ML20080H150
| ML20080H150 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/13/1983 |
| From: | Chiangi N CAROLINA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, 134, MQAH-83-257, NUDOCS 8309210160 | |
| Download: ML20080H150 (1) | |
Text
CP&L rhi PohdLh Company B3 P. O. Box 10'1, New Hill, North Carolina 27562 September 13, 1983 FILE: SH N-2/18 MQAH 83-257 Item 134 Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region 11 101 Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAP, POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 BACKDRAFT DAMPERS RECEIVED WITH ONE COUNTERBALANCE ARM IN LIEU OF TWO
Dear Mr. O'Reilly:
This is to confirm the September 12, 1983 telephone conversation between Mr. N. J. Chiangi (CP&L) and Mr. A. Hardin (NRC).
Mr. Hardin was informed that the June 2, 1983 potentially reportable item, pertaining to thirty-four (34) Unit No. 1 backdraft dampers (Seismic Class I) that were received from Ruskin Manufacturing Company with one (1) counterbalance ar.a assembly in lieu of the required two (2), has been evaluated and considered not to be reportable per the provisions of 10CFR50.55(e) and 10CFR, Part 21.
Thank you for your consideration in this matter.
Yours very truly, NJC/mt d
cc:
Mr. R. C. DeYoung N. J. Chia gi - Manager Mr. G. Maxwell Quality Assu
>/ Quality Control Mr. R. L. Prevatte Harris Plant CO O *id lc 8309210160 830913 6M PDR ADOCK 05000400 l
S PDR