C U G

A U A

F F O L

A 0 S U

A T0 0

2 0 0

0 0

0 0

0 C

A Y

R A

M M

D U

E L

S UD1 0

3 0 0

0 0

0 0

0 E

H C

S N

D D T

S

)

)

E E U

G

)

)

L P

)

)

)

U U U

A L P 0 C L P L P S S 0 C C

C O C O C S S

(

(

S S C

C C

C I

I R

S S S S S S E

W R R S S O

P R R E E S S S 5 L

E E S S E E E E L P L

U S S S S D D F F O C F

N I

llll

LICFNSING SCNEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS OF 08/31/83 (INCLUDES SCHEDULES FOR ADDITIONAL UNITS WITH PROJECTED CONSTRUCTION COMPLETIDH IN CY 1983-1984)

(LISTED IN ORDER OF FACILITY NAME)

SER SSER l

EST.

STAFF TECH STAFF TECH ASLB COMMM APPL.

DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

CONST.

PLANT (MONTHS) Eli TO DL 1ER 11LQ EEi TO DL liiR OF HRG DECISLCli EAIE COMPL.

l BYROM 1 0

11/81C 01/82C 02/82C 03/82C 04/82C 08/82C Ot/83C 03/83C 11/83 11/83 12/83 CALLAWAY 1 0

09/81C 09/81C 10/81C 11/81C 01/82C 05/83C 06/83C 11/81C 12/83 03/84 04/84 CATAWBA 1 0

08/82C 01/83C 02/83C 03/83C 01/83C 04/83C 05/83C 10/83 05/84 05/84 05/84 COMANCHE PEAK 1 0

05/81C 07/81C 07/81C 11/81C 09/81C 10/83 11/83 12/81C 11/83 11/83 12/83 COMANCHE PEAK 2 0

05/81C 07/81C 07/81C 19/81C 09/8tC 10/83 11/84 12/81C 11/83 11/84 12/84 DIABLO CANYON 1 0

12/72C 01/75C 10/74C 07/76C 05/76C 06/83C 08/83 12/76C N/S 09/83 DIABLO CANYON 2 0

12/72C 01/75C 10/74C 07/76C 05/76C 06/83C N/S 12/76C N/S ENRICO FERMI 2 0

04/81C 05/77C 09/77C 08/81C 09/81C 01/83C 02/83C 03/82C 10/820 11/83 12/83 GRAND GULF 1 0

05/81C 08/81C 09/81C 10/81C 10/81C 03/83C 05/83C N/A N/A 10/85 06/82C LASALLE 2 0

03/78C 02/81C 03/81C 04/81C 11/78C 07/83C 08/83C N/A N/A 09/83 09/83 MIDLAND 2 0

02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 10/82C 11/82C 09/84 09/84 10/84 PALD VERDE 1 0

10/81C 10/81C 11/81C 12/81C 03/82C 09/83 09/83 04/82C 12/82C 04/84 05/84 PERRY 1 0

02/82C 05/82C 05/82C 07/82C 08/82C 10/83 11/83 05/83C 03/84 11/84 12/84 SAN ONOFRE 3 0

01/81C 01/81C 02/81C 02/8tc 04/81C 04/83C 06/82C 06/81C 05/82C 09/83 11/82C SEABROOK 1 0

05/82C 12/82C 03/83C 04/83C 12/82C M/S N/S 08/83C 06/84 88/84 09/84 SHORENAM 0

03/77C 03/81C 04/81C 10/81C 00/77C N/S 08/83 05/82C 09/83 02/84 03/84 SUSQUEHANNA 2 0

03/81C 03/81C 04/81C 08/81C 07/81C 02/83C 11/83 10/81C 04/82C 12/83 01/84 WASHINGTON NUCLEAR 2 0

07/81C 05/82C 03/82C 10/82C 12/81C 11/82C 05/83C N/A N/A 10/83 11/83 WATERFORD 3 0

05/81C 05/8*C 07/81C 08/8tc 49/81C 05/83C 07/83C 08/83C 05/83C 05/83 WATTS BAR 1 0

06/73C 06/82C 07/82C 08/82C 12/78C 09/82C 11/83 N/A N/A 12/83 01/84 WATTS BAR 2 0

06/73C 06/82C 07/82C 08/82C 12/78C 09/82C 06/84 N/A N/A 12/84 01/85 WOLF CREEK 1 0

01/82C 03/82C 04/82C 05/82C 06/82C 07/83C 08/83C 01/84 06/84 07/84 08/84 23MMER 1 0

10/76C 12/77C 01/79C 03/79C 06/77C 08/82C 08/82C 02/82C N/S 11/84 12/84 CLICENSING SCHEDULES AND DECISION DATES DO NOT REFLECT POTENTIh'e DELAY FROM EMERGENCY PREPAREDNESS REVIEW.

[

l l

[

LICENSIFG SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY 1984 ISSUE APPL. CONST.

E.Lfdd ligg COMPLETE BEAVER VALLEY 2 12/84 12/85 BELLEFONTE 1 12/84 05/85 BELLEFONTE 2 N/S 05/86 BRAIDWOOD 1 05/84 04/85 BRAIDWOOD 2 N/S 04/86 BYRCN 2 02/84 05/85 CATAWBA 2 N/S 10/86 CLINTON 1 05/83C 01/86 CLINTON 2 N/S GRAND GULF 2 N/S N/S HARRIS 1 04/84 06/85 HARRIS 2 N/S 06/89 HOPE CREEK 1 02/85 01/86 LIMERICK 1 10/83 08/84 LIMERICK 2 N/S 04/88 MARBLE HILL 1 04/85 06/86 MARBLE HILL 2 N/S 12'87 MIDLAND 1 11/83 02/85 MILLSTONE 3 11/84 11/85 NINE MILE POINT 2 01/85 02/86 PALO VERDE 2 12/84 02/85 PALO VERDE 3 03/86 05/66 PERRY 2 N/S 05/87 RIVER BEND 1 05/84 04/85 RIVER BEND 2 N/S SEABROOK 2 N/3 12/86 SOUTH TEXAS 1 01/86 12/86 SOUTH TEXAS 2 N/S 12/88 V0GTLE 1 08/85 09/86 V0GTLE 2 03/88 WASHINGTON NUCLEAR 1 N/S N/S WASHINGTON NUCLEAR 3 12/84 12/85

LICENSING SCHEDULES FOR ALL PENDING CP APPLICATIONS REPORT AS OFr 08/3f/83 (LISTED IN ORDER OF FACILITY NAME)

SER SSER STAFF TECH STAFF TECH ASLO COMM ISSUE IMPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

PLANT RE1 TO DL 1ER ELIS m

TO DL 131R OF HRG DECISION DAIE CLINCH RIVER 02/76C 02/83C 03/83C 04/83C 02/77C 04/83C 05/83C 08/82C 04/84 06/84 SKAGIT/NANFORD 182 05/82C 07/77C 08/77C 02/83C N/S 11/82C 12/82C N/S N/S M/S IP P

e

=

HEW APPLICATION F 0 R E C A 5 T --- O P E R A T I H G LICEH$E REVIEWS (ANTICIPATED TENDER DATES FOR ALL UNITS WITH CONSTRUCTION PERMITS)

AS OF WEEK ENDING: 08/31/83

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _. _ _ -====

_________________________==-_______._____________......._.-_......._________-

-____--__ =

LICENSING APPL.

APPt.

1ST UNIT DOCKET PROJECT SUBMITS SUBMITS CONST.

FACILITY HUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL

._--_==

___

FYG3 MILLSTONE 5 050-00423 NORTHEAST HUCLEAR ENERGY E.DOOLITTLE 10/29/82C 10/29/82C 11/01/85 M.ROTHSCHILD MARBLE HILL 1 &2 054680547 PUBLIC SERVICE OF INDIANA P,0 CONNOR 11/23/82C 11/23/82C 06/00/86 E.CNEN BEAVER VALLEY 2 050-004tc NIQUESNE LIGHT L.LAZO 01/26/83C 01/26/83C 12/31/85 R.PALLA HINE MILE POINT 2 050-20410 HIA9 ARA MOHAWK POWER M.NAUGHEY 01/31/83C 01/31/83C 02/00/86 B.50RDENICK HOPE CtEEK !

05F 00354 PUBLTC SERVICE ELECTRIC & GAS D. WAGNER 03/02/83C 03/02/83C 01/14/86 R. GODDARD

____ _ - =..=.

-..24-0425 GEORG!A POWER M. MILLER 06/30/83C 09/00/83 09/00/86 B.BORDENICK V0GTLE 1 &2 G

_-_______=

____=

_ _ =

1 1

1 m

.m.

.___-..._.....m

_...m._

J NEW APPLICATION FORECAST-SPECIAL REVIEW AS OF WEEK ENDING: 08/31/83 STAMDARDIZATION REVIEW 5 PROJ PROJECT TENDER PROJECT 1 APPLICANT MANAGER DATE (NSS)WAPWR 668 WESTINGHOUSE G.MEYER 89/30/83 7

I 4

T 4

I Y

f L

t

C0MM0N ABBREVIATIONS USED WITHIN THE PUBLICATION ACRS ADb!SORY COMMITTEE ON REACTOR SAFEGUARDS L.A.:

LICENSING ASSISTANT AE ARCHITECT / ENGINEER LESRs LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)

AEB ACCIDENT EVALUATION BRANCH LGR LICENSING GUIDANCE BRANCH ASB AUXILIARY SYSTEMS BRANCH LMFBR: LIQUID METAL FAST BREEDER REACTOR ASLB ATOMIC SAFETY LICENSING BOARD LQB LICENSEE QUALIFICATIONS BRANCH 882 BURNS 8 ROE MEB MECHANICAL ENGINEERING BRANCH 58V:

BLACK 8 VEACH MPA:

MANAGEMENT AND PROGRAM ANALYSIS 88W:

BABC0CK & WILCOX MTEB MATERIALS ENGINEERING BRANCH BECHz. BECHTEL MWE MEGAWATTS ELECTRIC BRRT: BROWN & ROOT MWT MEGAWATTS THERMAL BWR BOILING WATER REACTOR NSSS: MUCLEAR STEAM SYSTEMS SUPPLIER CEB CHEMICAL ENGINEERING BRANCH 0 ?.

  • OPERATING LICENSE COMB C0i18USTION ENGINEERING GLB OPERATOR LICENSING BRANCH CP:

CONSTRUCTION PERMIT OPS:

OFFSHORE POWER SYSTEMS CPB CORE PERFORMANCE BRANCH CSB CONTAINMENT SYSTEMS BRANCH CWE COMMONWEALTH EDISON PDA PRELIMINARY DESIGN APPROVAL PG8E8 PACIFIC GAS 8 ELECTRIC DES:

DRAFT ENVIRONMENTAL STATEMENT PID:

PARTIAL INITIAL DECISION PM:

PROJECT MANAGER PS:

POWER SYSTEMS BRANCH EEB ENVIRONMENTAL ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:

ENVIRONMENTAL PROTECTION AGENCY PTRS: PROCEDURES AND TEST REVIEW BRANCH EPLB EMERGENCY PREPAREDNESS LICENSING BRANCH PWR PRESSURIZED WATER REACTOR ER:

ENVIRONMENTAL REPORT EQB EQUIPMENT QUALIFICATION BRANCH ESR EARLY SITE REVIEW QAB QUALITY ASSURANCF BRANCH ETSB EFFLUENT TREATMENT SYSTEMS BRANCH RAB RADIOLOGICAL ASSESSMENT BRANCH F.R.:

FEDERAL REGISTAR RSB REACTOR SYSTEMS BRANCH

(

FDA FINAL DESIGN APPROVAL l

FES:

FINAL ENVIRONMENTAL STATEMENT l

FSAR FINAL SAFETY ANALYSIS REPORT S8L SARGENT & LUNDY S8We STONE 8 WEBSTER SAB SITING ANALYSIS BRANCH G8H GIBBS & HILL SAR:

SAFETY ANALYSIS REPORT GHDRs GIBBS & HILL SDA:

STANDARD DESIGN APPROVAL GIL:

GILBERT COMMOMWEALTH SES:

STRUCTURAL ENGINEERING BRANCH GSB GEOSCIENCES BRANCH SER SAFETY EVALUATION REPORT SIB SYSTEMS INTERACTION BRANCH SP SPECIAL PROJECT HGB HYDROLOGIC AND GEOTECHNICAL BRANCH SSC:

SOUTHERN SERVICES COMPANY HTGR HIGH TEMPERATURE GAS COOLED REACTOR

$$ER: SUPPLEMENT TO SAFETY EVALUATION TVA TENNESSEE VALLEY AUTHORITY ICBr INSTRUMENTATION AND CONTROL BRANCH UEC UNITED ENG. t CONSTRUCTORS UFB UTILITY FINANCE BRANCH WEST: WESTINGHOUSE

M M

Z O

M

>=

0 W

W l

l t

~

PR0 JECT INDEX SECTION II OPERATING LICENSE EVIEW CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS 2-1 BEAVER VALLEY 2 2-36 CLINCH RIVER 2-38 (NSS)CESSAR SYSTEM 80 2-2 BELLEFONTE 1 82 2-37 SKAGIT/HANFORD 182 2-39 (NSS)GESSAR SEVERE ACC 2-3 BRAIDWOOD 1 82 2-4 BYRON 1 82 2-5 CALLAWAY 1 2-6 CATAWBA 1 82 2-7 CLINTON 1 82 2-8 COMANCHE PEAK 1 82 2-9 DIABLO-CANYOH 1 82 2-10 ENRICO FERMI 2 2-11 GRAND GULF 1 8 2' 2-12 HARRIS 1 82 2-13 HOPE CREEK 1 2-14 LASALLE 2 2-15 LIMERICK 1 82 2-16 MARBLE HILL 1 82 2-17 MIDLAND 1 82 2-18 MILLSTONE 3 2-19 NINE MILE POINT 2 2-20 PALO VERDE 1,2,3 2-21 PERRY 1 82 2-22 RIVER BEND 1 82 2-25 SAN ONOFRE 3 2-24 SEABROOK 1 82 2-25 SHOREHAM 2-26 SOUTH TEXAS 182 2-27 SUSQUEHANNA 2 2-28 V0GTLE 1 82 2-29 WASHINGTON NUCLEAR 1 2-30 WASHINGTON NUCLEAR 2 2-31 WASHINGTON NUCLEAR 3 2-32 WATERFORD 3 2-33 WATTS BAR 182 2-34 WOLF CREEK 1 2-35 ZIMMER 1 s

NRR LICENSING SYSTEM PAGE NO: 2-1 BEAVER VALLEY 2 0L CURRENT STATUS REPORT REPORT AS OF: 08/31/83 PLANT C H A R A C T E R I S T I C 5:

KEY PERS0NNELa DOCKET NO:

05000412 LIC. PM:

L. LAZO ASLB CHAIR N/A APPLICANT:

DUQUESNE LIGNT LIC. BC:

G. KNIGHTON MEMBER 1:

LOCATION:

5 MI E OF E. LIVERPOOL, OH LIC. LA.:

E. HYLTON MEMBER 2:

REGION:

1 AE2 S8W COUNSEL:

R. PALLA CONST. INSP S. FOLSON REAC. TYPE: PWR NSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP DESIGN PWR: 2774 MWT/0852 MWE CONST S8W RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The FSAR was tendered on 01-26-83.

The SAR was docketed on 05/18/83.

ER DOCKETED:

05/18/83 05/18/83C ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

05/25/84 ISSUE DES:

07/27/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

12/31/84 CURRENT ENV. STATUS:

The ER was tendered on 01-26-83.

The ER was docketed on 05/18/83.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

01/26/83 01/26/83C SAR DOCKETED:

05/18/83 05/18/83C SAR Q'S RECEIVED BY PM:

09/30/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 10/28/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/31/84 Opportunity for Hearing was published in the Federal ISSUE DRAFT SER:

02/24/84 Register on June 1,

1983.

INPUT TO SER:

07/27/84 ISSUE SER:

09/28/84 ACRS FULL COMMITTEE MEETING 10/31/84 INPUTS TO SE SUPPLEMENT 18 11/00/84 ISSUE SE SUPPLEMENT 1 12/31/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

The information for antitrust review of operating HEARING STARTED:

05/31/85 license application was tendered 12/15/82.

ASLB INITIAL DECISION:

11/29/85 COMMISSION EFFECTIVEMESS DECISION: 11/00/85 TECH SPECS COMPLETED:

COMMISSION DECISIDH 12/00/85 ISSUE LIC. WITH POWER RESTRICTIDH LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION CUMPLETION - APPL.:

12/31/85 07/30/82

nK K L ICENSING SYSTEM PAGE NO: 2-2 BELLEFONTE 1 82 0L CURRENT STATUS REPORT REPORT AS OF 08/31/83 PLANT CHARACTERI*TICSt KEY PERS0NNEL:

DOCKET NO:

043880439 LIC. PM:

M. THADANI ASLB CHAIR: N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM MEMBER 1:

N/A l

LOCATION:

6 MI NE OF SCOTTSBORD, ALA LIC. LA.:

M.

DUNCAN MEMBER 2:

N/A l

REGION:

2 AE:

TVA COUNSEL:

B. PATON CONST. INSP R. CRLENJAK REAC. TYPE: PWR NSSS: B3W ANTITRUST:

J. RUTBERG RESID. INSP: J. WILCOX DESIGN PWR 3760 MWT/1235 MWE CONST: TVA RM ANALYST:

B. ST MARY ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

As a result of applicant's construction celay, the staff review schedule has been delayed and the applicant has ER DOCKETED:

06/12/78 06/12/78C revised the fuel loading to 05/85.

The staff evaluated ER SITE VISIT COMPLETES-02/20/82 06/17/82C the impacts of this delay on the safety and environmental INPUT TO DES TO PM:

11/04/83 review schedules and issued new schedule on 01/25/83.

ISSUE DES:

12/16/83 RESPONSE TO COMMENTS ON DES:

03/05/84 ISSUE FES:

05/18/84 CURRENT ENV. STATUS:

As a result of appilcant's construction delay, the environ-mental review schedule was re-evaluated and revised as SAFETY / NEARING MILESTONES:

indicated in the environmental milestones. The environmental APPLICATION TENDERED:

02/03/78 02/03/78C site visit was completed on 6/17/82.

SAR DOCKETED:

06/12/78C SAR Q'S RECEIVED BY PM:

07/03/80 11/01/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/02/83 INPUT TO DRAFT SER TO PM:

01/20/84 CURRENT HRG. STATUS:

ISSUE DRAFT SER:

03/16/84 No hearing is anticipated.

INPUT TO SER:

06/15/84 ISSUE SER:

08/17/84 ACRS FULL COMMITTEE MEETING:

09/28/84 INPUTS TO SE SUPPLEMENT 1 10/05/84 ISSUE SE SUPPLEMENT 1:

12/14/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST NEARING STARTED:

N/A Pending determination ASLB INITIAL DECISIGH N/A COMMISSION EFFECTIVENESS DECISIGHz TECH SPECS COMPLETED:

02/01/85 COMMISSION DECISIDH:

04/15/85 ISSUE LIC. WITH POWER RESTRICTIDM:

ISSUE FULL POWER LICENSE AMEND:

05/00/85 LATEST AMENDMENT:

No.'23 (12/17/82).

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

On 07/06/82 TVA revised fuel load date to 5/85.

Staff CONSTRUCTION COMPLETION - APPL.:

05/00/85 07/06/82 evaluated impact on safety and environmental review schedules and issued new schedule on 01/25/83.

NRR LICENSING SYSTEM PAGE NO: 2-3 BRAIDWOOD 182 0L CURRENT STATUS REPORT REPORT AS OF: 08/3'/83 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

045680457 LIC. PM:

J. STEVENS ASLB CHAIR:

M. MILLER APPLICANT:

COMMONWEALTH EDISON LIC. BC:

J. YOUNGBLOOD MEMBER la R. COLE LOCATION:

24 MI SSW OF JOLIET. ILL LIC. LA.:

M. RUSHBROOK MEMBER 2:

D. CALLIHAN REGION:

3 AE 58L COUNSEL:

D. HASSELL CONST. INSPt J. NEISLER REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP: L. MCGREGOR DESIGN PWR 3425 MWT/1120 MWE CONST: CWE RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Draf t SER was issued on July 15, 1983.

ER DOCKETED:

11/30/78C ER SITE VISIT COMPLETE:

05/31/83 05/05/83C INPUT TO DES TO PM:

11/01/83 ISSUE DES:

01/01/84 RESPONSE TO COMMENTS ON DES:

04/15/84 ISSUE FES:

06/00/84 CURRENT ENV. STATUS:

Site visit was conducted during May, 1983.

Amendment 2 to ER submitted during June, 1983.

Public meeting scheduled SAFETY / HEARING MILESTONES:

during August, 1983.

APPLICATION TENDERED:

06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:

12/31/82 12/31/82C SAR APPL. RESPONSE 70 Q'S RECEIVED: 03/01/83 05/06/83C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

05/01/83 06/15/83C Opportunity for Hearing was published in the Federal ISSUE DRAFT SER:

07/15/83 07/15/83C Register on 06/13/79. There will be a contested hearing.

INPUT TO SER:

11/01/83 ISSUE SER:

12/01/83 ACRS FULL COMMITTEE MEETING:

01/00/84 INPUTS TO SE SUPPLEMENT 18 04/01/84 ISSUE SE SUPPLEMENT 12 05/00/84 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

-Appilcant has submitted antitrust information pursuant to HEARING STARTED:

It 00/84 Reg. Guide 9.3.

ASLB INITIAL DECISIDH 03/00/85 COMMISSION EFFECTIVENESS DECISION: 04/00/85 TECH SPECS COMPLETED:

04/00/85 COMMISSION DECISION:

04/00/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

04/00/85 FSAR Amendment No. 42 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

CONSTRUCTION COMPLETION - APPL.:

04/00/85 04/14/82

~ _..

-- -. ~ - _ _

NRR LICENSING SYSTEM PAGE NO: 2-4 BYROM 1 82 0L CURRENT STATUS REPORT REPORT AS OF 08/31/83 i

PLANT CHARACTiRI$ TIC 5:

KEY P E R S 0 N N E La DOCKET NO:

045480455 -

LIC. PM:

L. OLSHAN ASLB CHAIR:

I. SMITH APPLICANT:

COMMONWEALTH EDISDN LIC. BC:

J. YOUNOBLOOD MEMBER 1 R. COLE LOCATION:

17 MI SW OF ROCKFORD, ILL LIC. LA.:

M. RUSHBROOK MEMBER 2:

D. CALLIHAN REGION:

3 AE:

S8L COUNSEL:

S. GOLDBERG CONST. INSP M. RING REAC. TYPE: PWR HSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP: W. FORNEY DESIGN PWR 3425 MWT/1120 MWE CONST CWE RM ANALYST S. HEDLUND i

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER and Supplements 1 and 2 have been issued. Several outstanding and confirmatory issues remain to be ER DOCKETED:

11/30/78C resolved prior to licensing.

ER SITE VISIT COMPLETE:

05/31/81 05/31/81C INPUT TO DES TO PM:

08/15/81 08/15/81C l

ISSUE DES:

11/05/81 11/05/81C i

RESPONSE TO COMMENTS ON DES:

03/01/82 03/01/82C ISSUE FES:

04/05/82 04/05/82C

{

r CURRENT ENV.' STATUS:

Environmental review completed and FES (NUREG-0848) pubitshed in April 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:

08/15/81 08/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/15/81 10/15/81C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/07/81 11/07/81C t

-Hearing began March 1, 1983.

Hearing concluded on ISSUE DRAFT SER:

August 12, 1983.

INPUT TO SER:

01/07/82 01/07/82C ISSUE SER:

02/07/82 02/07/82C ACRS LETTER RECEIVED:

03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 28 08/20/82 08/20/82C ISSUE SE SUPPLEMENT 2 12/10/82 01/31/83C FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

i Appilcant has submitted antitrust information pursuant HEARING STARTED:

03/08/83 03/01/83C to Reg. Guide 9.3.

ASLB INITIAL DECISION:

11/08/83 COMMISSION EFFECTIVENESS DECISION: 11/00/83 TECH SPECS COMPLETED:

11/00/83 COMMISSION DECISION:

11/00/83 ISSUE LIC. WITN POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/08/83 l

FSAR - Amendment 42 ER - Amendment 4 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

12/08/83 06/21/83 F

l L

t

[

I L

HRR LICENSING SYSTEM PAGE NO: 2-5 CALLAWAY 1 0L CURRENT

. STATUS REPORT REPORT AS OF 08/31/83 PLAHT CHARACTERI5TICSt AEY PERS0NNELa DOCKET HO:

05000483 LIC. PM:

G. EDISON ASLB CHAIR:

J. GLEASON APPLICANT:

UNION ELECTRIC LIC. EC B. YOUNGBLOOD MEMBER 1:

G.

BRIGHT LOCATION:

10 MI SE OF FULTON, M0 LIC. LA.:

M. RUSHBROOK MEMBER 28 J. KLINE REGIDH:

3 AE:

BECH COUNSEL:

B. PERLESS CUNST. INSP: J. KONKLIN REAC. TYPE: PWR HSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP J. HEISLER DESIGH PWR: 3425 MWT/1188 MWE CONST DANIEL RM ANALYST:

5. HEDLUND CURRENT SAF. STATUS:

EHVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SAR was docketed 08/08/80. The SER was issued by HRC on 10/07/81 and the SER Supplement No. 1 was issued on ER DOCKETED:

12/12/80 12/12/80C 01/15/82. SSER 2 was issued 6/28/83.

ER SITE VISIT COMPLETE:

12/00/81 12/00/81C INPUT TO DES TD PM:

08/01/81 08/01/81C ISSUE DES:

09/29/81 09/29/81C RESPONSE TO COMMENIS ON DES:

12/01/81 12/01/81C ISSUE FES:

01/29/82 01/29/82C CURRENT ENV. STATUS:

ER was docketed 12/12/80. The DES was issued by HRC on 09/29/81 and the FES was issued on 01/29/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/25/79 10/25/79C SAR DOCKETED:

08/08/80 08/08/80C SAR Q'S RECEIVED BY PM:

12/18/80 12/18/80C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/81C CURRENT HRG. STATUS:

INPUT TD DRAFT SER TO PM:

Hearings were held on limited issues during November 1981 ISSUE DRAFT SER:

N/A A decision on these limited issues was rendered by the INPUT TO SER:

09/11/81 09/11/81C licensing board on 12/13/82. Joint intervenors have ISSUE SER:

10/07/81 10/07/81C appealed the initial decision. Oral arguments on the appeal were made on 6/22/83. The hearing on the one ACRS LETTER RECEIVED:

11/19/81 11/19/81C remaining contention, emergency preparedness, is scheduled INPUTS TO SE SUPPLEMENT 28 04/01/83 05/01/83C for 9/13/83.

ISSUE SE SUPPLEMENT 22 06/28/83 06/28/83C FEMA LETTER RECEIVED:

11/00/83 CURRENT ANTITRUST:

OL revied is in progress.

HEARING STARTED:

11/17/81 11/17/81C ASLB INITIAL DECISICH:

12/00/83 COMMISSION EFFECTIVENESS DECISION: 01/00/84 TECH SPECS COMPLETED:

02/00/84 COMMISSION DECISION:

03/00/84 ISSUE LIC. WITH POWER RESTRICTIDH 04/00/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

07/00/84 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

The Caseload Forecast Panel is reviewing construction CONSTRUCTION COMPLETION - APPL.:

04/00/44 08/23/82 progress in order to make a new construction completion schedule estimate. An April 1984 estimate is based on the anolicant's fuel load date.

NRR LICEH$ING SY$ TEM PAGE HO: 2-6 CATAWBA 1 &2 0L CURRENT STATUS REPORT REPORT AS OF 08/31/83 PLAMT C H A R A C T E R I S T I C S:

K,E Y PERSONNEL:

DOCKET h0 041380414 LIC. PM:

K. JABBOUR ASLB CHAIR:

J. KELLEY APPLICANT:

DUKE POWER LIC. BC:

E. ADENSAM MEMBER 1:

D. CALLIHAN LOCATION:

6 MI HNW OF ROCK HILL, 3C LIC. LA.:

M.

DUNCAN MEMBER 2:

R. FOSTER REGION:

2 AE2 DUKE COUNSEL:

G. JOHNSON CONST. INSP P. VAND00RH REAC. TYPE: PWR NS$$: WEST ANTITRUST B. V0GLER RESID. INSPs P. VAND00RN DESIGN PWR: 3582 MWT/1145 MWE CONST DUKE RM AHALYST:

L. LANIER ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SER was issued on February 9, 1983.

SSER 81 was issued on May 2, 1983.

ER DOCKETED:

06/11/81 0 6 /11.~81 C ER SITE VISIT COMPLETE:

10/15/81 10/15/81C INPUT TO DES TO PM:

06/25/82 07/29/82C ISSUE DES:

08/05/82 08/11/82C RESPONSE TO COMMENTS ON DES:

11/30/82 11/30/82C ISSUE FES:

01/07/83 01/07/83C CURRENT ENV. STATUS:

r DES was issued on 08/11/82. FES was issued on SAFETY / HEARING MILESTONES:

1/7/83.

APPLICATION TENDERED:

03/26/79 03/26/79C SAR DOCKETED:

06/11/81 06/11/81C SAR Q'S RECEIVED BY PM:

12/15/81 12/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/10/82 12/10/82C INPUT TO DRAFT SER TO PM:

07/02/82 12/30/82C l

CURRENT HRG. STATUS:

Combined hearing anticipated to start 10/83.

ISSUE DRAFT SER:

11/19/82 11/19/82C INPUT TO SER:

01/09/83 01/19/83C ISSUE SER:

02/06/83 02/09/83C ACRS LETTER RECEIVED:

03/18/83 03/18/83C INPUTS TO SE SUPPLEMENT 18 04/12/83 04/12/83C ISSUE SE SUPPLEMENT 18 05/02/83 05/02/83C FEMA LETTER RECEIVED:

09/15/83 CURRENT ANTITRUST:

Operating license antitrust review is in progress.

HEARING STARTED:

10/00/83 ASLB INITIAL DECISION.

05/00/84 COMMISSION EFFECTIVENESS DECISION: 05/00/84 TECH SPECS COMPLETED:

05/00/84 l

COMMISSIDH DECISION

  • 05/00/84 ISSUE LIC. WITH POWER RESTRICTIUH ISSUE FULL POWER LICENSE AMEND 8 05/00/84 LATEST AMENDMENT:

Revision 7 dated 02/22/83.

SCHED. DATE RECEIPT DATE 1

CP Amend. Issued 12/23/80 indicating change in ownership.

CONSTRUCTION COMPLETION - APPL.:

05/00/84 05/00/82 CEW SLIPS / MOTES:

l

NRR LICENSING SYSTEM PAGE NO: 2-7 CLINTON 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF: 08/31/83 PLANT CHARACTERI$TICSt KEY PERSONNEL DOCKET NO:

046180462 LIC. PM:

H. ABELSON ASLB CHAIR:

H. CLARK APPLICANT:

ILLINDIS POWER LIC. BC:

A. SCHWENCER MEMBER 1 G. FERGUSON LOCATION:

6 MI E OF CLINTON, ILL LIC. LA.:

E. NYLTON MEMBER 28

0. PARIS REGIDH:

3 AE S8L COUNSEL:

R. GODDARD CONST. INSP F. JABLONSKI REAC. TYPE: BWR HSSS: GE ANTITRUST B. V0GLER RESID. INSP: H. LIVERMORE DESIGN PWR 2894 MWT/0950 MWE CONST: BALDWIN RM ANALYST B. ST 11ARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR was docketed 09/08/80. SER was issued 02/17/82.

Supplement No. 1 was issued 07/22/82. SSER Ho. 2 was ER DOCKETED:

03/01/81 09/08/80C issued in May 1983.

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM 12/08/81 12/08/81C ISSUE DES:

12/18/81 12/28/81C RESPONSE TO COMMENTS ON DES:

02/22/82 03/25/82C ISSUE FES:

05/20/82 05/20/82C CURRENT ENV. STATUS:

The draft environmental statement was completed December 1981.

The FES was completed May 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/01/79 12/01/79C SAR DOCKETED:

09/08/80 39/08/80C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

A third prehearing conference was held June 2, 1983.

Five ISSUE CRAFT SER:

contentions are admitted. Hearing entimated to start in INPUT TO SER:

12/05/81 12/05/31C late 1983 or early 1984.

Awaiting Board order.

ISSUE SER:

01/05/82 02/17/82C ACRS LETTER RECEIVED:

02/12/82 03/09/82C INPUTS TO SE SUPPLEMENT 28 06/30/82 06/30/82C ISSUE SE SUPPLEMENT 2 05/20/83 05/27/83C FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Operating license antitrust review completed HEARING STARTED:

12/00/83 March 18, 1982 (SECY-82-120).

ASLB INITIAL DECISIGH:

N/S COMMISSIDH EFFECTIVENESS DECISION: 01/00/84 TECH SPECS COMPLETED:

11/00/85 COMMISSIDH DECISION:

12/00/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

04/00/86 FSAR Amendment 926, 07/83.

SCHED. DATE RECEIPT DATE CEW SLIPS / MOTES:

A two year slip in fuel load date to 1/86 was announced by CONSTRUCTION COMPLETION - APPL.:

01/00/86 05/24/83 IPC on 05/24/83.

l l

NRR LICEN5ING SYSTEM PAGE NO: 2-8 CDMANCHE PEAK 1 82 0L CURRENT STATUS REPORT REPOR7 AS OF 08/31/83 PLAN 1 CHARACTERI$ TICS:

KEY PERSONWELa DOCKET NO:

044580446 LIC. PM:

S. BURWELL ASLB CHAIR P. BLOCH APPLICANT:

TEXAS UTILITIES GENERATING LIC. BC:

B. YOUNGBLOOD MEMBER 1 W. JORDAN LOCATION:

4 MI N OF GLEN ROSE, TEX LIC. LA.:

M. RUSHBROCK MEMBER 2 K. MCCOLLOM REGIDH 4

AE:

G8H COUNSEL:

M. ROTHSCHILD CONST. INSP R. TAYLOR REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSF: D. KELLEY DESIGN PWR 3411 MWT/1150 MWE CONST BRRT RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The SER was issued 07/14/81. The staff deferred scheduling the Comanche Peak revinw by the ACRS until sufficient ER DOCKETED:

01/19/79 01/19/79C information was provided to reso' ve a large number of open ER SITE VISIT COMPLETE:

06/20/80 08/07/80C A

issues. SSER 81 was issued 10/16/81 Application was INPUT TO DES TO PM:

08/15/80 04/27/81C reviewed by the ACRS on 11/13/81.

SSER 82 responding to ISSUE DES:

04/30/81 05/22/81C the ACRS was issued on 01/20/32. SSER 83 containing RESPONSE TO COMMENTS ON DES:

07/19/81 08/28/81C emergency preparedness wa s issued 03/11/83.

ISSUE FES:

09/18/81 09/24/81C CURRENT ENV. STATUS:

The DES was issued on 05/22/81. The EPA Federal Register Notice was printed on 35/29/81 and the comment period SAFETY / HEARING MILESTONES:

ended 07/13/81. The FES was issued on 09/24/81.

APPLICATION TENDERED:

03/01/78 03/01/78C SAR DOCKETED:

05/12/78 05/12/78C SAR Q'S RECEIVED BY PM:

12/30/78 02/22/71C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/08/79 01/31/80C CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

04/13/79 03/11/81C Hearing began 12/02/81 Issues heard were financial ISSUE DRAFT SER:

03/31/81 03/31/81C qualifications and operating QA program.

Further hearing INPUT TO SER:

05/22/81 07/08/81C sessions on QA/QC during construction were held 06/07-11/52, ISSUE SER:

07/14/81 07/14/ 81C 07/26-30/82, and 09/13-17/82.

The fifth and sixth hearing session continuing testimony on QA/QC during construction ACRS LETTER RECEIVED:

11/17/81 11/17/81C and emergency preparedness were held 5/16-20 and 6/13-16/83.

INPUTS TO SE SUPPLEMENT 4 10/28/83 The seventh hearing session continuing testimony on QA/qC ISSUE SE SUPPLEMENT 48 09/09/83 during construction has not been noticed.

FEMA LETTER RECEIVED:

11/00/83 CURRENT ANTITRUST:

ALJ appointed on 02/23/82 to replace ASLB. Prehearing HEARING STARTED:

12/02/81 12/02/81C conference held 04/13/82 to determine status of parties.

ASLB INITIAL DECI52 is 11/00/83 Briefs filed 05/04/82 re:: vest immediate imposition of COMMISSION EFFECTI (ESS DECISIDH 11/00/83 settlement license conditions. A Memorandum and Order TECH SPECS COMPLE1 t

11/00/83 approving settlement agreements 8 proposed license COMMISSION DECISIO.6 11/00/83 conditions 8 dismissing proceedings was issued 05/06/82.

ISSUE LIC. WITH POWER RESTRICTION:

12/00/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/83 41 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

SSER-4, an interim supplement, is slipped 1 month due to CONSTRUCTION COMPLETION - APPL.

12/00/83 07/08/83 appilcant delays in submittal of information and staff delay in reviewing earlier submittals. No impact on fuel load date is croiectad.

NRR LICENSING SYSTEM PAGE NO: 2-9 DIABLO-CANYOH 1 82 0L CURRENT

$TATUS REPORT REPORT AS OFI 08/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO 027580323 LIC. PM:

B. BUCKL EY ASLB CHAIR:

J. WOLF APPLICANT:

PACIFIC GAS 3 ELECTRIC LIC. BC:

C. KNIGHTON MEMBER 1:

J. KLINE LOCATION:

12 MI WSW OF SAN LUIS OBISPO LIC. LA.:

J. LEE MEMBER 2:

G. BRIGHT REGIDH 5

AE:

PG8E COUNSEL:

L. CHANDLER CONST. INSP: D. KIRSCH REAC. TYPE: PWR HSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP: J. CARLSON DESIGN PWR 3338 MWT/1084 MWE CONST: PG8E RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SSER 15 (Equip. Qualification) was issued on 10-02-81 SSER 16 is estimated for 08/6s/83 (indicated as SSER9 ER DOCKETED:

11/09i71 11/09/71C

  1. on schedule). Favorable ASLB Initial Decision on a ER SITE VISIT COMPLETE:

full power license was issued on August 31, 1982.

Low INPUT TO DES TO PM:

10/09/72 10/09/72C Power license was issued on 09-22-81 and suspended on ISSUE DES:

12/12/72 12/12/72C November 19, 1981.

RESPONSE TO COMMENTS ON DES:

04/27/73 04/27/73C ISSUE FES:

09/15/75 05/28/76C CURRENT ENV. STATUS:

Complete SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

07/10/73 07/10/73C SAR DOCKETED:

10/02/73 10/22/73C SAR Q'S RECEIVED BY PM:

01/04/74 01/04/74C SAR APPL. RESPONSE TD Q'S RECEIVED: 11/01/74 11/01/74C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/24/75 01/24/75C LP hearings were held 05/19-22/81.

A favorable PID on ISSUE DRAFT SER:

low power operation was issued 07/17/81. A full power INPUT TO SER:

01/24/75 01/24/75C

~

hearing was completed on 01/26/82.

In 8/82 an Initial ISSUE SER:

10/04/74 10/16/74C Decision was issued authorizing issuance of a full power operating license. The ASLAB reopened the record on design ACRS LETTER RECEIVED:

05/00/78 07/18/78C quality assurance. Evidentiary hearing concluded on 7/22/83 INPUTS TO SE SUPPLEMENT 9:

06/21/83 06/21/83C to determine if construction quality assurance will also be ISSUE SE SUPPLEMENT 9:

08/01/83 subject of a hearing.

FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Not required HEAkING STARTED:

10/29/75 12/07/16C ASLB INITIAL DECISION:

N/S COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

C9/15/81 09/15/81C COMMISSION DECISION:

09/00/83 ISSUE LIC. WITH POWER RESTRICTION: 09/30/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/30/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Estimate of dates from end of LP hre to lic. complete CONSTRUCTION COMPLETION - APPL.

dependent upon dev./ approval of State and local Emergency Plans. Ongoing Design Verif. Program likely to identify plant modifications.

Const. completion deoendent on mods.

HRR LICEN$ING SYSTEM PAGE NO: 2-10 ENRICO FERMI 2 0L CURRENT STA TUS REPQRT REPORT AS OF: 08/31/83 PLANT CHARACTERI$TICSt KEY PERS0NNELa DOCKET NO:

05000341 LIC. PM:

D. LYNCH ASLB CHAIR:

G. MILLHOLLIN APPLICANT:

DETROIT EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1 P. MORRIS LOCATION:

LAGUNA BEACH. MICH LIC. LA.:

M.

RUSHBROOK MEMBER 2:

D. SCHINK REGIDH:

3 AE:

S8L COUNSEL:

C. WOODHEAD CONST. INSP: P. PELKE REAC. TYPE: BWR HSSS: GE ANTITRUST:

A. HOCGDON RESID. INSP: P. BYRON DESIGN PWR: 3292 MWT/1093 MWE CONST: DANIEL RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE An inte-im SER was issued on 09-29-77 and a final SER was issued on 07-10-81 SSER No. 1 was issued 9-25-81 ER DOCKETED:

04/04/75 04/04/75C SSER No. 2 was issued 1-29-82 with 7 prelicensing issues ER SITE VISIT COMPLETE:

C9/27/78 10/31/78C outstanding. SSER No. 3 was issued on 2-4-83.

The staff has INPUT TO DES TO PM:

07/31/81 04/24/81C requested that the standby liquid control system be ISSUE DES:

05/01/8n 04/30/81C upgraded to conform to the Level 1 QA/QC program.

RESPONSE TO COMMENTS ON DES:

07/31/81 06/29/8tc ISSUE FES:

08/31/81 09/04/81C CURRENT ENV. STATUS:

Addendum No. I to the FES was issued 03-03-82.

SAFETY /HEA7ING MILESTONES:

APPLICATION TENDERED:

10/22/74 10/22/74C SAR DOCKETED:

04/05/75 04/05/75C SAR Q'S RECEIVED BY PM:

06/13/75 08/11/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/29/75 01/12/76C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/24/75 03/08/76C A hearing on two issues began on 03-31-82 and ended on ISSUE DRAFT SER:

04-02-82.

Monroe County, Michigan petitioned for INPUT TO SER:

03/05/76 05/20/77C leave to reopen hearings on the evacuation issue of ISSUE SER:

08/01/77 09/29/77C Emergency Prepardness; the Board denied this petition.

ASLB issued initial decision on 10/29/82 authorizing ACRS LETTER RECEIVED:

08/20/81 08/11/81C operating Ilconse issuance. The Commission issued its INPUTS TO SE SUPPLEMENT 3 08/22/82 01/05/83C Immediate Effectiveness Decision on 12/22/82.

ISSUE SE SUPPLEMENT 38 09/01/82 07/04/83C FEMA LETTER RECEIVED:

09/01/83 CURRENT ANTITRUST:

An ASLB decision on antitrust matters was issued on HEARING STARTED:

12/02/81 03/31/82C 04-25-78.

ASLB INITIAL DECISION:

10/00/82 10/29/82C COMMISSION EFFECTIVENESS DECISION: 12/22/82 12/22/82C TECH Si'ECS COMPLETED:

10/30/83 COMMISSION DECI3 ION:

11/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/A LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/30/83 The latest final Safety Analysis Report Amendment is number 49.

SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

CONSTRUCTION COMPLETION - APPL.

12/30/83 06/22/83

~

HRR LICEN5ING SYSTEM PAGE NO: 2-11 GRAND GULF 1 &2 LIC CURRENT

$TATU$

REP 0RT REPORT AS OF: 08/31/83 PLANT C H A R A C T E R I 5 T I C 5:

KEY PERS0NNEL DOCKET NO 041680417 LIC. PM:

D. HOUSTON ASLB CHAIR:

J. LAURENSON APPLICANT:

MISSISSIPPI POWER 8 LIGHT COMPANY LIC. BC:

A.

SCHWENCER MEMBER 1:

G. BRIGHT LOCATION:

25 MI S OF VICKSBURG, MISS LIC. LA.:

E. HYLTON MEMBER 2:

J. HARBOUR REGION:

2 AE BECH COUNSEL:

M. WAGNER CONST. INSP: R. VANDORM REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: A. WAGNER DESIGN PWR 3833 MWT/1250 MWE CONST: BECH RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued on September 10, 1981.

SSERs were issued in December 1981, in June and July 1982 and in May 1983.

ER DOCKETED:

06/05/78 06/30/78C The ACRS report on full power operation for Unit I was ER SITE VISIT COMPLETE:

12/14/79C issued August 18, 1982.

Interim FEMA letter was received INPUT TO DES TO PM:

04/30/81 04/30/81C 12/17/82.

ISSUE DES:

05/31/81 05/31/81C RESPONSE TO COMMENTS ON DES:

08/15/81 08/15/81C ISSUE FES:

09/15/81 10/09/81C CURRENT ENV. STATUS:

DES was issued in May 1981 FES was issued October 9, 1981.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/28/78 04/28/78C SAR DOCKETED:

06/05/78 06/30/78C SAR Q'S RECEIVED BY PM:

04/24/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/0t/80 09/30/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S No hearing. Petition was filed by the State ISSUE DRAFT SER:

09/18/81C of Louisiana on basis of Court of Appeals, District of INPUT TO SER:

04/01/81 08/14/81C Columbia, opinion on S-3 Table issue.

Board denied petition ISSUE SER:

06/PD/81 09/10/81C for intervention on October 20, 1982.

The State of Louisiana filed an appeal to the Board's denial. Appeal ACR$ LETTER RECEIVED:

07/00/81 08/18/82C Board upheld the denial for intervention in a decision INPUTS TO SE SUPPLEMENT 4:

04/01/82 03/15/83C issued December 8, 1982.

ISSUE SE SUPPLEMENT 48 05/31/83C FEMA LETTER RECEIVED:

04/00/83 06/29/83C CURRENT ANTITRUST:

OL review is in progress. No significant changes have NEARING STARTED:

N/A occurred since the CP.

ASLB INITIAL DECISIDH N/A COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

09/01/81 06/16/E2C COMMIS3 ION DECISION:

10/00/83 ISSUE LIC. WITH POWER RESTRICTIDH2 04/23/82 06/16/82C LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/30/83 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

Unit 1 OL for fuel load to 5% power issued 06/16/82, FP de-CONSTRUCTIDH COMPLETION - APPL.

06/16/82C OL ISSUED layed by Region II COA on TS,serveillance proceduse esfic-lancies 8 outstanding items, maint. A mods for 1st refueling outane.

Anol. not ready to ao above 5% until 10fE3.

NRR LICEN5ING SYSTEM PAGE NO: 2-12 HARRIS 1 82 0L C fl R R E N T STATUS REPORT REPORT AS OF 08/31/83 PLANT C H A R A C T E R I S T I C 5:

KEY P E R S 0 N N E L:

DOCKET NO:

0400-0401 LIC. PM:

B. BUCKLEY ASLB CHAIR:

J. KELLEY APPLICANT:

CAROLINA POWER 8 LIGHT LIC. BC:

G. KNIGHTON MEMBER 1:

G. BRIGHT LOCATION:

20 MI SW OF RALEIGH, NC LIC. LA.:

J. LEE MEMBER 2:

J. CARPENTER REGION:

2 AE:

EBASCO COUNSEL:

C. BARTH CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP G. MAXWELL DESIGN PWR: 2775 MWT/0915 MWE CONST: DANIEL RM ANALYST B. ST MARY OURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR was docketed on 12/22/81 Questions were sent to the applicant between 4/26/82 and 7/30/82. Most of ER DOCKETED:

12/22/81 12/22/81C applicant's responses were received by 08/31/82. Draft ER SITE VISIT COMPLETE:

04/08/82 04/08/82C SER issued 2/1/83.

INPUT TO DES TO PM:

01/14/83 02/08/83C ISSUE DES:

04/00/83 04/03/83C RESPONSE TO COMMENTS ON DES:

09/30/83 ISSUE FES:

10/31/83 CURRENT ENV. STATUS:

ER was docketed on 12/22/81. The site visit was complete on 04/08/82 and questions were sent to applicant on SAFETY / HEARING MILESTONES:

04/28/82. Most of the applicant's responses wehe received by October 15, 1982. Draft Environeental Statement APPLICATION TENDERED:

06/26/80 06/26/80C i

was issued in April 1983.

SAR DOCKETED:

12/22/81 12/22/81C SAR Q'S RECEIVED BY PM:

07/09/82 07/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/08/82 11/08/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM 09/01/83 Notice for Opportunity for Hearing was published in the ISSUE DRAFT SER:

01/03/83 02/01/83C Federal Register on January 27, 1982.

Several petitions INPUT TO SER:

09/01/83 to intervene were filed. Prehearing conference on petitions ISSUE SER:

11/01/83 was held on July 13-14. 1982.

Board decision on contentions issued September 23. 1982.

Further clarification issued ACRS FULL COMMITTEE MEETING:

01/02/84 January 11, 1983.

A pre-hearing conference was held'on INPUTS TO SE SUPPLEMENT 1 03/01/84 February 24. 1983 on discovery and scheduling.

ISSUE SE SUPPLEMENT 18 04/02/84 FEMA LETTER RECEIVED:

04/09/84 CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

01/04/84 ASLB INITIAL DECISION:

05/01/85 COMMISSION EFFECTIVENESS DECISIDH 05/00/85 TECH SPECS COMPLETED:

05/01/85 COMMISSION DECISION:

05/00/85 ISSUE LIC. WITH POWER RESTRICTION: 06/00/85 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

06/03/85 FSAR Ho. 9 ER No. 5 SCHED. DATE RECEIPT D4TE NEW SLIPS / NOTES:

Staff schedule based on fuel Ioad date of 86/03/85.

CONSTRUCTION COMPLETION - APPL.

06/G3/85 10/06/82 i

i

NRR LICENSING SYSTEM PAGE NO: 2-13 HOPE CREEK 1 0L CURRENT STATUS REPORT REPORT AS OF 08/31/83 PLANT C H A R A C T E R I 5 T I C 5:

KEY PERS0NNELa DOCKET N0:

05000354 LIC. PM:

D. WAGNER ASLB CHAIR: N/A APPLICANT:

PUBLIC SERVICE ELECTRIC 8 GAS LIC. BC:

A. SCHWENCER MEMBER 1:

LOCATION:

18 MI SE OF WILMINGTON, DEL LIC. LA.:

E. HYLTON MEMBER 2:

REGIDM:

1 AE:

BECH COUNSEL:

R. GODDARD CONST. INSP: W. BATEMAN REAC. TYPE: BWR NSSS: GE ANTITRUST:

RESID. INSP DESIGN PWR 3440 MWT/1067 MWE CONST: BECH RM ANALYST B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR was tendered on March 2, 1843 and docketed on June 29, 1983.

ER DOCKETED:

06/29/83 06/29/83C ER SITE VISIT COMPLETE:

07/28/83 07/28/83C INPUT TO DES TO PM:

04/13/84 ISSUE DES:

06/15/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

11/16/84 CURRENT ENV. STATUS:

ER was tendered on March 2, 1983 and docketed on June 29, 1983.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/83 03/02/83C SAR DOCKETED:

06/29/83 06/29/83C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 10/31/83 CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/23/84 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

02/21/84 Federal Register on August 10, 1983.

INPUT TO SER:

08/20/84 ISSUE SER:

10/12/84 ACRS FULL COMMITTEE MEETING 11/08/84 4

INPUTS TO SE SUPPLEMENT 13 01/01/85 ISSUE SE SUPPLEMENT 18 02/15/85 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

07/15/85 ASLB INITIAL DECISION:

01/00/86 COMMISSION EFFECTIVENESS DECISION: 01/08/86 TEC!I SPECS COMPLETED:

COMMISSION DECISION:

01/08/86 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

01/14/86 06/30/82

_ = _

HRR LICENSING SY$ TEM PAGE NO: 2-14 LASALLE 2 0L CURRENT STATUS REP 0RT REPORT AS OF 08/31/83 PLANT C H A R A C T E R I 5 T I C 5:

KEY P E R S 0 N N E La DOCKET NO:

05000374 LIC. PM:

A. BOURNIA ASLB CHAIR:

M. MILLER APPLICANT:

COMMONWEALTH EDISON LIC. BC:

A. SCHWENCER MEMBER 1 F. SHON LOCATION:

11 MI SE OF OTTAWA, ILL LIC. Lt.:

E. HYLTON MEMBER 2:

D. PARIS REGION:

3 AE:

SSL COUNSEL:

C. WOODHEAD CONST. INSP H. WESCOTT i

REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID INSP: W. GULDEMOND DESIGN PWR 3293 MWT/1078 MWE CONST: CWE RM ANALYST:

S. HEDLUND t

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SSER-1 was issued in June 1981 SSER-2 was issued in February *982.

SSER-3 was issued on April 16, 1982.

ER DOCKETED:

01/17/77 OS/12/77C SSER-4 was issued on July 14, 1982.

SSER-5 was issued ER SITE VISIT COMPLETE:

on August 17, 1983.

INPUT TO DES TO PM:

07/t7/78 02/17/78C ISSUE DES:

03/I2/78 03/29/78C RESPONSE TO COMMENTS ON DES:

07/14/78 07/14/78C ISSUE FES:

09/22/78 ft/03/78C CURRENT ENV. STATUS:

Environmental Protection Plan has been issued with Unit i license.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/09/76 09/01/76C SAR DOCKETED:

04/08/77 05/12/77C SAR Q'S RECEIVED BY PM:

07/22/77 07/27/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/15/77 08/18/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/06/78 tt/0*/78C No hearing.

ISSUE DRAFT SER:

INPUT TO SER8 12/29/75 02/27/81C ISSUE SER:

09/05/80 03/05/81C ACRS LETTER RECEIVED:

04/09/81 04/16/81C INPUTS TO SE SUPPLEMENT 5 07/20/83 07/20/83C ISSUE SE SUPPLEMENT 5:

07/00/83 08/17/83C FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Complete.

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISIOM:

TECH SPECS COMPLETED:

04/12/82 04/12/82C 1

COMMIS$10N DECISIDH:

09/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Lasalle Unit 1 criticality was achieved on June 21, 1982.

CONSTRUCTION COMPLETION - APPL.*

09/00/83 02/01/83 Construction completion date for Unit 2 has been reassessed by applicant and has slipped to 10/83.

r l

NRR LICENSING

$YSTEM PAGE N0* 2-15 LIMERICK 1 82 0L CURRENT 5TATUS REPORT REPORT AS OF: 88/31/83 PLANT C H A R A C T E R I S T I C 5:

KEY PERSONNEL DOCKET NO:

535280353 LIC. PM:

R. MARTIN ASLB CHAIR L. BRENNEA APPLICANT:

PHILADELPHIA ELECTRIC LIC. BC; A. SCHWENCER MEMBER 1:

R. COLE LOCATICH:

35 MI NW OF PHILADELPHIA, PA LIC. LA.:

E. HYLTON MEMBER 2:

P. MORRIS REGION:

1 AE:

BECH COUNSEL:

A.

HDDGCOM CONST. INSP:

R E A C.- TYPE: BWR NSSS: CE ANTITRUST:

8. V0GLER RESID. INSP: 5. CHAUDHARY DESIGN PWR: 3440 MWT/1065 MWE CONST: BECH RM ANALYST:

. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Applicant submitted Probabilistic Risk Assessment with FSAR on March 17, 1981.

SAR was docketed on 07/27/81.

ER DOCKETED:

07/27/81 07/27/81C NUREG/CR on PRA issued by Board Notification on 03/04/83.

ER SITE VISIT COMPLETE:

08/20/82 08/20/82C INPUT TO DES TO PM:

06/10/83 06/10/83C ISSUE DES:

06/24/83 06/24/83C RESPONSE TO COMMENTS ON DES:

10/06/83 ISSUE FES:

03/00/84 CURRENT ENV. STATUS:

ER was docketed on 07/27/81. DES will be issued in two parts (June 8 Oct. '83).

The second part will address SAFETY / HEARING MILESTONES:

impacts by severe accidents and will be based on applicanti severe accidents risk assessment submitted April 21, 1983.

APPLICATION TENDERED:

01/08/81 03/17/8tc SAR DOCKETED:

07/27/81 67/27/81C SAR Q'S RECEIVED BY PM:

07/08/82 02/01/83C SAR APPL. RESPONSE TO G'S RECEIVED: N/S INPUT TO DRAFT SER 70 PM:

N/S CURRENT HRG. STATUT:

Notice of Opportunity of Hearing was published in the ISSUE DRAFT SER:

N/S Federal Register on August 21, 1981 A special prehearing INPUT TO SER:

N/S conference addressing conditionally admitted contentions ISSUE SER:

08/30/83 was held 05/09/83. Actions were spec;fied by the Board ACRS FULL COMMITTEE MEETING:

10/13/83 for all parties.

INPUTS TO SE SUPPLEMENT 13 10/07/83 l

ISSUE SE SUPPLEMENT 1:

10/30/83

/

FEMA LETTER RECEIVED:

10/07/83

)

J CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

01/00/84 ASLB INITIAL DECISION:

03/00/85 COMMISSION EFFECTIVENESS DECISION: 03/00/85 TECH SPECS COMPLETED:

03/00/85 COMMISSION DECISION:

03/00/85 ISSUE LIC. WITH POWER RESTRICTION: 03/00/85 ISSUE FULL POWER LICENSE AMEND:

03/00/85 LATEST AMENDMENT:

Rev. 14, July 29, 1983 (ER OL); Rev. 22. July 29, 1983 (FSAR); Rev. 5, March 31, 1983 (EP), Rev 3. April 30, 1983 SCHED. DATE RECEIPT DATE CEW SLIPS / NOTES:

Applicant estimates 2 month improvement in construction CONSTRUCTIDH COMPLETI0H - APPL.:

08/00/84 12/27/82 completion schedule. ASLB estimates that 17 months are necessary for hearing.

i

NRR LICEN5ING SYSTEM PAGE NO: 2-16

.RARBLE MILL 1 82 0L CURRENT 5TATUS REPORT REPORT AS OF 08/31/43 PLANT CNARACTERI5TICSt KEY PERS0NNEL DOCKET NO:

054680547 LIC. PM:

P. O CONNOR ASLB CHAIR:

I. SMITH APPLICANT:

PUBLIC SERVICE OF INDIANA LIC. BC:

J. YOUNGBLOOD MEMBER 1 G. LINENBERGER LOCATION:

10 MI $ OF MADISON, IN LIC. LA.:

M. RUSNBROOK MEMBER 28

0. PARIS REGION:

3 AE2 S8L COUNSEL:

E. CNEN CONST. INSP P. PELKE REAC. TYPE: PWR NSSS: WEST ANTITRUST J. RUTBERG RESID. INSP J. SCHAPKER DESIGN PWR 3415 MWT/1130 MWE CONST: PSI RM ANALYST S. NEDLUND l

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was docketed on 02/25/83.

ER DOCKETED:

03/01/83 02/25/83C ER SITE VISIT COMPLETE:

07/11/83 07/11/83C INPUT TO DES TO PM:

03/30/84 ISSUE DES:

05/30/84 RESPONSE TO COMMENTS ON DES:

i ISSUE FES:

11/30/84 CURRENT ENV. STATUS:

Application was docketed on 02/25/83. ER site visit completed on 07/11/83.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

12/01/82 11/23/82C SAR DOCKETED:

03/01/83 02/25/83C SAR O'S RECEIVED BY PM:

10/28/83 SAR APPL. RESPONSE TO 4'S RECEIVED: 12/02/83 l

CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

03/02/84 An Atomic Safety and Licensing Board was established on ISSUE DRAFT SER:

04/06/84 4/26/83. Three petitions for a hearing have been INPUT TO SER:

10/05/84 received. A Board Memorandum & Order dated 6/30/83 ISSUE SER:

12/07/84 provided two petitioners 30 d.ys to file amended petitions. The petitioners Valley Watch Inc. 8 Sassafras ACRS FULL COMMITTEE MEETING:

01/10/85 Audubon Society filed their amended petitions on INPUTS TO SE SUPPLEMENT 12 03/01/85 7/26/83 and 7/21/83 respectively.

ISSUE SE SUPPLEMENT 1*

04/15/85 FEMA LETTER RECEIVED I

CURRENT ANTITRUST:

Notice of a receipt of antitrust information at OL HEARING STARTED:

09/15/85 stage published 4/6/83.

ASLB INITIAL DECISION:

05/15/86 COMMISSION EFFFCTIVEMESS DECISION: 06/00/86 TECH 5PECS COMPLETED:

06/00/86 l

COMMISSION DECISION:

06/00/86 ISSUE LIC. WITN POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

Amendment 26 (06/24/83)

SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

CONSTRUCTION COMPLETION - AFPL.'

06/09/86 12/15/82

.s

,e_."

1' s

l NRR LICEN$IL-SY$ TEM PAGE NO 2-17 MIDLAND 1 4 2 0L CURRENT STATUS REP 0RT REPORT AS OF 88/31/83 PLANT CHARACTERI5 TIC 5 KEY P E R S O M N E La DOCKET NO

'933080329 LIC. PM:

D. HOOD ASLB CHAIR:

C. BiCHH0EFER APPLICANT 2 CONSUMERS POWER LIC. BC:

E. ADENSAM MEMBER 1 F. COWAN LOCATION:

SW BOUNDARY 3F MIDLAND MICH.

LIC. LA.:

M. DUNCAN MEMBER 2 J. HARBOUR REGION:

3 AEt BECH COUNSEL:

W. PATON CONST. INSP R. LANDSMAN REAC. TYPE: PWR NSSS 58W ANTITRUST

  • B. V0GLER RESID. INSP: R. COOK DESIGN PWR 2452 MWT/0818 MWE CONST BECH RM ANALYST B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Utilization of National Laboratories or other p

agencies to complete some review areas is currently ER DOCKETED:

0'/01/78 04/14/78C in progress. CP extension was issued 12/28/81. ACRS ER SITE VISIT COMPLETE:

09/08/78 09/08/78C Full Committee Meeting was held-86/04/82. SSER 81 INPUT TO DES TO PM:

02/03/82 02/03/82C responding to ACRS letter was issued 6/30/82. SSER 82 ISSUE DES:

02/05/82 02/05/82C j

on soils settlement problems was issued 10/06/82.

RESPONSE TO COMMENTS ON DES:

07/08/82 07/08/82C ISSUE FES:

07/30/82 07/30/82C I'

CURRENT ENV. STATU3 The DES was issued 02/05/82. The FES was issued on July 30, 1982.

SAFETY / NEARING MILESTONES:

'I APPLICATION TENDERED:

08/31/77 08/31/77C SA2 DOCKETED:

09/30/77 11/13/77C SAR Q'S RECEIVED BY PMt 03/2t/78 10/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/08/78 12/08/78C INPUT TO DRAFT SER TO PM:

11/01/78 12/01/78C CURRENT NRG. STATUS:

f Three prehearings ending 04/27-28/81.were held for a ISSUE DRAFT SER:

N/A separate hearing on soils settlement. Hearing on soils INPUT TO SER:

04/23/82 04/23/82C l

settlement began July 7, 1981 and is continuing. Combined ISSUE SER:

05/81/82 05/11/82C hearings for soils issues and OL issues commenced on 11/15/82 and are continuing.

ACRS LETTER RECEIVED:

06/15/82 06/08/82C INPUTS TO SE SUPPLEMENT 28 08/16/82 08/16/82C 4

' ISSUE SE SUPPLEMENT 2:

10/06/82 10/06/82C FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

01/14/83 01/14/83C Proceeding completed. License was amended 10/20/80.

HEARING STARTED:

11/15/82

- 11/15/82C ASLB INITIAL DECISION:

09/09/84 COMMISSION EFFECTIVENESS DECISION: 10/0u/84 TECH SPECS COMPLETED:

09/00/84 COMMISSION DECISION:

09/00/84 ISSUE LIC. WITH POWER RESTRICTION: 09/00/84

,O LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/09/84 110 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Appilcant revised completion schedule en 4/12/83. Unit 2 CONSTRUCTION COMPLETION - APPL.:

10/08/84 04/12/83 slipped to 10/84 and unit 1 to 2/85.

NRC caseload visit held 4/19-21/83. On 7/14/83 Dow Chemical announced decision not to buw st-

. T-t on schedule under anni. evaluation.

NRR LICENSINO SYSTEM PAGE NO: 2-18

-MILLSTONE 3 0L C U R.R E N T STATUS REP 0RT REPORT AS OF: 08/31/83 3

PLANT C N A R A C T E R I S T I C S:

KEY P E R S O N N E La DOCKET NO:

05000423 LIC. PM:

E. D9OLITTLE ASLB CHAIR: N/A ',

APPLICANT:

MORTNEAST MUCLEAR ENERGY LIC. BC:

B. YOUNGBLOOD MEMBER 1:

N/A LOCATION:

3.2 MI WSW OF MEW LONDON CT, LIC. LA.:

M. RUSNBROOK MEMBER 2:

N/A

. REGION:

1 AE 58W COUNSEL:

M. ROTNSCHILD CONST. INSP:

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP(T.REBELCWSKI DESIGN PWt 3565 MWT/1156 MWE CONST S&W

't RM ANALYST:

L. LANIER g

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety review questions sent to applicant on 05/03/83, 05/31/83 and 06/29/83. Responses received on 7/22/83 ER DOCKETCD:

02/01/83 02/03/83C 2

and 08/01/83. Additional responses expected on 08/29/83.

ER SITE VISIT COMPLETE:

07/21/83 07/21/83C All responses expected prior to 10/01/83.

INPUT TO DES TO PM:

ISSUE DES:

- J4/17/M4 RESPONSE TO COMMENTS ON DES:

3~-

ISSUE FES:

11/-6/84 CURRENT ENV. STATUS:

's Environmental site visit completed on 07/20 and 07/21/83.

APPLICATION TENDERED:

11/01/82 10/29/82C SAR DOCKETED:

02/01/83 02/03/83C SAR Q'S RECEIVED BY PM:

08/15/83 SAR APPL. RESPONSE TO 4'S RECEIVED: 09/01/83 CURRENT NRG. STATUS INPUT TO DRAFT SER TO PM:

11/01/83 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

12/01/83 Federal Register on March 4, 1983. No requests for INPUT TO SER:

05/15/84 hearing or petitions for leave to intervene were re.ceived.

ISSUE SER:

07/16/84 ACRS FULL COMMITTEE MEETING:

08/15/84 IMPUTS TO SE SUPPLEMENT 1:

10/15/84-ISSUE SE SUPPLEMENT 1 11/15/84 i FEMA LETTER RECEIVED:

CURRENT ANTITRUST NEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISIDM 11/08/85 TECH SPECS COMPLETED:.

11/00/85 COMMISSION DECISI0H:

11/01/85 ISSUE LIC. WITN POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

Amendment 2 to FSAR received 04/21/83. Amendment 3 to ER received 07/27/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL,.

11/01/85 09/30/82 A

r

- -u m

v

s NRR LICEN$ING SYSTEM PAGE NO: 2-19 NINE MILE POINT-2 0L CURRENT STATUS REP 0RT REPORT AS OF 08/31/83 PLANT CHARACTERISTIC 5 KEY P E R S O N N E L:

,. ~..

DOCT.ET NO:

05000410 LIC. PM:

M. HAUGHEY ASLB CHAIR:

APPLICANTL,HtAGARA MOHAWK POWER LIC. BC:

A. SCHWENCER MEMBER 1:

LOCATION:

SIMI NE OF OSWEGO, NY LIC. LA.:

E. HYLTON MEMBER 2:

REGIOM:.

1 '

AE:

58W COUNSEL:

B. BORDENICK CONST. INSP: L. MARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:

L. DEWEY RESID. INSP:

DESIGN PWR 3489 MWT/1080 MWE CONST: S8W RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The FSAR was tendered on 01-31-83 and docketed on 04/12/83.

ER DOCKETED:

03/31/83 04/?2/83C ER SITE VISIT COMPLETE:

08/05/83 08/03/83C INPUT TO DES TO PM:

05/18/84 ISSUE DES:

07/20/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

12/14/84 CURRENT ENV. STATUS:

The ER was tendered on 01-31-83 and docketed on 04/12/83.

ER site visi+. was completed on 8/2-3/83.

Environmental SAFETY / HEARING MILESTONES:

public meeting was held on 03/02/83.

APPLICATION TENDERED:

01/31/83 01/31/83C SAR DOCKETED:

03/31/83 04/12/83C SAR Q'S RECEIVED Bf PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 10/27/83 l

CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/19/84 l

Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

02/16/84 Federal Regi ster on OS/13/83. The ASLB ordered on August INPUT TO SER:

08/06/84 4,

1983, that no hearing be held in this operating ISSUE SER:

10/05/84 1icense application proceeding.

ACRS FULL COMMITTEE NEETING:

11/08/84 INPUTS TO SE SUPPLEMENT 1 12/01/84 ISSUE SE SUPPLEMENT 1:

01/00/8S FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISION: 01/00/86 TECH SPECS COMPLETED:

02/00/86 COMMISSION DECISION:

02/28/86 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

CP Extension was issued on February 28, 1983.

SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

CONSTRUCTION COMPLETION - APPL.:

02/00/86 01/31/83 l

l L_

MRR LICENSING SYSTEM PAGE MO: 2-20

.PALO VERDE 1,2,3 0L CURRENT 5TATUS REPORT REPORT AS OF 08/31/33 PLAMT CHARACTERISTICS KEY PERSONNEL:

DOCKET NO:

0528-0530 LIC. PM E. LICITRA ASLB CHAIR:

R. LAZO APPLICANT:

ARIZONA PUBLIC SERVICE LIC. BC:

G. KNIGHTON MEMBER 1:

R. COLE LOCATION:

36 MI W OF PHOENIX, AZ LIC. LA.:

J. LEE MEMBER 28 D. CALLINAM REGION:

5 AE BECH COUNSEL:

L. DEWEY CONST. INSP L. VBRUEGGEN REAC. TYPE: -PWR NSSS: COMB AKTITRUST:

B. V0GLER RESID. INSP G. FIORELLI DESIGN PWR 3817 MWT/1304 MWE CONST: BECH RM ANALYST S. HEDLUND ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

06/20/80C Several " Independent Design Review" meetings have been completed. The SER was issued on November 11, 1981.

SER ER DOCKETED:

07/01/80 supplement Hos.

1,2, and 3 were issued on February 5, 1982 ER SITE VISIT COMPLETE:

01/30/81 01/30/81C and May 17, 1982, and September 23, 1982 respectively.

INPUT TO DES TO PM:

10/05/81 10/05/81C Supplement No. 4 was issued on March 15, 1983.

Supplement ISSUE DES:

10/26/81 10/26/81C RESPONSE TO COMMENTS ON DESe 02/25/82 02/25/82C No. 5 is targeted for 9/30/83.

ISSUE FES:

03/11/82 03/11/82C OURRENT ENV. STATUS:

The ER (OL) review is complete. A site visit was completed on January 30, 1981.

The DES was issued on SAFETY / NEARING MILESTONE 3 October 26, 1981 and the FES was issued on March 11, APPLICATION TENDERED:

10/05/79 10/05/79C 1982.

SAR DOCKETED:

06/20/80 06/20/80C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

INPUT TO DRAFT SER T3 PM:

CURRENT HRG. STATUS:

The hearing started 4/27-30, 1982, resumed on 5/25-28 and ISSUE DRAFT SER:

on 6-22.

Nearing record was clomed on 6-25-82.

A late INPUT TO SER:

10/30/81 10/30/81C petition, dated 10-13-82 dealing with salt drift on ISSUE SER 11/11/81 11/11/81C farm crops, was filed by W. Valley Ac-i. Protection Council. On 12-30-82, the Board issued a favorable ID ACRS LETTER RECEIVED:

12/18/81 12/18/81C but reopened the hearing on Units 2 and 3 to consider INPUTS TO SE SUPPLEMENT 5:

09/23/83 late petition'by W. Valley. Board's decision authorizes ISSUE SE SUPPLEMENT 5 09/30/83 full power license for Unit 1.

FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST Antitrust OL review for units 1 8 2 has resul6cd in a HEARING

  • STARTED:

04/27/82 04/27/82C

' finding of no significant antitrust changes since the ASLB INITIAL DECISION:

12/30/82 12/30/82C CP review. A Federal Register of the finding was COMMISSION EFFECTIVENESS SECIEION: 04/27/83 04/27/83C TECH SPECS COMPLETED:

05/01/84 published 2-9-83.

COMMISSIGN DECISION:

04/00/84 ISSUE LIC. WITH POWER RESTRICTION 05/01/84 ISSUE FULL POWER LICENSE AMEND:

07/00/84 LATEST AMENDMENT:

FSAR Amendment No. 11 SCHED. DATE RECEIPT DATE ER Supplement No. 4 NEW SLIPS /H3TES:

CONSTRUCTION COMPLETION - APPL.:

05/00/84 08/16/83 e

NRR LICEN$ING SYSTEM PAGE NO: 2-21 PERRY 1 82 0L CURREdT STATUS REPORT REPORT AS OF: 08/31/83 PLANT CNARACTERISTICS:

KEY P E R S 0 N N E L:

DOCKET NO:

844080441 LIC. PM:

J. STEFAN0 ASLB CHAIR:

P. BLOCH APPLICANT:

CLEVELAND ELECTRIC ILLUMINATING LIC. BC:

J. YOUNGBLOOD MEMBER 1:

J. KLINE LOCATION:

7 MI NE OF PAINESVILLE, OHIO LIC. LA.:

M. RUSHBROOK MEMBER 2:

G. BRIGHT REGION:

3 AE2 GIL COUNSEL:

J. CUTCHIN CONST. INSP: P. PELKE REAC. TYPE: BWR NSSS: GE ANTITRUST:

J. CUTCHIN RESID. INSP: M. GILDNER DESIGN PWR 3759 MWT/1205 MWE CONST: KAISER RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The Safety Evaluation Report was issued in May 1982.

The ACRS Report was issued on July 13, 1982.

SSER No. 1 ER DOCKETED:

06/26/81 06/19/81C was issued in August 1982.

SSER Ho. 2 was issued in ER SITE VISIT COMPLETE:

.t Jan. 1983.

SSER No. 3 was issued in 4/83.

SSER Ho. 4 is INPUT TO DES TO PM:

01/01/82 01/01/82C scheduled for November, 1983.

ISSUE DES:

02/26/82 07/26/82C RESPONSE TO COMMENTS ON DES:

06/30/82 06/30/82C ISSUE FES:

08/13/82 08/13/82C CURRENT ENV. STATUS:

Environmental acceptance review was completed on June 9,

1981 The ER was docketed June 19, 1981.

FES SAFETY / NEARING MILESTONES:

issued in August 1982.

APPLICATI0H TENDERED:

06/26/80 06/26/80C SAR DOCKETED:

01/09/81 01/30/8tC SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

02/24/82 02/24/82C Nearing on issue 3 (QA Const. Prog.) completed. Issues ISSUE DRAFT SER:

02/26/82 02/26/82C i

I (EP), 13 (Turbine Missiles), 14 (In core T/C's) and 15 INPUT TO SER:

04/10/82 05/10/82C (Steam Erosion) N/S.

Issue 6 (ATWS-auto SLCS) and 8 (H2 ISSUE SER:

05/10/82 05/24/82C control for degraded core accident) deferred pending Comm.

rulings. All other issues deleted by summ disp.

Hearing ACRS LETTER RECEIVED:

07/13/82 07/13/82C l

on issue (3) completed 4/29/83. Favorable Board decision INPUTS TO SE SUPPLEMENT 4:

10/3 0 /t.3 expected on issue 3.

ISSUE SE SUPPLEMENT 4:

11/30/83 FEMA LETTER RECEIVED:

12/00/83 CURRENT ANTITRUST:

CP antitrust review has been completed. OL antitrust HEARING STARTED:

05/23/83 05/23/83C status is under review.

ASLB INITIAL DECISION:

03/00/84 COMMISSION EFFECTIVENESS DECISION: 04/00/84 TECH SPECS COMPLETED:

10/00/84 COMMISSION DECISION:

11/C0/84 ISSUE LIC. WITH POWER RESTRICTION:

12/00/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S Number 12 (7-9-83).

SCHED. DATE RECEIPT D4TE NEW SLIPS / NOTES:

FEMA Letter of 4/28/83 schedules completion of offsite CONSTRUCTION COMPLETION - APPL.:

12/00/84 03/08/83 emergency plan review by 12/83.

I f

I NRR LICEN5ING SYSTEM PAGE NO 2-22 RIVER BEND 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF 08/31/83 a

PLANT CHARACTERI5TICSt KEY P E R S 0 N N E L:

DOCKET NO:

045880459 LIC. "M E. WEINKAM ASLB CHAIR:

B. COTTER APPLICANT:

GULF STATES UTILITIES LIC. BC:

A. SCHWENCER MEMBER 1:

G. LINENBERGER LOCATION:

24 MI MNW OF BATON ROUGE, LA LIC. LA.:

E. NYLTON MEMBER 2:

R. COLE REGION:

4 AE SaW COUNSEL:

D. REPKA CONST. INSP

. UNASSIGNED REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP R. BROWN DESIGN PWR 3015 MWT/0934 MWE CONST S8W RM ANALYST L. LAHIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Applicant tendered FSAR for docketing on 04/24/81.

FSAR was docketed on 08/25/81. Draft SER issued 06/01/83.

ER DOCKETED:

38/25/81 08/25/81C Construction permit extension requested and granted from ER SITE VISIT COMPLETE:

01/22/82 01/22/820 03/83 to 12/85 for unit 1.

INPUT TO DES TO PM:

12/09/83 ISSUE DES:

01/09/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

06/08/84 CURRENT ENV. STATUS:

Applicant tendered ER for docketing on 04/24/81.

ER was docketed on 08/25/81 SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/z4/81 04/24/81C SAR DOCKETED:

08/25/81 08/25/81C SAR Q'S RECEIVED BY PM:

12/07/81 06/01/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/14/82 12/01/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

03/04/83 03/30/83C Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

04/30/83 06/01/83C Federal Register on 09/04/81. Prehearing conference INPUT TO SER:

11/04/83 held 06/14/83 in Baton Rouge,. La.

ISSUE SER:

12/02/83 ACRS FULL COMMITTEE MEETINu:

01/13/84 INPUTS TO SE SUPPLEMENT 18 04/00/84 ISSUE SE SUPPLEMENT 18 05/00/84 FEMA LETTER RECEIVED:

05/01/84 CURRENT ANTITRUST:

Status to be. determined.

HEARING STARTED:

10/00/84 4

ASLB INITIAL DECISION:

03/00/85 COMMISSION EFFECTIVENESS DECISION: 04/00/85 I

e 10/00/84 TECH SPECS COMPLETED:

COMMISSION DECISION:

04/00/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

04/00/85 Humber 9.

SCHED. DATE RECEIPT DA1E NEW SLIPS / NOTES:

Amendment 10 to FSAR was received in September, 1983.

CONSTRUCTION COMPLETION - APPL.

04/00/85 01/14/83 1

t c

i

. - - -. - - ~..

. - -.- -._- -. - ~. _ - ~ --

4 NRR LICEN5ING SYSTEM PAGE NO: 2-23 SAN ONOFRE 3 LIC CURRENT STATUS REP 0RT REPORT AS OF: 08/31/83 1

r PLANT _CNARACTERISTIC5:

KEY PERS0NNEL:

DOCKET NO:

05000362 LIC. PM:

N. R0nD ASLE CHAIR J. KELLEY APPLICANT 6 SOUTNERN CALIFORNIA EDISDN LIC. BC G. KP DITON MEMBER 1:

C. NAND LOCATION:

S MI S OF SAN CLEMENTE. C#

LIC. LA.:

J. Lek MEMBER 2:

E. JOHNSON REGION:

5 AE2 BECN COUASEL:

L. CHANDLER C'J N S T. INSP D. KIRSCN REAC. TYPE: PWR NSSS COMB AN TIT P'JST :

J. GOLDBERG RESID. INSP: A. CNAFFEE DESIGN PWR 3410 MWT/1100 MWE CONST BECN RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER on geological and seismological matters was issued on 12/31/80. ACRS subcommittee meetings were held 01/30/81 and ER DOCKETED:

03/01/77 03/23/77C 03/11/81 and full committee meetings were held 02/5/81 and ER SITE VISIT COMPLETra 05/20/77 05/20/77C 03/12/81. SER (Non-TMI matters), was issued on 02/06/81.

INPUT TO DES TO PM:

10/01/77 12/01/80C SER supplement on TMI issues was issued on 02/25/81 SER ISSUE DES:

01/27/78 01/20/81C supplement No. 2, 3, 4, 5, and 6 addressing open iteme were RESPONSE TO COMMENTS ON DES:

Issued 05/08/81, 09/16/81, 01/22/82, 02/16/82, and 06/30/82.

ISSUE FES:

04/00/81 04/29/81C CURRENT ENV._ STATUS:

DES addressing class 9 accidents was issued 01-20-81, FES was i ssued 04-29-81.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED 11/29/76C SAR DOCKETED:

03/01/77 03/23/77C SAR Q'S RECEIVED BY PM:

08/15/77 09/29/77C SAE APPL. RESPONSE TO Q'S RECEIVED: 11/18/77 12/08/77C I

CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

02/10/78 08/11/78C Motions for summary disposition were granted by ASLB.

ISSUE DRAFT SER:

01/15/88 01/tS/81C Hearing started 06/22/81.and ended 09/31/81. ASLB PID INPUT TO SER:

C6/23/78 01/tS/8tC was rendered on 01/11/82 and ID on 05/14/82. ASLAB ISSUE SER:

08/01/80 02/06/81C Decisios. (ALAB-717) was issued on 03/04/83.

I ACRS LETTER RECEIVED:

03/17/8W 03/17/81C INPUTS TO SE SUPPLEMENT 6 04/21/83 04/21/83C ISSUE SE SUPPLEMENT 6:

06/30/82 06/30/82C FEMA LETTER RECEIVED:

12/01/81 12/01/81C CURRENT ANTITRUST:

The antitrust review is complete.

NEARING STARTED:

06/22/81 06/22/81C ASLB IMITIAL DECISION:

05/14/82 05/14/82C COMMISSION EFFECTIVENESS DECISION: 05/14/82 05/14/82C TECN SPECS COMPLETED:

11/15/82 11/15/82C i

COMMISSION DECISION:

09/00/83 ISSUE LIC. WITN POWER RESTRICTIDH:

11/15/82 11/15/82C LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

CONSTRUCTION COMPLETION - APPL.:

II/15/82C C9/27/82 L

l NRR LICEN$ING SYSTEM PAGE NO: 2-24 SEABROOK 1 8 2 0L CURRENT STATUS REP 0RT REPORT AS OF 08/31/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:

044380444

.LIC. PM:

V. HERSES ASLB CHAIR H. HCYT APPLICANT:

PUBLIC SERVICE OF NEW HAMPSHIRE LIC. BC:

G. KNIGHTON MEMBER 1 E. LUEBKE LOCATION:

13 MI S OF PORTSMOUTH, NH LIC. LA.:

J. LEE MEMBER 28 J. HARBOUR REGION:

1 AE UEC COUNSEL:

R. LESSY CONST. INSP A.

TOTH REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP A. CERNE DESIGN PWR: 3411 MWT/1198 MWE CONST: UEC RM ANALYST:

B. ST MARY ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

The FSAR acceptance review was completed in September 1981.

The FSAR was docketed October 5, 1981.

Applicant has ER DOCKETED:

10/05/81 10/05/81C responded to round 1 Q's.

SER was issued 03/07/83. ACRS ER SITE VISIT COMPLETE:

12/02/81 12/02/81C subcommittee meeting was held April 1-2, 1983.

ACRS INPUT TO DES TO PM:

03/01/82 03/01/82C full committee meeting was held on April 15, 1983.

The ISSUE DES:

05/14/82 05/14/82C ACRS letter is contained in SSER 2 which was issued RESPONSE TO COMMENTS ON DES:

08/18/82 09/15/82C ISSUE FES:

12/08/82 12/08/82C 06/30/83.

CURRENT ENV. STATUS:

ER was tendered June 1981.

ER acceptance review was completed September 1981 The ER was docketed SAFETY / HEARING MILESTONES:

October 5, 1981 DES was issued in May, 1982.

FES APPLICATION TENDERED:

06/29/81 06/29/81C was issued in December 1982.

SAR DOCKETED:

10/05/81 10/05/81C SAR Q'S RECEIVED BY PM 01/20/82 03/05/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/12/82 04/13/82C INPUT TO DRAFT SER TO PM:

05/07/82 10/08/82C CURRENT HRG. STATUS:

Notice for Opportunity for Hearing was published in ISSUE DRAFT SER:

07/30/82 08/13/82C the Federal Register on October 19, 1981.

Prehearing INPUT TO SER:

11/31/82 12/29/82C conferences were held May 6-7, 1982 July 15-16, 1982 ISSUE SER:

01/12/83 03/07/83C and April 7-8, 1983.

ASLB Order identifying parties, contentions and prehearing schedule was issued September ACRS LETTER RECEIVED:

02/17/83 04/19/83C 13, 1982.

Hearings started August 17, 1983.

INPUTS TO SE SUPPLEMENT 3:

N/S ISSUE SE SUPPLEMENT 3:

N/S FEMA LETTER RECEIVED:

09/00/83 CURRENT ANTITRUST HEARING STARTED:

08/17/83 08/17/83C Status to be determined.

ASLB INITIAL DECISION:

06/00/84 COMMISSION EFFECTIVENESS DECISION: 07/00/84 TECH SPECS COMPLETED:

07/00/84 COMMISSION DECISION:

08/06/84 ISSti LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

09/00/84 LATEST AMENDMENT:

48 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

Fuel load slipped to 9/84 per applicant letter of 12/02/82.

CONSTRUCTION COMPLETION - APPL.:

09/30/84 12/02/82

. - ~

NRR LICENSING SYSTEM PAGE NO: 2-25 SHORENAM 0L CURRENT STATUS REP 0RT REPORT AS OFI 08/31/83 e

PLANT CHARACTERISTICSt KEY PERS0NNELa I

DOCKET NO:

05000322 LIC. PM:

R. CARUS 0 ASLB CHAIR L. BRENNER APPLICANT:

LONG ISLAND LIGHTING CO.

LIC. BC:

4. SCHWENCER' MEMBER 1:

P. MORRIS LOCATION:

BROOKHAVEN, NY (LI)

LIC. LA.:

E. NYLTON MEMBER 2 G. FERGUSON REGION:

1 AE2 S8W COUNSEL:

B. BORDENICK CONST. INSP L. HARROW L

REAC. TYPE: BWR NSSS: GE ANTITRUST:

J. RUTBERG RESID. INSP J. HIGGINS DESIGN PWR: 2436 MWT/0820 MWE CONST: 58W RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATF, ACTUAL DATE The ACRS meeting was held in October 1781.

SER Supplement 2 was issued in March 1982.

SSER 03 was ER DOCKETED:

01/26/76 Ot/26/76C issued 02/04/83.

ER SITE VISIT COMPLETE:

08/06/76 08/03/76C INPUT TO DES TO PM:

11/22/76 11/29/76C ISSUE DES:

03/11/77 03/24/77C RESPONSE TO COMMENTS ON DES:

07/22/77 07/22/77C ISSUE FES:

10/21/77 10/18/77C CURRENT ENV. STATUS:

The environmental review is complete.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/09/75 09/04/75C SAR DOCKETED:

12/15/77 01/26/76C SAR Q'S RECEIVED BY PM:

06/04/76 07/09/76C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/23/76 07/23/76C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PH8 07/15/77 08/Ot/77C The first emergeney planning pre-hearing conference was ISSUE DRAFT SER:

h9ld 7/t3/83. A new safety contention regarding eme: gency INPUT TO SER:

03/10/81 03/10/81C diesel generators was admitted on 06/22/83. Hearings on ISSUE SER:

04/10/81 04/10/81C that contention are scheduled to start 08/29/83,. but were postponed indefinitely on 8/16/83, after a crankshaft ACRS LETTER RECEIVED:

09/18/81 10/19/81C on one of the EDGs failed during a load test.

Hearings on INPUTS TO SE SUPPLEMENT 4:

N/S Emergency Planning scheduled to begin 11/14/83.

ISSUE SE SUPPLEMENT 4 08/30/83 FEMA LETTER RECEIVED:

06/23/83 06/23/83C CURRENT ANTITRUST:

.Not required.

HEARING STARTED:

05/04/82 05/04/82C ASLB INITIAL DECISION:

09/00/83 COMMISSION EFFECTIVENESS DECISION: 12/00/83 TECH SPECS COMPLETED:

09/00/83 COMMISSION DECISIGHz 02/00/84 ISSUE LIC. WITH POWER RESTRICTION: 10/00/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/00/83 FSAR Amendment 30 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

03/00/84 08/04/83 The ASLB announced on 8/9/83 that it expected to issue a partial initial decision in late August or early September, 1983.

NRR LICENSING SYSTEM PAGE NO: 2-26 l

SOUTN TEXAS 1 &2 0L CURRENT STATUS REPURT REPORT AS OF 08/31/83 l

PLANT CHARACTERISTICS:

KEY P E R S 0 N N E L:

DOCKET NO:

049880499 LIC. PM:

A. VIETTI ASLB CHAIR:

C. BECHHOEFER APPLICANT:

HOUSTON LIGHTING & POWER COMPANY LIC BC:

G. KHIGHTON MEMBER 1:

J. LAMB LOCATION:

12 MI SSW OF BAY CITY, TEX LIC. LA.:

J. LEE MEMBER 2 E. HILL REGION:

4 AE BECH COUNSEL:

R. PERLIS CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP W. HILL DESIGN FWR 3800 MWT/1250 MWE CONST: EBASCO RM ANALYST:

L. LANIER ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

l BRRT has been replaced by Bechtel as the A/E.

BRRT has beers replaced by Ebasco as the constructor.

ER DOCKETED:

07/17/78C Hon-safety related construction restarted on June 15, 1982.

ER SITE VISIT COMPLETE:

09/26/78 09/26/78C l

Safety related construction restarted on August 15, 1982.

INPUT TO DES TO PM:

08/00/85 l

Current FLD is 12/86. Milestones now reflect a 12/86 FLD.

ISSUE DES:

09/00/85 Applicant plans a series of updates to the FSAR.

Review RESPONSE TO COMMENTS ON DES:

01/00/86 effort from updated FSAR docket thru applicant responses ISSUE FES:

02/00/86 to Q's.

CURRENT ENV. STATUS:

Schedule revised to reflect new 12/86 FLD.

Applicant SAFETY / HEARING MILESTONES:

plans update to the ER.

APPLICATION TENDERED:

05/10/78 05/10/78C SAR DOCKETED:

07/17/78C SAR Q'S RECEIVED BY PM:

01/22/79 02/08/82C SAP APPL. RESPONSE TO Q'S RECEIVED: N/S INPUT TO DRAFT SER TO PM:

02/01/85 CURRENT HRG. STATUS:

ISSUE DRAFT SER:

02/01/85 As provided in a Commission Order of 9/22/80, an INPUT TO SER:

11/01/85 expedited hearing on QA programs and management was held.

The record of this phase of the hearing ISSUE SER:

12/01/85 was closed on June 17, 1982.

Phase II of hearing will consider all aspects of Quadrex Report.

ACRS FULL COMMITTEE MEE1ING:

01/00/86 Phase II is expected to begin in the Summer of '83.

INPUTS TO SE SUPPLEMENT 18 01/00/86 ISSUE SE SUPPLEMENT 18 01/00/86 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Memo and Order issued May 6, 1982 approving settlements and HEARING STARTED:

06/00/86 proposed license conditions and dismissing proceeding.

ASLB INITIAL DECISION:

11/00/86 COMMISSION EFFECTIVENESS DECISION: 12/00/86 TECH SPECS COMPLETED:

12/00/86 COMMISSION DECISION:

12/00/86 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

12/00/86 LATEST AMENDMENT:

FSAR amendment 832 was issued 07/19/83.

SCHED. DATE RECEIPT DATE ER amendment 86 was issued 12/01/82.

NEW SLIPS / NOTES:

All schedules now reflect new official FLD of 12/86.

CONSTRUCTION COMPLETION - APPL.:

12/00/86 03/00/82 n

t__

m

HRR LICEN$ING SYSTEM PAGE HD: 2-27 SUSQUEHAMMA 2 0L CURRENT STATUS REPORT REPORT AS OF 08/31/83 PLANT CHARACTERI5TICSt KEY P E R S 0 N N E L:

DOCKET HO:

05000388 LIC. TM R. PERCH ASLB CHAIR J. GLEASON APPLICANT:

PENNSYLVANIA POWER 8 LIGHT LIC. BC:

A. SCHWEHCER MEMBER 1:

LOCATION:

7 MI NE OF BERWICK. PA LIC. LA.:

E. HYLTON MEMBER 2:

P. PURDOM REGION:

1 AE:

BECH COUNSEL:

J. CUTCHIN CONST. INSP L. HARROW REAC. TYPE: BWR HSSS: GE ANTITRUST:

A. H00GDON RESID. INSP J. MCCANN DESIGN PWR: 3440 MWT/1052 MWE CONST: BECH RM ANALYST L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued 04/06/81. SSER 81 was issued 07/07/81 Post ACRS SSER 62 was issued 09/10/81.

SSER 83 was ER DOCKETED:

06/10/78C issued 07/17/82. SSER 84 was issued 11/12/82. SSER 85 ER SITE VISIT COMPLETE:

10/20/78 10/20/78C was issued 3/29/83. SSER 86 is scheduled for 11/83.

INPUT TO DES TO PM:

ISSUE DES:

03/30/81 03/30/81C RESPONSE TO COMMENTS ON DES:

05/21/81 05/21/81C ISSUE FES:

06/15/81 07/02/81C CURRENT ENV. STATUS:

DES was issued on 03-30-81 FES was issued 07-02-81 SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/05/78 04/10/78C SAR DOCKETED:

07/31/78 07/31/78C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CUPdENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

04/07/80 04/07/80C The OL hearing is complete; Initial Decision issued on ISSUE DRAFT SER:

04-12-82.

INPUT TO SER:

03/23/81 03/23/81C ISSUE SER:

04/06/88 04/06/81C ACRS LETTER RECEIVED:

08/15/81C INPUTS TO SE SUPPLEMENT 6:

02/01/83 02/03/83C ISSUE SE SUPPLEMENT 6:

11/00/83 FEMA LETTER RECEIVED:

06/00/82 06/00/82C CURRENT ANTITRUST:

Complete.

HEARING STARTED:

10/06/81 10/06/81C ASLB INITIAL DECISION:

04/12/82 04/12/82C COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

12/00/83 COMMISSION DECISIDH 12/00/83 ISSUE LIC. WITH POWER RESTRICTIOH LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

01/00/84 FSAR:

No. 30s ER:

No. 5 SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETION - APPL.:

01/00/84

NRR LICEN$ING SYSTEM PAGE NO: 2-28 V0GTLE 1 82 0L CURRENT STATUS REPORT REPORT AS OF 08/31/83 PLANT C H A R A C T E R I S T I C 5:

KEY PERS0NNELa DOCKET NO 0424-0425 LIC. PM:

M. MILLER ASLB CHAIR:

A.

ROSENTHAL APPLICANT:

GEORGIA PGWER LIC. B C 's E. ADAMSAM MEMBER 1 LCCATION:

25 MI SSE OF AUGUSTA, GA LIC. LA.:

M. DUNCAN MEMBER 2:

REGION:

2 AE:

SSC/BECH COUNSEL:

B. BORDENICK CONST. INSP J. RAUSCH REAC. TYPE: PWR NSSS: WEST ANTITRUST:

RESID. INSP W. SANDERS DESIGN PWR: 3565 MWT/1210 MWE CONST: GPO RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONSS:

SCHED. DATE ACTUAL DATE FSAR was tendered on 06/30/83. Acceptance review is underway.

ER DOCKETED:

11/00/83 ER SITE VISIT COMPLETE:

01/00/84 INPUT TO DES TO PM:

05/00/84 ISSUE DES:

07/00/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

01/00/85 CURRENT ENV. STATUS:

ER is estimated for tendering in September 1983.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/30/83 06/30/83C SAR DOCKETED:

09/00/83

.SAR Q'S RECEIVED BY PM:

12/00/83 SAR APPL. RESPONSE TO 4'S RECEIVED: 04/00/84 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/00/84 Notice of Opportunity for Hearing is to be published in the ISSUE DRAFT SER:

08/00/84 Federal Register.

INPUT TO SER:

02/00/85 ISSUE SER:

04/00/85 ACRS FULL COMMITTEE MEETING:

05/00/85 INPUTS TO SE SUPPLEMENT 1:

ISSUE SE SUPPLEMENT 1:

08/00/85 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

To be determined.

HEARING STARTED:

01/00/86 ASLB INITIAL DECISION:

07/00/86 COMMISSION EFFECTIVENESS DECISIDH: 08/00/86 TECH SPECS COMPLETED:

COMMISSION DECISION:

09/00/86 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

09/00/86 12/31/81

l NRR LICENSING SYSTEM PAGE NO: 2-29 WASHINGTON HUCLEAR 1 0L CURRENT STATJS REPORT REPORT AS OF 08/31/83 PLAHT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO:

05000460 LIC. PM:

M. THADANI ASLB CHAIR:

H. GROSSMAN APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

E. ADENSAM MEMBER 1:

G. BRIGHT LOCATION:

10 MI H OF RICHLAND, WA LIC. LA.:

M. DUNCAN MEMBER 2 J. HARBOUR REGICH:

5 AE:

UEC COUNSEL:

M. YOUNG CONST. IHSP: J. CLIN REAC. TYPE: PWR HSSS: B3W ANTITRUST:

J. RUTBERG RESID. INSP:

A.

TOTH DESIGH PWR: 3760 MuT/1266 MWE CONST: BECH RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMEHTAL MILESTONES:

SCHED DATE ACTUAL DATE Application was tendered on 11-25-81.

Application was docketed on July 16, 1982.

The staff reviews will be ER L.KETED:

07/00/82 07/16/82C performed on " manpower available" basis.

The construction ER SITE VISIT COMPLETE:

permit was amended effective 06/16/83, extending the INPUT TO DES TO PM:

construction completion date from 01/01/82 to 06/01/91.

ISSUE DES:

N/S RESPONSE TO COMMENTS ON DES:

ISSUE FES:

N/S CURRtHT ENV. STATUS:

The staff reviews will be performed on " manpower available" basis.

SAFETY / HEARING MILESTPdES:

APPLICATION TENDEF.ED:

11/25/81 11/25/81C SAR DOCKETED:

07/00/82 07/16/82C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

Hotice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

Federal Register on August 16, 1982.

A petition to INPUT TO SER:

intervene has been received from the Coalition for ISSUE SER:

N/S Safe Power.

A prehearing conference was held in Richland, Wa., on January 26 and 27, 1983.

ASLB ACRS FULL COMMITTEE MEETING:

N/S denied CP amended hearing contention 81, and admitted INPUTS TO SE SUPPLEMENT 1:

CP contention 82.

The CP extension hearing is ISSUE SE SUPPLEMENT 18 N/S scheduled for January 10, 1984.

FEMA LETTER RECEIVED:

CURRENT ANTITRUST HEARING STARTED:

N/S ASLB INITIAL DECISIDH N/S COMMISSION' EFFECTIVENESS DECISI0H N/S TECH SPECS COMPLETED:

COMMISSIDH DECISION:

ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S ER amend. I dated 02/11/83, received 03/04/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Construction delay of from 2 to 5 years was announced CONSTRUCTION COMPLETION - APPL.:

N/S 04/29/82 on 4/29/82.

~

... m.

m

NRR LICENSING SYSTEM PAGE NO: 2-30 WASHINGTON NUCLEAR 2 0L CURRENT STATUS REP 0RT REPORT AS OF: 08/31/83 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNEL:

DOCKET NO:

05000397 LIC. PM:

R. AULUCK ASLB CHAIR:

E. BOWERS APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

A. SCHWENCER MEMBER 1:

R. COLE LOCATION:

30 MI NW OF RICHLAND, WASH LIC. LA.:

E. HYLTON MEMBER 2:

E. HILL REGION:

5 AE BIR COUNSEL:

W. PATON CONST. INSP A.

TOTH REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: R. FEIL DESIGN PWR: 3323 MWT/1103 MWE CONST: BECH RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued 3/31/82. Geology / Seismology reviews were included in SSER No. 1 issued August 11, 1982.

ACRS ER DOCKETED:

02/28/77 04/20/77C meeting was held on October 7, 1982.

SSER No. 2 was ER SITE VISIT COMPLETE:

07/13/77 07/14/77C issued 12/21/82. SSER 83 issued on 05/20/83.

INPUT TO DES TO PM:

06/30/81 06/30/81C ISSUE DES:

07/31/81 07/31/81C RESPONSE TO COMMENTS ON DES:

09/28/81 09/28/81C ISSUE FES:

12/31/81 12/31/81C CURRENT ENV. STATUS:

FES was issued 12-31-81.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/30/76 12/30/76C SAR DOCKETED:

04/01/78 06/22/78C SAR Q'S RECEIVED BY PM:

01/05/79 03/07/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/11/79 07/26/79C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/12/81 10/12/81C A prehearing conference on CP extension order was held ISSUE DRAFT SER:

11/17/81 11/17/81C on January 26, 1983, in Richland, Wa.

On February 22.

INPUT TO SER:

05/30/82 OS/30/82C 1983, the ASLB denied the request for hearing filed by ISSUE SER:

03/31/82 03/31/82C the Coalition for Safer Power and dismissed the proceeding.

No DL hearings schedul d.

ACRS LETTER RECEIVED:

11/13/82 11/13/820 INPUTS TO SE SUPPLEMENT 3 11/22/82 11/22/82C ISSUE SE SUPPLEMENT 3:

05/20/83 05/20/83:

FEMA LETTER RECEIVED:

08/01/83 CURRENT ANTITRUST:

Not required HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISIDH N/S TECH SPECS COMPLETED:

09/00/83 COMMISSION DECISION:

10/00/83 ISSUE LIC. WITH POWER RESTRICTION:

L ATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

11/00/83 SCHED. DATE RECEIPT DtTE NEW SLIPS / NOTES:

01NSTRUCTION COMPLETION - APPL.

11/00/83 08/24/83

I NRR LICEN$ING SYSTEM PAGE NO: 2-31 WASHINGTON NUCLEAR 3 0L CURRENT STATUS REPORT MEP9RT AS OF 08/3f/83 PLANT CHARACTERI$ TIC $2 KEY PERS0NNELa DOCKET NO:

05000508 LIC. PM:

A. VIETTI ASLB CHAIR:

M. MARQULIES APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC G. KNIGhTON MEMBER 12 F. SHON LOCATIONt 26 MI W OF OLYMPIA, WA LIC. LA.:

J. LEE MEMBER 2:

R. FOSTER REbiON:

5 AE:

EBASCO COUNSEL:

D. HASSELL CONST. INSP D. KIRSCH REAC. TYPE: PWR NSSS: COMB ANTITRUST B. V0GLER RESID. INSP W. ALBERT DESIGN PWR: 3800 MWT/1242 MWE CONST EBASCO RM ANALYST L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was tendered on June 2, 1982, and was docketed on 08/27/82. Review effort from FSAR docket ER DOCKETED:

08/27/82 08/27/82C thru appilcant responses to 4's.

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

09/08/83 ISSUE DES:

11/07/83 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

04/06/84 CURRENT ENV. STATUS:

Application was tendered on June 2, 1982, and was docketed on 08/27/82. Review effort from ER docket SAFETY / HEARING MILESTONES:

thru preparation and issuance of the DES.

APPLICATION TENDERED:

06/02/82 06/02/82C SAR DOCKETED:

08/27/82 08/27/82C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/28/83 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

12/01/83 Federal Register on 09/15/82. On February 25, 1983, a INPUT TO SER:

06/05/84 request for a hearing and petition for leave to intervene ISSUE SER:

08/09/84 was received from coalition for Safe Power of Portland, Oregon. On April 21, 1983 the Licensing Board handed down ACRS FULL COMMITTEE MEETING:

09/00/84 an order to accept its late filed petition..Prehearing INPUTS TO SE SUPPLEMENT 18 11/06/84 was held on August 17, 1983.

ISSUE SE SUPPLEMENT 1:

12/13/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST 3.

Notice of receipt of Antitrust Information was published HEARING STARTED:

05/00/85 in the Federal Register on October 27, 1983.

ASLB INITIAL DECISION:

11/00/85 COMMISSION EFFECTIVENESS DECISION: 12/00/85 TECH SPECS COMPLETED:

12/00/85 COMMISSION DECISI0H:

12/00/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

On July 8, 1983, the Supply System Executive Board CONSTRUCTION COMPLETION - APPL.:

12/00/85 10/01/82 adopted a resolution calling for an immediate construction delay of WNP-3 until an assured source of funding can be obtained.

NRR LICEN$ING SYSTEM PAGE NO: 2-32 WATERFORD 3 0L CURRENT STATUS REP 0RT REPORT AS OF 08/31/83 PLANT CHARACTERI$7ICSt KEY PERS0NNELa DOCKET NO:

05000382 LIC. PM:

J. WILSON ASLB CHAIR:

S. WOLFE APPLICANT:

LOUISIANA POWER 8 LIGHT LIC. BC:

G. KNIGHTON MEMBER 1 W. JORDAN LOCATION:

20 MI W OF MEW ORLEANS, LA LIC. LA.:

J. LEE MEMBER 2:

H. FOREMAN REGIf a 4

AE EBASCO COUNSEL:

S. TURK CONST. INSP

, UNASSIGNED REAC. TYPE: PWR HSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP L. CONSTABLE DESIGN PWR 3560 MWT/1151 MWE CONST: ESASCO RM ANALYST L. LAMIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The safety review was expedited. SSER No. 4 was issued issued 7/8/83. Fuel Ioad date was delayed unti! 05/43 ER DOCKETED:

12/09/78 12/09/78C by applicant. A new date will be supplied in September.

ER SITE VISIT COMPLETE:

12/05/88 12/05/40C INPUT TO DES TS PR 04/06/81 04/04/8tC ISSUE DES:

05/01/81 SS/01/StC RESPONSE TO COMMENTS ON DES:

07/24/81 08/19/81C ISSUE FES:

09/30/89 09/30/ SIC CURRENT ENW. STATUS:

The DES was completed in Mey 1981 FES was completed September 1981.

SAFETY / NEARING MILESTDNES:

APPLICATION TENDERED:

09/28/78 09/28/78C SAR DOCRETED:

12/18/78C SAR 4'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE T0 t'S RECEIVED: 98/08/80 12/15/80C CURRENT MRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/03/88 05/15/81C Constested hearing started 03/82. Partial initial Decision ISSUE DRAFT SER:

Issued 11/03/82. Hearing for remaining item (emergency INPUT TO SER:

05/08/81 05/15/81C preparedness) was held Feb. 7-11, 1983.

Record closed ISSUE SER:

07/09/81 07/09/81C Feb. 11, 1983.

Appeal Board hearing was held April 19, 1953 to hear rebut *al of 11/03/87 PID.

Second partial initial ACRS LETTER RECEIVED:

08/08/81 08/08/81C decision issued 05/26/83 by ASLB.

ASLAB decision issued INPUTS TO SE SUPPLEMENT 58 C5/18/83 05/tS/83C 06/29/83. Commission review extended until 09/07/83.

ISSUE SE SUPPLEMENT 58 02/28/83 07/08/83C FEMA LETTER RECEIVED:

09/15/83 CURRENT ANTITRUST Staff is reviewing OL antitrust information.

HEARING STARTED:

08/17/83 08/17/83C ASLB INITIAL DECISION:

05/26/83 05/26/83C COMMISSION EFFECTIVENESS DECISIDH 09/00/83 TECH SPECS COMPLETED:

09/00/83 COMMISSION DECISION:

ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/00/83 ER 83 - 8/81 FSAR 832 - 6/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

To date State of Louisiana does not have an approved CONSTRUCTION COMPLETION - APPL.:

05/00/83 08/24/82 emergency plan.

NRR LICEN$ING SY$ TEM PAGE NO: 2-35 WATTS BAR 1 &2 0L CURRENT STATUS REPORT REPORT AS OF 08/31/83 PLANT CNARACTERISTICSt KEY PLRS0NNELa DOCKET NO:

039080391 LIC. PM:

T. KENYON ASLB CHAIR N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM MEMBER 18 N/A LOCATION:

10 MI S OF SPRING CITY, TENN LIC. LA.:

M. DUNCAN MEMBER 2 N/A REGION:

2 AE:

TVA COUNSEL:

M. YOUNG CONST. INSP W.

SWAN REAC. TYPE: PWR NSSS: WEST ANTITRUST J. RUTBERG RESID. INSP T. HEATHERLY DESIGN PWR 3411 MWT/It65 MWE CONST TVA RM ANALYST L. LANIER CURRENT SAF. STATUS:

ENVIRUNMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CFP predicted earliest Unit 1 completion date at 06/84.

SER published 07/82.

ACRS subcommittee meetings held ER DOCKETED:

01/05/77 1*'23/76C 04/30/82 and 08/10/82. ACRS full committee meeting ER SITE VISIT COMPLETE:

03/18/77 02/25/77C held 08/13/82. ACRS letter received 08/16/82. Supplement INPUT TO DES TO PM:

07/06/77 08/IS/77C et to SER published 09/22/82. Supplement 92 to SER ISSUE DES:

11/29/77 06/02/78C scheduled 11/83.

RESPCNSE TO COMMENTS ON DES:

N/A ISSUE FES:

11/24/78 12/29/78C CURRENT ENV. STATUS:

Ceeplete except for environmental toch specs.

SAPETY/ NEARING MILESTONES:

APPLICATION TENDERED:

06/30/76 06/30/76C SAR DOCKETED:

10/04/76 10/04/76C SAR t'S RECEIVED BY PM:

12/15/76 05/20/77C SAR APPL. RESPONSE TO t's RECEIVED: 03/23/77 02/10/74C CURRENT NRS. STATUS:

INPUT TO DRAFT SER TO PM:

06/18/40 12/IS/ SIC No heerings are assumed.

ISSUE DRAFT SER:

12/30/88 12/30/ SIC INPUT TO SER:

06/04/42 06/04/82C ISSOE SER:

07/08/82 07/05/82C ACRS LETTER RECEIVED:

09/08/82 04,14/82C INPUTS TO SE SUPPLEMENT 28 08/27/82 09/03/42C ISSUE SE SUPPLEMENT 2:

11/08/43 FEMA LETTER RECEIVED:

09/01/83 CURRENT ANTITRUST:

Complete NEARING STARTED:

N/A ASiB INITIAL SECISION:

N/A COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

12/08/83 COMMISSION DECISION:

ti/00/83 ISSUE LIC. WITN POWER RESTRICTION: 01/06/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

03/00/84 FSAR No. 46 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

01/00/84 02/25/83

l l

l NRR LICENSING

$YSTEM PAGE N0: 2-34 WOLF CREEK 1 0L CURRENT STATUS REP 0RT REPORT AS OF: 08/31/83 PLAHT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO:

05000482 LIC. PM:

J. HOLOMICH ASLB CHAIR:

J. LAURENSON APPLICANT:

KANSAS GAS 8 ELECTRIC LIC. BC:

B. YOUNGBLOOD MEMBER 1 G. ANDERSON LOCATION:

3.5 MI NE OF BURLINGTON, KAN LIC. LA.:

M. RUSH 8R00K MEMBER 2:

H. PAXTON REGIOHe 4

AE BECH COUNSEL:

M. KARMAN CONST. INSP H. ROBERDS REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP: S. SCHUM DESIGN PWR 3425 MWT/1150 MWE CONST DANIEL RM ANALYST:

S. HEDLUND ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE 1

CURRENT SAF. STATUS:

)

The SER was issued in April 1982. SSER-1 was issued in August 1982 and SSER-2 in June 1983.

SSER-3 was issued ER DOCKETED:

11/25/80 11/25/80C ER SITE VISIT COMPLETE:

07/28/81 04/21/81C in August 1983.

INPUT-70 DES TO PM:

10/01/81 10/01/81C l

ISSUE DES:

01/05/82 01/05/82C RESPONSE TO COMMENTS ON DES:

05/14/82 05/14/82C ISSUE FES:

06/11/82 06/11/82C l

CURRENT ENV, STATUS:

The DES was issued in January 1982.

The FES was issued SAFETY / HEARING MILESTONES:

in June 1982.

APPLICATION TENDERED:

02/21/80 02/21/80C SAR DOCKETED:

08/07/80 08/07/80C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

INPUT TO PRAFT SER TO PM 03/12/82 G3/12/82C CURRENT HRG. STATUS:

Notice of Opportunity for Hearir.g was published in the ISSUE DRAFT SER:

Federal Register on 12/18/80.

Two petitions for INPUT TO SER:

03/19/82 03/19/82C leave to intervene were filed. A special combined ISSUE SER:

04/07/82 04/07/82C prehearing conference was held on 4/15/81. A second prehearing conference was held on March 10, 1983.

ACRS LETTER RECEIVED:

05/11/82 05/11/82C Hearing is tentatively scheduled for Jan. 17-26, 1984 INPUTS TO SE SUPPLEMENT 38 07/08/83 07/08/83C ISSUE SE SUPPLEMENT 33 08/26/83 08/26/83C and Feb. 14-23, 1983.

FEMA LETTER RECEIVED:

09/15/83 CURRENT ANTITRUST:

HEARING STARTED:

01/17/84 OL antitrust review is in progress.

ASLB INITIAL DECISI0Hz 06/00/84 COMMISSIGH EFFECTIVENESS DECISION: 07/00/84 TECH SPECS COMPLETED:

02/00/84 COMMISSIDH DECISION:

07/00/84 ISSUE LIC. WITH POWER WESTRICTION: N/A ISSUE FULL POWER LICENSE AMEND:

08/00/84 LATEST AMENDMENT:

SNUPPS FSAR - No. Its Wolf Creek Site Addendum - No. 10s SCHED. DATE RECEIPT DATE ER - No. 4.

NEW SLIPS / MOTES:

CONSTRUCTION COMPLETION - APPL.:

08/08/84 05/23/83

NRR LICENSTNG SY$ TEM PAGE NO: 2-35 ZIMMER 1 0L CURRENT S fATUS REP 0RT REPORT AS OF 08/31/83 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNEL DOCKET NO:

05000358 LIC. PM:

L. KINTNER ASLB CHAIR:

J. FRYE APPLICANT:

CINCINNATI GAS 8 ELECTRIC LIC. BC:

B. YOUNGBLOOD MEMBER 12 F. HOOPER LOCATION:

24 MI SE OF CINCINNATI, OH LIC. LA.:

M. RPtHBROOK MEMBER 2 M. LIVINGSTON REGION:

3 AE S8L COUNSEL:

C. BARTH CONST. INSP: D. HUNTER REAC. TYPE: BWR HSSS: GE ANTITRUST:

S. LEWIS RESID. INSP: F. CHRISTIANSON DESIGN PWR: 2436 MWT/0810 MWE CONST: KAISER RM ANALYST B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SSER1 was issued on 06/04/81, SSER2 on 10/81, and SSER3 on 08/23/82. Resolution of open items in the safety review is ER DOCKETED:

09/10/75 09/10/75C continuing. On 11/12/82 the Commission issued an order to ER SITE VISIT COMPLETE:

10/09/75 10/09/75C Show Cause 8 Order Immediately Suspending C onstruction INPUT TO DES TO PM:

08/20/76 08/19/76C because of QA concerns. On 12/8/82, appl. consented to the ISSUE DES:

10/15/76 10/15/76C Order.

In response to Commission's Order, appl. obtained RESPONSE TO COMMENTS ON DES:

03/25/77 04/01/77C 4

a report of a review by an independent contractor on Zimmer ISSUE FES:

06/10/77 06/10/77C project eget.

Report recommends a revised organization to complete construction. NRC eval. team reported results of assessment of hardware at Zimmer (NUREG-0969).

CURRENT ENV. STATUS:

Complete SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

08/15/75 05/09/75C SAR DOCKETED:

09/15/75 09/10/75C SAR Q'S RECEIVED BY PM:

10/29/76 01/06/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/31/76 07/29/77C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/28/77 08/11/77C Hearing completed 3/5/82. Licensing Board decision rendered ISSUE DRAFT SER:

N/A 6/82, which authorizes fuel loading and low power testing INPUT TO SER:

05/20/77 12/07/77C up to 5% power but precludes the NRC staff from issuing a ISSUE SER:

07/29/77 01/31/79C full power license and orders additional hearings on emergency plans.

On b/2/83, Appeal Board affirmed Licensing ACRS LETTER RECEIVED:

09/16/77 03/13/79C Board's decision with mods.

On 7/13/83 decision became INPUTS TO SE SUPPLEMENT 3:

06/17/82 08/02/82C final.

Intervenor MVPP moved the Licensing Board to reopen ISSUE SE SUPPLEMENT 38 08/23/82 08/23/82C the hearing on quality assurance issues.

FEMA LETTER RECEIVED:

04/15/82 04/tS/82C CURRENT ANTITRUST:

Antitrust review is now closed.

HEARING STARTED:

02/26/82 02/26/G2C ASLB INITIAL DECISION:

N/S COMMISSION EFFECTIVENESS DECISION: HeS TECH SPECS COMPLETED:

11/00/84 COMMISSION DECISI0H:

11/00/84 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/09/84 Application amendment 150, FSAR Revision 96.

SCHED. DfTE RECEIPT DATE NEW SLIPS / NOTES:

Applicant letter of 86/01/83 revised estimated construction CONSTRUCTION COMPLETION - APPL.:

12/00/84 06/01/83 completion date to the fourth quarter of 1984.

Construction is still suspended by 11/12/82 Order.

NRR LICEN$ING SYSTEM PAGE NO: 2-36 CLINCH RIVER CP CURRENT STATUS REPORT REPORT AS OF 88/31/83 PLANT C H A R A C T E R I S T I C 5:

KEY PERS0NNELa DOCKET NO:

85000537 LIC. PM:

R. STARK ASLB CHAIR:

M. MILLER APPLICANT:

PROJECT MANAGEMEKT CORP.1 DOE;TVA LIC. BC:

H. GRACE MEMBER 1 G. LINENBERGER LOCATION:

25 MI W OF KNOXVILLE, TH LIC. LA.:

P. SHUTTLEWORTH MEMBER 2:

C. HAND REGION:

2 AE:

B8R COUNSEL:

S. TRERY CONST. INSP I

REAC. TYPE: LMFBR HSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP 8-DESIGN PWR 0975 MWT/0350 MWE CONST: 58W RM ANALYST B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety review was reinitiated in October 1981.

'A revision to the Site Suitability Report was issued June 11, 1982.

ER DOCKETED:

04/11/75 04/ft/75C On Auaust 17, 1982, HRC issued an order granting Clinch ER SITE VISIT COMPLETE:

River's request to begin site preparation activities.

INPUT TO DES TO PM:

The Site Suitability Report hearing sessions were held ISSUE DES:

02/12/76C in Oak Ridge during the week of August 23, 1982.

SER was RESPONSE TO COMMENTS ON DES:

issued 3/11/83.

The ACRS meeting was held 4/14/83.

LWA-2 ISSUE FES:

02/07/77 02/07/77C will not be requested. Safety hearing was held August 8-11, l

I 1983.

Supplement No. 1 was issued on 5/2/83 and Supplement No. 2 was issued on 5/20/83.

CURRENT ENV. STATUS:

The FES was issued in February 1977. A draft supplement to the FES was issued on July 19, 1982.

A final supplement SAFETY / NEARING MILESTONES:

was issued on October 29, 1982.

APPLICATION TENDERED:

10/15/74 10/15/74C SAR DOCKETED:

06/13/75 06/13/75C SAR 9'S RECEIVED BY PM:

04/09/82 04/09/82C SAR APPL. RESPONSE TO 9'S RECEIVED: 05/15/82 05/15/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/16/82 07/16/82C Hearing sessions on the SSR took place on August 23-27, ISSUE DRAFT SER:

09/27/82 09/27/82C 1982.

The FES hearings were held November 15-19, 1982, INPUT TO SER:

01/14/83 02/04/83C December 13-17, 1982, and on January 4-5, 1983.

PID was ISSUE SER:

03/11/83 03/tt/83C issued on 02/28/83 on the FES hearing. Safety hearing was held August 8-11, 1983.

ACRS LETTER RECEIVED:

04/19/83 04/19/83C INPUTS TO SE SUPPLEMENT 28 04/22/83 04/22/83C ISSUE SE SUPPLEMENT 28 05/20/83 05/20/830 CURRENT ANTITRUST:

HEARING STARTED:

08/23/82 08/23/82C ASLB INITIAL DECISION:

04/01/84 COMMISSION EFFECTIVEMESS DECISION: 06/00/84 TECH SPECS COMPLETED:

COMMISSION DECISION:

06/06/84 LATEST AMENDMENT:

l NEW SLIPS / MOTES:

I h

l l

(

HRR LICEN$ING

$YSTEM PAGE NO: 2-37 l

l SKAGIT/HANFORD 182 CP CURRENT STATUS REPORT REPORT AS OF8 08/31/83 i

i PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNEL DOCKET NO:

052280523 LIC. PM:

M. THADANI ASLB CHAIR J. WOLF APPLICANT:

PUGET SOUND POWER 8 LIGHT LIC. BC:

E. ADENSAM MEMBER 1:

F. HOOPER LOCATION:

12 MI. NW OF RICHLAND. WA.

LIC. LA.:

M.

DUNCAN MEMBER 2:

G. LINENBERGER REGIGH:

5 AE:

BECH COUNSEL:

L. DEWEY CONST. INSP:

REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP DESIGN PWR: 3833 MWT/1277 MWE CONST BECH RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONSS:

SCHED. DATE ACTUAL DATE Supplement No. 2 to the SER was issued 10/81 on TMI related action items.

The ER 8 FSAR amendments were submitted on ER DOCKETED:

09/30/74 09/30/74C 12/31/83. The applicant provided information on relocation ER SITE VISIT COMPLETE:

02/05/82 02/05/82C of the site to Hanford Reservation. Supplement 3 to the INPUT TO DES TO PM:

04/09/82 04/09/82C to the SER was issued in 12/82.

The staff recommends ISSUE DES:

05/04/82 05/04/82C additional investigations of the May Junction menocline.

RESPONSE TO COMMENTS OH DES:

08/06/82 09/30/82C An ACRS subcommittee site visit and meeting was complete on ISSUE FES:

N/S 01/24-25/83.

The ACRS completed its review in a meeting on 02/10/83 and reported the results of its review in a letter to the chairman on 02/16/83.

CURRENT ENV. STATUS:

Site relocation (to Hanford) DES was issued on 5/4/82. In response to the applicant's request of 2/4/83, issuance of SAFETY / HEARING MILESTONES:

the FES + 2d been defered until issuance of the Northwest Conserva uon and Electric Power Plan by the Northwest Power APPLICATION TENDERED:

08/06/74 08/06/74C Council. On 4/27/83 Council adopted its first plan.

The SAR DOCKETED:

01/15/75 01/15/75C proposed portfolio of electrical resources for the next 20 SAR Q'S RECEIVED BY PM:

02/10/82 02/10/82C years did not include S/HNP.

Applicant is proposing SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/82 10/01/82C cancellation of the facility.

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

A prehearing schedule on safety matters was established on ISSUE DRAFT SER:

1/18/83 including a tentative date of 5/17/83 for beginning INPUT TO SER:

07/11/77 07/11/77C of hearing. Applicants on 2/4/83 and the intervenors on ISSUE SER:

08/31/77 08/31/77C 2/10/83 submitted motions to suspend the safety prehearing schedule. On 2/18/83 the Board suspended the prehearing ACRS LETTER RECEIVED:

01/00/83' 02/16/83C schedule (Safety) including the filing of new contentions INPUTS TO SE SUPPLEMENT 3 11/30/82 11/30/82C pending adoption of the Final Regional Power Plan and uneil ISSUE SE SUPPLEMENT 3:

11/30/82 12/30/82C the conclusion of hearings on "Need for Power".

CURRENT ANTITRUST:

Complete HEARING STARTED:

07/15/75 07/15/75C ASLB INITIAL DECISION:

N/S COMMISSIDH EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:

N/A COMMISSION DECISION:

N/S CP ISSUED:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES:

l l

t NRR LICEN5ING SYSTEM PAGE NO: 2-38 (HSS)CESSAR SYSTEM 80 FDA CURRENT STATUS REP 0RT REPORT AS OF1 08/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET HG.

05000470 LIC. PM:

G. MEYER ASLB CHAIR:

APPLICANT:

COMBUSTIDH ENGINEERING LIC. BC C.

THOM45 MEMBER 1:

LGCATION:

N/A LIC. LA.:

P.

ANDERSON MEMBER 2 REGION:

0 AE:

COUNSEL:

M. WAGNER CONST. INSP REAC. TYPE: PWR NSSS: COMB ANTITRUST:

RESID. INSP DESIGH PWR 3800 MWT/1295 MWE CONST:

RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER (HUREG-0852) issued 11/81 Awaiting documentation to resolve ACRS, open, and confirmatory issues.

SSER-1 was ER DOCKETED:

issued 03/30/83.

SSER-2 is scheduled to be issued on ER SITE VISIT COMPLETE:

09/14/83.

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

N/A.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/27/78 10/27/78C SAR DOCKETED:

12/21/79 12/21/79C SAR Q'S RECEIVED BY PM:

09/01/80 09/01/81C SAR APPL. RESPONSE TD Q'S RECEIVED: 01/01/81 07/15/81C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S N/A.

ISSUE C1'.FT SER:

N/S INPUT 10 SER:

11/01/81 11/13/81C ISSUE SER:

05/01/82 11/10/81C ACRS LETTER RECEIVED:

06/21/82 12/15/81C INPUTS TO SE SUPPLEMENT 23 07/15/83 07/27/83C ISSUE SE SUPPLEMENT 28 09/14/83 CIIRRENT ANTITRUST:

HEARING STARTED:

N/A ASLB INITIAL DECISIGHz N/A COMMISSION DECISION:

09/00/83 SPECIAL PROJECT COMPLETE:

09/30/83 LATEST AMENDMENT:

HEW SLIPS / MOTES:

u

1 NRR LICENSING SYSTEM PAGE NO: 2-39 (NSS)GESSAR SEVERE ACC FDA CURRENT STATUS REPORT REPORT AS OF 08/31/83 PLANT CHARACTERISTICSt KEY PERSONNELa DOCKET NO:

00007447 LIC, PM:

D. SCALLETTI ASLB CHAIR: N/A APPLICANT:

GENERAL ELECTRIC COMPANY LIC. BC:

C. THOMAS MEMBER 1:

N/A LOCATION:

N/A LIC. LA.:

P.

ANDERSON MEMBER 2:

N/A REGION:

0 AE BRAUN COUNSEL:

B. BORDENICK CGNST. INSP REAC. TYPE: BWR HSSS: GE ANTITRUST:

RESID. INSP DESICM PWR 3579 MWT/1220 MWE CONST:

RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82; review is in progress.

Dates shown reflect review for the severe accident ER DOCKETED:

design.

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C SAR DOCKETED:

02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:

09/01/82 10/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/01/83 02/Ot/83C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

ISSUE DRAFT SER:

INPUT TO SER:

02/01/84 ISSUE SER:

03/01/84 ACRS FULL COMMITTEE MEETING:

04/06/84 INPUTS TO SE SUPPLEMENT 1 04/2t/84 ISSUE SE SUPPLEMENT 18 05/25/84 CURRENT ANTITRUST:

FDA antitrust review is in progress.

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION DECISIDH2 N/A SPECIAL PROJECT COMPLETE:

05/00/84 LATEST AMENDMENT:

FSAR Amendment No. 14 was received in April, 1983.

NEW SLIPS / NOTES:

NRR LICENSING

$YSTEM AS OF808/31/83 H0N-POWER RENEWALS INPUT ISSUE DOCKET EARLIEST ISSUEM TER ISSUE FES OR START ISSUE HON-POWER FACILITY NUMBER DOCKET REE TO PM 1Eg glA HEARING RL CONNENTS AFRRI 05000170 10/80C H/A 09/81C 01/82C N/A N/S N/S CONTESTED CASE 1000.0000KW TRIGA CORNELL U.

05000157 05/80C N/A 02/83C 07/83C 09/83 N/A 09/83 100.0000KW TRIGA CORNELL UNIVERSITY 05000097 10/78C N/A 02/83C 09/83 09/83 N/A 09/83

.1000KW CRITI CE TEST REACTOR 05000070 07/77C N/S N/S N/S H/S N/S N/S ORDER TO SHOW CAUSE.

50.0000KW TANK ASLAB HEARINGS.

GE HTR 05000073 11/79C N/A 06/84 09/84 09/84 N/A 09/84 100.0000KW POOL IDWA STATE 05000116 09/79C N/A 09/83 09/83 09/83 N/A 09/83 10.0000KW ARGHT MANHATTAN COLLEGE 05000199 08/83C N/A 08/84 1C/84 10/84 H/A 10/84

.0001KW CRITI MICHIGAN STATE 05000294 09/77C N/A 12/83 12/83 N/A N/A 12/83 250.0000KW TRIGA HBSR 05000184 12/80C 02/82C 09/82C 09/83 09/82C N/A 09/83 POWER INCREASE TO 20 MW 10.0000KW TANK INCLUDED IN RENEWAL RENSSELAER 05000225 05/79C N/A 05/83C 09/83 09/83 N/A 09/83

.0000KW CRITI U. OF KANSAS 05000148 03/80C N/A 02/84 04/84 04/84 H/A 04/84 250.0000KW POOL U. OF MD.

05000166 05/80C N/A 10/83 12/83 N/A N/A 12/83 250.0000KW TRIGA U. OF MO., ROLLA 05000123 10/79C N/A 04/84 06/84 N/A N/A 06/84 200.0000KW POOL U. OF OKLA.

05000112 10/78C N/A 05/83C 09/83 09/83 N/A 09/83

.0150KW AGN U. OF TEXAS 05000192 05/80C N/A 03/83C 06/83C 07/81C N/A 07/83C 250.0000KW TRIGA U. OF UTAH 05000407 05/83C H/A 11/83 02/84 H/A N/A 02/84 100.0000KW TRIGA

NRR LICEN5ING SYSTEM AS OF308/31/83 NON-POWER RENEWALS INPUT ISSUE DOCKET EARLIEST ISSUEM. TER ISSUE FES OR START ISSUE NON-POWER FACILITY NUMBER DOCKET LE1 TO PM 11R Eli HEARING EL COMMENTS U. OF VA., CAVALIER 05000396 06/84 N/A 07/84 09/84 N/A N/A 09/84

.1000KW POOL DCLA, ARGONAUT 05000142 02/80C N/A 10/82C 06/81C 06/81C 09/80C N/S CONTESTED CASE 100.0000KW ARGNT l

UNION CARBIDE 05000054 05/80C N/A 10/82C 12/83 12/83 N/A 12/83 5000.0000KW POOL VA N0 SPITAL 05000131 01/80C N/A 05/83C 07/83C N/A N/A 08/83C l

18.0000KW POOL VA. POLY. INSTITUTE 05000124 10/79C N/A 01/84 03/84 03/84 N/A 03/84 100.0000KW ARGNT WEST., TRAINING REACTOR 05000087 12/81C N/A 11/85 02/84 02/84 N/A 02/84 10.0000KW TANK J

u FOR TEST REACTORS ONLY

w M

M Z

Q M

U hJ en

{

I 4

I

l l'

l NRR LICENSING SYSTEM PAGE NO: 2-f 0L C.U R R E N T STATUS REPORT REPORT AS OFs PLANT. CHARACTE1: ISTICSt KEY PERSONNELa DOCKET NO:

Docket No. or Project No.,if not docketed LIC. PM:

Licensing Project Manager ASLB CHAIR ASLB Chairman APPLICANT:

Utility LIC. BC:

Licensing Branch Chief MEMBER 12 on panel LOCATIDH Miles and direction from nearest major town LIC. LA.:

Licensing Assistant MEMBER 2:

on panel REGION:

1 through 5 AE:

Architect / Engineer COUNSEL:

Attorney assigned to case CONST. INSP : Construction Inspector REAC. TYPE: PWR, BWR, HTGR or LMFBR NSSS: Nuclear Steam Systems Supplier ANTITRUST Antitrust Attorney RESID, INSP: Resident inspector DESIGN PWR: Megawatts electric & thermal CGNST: Constructor MP A AN A LYST MPA analyst assigned to track protect CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety status for this reporting period only. It consists of accomplish nents and schsdule changes occurring since the last issue of Blue Book. Outstanding issues and late input from ER DOCKETED:

Environmental Report review branches should be indicated, along with indication of the critical path.

P O

T Project Manager ISSUE DES:

Draft Environmental Statement RESPONSE TO COMMENTS ON DES:

ISSUE FES Final Environmental Statement CURRENT ENV. STATUS:

Environmental status for this reporting period only. It consists of accomplishments and schedule chengss occurring since the last issue of Blue Book. Outstanding issues and late SAFETY / HEARING MILESTONES:

input from review branches should be indicated.

APPLICATION TENDERED:

SAR DOCKETED:

Safety Analysis Report SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

Changes in the hearing dates since the last issue of Blue Book. Changes in intervention and ISSUE DRAFT SER:

Safety Evaluation Report contentions should be indicated.

ER ACRS LETTER RECEIVED:

Advisory Committee INPUTS TO SE SUPPLEMENT 3:

on Reactor Safeguards ISSUE SE SUPPLEMENT 3:

CURRENT. ANTITRUST:

Changes in the antitrust status since the last issue of Blue Book.

HEARING $ TARTED:

ASLB INITIAL DECISION:

Atomic Safety & Licensing Board ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

I ISSUE PARTIAL POWER LICENSE:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

The latest amendment submitted by the applicant.

SCHED. DATE RECEIPT DATE MEW SLIPS / NOTES:

Slips or potential problems that should be brought to management's attention.

CONSTRUCTION COMPLETION - APPL.I

'I[

construction in construction Completion Completion

  • c.s. -

. rmIwTruG orrIcs: 1983-3si-299 166 l

1

L NR eOmu 335

'^ "'#"# #V U S NUCLE AR REGUL ATORY COMMISSION BIBLIOGRAPHIC DATA SHEET NUREG-0580 Vol. 12. No. 8 6 TIT LE AND SUhTITLE (Add Volume No, st worwroarel 2 (Leave Dinkl Regulatory Licensing Status Sumary' Report 3,, c,,,,,,,S ACCESSION NO.

(Bluebook)

7. AUTHOR (St
5. DATE REPORT COMPLE TED MONTH l YEAR Seotember 1983
9. PE RFORMING ORGANIZATION NAME AND MAILING ADORESS (tactude Iso Code /

DATE REPORT ISSUED MONTH l YEAR Office of Resource Management Management Infomation Branch September 1983

, ft,,,, y,,,

U. S. Nuclear Regulatory Comission Washington. DC 20555

s. ite,,, umai
12. SPONSORING ORGANIZATION NAME AND MAILING ADDRESS (include Ip Codel P

' RK M @

Offica of Resource Management Managsilent Infomation Branch ti. CONTRACT NO-U. S. Nuclear Regulatory Comission Washington, DC 20555 13 TYPE OF REPORT PE RIOD COVE RE D (inclusive dates /

August 1,1983 - August 31, 1983 15 SUPPLEME N T ARY NOTES 14 (Leave o'm *J 56 ABSTR ACT (200 woros or sess)

Provide a review of the status of the progress of the licensing reviews for all construction permits, operating licenses, special projects and non-power reactor renewals under review, as reported to Congress.

17. KE Y WORDS AND DOCU* ENT AN ALYSIS 17a DESCRIPTORS M

I L 17e IDE NTaFIE RS OPE N ENDE D TERMS I

\\

IS AV AIL ABILITY ST ATE ME NT 19 SE CURITY CL ASS iTn,a recorrt 21 N O OF 'P AGE S Unclassified Unlimited 20 SE CURITY CL ASS f Ta s paarJ 22 PRICE Unclassified 5

i

UNITED STATES

,,,3, c,,33,,n Postatt a sesseseo NUCLEA3 REGULATORY COMMISSION 5 '

,[3)*3 t WASHINGTON. D.C. 20bE6

..... ut OFFICIAL BUSINESS PENALTY FOR PPlVATE USE $3X) to b

a *

' z 4,

[

A s

, 1 '.

i r'

i li Y 1

,, l I ',,1 < '

I 4

s 0

e 4

e s

4 4

9 a

4 1

4.