Deficiency Rept,Item 141 Re Pipe Hanger Not Fabricated in Accordance W/Design Drawing.Initially Reported on 830909. Item Determined Not Reportable Per 10CFR50.55(e) & 10CFR21
ML20080H484
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/13/1983
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, MQAH-83-255, NUDOCS 8309210359
Download: ML20080H484 (1)


Text

- _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

CP&L g3 SEP g CMA I4Er & Light Company


=-

P. O. Box 101, New Hill, North Carolina 27562 September 13, 1983 l

l l FILE: SH N-2/18 MQAH 83-255 l Item 141 Mr. James P. O'Reilly '

United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 i

DOCKET NO. 50-400 PIPE HANGER NOT FABRICATED IN ACCORDANCE WITH THE DESIGN DRAWING

Dear Mr. O'Reilly:

This is to confirm the September 9, 1983 telephone conversation between Mr. K. V. Hate' and Mr. A. Hardin. Mr. Hardin was informed that the August 15, 1983 potentially reportable item, pertaining to pipe hanger 1-FP-H-870 not being fabricated by Bergen-Paterson in accordance with the design drawing, has been evaluated and considered not to be reportable per the provisions of 10CFR50.55(e) and 10CFR, Part 21.

Thank you for your consideration in this matter.

Yours very truly, NJC/mt h, L

  • p cc: Mr. R. C. DeYoung N. J. Ch angi - Manager Mr. G. Maxwell Quality Assu ce/ Quality Control Mr. R. L. Prevatte Harris Plant

,- ra^'

N '.

8309210359 830913 PDR ADOCK 05000400 S PDR -[]

t/0 -