ML20080F956

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept,Item 140 Re Hanger Sketch Incorrectly Identifying Field Welds as Shop Welds.Initially Reported on 830815.Investigation in Progress.Final Rept to Be Submitted by 840206
ML20080F956
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 09/09/1983
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8309190458
Download: ML20080F956 (1)


Text

. _ . ._ _ _ _ _ _ _ _ _

CD&L Carolina Power & Light Company P. O. Box 101, New' Hill, N. C. 27562 September 9, 1983 Mr. James P. O'Reilly NRC-ll5

, ~ United States Nuclear Regulatory Commission 6 Region II- .g g_. @g /

101 Marietta Street, Northwest (Suite 2900)

' Atlanta, Georgia 30303 CAROLINA PC TER & LIGHT COMPANY'

.SHEARON HARLIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2

, HANGER SKETCH INCORRECTLY IDENTIFIED FIELD WELDS AS SHOP WELDS - ITEM 140

Dear Mr. O'Reilly:

On August 15, 1983, Mr. N.-J. Chiangi notified the-NRC (Mr. F. Cantrell) of a potentially reportable item per the provisions of 10CFR50.55(e). The NRC was informed that a hanger sketch incorrectly-identified field welds as shop welds and consequently, QC did not inspect the joints identified as shop welds on i the hanger drawing. ,

t Per an approved Field Change Request, weld symbols may be designated as' shop j or field regardless of where the weld will be made. It is essential that receipt and field QC inspectors clearly identify joints inspected and to what revision

. they were inspected. This was not done. 'Potentially, there are approximately j~ 5000 pipe hangers watch could be categorized as having this subject problem.

An investigation of the 5000 hangers is in process. Due to the number of hangers involved, we will require until February 6,'1984 to submit a report on the.

reportability of this item.

Thank you for your consideration in this matter.

Yours very truly, g & &

R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant i RMP/bs Attachment i'

i cc: Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)

Mr. R. C. DeYoung(NRC) y\@phgv B309190458 830909 8 i

PDR ADOCK 05000400 S