Regulatory Licensing Status Summary Report.Data as of December 31,1983.(Blue Book)
ML20080F347
Person / Time
Issue date: 01/31/1984
From:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
To:
References
NUREG-0580, NUREG-0580-V12-N12, NUREG-580, NUREG-580-V12-N12, NUDOCS 8402100442
Download: ML20080F347 (60)


Text

- - - - -

l NUREG-0580 l

Vol.12, No.12 l

REGULATORY LICENSING STATUS

SUMMARY

REPORT

\\g \\sS NUCLEAR POWER PLANTS g\\\\.L$ ggg,%

DATA FOR DECISIONS

\\TS (BLUE BOOK)

\\)St DECEMBER 1 - DECEMBER 31,1983 z

UNITED STATES NUCLEAR REGULATORY COMMISSION I

Ug4 h,;

[

+ '

=_

a AVAILABLE FROM NRC/GPO SALES PROGRAM SUPERINTENDENT OF DOCUMENTS GOVERNMENT PRINTING OFFICE WASHINGTON, D.

C.

20402 A YEARS SUBSCRIPTION CONSISTS OF 12 ISSUES FOR THIS PUBLICATION MICROFICHE OF SINGLE COPIES ARE AVAILABLE FROM NRC/GPO SALES PROGRAM WASHINGTON, D. C.

20555 e

O e

NUREG-0580 Vol.12, No.12 REGULATORY LICENSING STATUS

SUMMARY

REPORT l

l NUCLEAR POWER PLANTS DATA FOR DECISIONS l

(BLUE BOOK)

DECEMBER 1 - DECEMBER 31,1983 Manuscript Completed: January 1984 Date Published: January 1984 f

Prepared for: 0FFICE OF NUCLEAR REACTOR REGULATION Prepared by: 0FFICE OF RESOURCE MANAGEMENT U.S. NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555

,p m,

(

F0REWDRD T

l THIS MANAGEMENT REPORT, REGULATORY LICENSING STATUS

SUMMARY

REPORT, IS DESIGNED TO PROVIDE THE NECESSARY INFORMATION FOR CONTROLLING THE PROGRESS OF REVIEW PROCESSES FOR CENTRAL > STATION NUCLEAR REACTOR APPLICATIONS. IT UTILIZES DATA COLLECTED FROM THE OFFICE OF NUCLEAR REACTOR REGULATION, OFFICE OF THE EXECUTIVE LEGAL DIRECTOR, OFFICE OF INSPECTION 8 ENFORCEMENT, AND THE NATIONAL LABORATORIES, AND ANALYZED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE IMPLEMENTATION OF THE REGULATORY INFORMATION SYSTEM.

i SECTION I 0F THIS EDITION CONSISTS OF THE THREE

SUMMARY

OF ACCOMPLISHMENTS THE NEW APPLICATION F0kECAST FOR OL'S Atl3 CP'S, AND AN ABBREVIATION KEY.

SECTION II REPRESENTS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATION. ALL OL'S ARE LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGN REVIEWS, OTHER REVIEWS, AND FINALLY, A NON-POWER REACTOR

SUMMARY

EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTONES IN THE REVIEW.

l

LICENSING 0F HUCLEAR REACT 0RS THE U.S. HUCLEAR REGULATORY COMMISSION REQUIRES TWO SEPARATE LICENSES - ONE TO BUILD THE FACILITY AND ANOTHER TO OPERATI IT.

LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND OPERATING LICENSE.

THE UTILITY SUBMITS A FORMAL APPLICATION PESCRIBING THE DESIGN, LOCATInN, AND ENVIRONMENTAL IMPACT OF THE PROPOSED PLANT AND THE SAFEGUARDS TO BE PROVIDED. THE APPLICATION ALSD COVERS THE UTILITY'S FINANCIAL QUALIFICATIONS.

THE NRC MAKES COPIES OF THE APPLICATION AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM.

TECHNICAL EXPERTS ANALYSE THE APPLIC* TION, AND PREPARE A SAFETY EVALUATION AND AN ENVIRONMENTAL IMPACT STATEMENT. THESE DOCUMENTS AR" ALSO MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.

THE STAFF'S ANALYSIS IS SUBMITTED TO THE NRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS. A COMMITTEE OF INDEPENDENT EXPERTS. ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFFRENCES WITM THE APPLICANT, THE LICENSING STAFF AND OTHERS. THE ACRS FINDINGS ARE REPORTED TO THE NRC AND MADE PUBLIC.

A PUBLIC HEARING IS HELD, USUALLY HEAR THE PROPOSED SITE, BY AN NRC APPOINTED ATOMIC SAFETY a LICENSING BOARD.

PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS, AND COMMUNITY GROUPS MAY PARTICIPATE.

AFTER REVIEWING THE HEARING RECORD INCLUDING THE NRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAINST GRANTING A CONSTRUCTION PERMIT.

THE BOARD'S DECISION IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEL BY THE FIVE-MEMBER NUCLEAR REGULATORY COMMISSION.

IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTION PERMIT. THE DIRECTOR OF THE DIVISION OF LICENSING WILL ISSUE A CONSTRUCTION PERMIT.

AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE HRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS. CONSTRUCTION IS SUBJECT TO INSPECTION BY THE OFFICE OF INSPECTIDH AND INFORCEMENI.

AS CONS 1RUCTION PROGRESSES, ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE HRC FOR AN OPERATING LICENSE. THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE HRC IN DECIDING WHETHER OR NOT TO ISSUE THE OPERATING LICENSE.

IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED. CONTRASTED WITH THE CONSTRUCTION PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED. FINAL ISSUANCE OF AN OPERATING PERMIT IS SUBJECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THE DIVISION OF LICENSING AND OF THE COMMISSION.

l TABLE OF C0NTENTS l

PRINTED IN THE ORDER LISTED SECTION I

SUMMARY

OF ACCOMPLISHMENTS OL

SUMMARY

OF ACCOMPLISNMENTS CP

SUMMARY

OF ACCOMPLISHMENTS COMBINED HUMERICAL

SUMMARY

OF ACCOMPLISHMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICENSES IN THE HEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTION PERMITS IN THE NEXT FIVE YEARS NEW APPLICATION FORECAST:

OPERATING LICENSE REVIEWS SPECIAL REVIEWS COMMON ABBREVIATIONS USED WITHIM THE PUBLICATION 1

i.,

L,3

.S E C T I O N II

,1

(

g

\\

\\

PROJECT INDEX

/

\\

OPERATING LICENSE REVIEWS

  • 'i a

j

.N g

O' i

/

C0dSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS

'OTHER REVIEWS NON-POWER REACTORS

/

t SECTION III EXAMPLE REVIEW s i

_..am

-_uma_nus.__e_h A

. he m

,amm_

.a a

h__.-.

4,h-.-

.e 4---

E.awa'

%m.g a.m au

_w--a a.r_,,

h,-..---e-

---awe a

_m

.aam, w-._a am.A l

i 4

4 l

6 l

t 4

5 i

i i

]

4 1

l l

l I

L 1

a*

'l.

I h

6 6

I t

(

i 1

l ig I

4 J

I 4

g i

f z

l 0

C i

M H

U W

en p

4 l

a i

e i

0L

SUMMARY

0F ACC0MPLISHMEHTS AS OF DECEMBER 31, 1983 DECEMBER FISCAL YEAR TO DATE EACILITY SCHEDULED ACTUAL FACILITY SCHEDULED ACTUAL i_E R

' S SER ' S NONE BRAIDWOOD f 82 11/30/83 ft/30/83C HARRIS 1 11/01/83 11/30/83C i

SSER ' S SSER ' S DIABLO-CANYOH 182 12/23/83C COMANCHE PEAK 1 82 11/23/83C LASALLE 2 12/01/83 12/01/83C DIABLO-CANYON 182 10/14/83C LIMERICK 1 32 12/13/83 12/13/83C DIABLO-CANYOH 1 82 12/23/83C WASHINGTON NUCLEAR 2 12/20/83 12/20/83C LASALLE 2 11/21/83 11/21/83C W0LF CREEK 1 12/17/83 12/17/83C LASALLE 2 12/01/83 12/01/83C LIMERICK 1 82 12/30/83 12/13/83C MIDLAND 1 82 11/17/83 11/17/83C PALD VERDE 1,2,3 11/28/83 11/28/83C WASHINGTON NUCLEAR 2 12/20/83 12/20/83C WOLF CREEK 1 12/17/83 12/17/83C DES ' S DES ' S BELLEFONTE 1 82 12/16/83 BELLEFONTE 1 82 12/16/83 BRAIDWOOD 1 82 12/31/83C BRAIDWOOD 1 82 01/03/84 12/31/83C WASHINGTON NUCLEAR 3 12/23/83 12/23/83C WASHINGTON NUCLEAR 3 12/23/83 12/23/83C FES

'S FES ' s NONE HARRIS 1 10/31/83 10/31/83C 0L

'S ISSUEDW DL ' S ISSUEDu HONE NONE N

FULL POWER t

i

L A

U T

C A

e D

E E

T L

A U

D D

E O

H T

C l

S, l

A E

Y S

L A

T C

[

S N

I F

E D

M Y

E T

H I

U L

S I

C S

I A

S F

L I

S P 3 E

S E

S E

E M

9 S

E.

8 H.

N N

N H

1 D

R O

O O

S D

D H

N H

H N

R E

S S

C 1

3 E

S E

E P

C D

F C

R 5

S A E B

M E

F C E

0 D F

O Y

S L

R A A

U A

T C

M A

M '

U S

D E

L U

P D

U C

H R

C j'

E S

B M

f

  • E C

E D

j D

Y E

T I

L U

I S

C A

S F

I E

S S

E E_

S E

S E

E H

N N

N H

k R

O O

O S

3 H

H H

H H

'R E

S S

'r E

S E

E P

S S

D.

F C

j

i]i IIl j

L A

U T2 0

0 0

2 0

1 0

0 0

C 1

A D

E L

EU TD2 0

7 0

3 0

1 0

0 0

AE DH C

OS T

R A

E Y

S L

o T

A C

t D N

S

)

)

E E I

E F

)

)

L P

)

)

)

)

U U M

L P 0 C L

P L P S S H

0 C

(

(

0 C 0 C S S S

(

(

S S

(

(

(

(

I I

I S S S S S S 3

L 8 R R S S 9

P 1

R R E E S S 5 S M

E E S S E E E E L P 1

0 3 S S S $

D D F F O C C R E

C B

M A

E C

E D

F L

F A

0 O U

T0 0

5 0 2 0 0

0 O

0 S

C A

A Y

R A

M M

D U

E L

S U

D0 0

4 0

2 0

0 0 O

0 E

H C

S u

R E

D D B

)

)

M E E E

)

)

L P

)

)

)

U U C

E L P 0 C L P L P S S D

0 C

(

(

0 C 0 C 5 5

(

(

S S

(

(

(

(

I I

R S S S S S S EW R R S S O

P R R E E S S S S L

E E S S E E E E L

P L

U

$ S S S D D F F 0 C F

N ll lilll,f

REPORT AS OF: 12/31/83 LICENSIhG SCHEDULES FOR ALL PENDING OL APPLICATIONS 1983-1985)

(INCLUDES SCHEDULES FOR ADDITIONAL UNITS WITH PROJECTED CONSTRUCTIDH COMPLETION IN CY (LISTED IN ORDER OF FACILITY NAME)

SSER SER EST.

STAFF TECH STAFF TECH ASLB COMMM APPL.

DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

CONST.

E,LANl (MONTHS) pf,1 TO D(

jf3 ELLQ Fg1 TO DL 11g3 0F HRG DECISION PAJE COMPL.

BEAVER VALLEY 2 0

07/84 07/84 09/84 10/84 12/84 11/84 12/84 05/85 11/85 12/85 12/85 BRAIDWOOD 1 0

12/83C tt/83C tt/83C 02/84 06/84 04/84 05/84 10/84 03/85 04/85 04/85 BYRON 1 0

11/81C 01/82C 02/82C 03/82C 04/82C 08/82C 01/83C 03/83C 01/84 02/84 02/84 BYRON 2 0

11/81C 01/82C 02/82C 03/82C 04/82C 08/82C 02/84 03/83C 01/84 04/85 05/85 CALLAWAY 1 0

09/81C 09/81C 10/81C 11/81C 01/82C 02/84 03/84 11/81C 10/83C 03/84 04/84 CATAWBA 1 0

08/82C 01/83C 02/83C 03/83C 01/83C 04/83C 05/83C

!O/63C 04/84 05/84 05/84 CLINTON 1 0

12/81C 12/81C 02/82C 03/82C 05/82C 06/82C 05/83C 03/84 H/S 12/85 01/86 COMANCHE PEAK 1 0

05/81C 07/81C 07/81C 11/81C 09/81C 04/84 05/84 12/81C 07/84 07/84 07/84 DIABLO CANYOH 1 0

12/72C Ot/75C 10/74C 07/76C 05/76C 06/83C 12/83C 12/76C N/S 01/84 DIABLO CANYON 2 0

12/72C 01/75C 10/74C 07/76C 05/76C 06/83C N/S 12/76C N/S 08/84 08/84 l

ENRICO FERMI 2 0

04/81C 05/77C 09/77C 08/81C 09/81C 01/83C 02/83C 03/82C 10/82C 06/84 06/84 GRAND GULF 1 0

05/81C 08/81C 09/41C 10/81C 10/8tc 12/83 G2/84 N/A N/A 02/84 06/82C l

HARRIS 1 0

04/83C tt/83C 11/83C 01/84 10/83C 03/84 04/84 01/84 05/85 05/85 06/85 LASALLE 2 0

03/78C 02/81C 03/81C 04/81C 11/78C 12/83C 12/83C N/A N/A 03/84 12/83 LIMERICK 1 7

06/83C 08/83C 08/83C 10/83C 03/84 11/83C 12/83C 12/83C 03/85 03/85 08/s4 l

MILLSTONE 3 0

04/84 05/84 07/84 08/84 t1/84 10/84 11/34 N/A N/A 11/85 11/85 PALD VERDE 1 0

10/81C 10/81C 11/81C 12/81C 03/82C 02/84 03/84 04/82C 12/82C 04/84 05/84 PALD VERDE 2 0

10/81C 10/81C 11/81C 12/8tC 03/82C 02/84 12/84 04/82C 12/82C 01/85 02/85 PERRY 1 0

02/82C 05/82C 05/82C 07/82C 08/82C N/S 01/84 05/83C 06/84 11/84 12/84 RIVER BEND 1 0

05/84 01/84 02/84 04/84 09/84 04/84 05/84 10/84 03/85 04/85 04/85 SEABROOK 1 0

05/82C 12/82C 03/83C 04/83C 12/82C N/S N/S 08/83C 09/84 09/84 09/84 SHOREHAM 0

03/77C 03/81C 04/81C 10/81C 10/77C 12/83 09/83C 05/82C N/S 05/84 05/84 SUSQUEHANNA 2 0

03/81C 03/81C 04/810 08/81C 07/81C 02/83C 01/84 10/81C 04/82C 02/84 02/84 WASHINGTON NUCLEAR 2 0

07/81C 05/82C 03/82C 10/82C 12/81C 11/82C 12/83C N/A N/A 02/84 12/83 WATERFORD 3 0

05/81C 05/81C 07/81C 08/81C 09/81C 05/83C 07/84 08/83C 05/83C 04/84 05/84 WATTS BAR 1 0

06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 01/84 N/A N/A 03/84 04/84 WATTS BAR 2 0

06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 06/85 N/A N/A 09/85 10/85 WOLF CREEK 1 0

01/82C 03/82C 04/82C 05/82C 06/82C 04/84 06/84 01/84 06/84 07/84 08/84 ZIMMER 1 0

10/76C 12/77C 01/79C 03/79C 06/77C 08/82C 08/82C 02/82C N/S 11/84 12/84 W

NLICENSING SCHEDULES AND DECISION DATES DO NOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREPAREDNE

LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY 1985 ISSUE APPL. CONST.

PLANT 1}fR SQMPLETE BELLEFONTE 1 12/84 10/87 BELLEFONTE 2 03/86 05/86 BRAIDWOOD 2 02/86 04/86 CATAWBA 2 08/86 10/86 COMANCHE PEAK 2 11/84 01/86 GRAND GULF 2 N/S N/S HOPE CREEK t 02/85 01/86 LIMERICK 2 N/S 07/88 MARBLE HILL 1 04/85 06/86 MARBLE HILL 2 N/S 12/87

}

MIDLAND 1 11/83C 02/85 MIDLAND 2 It/83C 10/84 NINE MILE POINT 2 01/85 02/86 PALD VERDE 3 03/86 05/86 PERRY 2 N/S 11/91 RIVER BEND 2 N/S SEABROOK 2 N/S 12/86 SOUTH TEXAS 1 01/86 12/86 SOUTH TEXAS 2 N/S 12/88 V0GTLE I 09/85 09/86 V0GTLE 2 03/88 WASHINGTON NUCLEAR'1 N/S N/S WASHINGTON NUCLEAR 3 12/84 06/87 i

f I

l'

REPORT AS OF 12/31/83 LICENSING SCHEDULES FOR ALL PENDING CP APPLICATIONS (LISTED IN ORDER OF FACILITY NAME)

SSER SER STAFF TECH STAFF TECH ASLB CCMM ISSUE INPUT ISSUE ACRS ISSUE It!PUT ISSUE START INITIAL DEC.

PLANT p_El.

TO DL 18 tiLG ffa TO DL lig 0F HRQ DECISION DAlf CLINCH RIVER 02/76C 02/83C 03/83C 04/83C 02/77C 04/83C 05/83C 08/82C 04/84 06/84 l

l l

1 I

l s

S W

E I

V E

R E

5

)

N S T

E I

M C R E

I P

L N O

I T

G C U

N R T

I S

N T O3C8 A

/

H1 R

T3 I/

E W2 1

P S T

O I

NG UN I

LD LN T AE 5 RK OE E

A FE H

W 0

C S N

EF C TO A

R DS A

0 R E

F D N

E T

N D

O E T

I A

P T

I C

A I

T C N A

I

(

L P

P A

W E

N l

lll t

i C

3 8

R /

E 4

Df2 N l/

EA0 W

T D1 E

I V

E R

TRR CEE EGY JAE M.

L ON S

RA A

PMG W

I E

C I

E 3 V P 8 S

/ E S

0 3 R

- / 2 T

1 N

5 O

A G N

I C

I D T E N E A E

R S

K Z U

0 E TO E

I NH F W AG D

CN F

II O R LT N

PS S A PE O A AW D

I H

J 8

T OO6 A RN6 A

P T

C S

I L

P P

A W

RW E

P IA N

GW F)

JS OS RH P(

ll1llllllllllllll1ll\\

Ll ll 1

l!

C0MM0N ABBREVIA T IONS USED WITHIN THE PU8LICATIOH ACRS: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS L.A.+

LICENSING ASSISTANT AE2 ARCHITECT / ENGINEER LESR: LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)

AEB:

ACCIDENT EVALUATION BRANCH LGB:

LICENSING GUIDANCE BRANCH ASB:

AUXILIARY SYSTEMS BRANCH LMFBR: LIQUID METAL FAST BREEDER REACTOR ASLB: ATOMIC SAFETY LICENSING BOARD LQB:

LICENSEE QUALIFICATIONS BRANCH BAR:

BURNS & ROE MEB:

MECHANICAL ENGINEERING BRANCH B3V:

BLACK & VEACH METB METEOROLOGY 4 EFFLUENT TREATMENT SYSTEMS BRANCH B2W:

BABCOCK 2 WILCOX MTEB: MATERIALS ENGINEERING BRANCH BECH: BECHTEL MWE:

MEGAWATTS ELECTRIC BRRT: BROWN 4 ROOT MWT:

NEGAWATTS THERMAL BWR:

BOILING WATER REACTOR NSSS: HUCLEAR STEAM SYSTEMS SUPPLIER COMB: COMBUSTION ENGINEERING OL:

OPERATING LICENSE CMEB: CHEMICAL ENGINEERING BRANCH OLB:

OPERATOR LICENSING BRANCH CP:

CONSTRUCTION PERMIT CPB:

CORE PERFORMANCE BRANCH CSB:

CONTAINMENT SYSTEMS BRANCH CWE:

COMMONWEALTH EDISON PDA*

PRELIMINARY DESIGN APPROVAL PG3E: PACIFIC GAS 3 ELECTRIC DES:

DRAFT ENVIRONMENTAL STATEMENT PID:

PARTIAL INITIAL DECISION PM:

PROJECT MANAGER PS:

POWER SYSTEMS BRANCH EHEB-ENVIRONMENTAL & HYDROLOGIC ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:

ENVIRONMENTAL PROTECTION AGENCY PTRB: PROCEDURES AHD TEST REVIEW BRANCH EPLB: EMERGENCY PREPAREDNESS LICENSING BRANCH PWR:

PRESSURIZED WATER REACTOR ER:

ENVIRONMENTAL REPORT EQB:

EQUIPMENT QUALIFICATION BRANCH ESR:

EARLY SITE REVIEW QAB:

QUALITY ASSURANCE BRANCH ETSB: EFFLUEN' TREATMENT SYSTEMS BRANCH RAB RADIOLOGICAL ASSESSMENT BRANCH l

RM:

RESOURCE MANAGEMENT F.R.'

FEDERAL REGISTAR RRAB: RELIABILITY & RISK ASSESSMENT BRANCH FDA:

FINAL DESIGN APPROVAL RSB:

REACTOR SYSTEMS BRANCH FES:

FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT S8L:

SARGENT 8 LUNDY S&W:

STONE & WEBSTER SABR: SITING ANALYSIS BRANCH G2H:

GIBBS 8 HILL SAR:

SAFETY ANALYSIS REPORT GHDR: GIBBS 8 HILL SDA:

STANDARD DESIGN APPROVAL GIB:

GENERIC ISSUES BRANCH SGEB: STRUCTURAL 3 GE0 TECHNICAL ENGINEERING BRANCH GIL:

GILBERT COMMONWEALTH SER:

SAFETY EVALUATIDH REPORT GSB:

GEOSCIENCES BRANCH SIB:

SYSTEMS INTERACTION BRANCH SPC:

SPECIAL PROJECT HFEB: HUMAN FACTORS ENGINEERING BRANCH SPEB SAFETY PROGRAM EVALUATION BRANCH HTGR: HIGH TEMPERATURE GAS COOLED REACTOR SSC:

SOUTHERN SERVICES COMPANY SSER: SUPPLEMENT TO SAFETY EVALUATION ICB:

INSTRUMENTATION AND CONTROL BRANCH TVA:

TENNESSEE VALLEY AUTHORITY UEC:

UNITED EHG. 8 CONSTRUCTORS UFB UTILITY FINANCE BRANCH WEST: WESTINGHOUSE I

M s,

2 aw-4 1

i i

M M

Z O

M

>=

U W

l 4

4 a

-h-m eA-

-e m-r -

(

l PR0 JECT INDEX SECTIDH II OPERATING LICENSE REVIEW CONSTRUCTION PERMIT REVIEWS STANDARD DESICH REVIEWS OTHER REVIEWS 2-1 -BEAVER VALLEY Z 2-35 CLINCH RIVER 2-36 (MSS)CESSAR SYSTEM 80 22 BELLEFONTE 1 &2 2-37 (NSS)GESSAR SEVERE ACC 2-3 BRAIDWOOD 1 & 2 2-4 BYROM 1 &2 2-S CALLAWAY 1 2'6 CATAWBA 1 & 2 2-7 CLINTON 1 2-

8. COMANCHE PEAK 1 42 2-9 DIABLO-CANYON 1 &2 2-10 ENRICO FERMI-2 2-11 GRAND GULF 1 &2 2-12 HARRIS 1 2-13 HOPE CREEK 1 2-14 LASALLE 2 2-15 LIMERICK 1 82 2-16 MARBLE HILL 182 2-17 MIDLAND 1 &2 2-18 MILLSTONE 3 2-19 HINE MILE POINT 2 2-20 PALO VERDE 1,2,3 2-21 PERRY 1 &2 2-22 RIVER BEND 1 8 2 7-23 SEABROOK 1 82 2-24 SHOREHAM 2-25 SOUTH TEXAS-1 & 2 2-26 $USQUEHANNA 2 l-2-27 V0GTLE 1 82 2--28 WASHINGTON NUCLEAR 1 29 WASHINGTON HUCLEAR 2 2-30 WASHINGTOM HUCLEAR 3 2-31' WATERFORD 3 2-32 WATTS BAR 1 82 2-33 WOLF CREEK 1 2-34 ZIMMER 1 1

I s

NRR LICENSING SYSTEM PAGE NO: 2-1 BEAVER VALLEY 2 0L CURRENT STATUS REPORT REPORT AS OF 12/31/83 PLANT CHARACTERISTICS 3 KEY P E R S 0 N N E La DOCKET NO:

05000412 LIC. PM:

L. LAZO ASLB CHAIR: N/A APPLICANT

  • DUQUESNE LIGHT LIC. BC:

G. KNIGHTON MEMBER 13 LOCATION 5 MI E OF E. LIVERPOOL, OH LIC. LA.:

E. HYLTON MEMDER 2 REGION:

1 AE:

58W COUNSEL:

R. PALLA CONST. INSP: S. FOLSON REAC. TYPE: PWR NSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP:

DESIGN PWR: 2774 MWT/0852 MWE CONST S&W RM ANALYST S. HEDLUND ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

The FSAR was tendered on 01-26-83.

The SAR was docketed on 05/18/83.

ER DOCKETED:

05/18/83 05/18/83C ER SITE VISIT COMPLETE:

09/29/83 09/29/83C INPUT TO DES TO PM:

05/25/84 ISSUE DES:

07/27/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

12/31/84 CURRENT ENV. STATUS:

The ER was tendered on 01-26-83.

The ER was docketed SAFETY / HEARING MILESTONES:

on 05/18/83.

APPLICATION TENDERED:

01/26/83 01/26/83C SAR DOCKETED:

05/18/83 05/18/83C SAR Q'S RECEIVED BY PM:

08/26/83 11/08/83C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/10/84 INPUT TO DRAFT SER TO PM:

01/27/84 CURRENT NRG. STATUS:

ISSUE DRAFT SER:

02/24/84 Opportunity for Hearing was published in the Federal Register on June 1,

1983.

INPUT TO SER:

07/27/84 ISSUE SER:

09/28/84 ACRS FULL COMMITTEE MEETING:

10/31/84 INPUTS TO SE SUPPLEMENT 1 11/00/84 ISSUE SE SUPPLEMENT 13 12/31/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

The information for antitrust review of operating HEARING STARTED:

05/31/85 license application was tendered 12/15/82.

ASLB INITIAL DECISION:

11/29/85 COMMISSION EFFECTIVENESS DECISION:

11/00/85 TECH SPECS COMPLETED:

12/00/85 COMMISSION DECISION:

12/00/85 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

LATEST AMENDMENT:

l SCHEC. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

12/31/85 07/30/82 l

l i

NRR LICENSING SYSTEM PAGE NO: 2-2 BELLEFONTE 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF: 12/31/83 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNEL DOCKET NO:

043880439 LIC. PM:

UNASSIGNED ASLB CHAIR: N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM MEMBER 1:

N/A LOCATION:

6 MI NE OF SCOTTSBORO, ALA LIC. LA.:

M.

DUNCAN MEMBER 2 N/A REGION:

2 AE:

TVA COUNSEL:

B. PATON CONST. INSP R. CRLENJAK REAC. TYPE: PWR HSSS: B8W ANTITRUST:

J. RUTBERG RESID. INSP J. WILCOX DESIGN PWR: 3760 MWT/1235 MWE CONST TVA RM ANALYST:

B. ST MARf CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED, DATE ACTUAL DATE As a result of applicant's construction delay, the staff review schedule has been delayed and the applicant has ER DOCKETED:

06/12/78 06/12/78C revised the fuel loading to 05/85.

The staff evaluated ER SITE VISIT COMPLETE:

02/20/82 06/17/82C the impacts of this delay on the safety and environmental INPUT TO DES TO PM:

11/04/83 review schedules and issued a new schedule on 01/25/83.

ISSUE DES:

12/16/83 RESPONSE TO COMMENTS ON DES:

03/05/84 ISSUE FES:

05/18/84 CURRENT ENV. STATUS:

As a result of applicant's construction del'ay, the environ-mental review schedule was re evaluated and revised as SAFETY / NEARING MILESTONES:

)-

indicated in the environmental milestones. The environmental site visit was completed oi 6/17/82.

APPLICATION TENDERED:

02/03/78 02/03/78C SAR DOCKETED:

06/12/78C SAR Q'S RECEIVED BY PM:

07/03/80 11/01/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/02/83 CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/20/84 No hearing is anticipated.

ISSUE DRAFT SER:

03/16/84 INPUT TO SER:

06/15/84 ISSUE SER:

08/17/84 ACRS FULL COMMITTEE MEETING:

09/28/84 INPUTS TU SE SUPPLEMENi 1:

10/05/84 ISSUE SE SUPPLEMENT 1:

12/14/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Pending determination HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

02/01/85 COMMISSION DECISION:

10/00/87 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/00/85 No. 23 (12/17/82).

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

On 07/06/82 TVA revised fuel load date to 5/85.

Staff CONSTRUCTION COMPLETION - APPL.:

10/00/87 07/06/82 evaluated impact on safety and environmental review schedules and issued new schedule on 01/25/83.

t________

.a a

9

NRR L ICEHSING SYSTEM PAGd HO: 2-3 BRAIDWOOD 1 &2 0L CURREHT STATUS REPORT REPORT AS OF:- 12/31/83 PLAHT CHARACTERIST I C S:

KEY P E R S 0 N H E L:

DOCKET NO:

045630457 LIC. PM:

J. STEVENS ASLB CHAIR:

M. MILLER APPLICANT:

COMM0HWEALTH EDISOff LIC. BC:

J. YOUNGBLOOD MEMBER 1:

R. COLE LOCATION:

24 MI SSW OF JOLIET, ILL LIC.

LA.'

N. RUSHBROOK MEMBER 2:

D. CALLIHAN REGION:

3 AE:

SSL COUNSEL:

E. CHAH C0HST. INSP: J. NEISLER REAC. TYPE: PWR HSSS: WEST ANTITRUST B. V0GLER RESID. INSP L. MCGREGOR DESIGH PWR: 3425 MWT/1120 MWE CONST: CWE RM ANALYST:

S. HEDLUND ENVIRONMEMTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Final SER was issued on November 30, 1983.

11/30/78C ER DOCKETED:

ER SITE VISIT COMPLETE:

05/31/83 05/05/83C INPUT TO DES TO PM:

12/01/83 ISSUE DES:

01/03/84 12/31/83C RESPONSE TO COMMENTS OH DES:

04/15/84 ISSUE FES:

06/00/84 CURREllT ENV. STATUS:

Site visit was conducted during May, 1983.

PubIlc meeting held during August, 1983.

Amendment 4 to ER submitted SAFETY / HEARING MILESTONES:

during October, 1983.

APPLICATION TENDERED:

06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:

12/31/82 12/31/82C SAR APPL. RESPONSE TO Q'S RECE;VED: 03/01/83 05/06/83C INPUT TO DRAFT SER TO PM:

05/01/83 06/15/83C CURRENT HRG. STATUS:

ISSUE DRAFT SER:

07/15/83 07/15/83C INPUT TO SER:

11/01/83 11/01/83C ISSUE SER:

11/30/83 11/30/83C ACRS FULL COMMITTEE MEETING:

P" 00/84 INPUTS TO SE SUPPLEMENT 1

.. ' 01/8 4 ISSUE SE SUPPLEMENT 18 J5/00/84 FEMA LETTER P.ECEIVED:

N/S CURRENT ANTITRUST:

Applicant has submitted antitrust information pursuant to HEARING STARTED:

10/00/84 ASLB INITIAL DECISIDH 03/00/85 Reg. Guide 9.3.

COMMISSION EFFECTIVEHESS DECISI0H: 04/00/85 TECH SPECS COMPLETED:

04/00/85 COMMISSIDH DECISION:

04/00/85 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEHD:

04/00/85 LATEST AMENDMENT:

FSAR Amendment No. 43; ER Amendment No. 5.

SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

04/00/85 04/14/82

NRR LICENSING SYSTEM PAGE NO: 2-4 BYROH 1 8 2 0L CURREHT STATUS REP 0RT REPORT AS OF: 12/31/83 PLAHT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO:

045480455 LIC. PM:

L. OLSHAN ASLB CHAIR:

I. SMITH APPLICANT:

COMMONWEALTH EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1:

R.

COLE LOCATION:

'17 MI SW OF ROCKFORD, ILL LIC. LA.:

M. RUSHBROOK MEMBER 2:

D. CALLIHAN REGIDH:

3 AE:

S8L COUNSEL:

R. RAWSON CONST. I;iSP M. RING REAC. TYPE: PWR HSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP J. HINDS DESIGN PWR 3425 MWT/1120 MWE CONST: CWE RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER and Supplements 1, 2, and 3 have been issued.

Several outstanding and confirmatory issues remain to ER DOCKETED:

11/30/78C be resolved prior to licensing.

ER SITE VISIT COMPLETE:

05/31/81 05/31/81C INPUT TO DES TO PM:

08/15/81 08/15/81C ISSUE DES:

11/05/81 11/05/81C RESPONSE TO COMMENTS ON DES:

03/01/82 03/01/82C ISSUE FES:

04/05/82 04/05/82C CURRENT ENV. STATUS:

Environmental review completed and FES (HUREG-0848) published in April 1982.

SAFETY' HEARING MILESTOHES:

APPLICATION TENDERED:

06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:

08/15/81 08/15/31C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/15/81 10/15/81C INPUT TO DRAFT SER TO PM:

11/07/81 11/07/81C CURRENT HRG. STATUS:

. 1983. Hearing concluded on ISSUE DRAFT SER:

Hearing began March 1, August 12, 1983.

INPUT-TO SER:

01/07/82 01/07/82C ISSUE SER:

02/07/82 02/07/82C ACRS LETTER RECEIVED:

03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 2 08/20/82 08/20/82C ISSUE SE SUPPLEMENT 2 12/10/82 01/31/83C FEMA LETTER RECEIVED:

CURRENT ANTITRUST Applicant has submitted antitrust information pursuant HEARING STARTED:

03/00/83 03/01/83C to Raq. Guide 9.3.

ASLB INITIAL DECISION:

01/00/84 COMMISSION EFFECTIVENESS DECISI0H: 02/00/84 TECH SPECS COMPLETED:

01/00/84 COMMISSIDH DECISIGHz 02/00/84 l

ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

02/00/84 FSAR - Amendment 43 ER - Amendment 4 SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

02/15/84 09/23/83 f

HRR LICEHSIHG SYSTEM PAGE NO: 2-5 CALLAWAY 1 0L CURREHT STATUS REP 0RT REPORT AS OF: 12/31/83 PLAHT CHARACTERISTICS:

KEY PERSONHEL DOCKET HO:

05000483 LIC. PM:

J. HOLONICH ASLB CHAIR:

J. GLEASON APPLICANT:

UNION ELECTRIC LIC. BC:

B. YOUNGBLOOD MEMBER 1:

G. BRIGHT LOCATION:

10 MI SE OF FULTON, M0 LIC.

LA..

M. RUSHBROOK MEMBER 2 J. KLINE REGIDH 3

AE:

BECH COUNSEL:

B. PERLESS CONST. INSP J. KONKLIN REAC. TYPE: PWR HSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP J. NEISLER DESIGN PWR 3425 MWT/1188 MWE CONST: DANIEL RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SAR was docketed 08/08/80.

The SER was issued by HRC on 10/07/81 and the SER Supplement Ho. 1 was issued on ER DOCKETED:

12/12/80 12/12/80C 01/15/82. SSER 2 was i ssued 6/28/83. SSER 83 is ER SITE VISIT COMPLETE:

12/00/81 12/00/81C tentatively scheduled for March 1984.

INPUT TO DES TO PM:

08/01/81 08/01/81C ISSUE DES:

09/29/81 09/29/81C RESPONSE TO COMMENTS ON DES:

12/01/81 12/01/81C ISSUE FES:

01/29/82 O S'29/82C CURRENT ENV. STATUS:

ER was docketed 12/12/80. The DdS was issued by NRC on 09/29/81 and the FES was issued on 01/29/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/25/79 10/25/79C SAR DOCKETED:

08/08/80 08/08/80C SAR Q'S RECEIVED BY PM:

12/18/80 12/18/80C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/81C INPUT TO DRAFT SER TO PM:

CURRENT HRG. STATUS:

Hearings were held on limited issues 11/81.

A decision was ISSUE DRAFT SER:

N/A rendered by Board 12/13/82. Joint intervenors appealed on INPUT TO SER:

09/11/81 09/11/810

~9/14/83.

ASLAB ruled for applicants. Joint intervenors' ISSUE SER:

10/07/81 10/07/81C motion for reconsideration is pending before the ASLAB.

Hearing on emergency preparedness was completed'9/13/83. On ACRS LETTER RECEIVED:

11/19/81 11/19/81C 10/13/83 Board ruled for applicant on emergency prparedness INPUTS TO SE SUPPLEMENT 3:

02/15/84 issues. In ALAB-754, invulving emergency planning, Appeal ISSUE SE SUPPLEMENT 38 03/00/84 Board found ASLB ruling correct. All hearings are complete.

FEMA LETTER RECEIVED:

11/00/83 CURRENT ANTITRUST:

HEARING STARTED:

11/17/81 11/17/81C OL review is in progress.

ASLB INITIAL DECISION:

10/31/83 10/31/83C COMMISSION EFFECTIVENESS DECISIDH 01/00/84 TECH SPECS COMPLETED:

02/00/84 COMMISSIDH DECISION:

03/00/84 ISSUE LIC. WITH POWER RESTRICTION: 04/00/84 ISSUE FULL POWER LICENSE AMEND:

07/00/84 LATEST AMENDMENT:

Snupps FSAR - Ho. 12; Callaway Site Addendum Rev. 12 SCHED. DATE RECEIPT DATE HEW SLIPS /HOTES:

The Caseload Forecast Panel is reviewing construction CONSTRUCTIDH COMPLETION - APPL.:

04/00/84 09/12/83 progress in order to make a new construction completion schedule estimate. April 1984 is estimated by the aoolicant.

NRR LICENSING SYSTEM PAGE N0: 2-6 CATAWBA 182 0L CURRENT STATUS REPORT REPORT AS OF: 12/31/83 PLANT CHARACTERI5TICSt KEY PERS0NNEL:

1 DOCKET NO:

041310414 LIC PM:

K. JABBOUR ASLB CHAIR:

J. KELLEY APPLICANT:

DUKE POWER LIC. BC:

E.

ADENSAM MEMBER 1:

P. PURDOM LOCATIDH:

6 MI NNW OF ROCK HILL, SC LIC. LA.:

M. DUNCAN MEMBER 2:

R.

FOSTER REGION:

2 AE2 DUKE COUNSEL:

G. JOHNSON CONST. INSP:

P. VAND00RN PEAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP P. SKINNER DESIGN PWR 3582 MWT/1145 MWE CONST DUKE RM ANALYST:

L.

LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued on February 9, 1983.

SSER 81 was l

issued on May 2, 1983.

ER DOCKETED:

06/11/81 06/11/81C i

ER SITE VISIT COMPLETE:

10/15/81 10/15/81C l

INPUT TO DES TO PM:

06/25/82 07/29/82C ISSUE DES:

08/05/82 08/11/82C RESPONSE TO COMMENTS ON DES:

11/30/82 11/30/82C l

ISSUE FES:

01/07/83 01/ 07/83C CURRENT ENV. STATUS:

DES was issued on 08/11/82. FES was issued on 1/7/83.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/26/79 03/26/79C SAR DOCKETED:

06/11/81 06/11/81C SAR Q'S RECEIVED BY PM:

12/15/81 12/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/10/82 12/10/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/02/82 12/30/82C Combined hearing started on October 4, 1983.

ISSUE DRAFT SER:

11/19/82 11/19/82C INPUT TO SER:

01/09/83 01/19/83C ISSUE SER:

02/06/83 02/09/83C ACRS LETTER RECEIVED:

03/18/83 03/18/83C INPUTS TO SE SUPPLEMENT 1:

04/12/83 04/12/83C ISSUE SE SUPPLEMENT 18 05/02/83 05/02/83C FEMA LETTER RECEIVED:

02/15/84 CURRENT ANTITRUST:

Operating license antitrust review is in progress.

HEARING STARTED:

?""4/83 10/04/83C ASLB INITIAL DECISION:

4/00/s4 COMMISSION EFFECTIVENESS DECISION: J5/00/84 TECH SPECS COMPLETED:

05/00/84 i

COMMISSIDH DECISION:

05/00/84 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/00/84 Revision 7 dated 02/22/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CP Amend. Issued 12/23/80 indicating change in ownership.

CONSTRUCTION COMPLETION - APPL.:

05/00/84 05/00/82

PAGE NO: 2-7 NRR LICEN5ING SYSTEM CLINTON 1 0L CURRENT 5TATUS REPORT REPORT AS OF 12/31/83 KEY P E R S 0 N N E L:

PLANT CHARACTERISTICSt LIC. PM8 G. HARRIS 0N ASLB CHAIR H. CLARK LIC. BC:

A. SCHWENCER MEMBER 1 G. FERGUSON DOCKET NO:

05000461 APPLICANT:

ILLINDIS POWER LUCATION:

6 MI E OF CLINTON, ILL LIC. LA.:

E. HYLTON MEMBER 2:

D. PARIS REGION:

3 AE 58L COUNSEL:

R. GODDARD CONST. INSP F. JABLONSKI REAC. TYPE: BWR HSSSI GE ANTITRUST:

B. V0GLER RESID. INSPI N. LIVERMORE DESIGN PWR 2894 MWT/0950 MWE CONST: BALDWIN RM ANALYST B. ST MARY ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

FSAR was docketed 09/08/80. SER was issued 02/17/82.

Supplement No. 1 was issued 07/22/82. SSER No. 2 was ER DOCKETED:

03/01/81 09/08/80C ER SITE VISIT COMPLETE:

issued in May 1983.

INPUT TO DES TO PM:

12/08/81 12/08/81C ISSUE DES:

12/18/81 12/28/31C RESPONSE TO COMMENTS ON DES:

02/22/82 03/25/82C ISSUE FES:

05/20/82 05/20/82C CURRENT ENV. STATUS:

The draft environmental statement was completed December SAFETY / HEARING MILESTONES:

1981 The FES was completed May 1982.

APPLICATION TENDERED:

12/01/79 12/01/79C SAR DOCKETED:

09/08/80 09/08/80C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

INPUT TO DRAFT SER TO PM:

i CURRENT HRG. STATUS:

A third prehearing conference was held June 2, 1983.

Five ISSUE DRAFT SER:

contentions are admitted. Hearing estimated to start in INPUT TO SER:

12/05/81 12/05/81C ISSUE SER:

01/05/82 02/17/82C l

early 1984.

Awaiting Board order.

ACRS LETTER RECEIVED:

02/12/82 G3/09/82C INPUTS TO SE SUPPLEMENT 28 06/30/82 06/30/82C ISSUE SE SUPPLEMENT 2:

05/20/83 05/27/83C FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

NEARING STARTED:

03/19/84 Operatine license antitrust review completed ASLB INITIAL DECISION:

N/S March 18,'1982 (SECY-82-120).

COMMISSION EFFECTIVENESS DECISION: 10/00/85 TECH SPECS COMPLETED 11/00/85 t

COMMISSION DECISION:

12/00/85 ISSUE LIC. WITH POWER RESTRICTION:

t ISSUE FULL POWER LICENSE AMEND:

04/00/86 LATEST AMENDMENT:

-FSAR Amendment 827, 10/83.

SCHED, DATE RECEIPT DATE I

A two year slip in fuel load date to 1/86 was announced by CCHSTRUCTION COMPLETION - APPL.:

01/06/86 05/24/83 NEW SLIPS / NOTES:

IPC on 05/24/83.

NRR LICENSING SYSTEM PAGE NO: 2-8 CDMANCHE PEAK 1 82 0L CURRENT STATUS REPORT REPORT AS OF:' 12/31/83 PLANT CH.ARACTERISTICSt KEY P E R S 0 W H E L:

DOCKET ND:

044580446 LIC. PM:

S. BURWELL ASLB CHAIR P. BLOCH-APPLICANT:

TEXAS UTILITIES GENERATING LIC. BC:

B. YOUNGBLOOD MEMBER 1:

W. JORDAN LOCATION:

4 MI N OF GLEN ROSE, TEX LIC. LA.:

M. RUSHBROOK MEM8ER 28 K. MCCOLLOM REGION:

4 AE:

G8H COUNSEL:

S.

TREBY CONST. INSP: R. TAYLOR i

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP D. KELLEY DESIGN PWR 3411 MWT/1150 MWE CONST BRRT RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The SER was issued 07/14/81 The staff deferred scheduling the Comanche Peak review by the ACRS until sufficient ER DOCKETED:

01/19/79 01/19/79C l

information was provided to resolve a large number of open ER SITE VISIT COMPLETE:

-06/20/80 08/07/80C issues. SSER Of was issued 10/16/81. Application was INPUT TO DES TO PM:

08/15/80 04/27/81C' reviewed by the ACRS on 11/13/81 SSER 02 responding to ISSUE DES

  • 04/30/81 05/22/81C the ACRS was, issued on 01/20/82. SSER 03 containing RESPONSE TO COMMENTS ON DES:

07/19/81 08/28/81C j

l emergency preparedness was issued 03/11/83.

ISSUE FES:

09/18/81 09/24/81C i

I

-i CURRENT ENV. STATUS:

The DES was issued on 05/22/81 The EPA Federal Register l

. Notice was printed on 05/29/81 and the-comment period SAFETY / HEARING MILESTONES:

ended 07/13/81. The FES was issued on 09/24/81.

APPLICATION TENDERED:

03/01/78 03/01/78C SAR POCKETED:

05/12/78 05/12/78C SAR Q'S RECEIVED BY PM:

12/30/78 02/22/79C SAR APPL. RESPONSE TO 4'S RECEIVED: 05/08/79 01/31/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

04/13/79 03/11/81C l

Hearing began 12/02/81. Issues heard were financial ISSUE DRAFT SER:

03/31/81 03/31/81C qualifications and operating QA program. Further hearing INPUT TO SER:

05/22/81 07/08/81C l

sessions on GA/QC during construction were held 06/07-11/82, ISSUE SER:

07/14/81 07/14/81C 07/26-30/82, and 09/13-17/82.

The fifth and sixth hearing session on QA/QC during construction and emergency ACRS LETTER RECEIVED:

11/17/81 11/17/81C preparedness were held 5/16-20 and 6/13-16/83.

The seventh INPUTS TO SE SUPPLEMENT 5:

04/00/84 hearing session on 9A/QC during const. was held 10/17-18/83.

ISS'JE SE SUPPLEMENT 5 8 03/00/84 The emergency preparedness contention was dismissed.

FEMA LETTER RECEIVED:

02/30/84 CURRENT ANTITRUST *'

ALJ appointed on 02/23/82 to replace ASLB. Prehearing HEARING STARTED:

12/02/81 12/02/81C conference held 04/13/82 to determine status of parties.

ASLB INITIAL DECISICN:

07/00/84

. Briefs filed 05/04/82 request immediate imposition of COMMISSION EFFECTIVENESS DECISION: 07/00/84

. settlement Ilconse conditions. A Memorandum and Order TECH SPECS COMPLETED:

07/00/84 approving settlement agreements & proposed license COMMISSION DECISIGHz 07/00/84 conditions a di smissing proceedings was issued 05/06/82.

ISSUE LIC. WITH POWER RESTRICTION: 07/00/84 LATEST AMENDMENT:-

ISSUE FULL POWER LICENSE AMEND:

07/00/84 45 SCHED. DATE RECEIPT DATE

^

NEW SLIPS / MOTES:

SSER-4 was issued 11/23/83.

CONSTRUCTION COMPLETION - APPL.:

07/08/84 12/16/83 im.

mm

.em..

......-,o..mi..,isi i-iimi isa n

i l

PAGE NO: 2-9 l

NRR LICENSING SYSTEM DIABLO-CANYON 1 82 0L CURRENT STATUS REPORT REPORT AS OF: 12/31/83 KEY PERS0NNEL PLANT CHARACTERISTICS LIC. PM:

H.

SCHIERLING ASLB CHAIR:

J. WOLF LIC. BC:

G. KNIGHTON MEMBER 18 J. KLINE DOCKET NO:

027580323 APPLICANT:

PACIFIC GAS & ELECTRIC LIC.

LA.+

J. LEE MEMBER 2:

G.

BRIGHT LOCATION:

12 MI WSW OF SAN LUI3 OBISPD REGION:

5 AE:

PG8E COUNSEL:

L. CHANDLER CONST. INSP: D. KIRSCH REAC. TYPE: PWR NSSS: 4EST ANTITRUST:

J. RUTBERG RESID. INSP: J. CARLSON DESIGN PWR: 3338 MWT/1084 MWE CONST: PG&E RM ANALYSTr B.

ST MARY ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STA7US:

The Commission reinstated on 11/08/83 the authority to 11/09/71 11/09/71C load fuel and perform suberitical testing.

Fuel loading ER DOCKETED:

began on 11/15/83 and was completed on 11/20/83.

The ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

10/09/72 10/09/72C hearing and record for a full power license on design QA ISSUE DES:

12/12/72 12/12/72C was closed 11/21/83.

SSER 20 regarding cri ticality and RESPONSE TO COMMENTS ON DES:

04/27/73 04/27/73C low power testing was issued on 12/23/83.

A status report 09/15/75 05/28/76C ISSUE FES:

on the tiaff resolution of numerous allegations on construction design was issued on 01/04/84.

SSERs on breakwater and superstruct supports is in preparation.

CURRENT ENV. STATUS:

Complete SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

07/10/73 37/10/73C SAR DOCKETED:

10/02/73 10/02/73C SAR Q'S RECEIVED BY PM:

01/04/74 01/04/74C SAR APPL. RESPONS2 TO Q'S RECEIVED: 11/01/74 11/01/74C INPUT TO DRAFT SER TO PM:

01/24/75 01/24/75C l

CURRENT HRG. STATUS:

ISSUE DRAFT SER:

Favorable ASLB Initial Decision for full power license was INPUT TO SER:

01/24/75 01/24/75C issued 08/31/83.

However, in 4/83 the ASLAB reopened the 10/04/74 10/16/74C ISSUE SER:

reenrd for the full power license on matters of design Hearings were conducted October /

ACRS LETTER RECEIVED:

05/00/78 07/18/78C l

quality assurance.

l November 1983.

Evidentiary hearing on reopening the record INPUTS TO SE SUPPLEMENT 9:

06/21/83 06/21/33C on construction QA was completed 07/22/83; motion to reopen 12/23/83C ISSUE SE SUPPLEMENT 9:

record on construction QA was denied.

FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

HEARING STARTED:

10/29/75 12/07/76C Not required ASLB INITIAL DECISION:

N/S COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

G9/15/81 09/15/81C COMMISSION DECISION:

01/00/84 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Additional SSERs are expected in support of criticality / low CONSTRUCTION COMPLETION - APPL.:

power and full power authorization.

NRR LICENSING SYSTEM PAGE NO: 2-10 ENRICO FERMI 2 0L CURRENT STATUS REPORT REPORT AS OF 12/31/83 PLAN 1 C H A R A C T E R I S T I C S:

KEY PERS0NNEL DOCKET NO:

05000341 LIC. PM:

D.

LYNCH ASLB CHAIR:

G. MILLHOLLIN APPLICANT:

DETROIT EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1:

P. MORRIS LOCATION:

LAGUNA BEACH, MICH LIC.

LA.+

M. RUSHBROOK MEMBER 2 D.

SCHINK REGION:

3 AE S&L COUNSEL:

C. WOODHEAD CONST. INSP P.

PELFE REAC. TYPE: BWR NSSS: GE AHTITRUST:

A. HODGDON RESID. INSP: P. BYRON DESIGN PWR: 3292 MWT/1093 MWE CONST: DANIEL RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE An interim SER was issued on 09-29-77 and a final SER was issued on 07-10-81.

SSER Ho. I was issued 9-25-81.

ER DOCKETED:

(4/04/75 04/04/75C SSER No. 2 was issued 1-29-82 with 7 prelicensing issues ER SITE VISIT COMPLETE:

09/27/78 10/31/770 outstanding. SSER ilo. 3 was issued on 2-4-83.

The staff has INPUT TO DES TO PM:

07/31/81 04/24/81C requested that the standby liquid control system be ISSUE DES:

05/01/81 04/30/81C upgraded to conform to the Level 1 QA/QC program.

RESPONSE TO COMMENTS ON DES:

07/31/81 06/29/81C ISSUE FES:

08/31/81 09/04/81C CURRENT ENV. STATUS:

Addendum No. I to the FES was issued 03-03-82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/22/74 10/22/74C SAR DOCKETED:

04/05/75 04/05/75C SAR Q'S RECEIVED BY PM:

06/13/75 08/11/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/29/75 01/12/ 76 C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/24/75 03/08/76C A hearing on two issues began on 03-31-82 and ended on ISSUE DRAFT SER:

04-02-82.

Monroe County, Michigan petitioned for INPUT TO SER:

03/05/76 05/20/77C leave to reopen hearings on the evacuation issue of ISSUE SER:

08/01/77 09/29/77C Emergency Prepardness; the Board denied this petition.

ASLB issued initial decision on 10/29/82 authorizing ACRS LETTER RECEIVED:

08/20/81 08/11/81C operating license issuance. The Commission issued its INPUTS TO SE SUPPLEMENT 3:

08/22/82 01/05/83C Immediate Effectiveness Decision on 12/22/82.

The ISSUE SE SUPPLEMENT 3:

09/01/82 02/04/83C Commission denied intervenor's appeal on 10/27/83.

FEMA LETTER RECEIVED:

05/01/82 11/30/83C CURRENT ANTITRUST:

An ASLB decision on antitrust matters was issued on HEARING STARTED:

12/02/81 03/31/82C 04-25-78.

ASLB INITIAL DECISION:

10/00/82 10/29/82C COMMISSION EFFECTIVENESS DECISIDH:

12/22/82 12/22/82C TECH SPECS COMPLETED:

05/30/84 COMMISSION DECISIDH:

06/00/84 ISSUE LIC. WITH POWER RESTRICTICH: N/A LATEST AMENDMENI ISSUE FULL POWER LICENSE AMENDr 06/30/84 The latest final Safety Analysis Report Amendment is number 52.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

06/00/84 12/12/83 I

1 I

NRR LICENSING SYSTEM PAGE N0 2-11 GRAND GULF 1 & 2 LIC CURRENT STATUS REP 0RT REPORT AS OF 12/31/83 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

041680417 LIC. PM:

D. HOUSTON ASLB CHAIR:

J. LAURENSON APPLICANT:

MISSISSIPPI POWER 8 LIGHT COMPANY LIC. BC:

A.

SCHWENCER MEMBER 1:

G. BRIGHT LOCATION:

25 MI S OF VICKSBURG, MISS LIC. LA.:

E. HYLTON MEMBER 2:

J. HARBOUR REGION:

2 AE BEJH COUNSEL:

M. WAGNER CONST. INSP: R. VANDORM REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: A. WAGNER DESIGN PWR 3833 MWT/1250 MWE CONST BECH RM ANALYST B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued on September 10, 1981.

SSERs were issued in December 1981, in June and July 1982 and in May 1983.

ER DOCKETED:

06/05/78 06/30/78C The ACRS report on full power operation for Unit I was ER SITE VISIT COMPLETE:

12/14/79C issued August 18, 1982.

Final FEMA letter was received INPUT TO DES TO PM 04/30/81 04/30/81C 06/29/83.

ISSUE DES:

05/31/81 05/31/81C t

RESPONSE TO COMMENTS ON DES:

08/15/81 08/15/81C NEW SLIPS (CONT.):

to go above 5% until 3/84.

Also, FP ISSUE FES:

09/15/81 10/09/81C delayed by Region II COA on the recertification program for the operating staff.

CURRENT ENV. STATUS:

i DES was issued in May 1981 FES was issued October 9, 1981.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/28/78 04/28/78C SAR DOCKETED:

06/05/78 06/30/78C SAR Q'S RECEIVED BY PM:

04/24/79C 2

SAR APPL. RESPONSE TO Q'S RECEIVED: 07/01/80 09/30/80C CURRENT HRG. STATUS INPUT TO DRAFT SER TO PM:

N/S No hearing. Petition was filed by the State of Louisiana on ISSUE DRAFT SER:

09/18/81C basis of Court of Appeals, District of Columbia, opinion on INPUT TO SER:

04/01/81 08/14/81C S-3 Table issue. Board denied petition for intervention on ISSUE SER:

06/00/81 09/10/81C 10/20/82. State of Louisianna filed an appeal to the Board's denial. Appeal Board upheld denial for intervention in a ACRS LETTER RECEIVED:

07/00/81 08/18/82C decision issued 12/8/82. Intervenor filed petition on INPUTS TO SE SUPPLEMENT 58 12/15/83 11/17/83 requesting hearing on Amendment 10 to the OL, which ISSUE SE SUPPLEMENT 58 02/27/84 was i ssued 09/23/83.

FEMA LETTER RECEIVED:

04/00/83 06/29/83C CURRENT ANTITRUST:

HEARING STARTED:

N/A OL review is in progress. No significant changes have occurred since the CP.

ASLB INITIAL DECISION:

N/A l

COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

09/01/81 06/16/82C COMMISSION DECISION 02/00/84 ISSUE LIC. WITH POWER RESTRICTION: 04/23/82 06/16/82C ISSUE FULL POWER LICENSE AMEND:

03/00/84

' L ATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Unit 1 OL for fuel load to 5% power iss. 6/16/82. FP delayed CONSTRUCTION COMPLETION - APPL.:

06/16/82C OL ISSUED by Region II COA on TS surveillance proceduro deficiencies, operator recertification 8 outst. Items, maint. 8 mods for 1st refuel outane. Licensee not readv(See Curr. Saf. Status) l

NRR LICENSING SYSTEM PAGE NO: 2-12 HARRIS 1 0L CURRENT STATUS REPQRT REPORT AS OF 12/31/83 PLANT CHARACTERIETIC$2 KEY PERS0NNEL DOCKET NO:

05000400 LIC. PM:

B. BUCKLEY ASLB CHAIR:

J. KELLEY APPLICANT:

CAROLINA POWER 8 LIGHT LIC. BC:

G. KNIGHTON MEMBER 1 G. BRIGHT LOCATIDH 20 MI SW OF RALEIGH, NC LIC. LA.:

J.

LEE MEMBER 2:

J. CARPENTER REGION:

2 AE:

EBASCO COUNSEL:

C. BARTH CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP: G. MAXWELL DESIGN PWR: 2775 MWl/0915 MWE CONST DANIEL RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR was docketed on 12/22/81 Questions were sent to the applicant between 4/26/82 and 7/30/82. Most of ER DOCKETED:

12/22/81 12/22/81C applicant's responses were received by 08/31/82. Draft ER SITE VISIT COMPLETE:

04/08/82 04/08/82C SER i ssued 2/1/83.

Final SER was issued November 1983.

INPUT TO DES TO PM:

01/14/83 02/08/83C ISSUE DES:

04/00/83 04/00/83C RESPONSE TO COMMENTS ON DES:

09/30/83 09/30/83C ISSUE FES:

10/31/83 10/31/83 C CURRENT ENV. STATUS:

ER was docketed on 12/22/81. The site visit was complete on 04/08/82 and questions were sent to applicant on SAFETY / HEARING MILESTONES:

04/28/82. Most of the applicant's responses were received by October 15, 1982.

Draft Environmental Statement APPLICATION TENDERED:

06/26/80 06/26/80C was issued in April 1983.

Final Environmental Statement SAR DOCKETED:

12/22/81 12/22/8tC was i ssued in Octobe:- 1983.

SAR Q'S RECEIVED BY PM:

07/09/82 07/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/08/82 11/08/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER 70 PM:

10/15/82 12/22/82C Notice for Opportunity for Hearing was published in the ISSUE DRAFT SER:

01/03/83 02/01/83C Federal Register on January 27, 1982.

Several petitions INPUT TO SER:

09/01/83 11/15/83C to intervene were flied. Prehearing conference on petitions ISSUE SER:

11/01/83 II/30/83C was held on July 13-14, 1982.

Board decision on contentions issued September 23, 1982.

Further clarification issued ACRS FULL COMMITTEE MEETING:

01/12/84 January 11, 1983.

A pre-hearing conference was held on INPUTS TO SE SUPPLEMENT 1:

03/01/84 i

l February 24, 1983 on discovery and scheduling.

ISSUE SE SUPPLEMENT 1:

04/02/84 FEMA LETTER RECEIVED:

04/00/84 CURRENT ANTITRUST:

l Status to be determined.

HEARING STARTED:

01/00/84 ASLB INITIAL DECISIGHz 05/01/85 COMMISSION EFFECTIVENESS DECISION: 05/00/85 I

TECH SPECS COMPLETED:

05/01/85 COMMISSION DECISION:

05/00/85 ISSUE LIC. WITH POWER RESTRICTION: 06/00/85 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

06/03/85 FSAR No. 10 ER No. 5 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Staff schedule based on fuel load date of 06/03/85.

CONSTRUCTION COMPLETION - APPL.:

06/03/85 10/06/82 l

CPL voted on 12/21/83 to cancel Unit 2.

l l

l l

l l

I

l HRR LICEN$ING SYSTEM PAGE NO: 2-13 HOPE CREEK 1 0L CURRENT STATUS REP 0RT REPORT AS OF 12/31/83 PLANT C H A R A C T E R I 5 T I C S:

KEY PERS0NNEL DOCKET NO:

05000354 LIC. PM:

D. WAGNER ASLB CHAIR:

M. MILLER APPLICANT:

PUBLIC SERVICE ELECTRIC 3 GAS LIC. BC:

A. SCHWENCER MEMBER 1:

P. MORRIS LOCATIDH:

18 MI SE OF WILMINGTON, DEL LIC. LA.:

E. HYLTON MEMBER 2:

J. CARPENTER REGION:

1

.AE BECH COUNSEL:

L. DEWEY CONST. INSP: W. BATEMAN REAC. TYPE: BWR NSSS: SE ANTITRUST:

RESID. INSP:

DESIGN PWR: 3440 MWT/1067 MWE CONST: BECH RM ANALYST B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR was tendered on March 2, 1983 and docketed on June 29, 1983.

ER DOCKETED:

06/29/83 06/29/83C ER SITE VISIT COMPLETE:

07/28/83 07/28/83C INPUT TO DES TO PM:

04/13/84 ISSUE DES:

06/15/84 RESPONSE TO COMMENTS ON DdS ISSUE FES:

11/16/84 CURRENT ENV. STATUS:

ER was tendered on March 2, 1983 and docketed on June 29, 1983.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/83 03/02/83C SAR DOCKETED:

06/29/83 06/29/83C SAR Q'S RECEIVED BY PM:

08/22/83 11/30/83C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/23/84 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

02/21/84 Federal Register on August 10, 1983.

Board Order dated INPUT TO SER:

08/20/84 12/21/83 admitted 4 contentions into the proceeding.

ISSUE SER:

10/12/84 ACRS FULL COMMITTEE MEETING:

11/00/84 INPUTS TO SE SUPPLEMENT 12 01/01/85 ISSUE SE SUPPLEMENT 1:

02/15/85 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

07/15/85 ASLB INITIAL DECISION:

01/00/86 COMMISSION EFFECTIVENESS DECISION: 01/00/86 TECH SPECS COMPLETED:

12/00/85 COMMISSIDH DECISION:

01/00/86 ISSUE LIC. WITH POWER RESTRICTIDH:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

01/00/86 Amendment 92 submitted 10/31/83.

SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETION - APPL.:

01/14/86 06/30/82

___m H.R R LICEN5ING SYSTEM PAGE NO: 2-14 LASALLE 2 0L CURREHT STATUS REP 0RT REPORT AS OF: 12/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:

05000374 LIC. PM:

A. BOURNIA ASLB CHAIR:

M. MILLER APPLICANT:

COMMONWEALTH EDISON LIC. BC:

A. SCHWENCER MEMBER 1 F. SHON LOCATION:

11 MI SE OF OTTAWA, ILL LIC. LA.:

E. HYLTON MEMBER 28

0. PARIS REGION:

3 AE 58L COUNSEL:

C. WOODHEAD CONST. INSP H. WESCOTT REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: W. GULDEMOND DESIGN PWR: 3293 MWT/1078 MWE CONST: CWE RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SSER-1 was issued in June 1981.

SSER-2 was i ssued in February 1982.

SSER-3 was issued on April 16, 1982.

ER DOCKETED:

01/17/77 05/12/77C l

SSER-4 was issued on July 14, 1982.

SSER-S was i ssued ER SITE VISIT COMPLETE:

1 on August 17, 1983.

SSER 86 was issued in November, INPUT TO DES TO PM:

02/17/78 02/17/78C 1983.

SSER 87 was issued on December 1,

1983.

SSER ISSUE DES:

03/22/78 03/29/78C l

88 willl be issued in March 1984.

RESPONSE TO COMMENTS ON DES:

07/14/78 07/14/78C l

2 ISSUE FES:

09/22/78 11/03/78C CURRENT ENV. STATUS 8 Environmental Protection Plan has been issued with Unit 1 license.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/01/76 09/01/76C SAR DOCKETED:

04/08/77 05/12/77C SAR Q'S RECEIVED BY PM:

07/22/77 07/27/77C SAR APPL. RESPONSE TO Q'S RECEIVED 12/15/77 08/18/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/06/78 11/08/78C Ho hearing.

ISSUE DRAFT SER:

i INPUT TO SER:

12/29/78 02/27/81C TSSUE SER:

09/05/80 03/05/81C ACRS LETTER RECEIVED:

04/09/81 04/16/81C INPUTS TO SE SUPPLEMENT 8 12/08/83 12/08/83C ISSUE SE SUPPLEMENT 8:

03/00/83 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Complete.

HEARING STARTED:

N/A j

ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

12/00/83 COMMISSION DECISION:

03/00/84 ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

03/00/84 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Lasalle Unit 1 criticality was achieved on June 21, 1982.

CONSTRUCTION COMPLETION - APPL.:

12/00/83 10/11/83 Construction was completed on Unit 2 12/83.

Fuel load was initiated on 12/30/83 and completed on 1/11/84.

_._,m i

u NRR LICEN5ING SYSTEM PAGE NO: 2-15 LIMERICK 1 4 2 0L CURRENT STATUS REP 0RT REPORT AS OFs 12/31/83 i

PLANT CHARACTERI$TICSt KEY PERS0NNEL DOCKET.ND:

035230353 LIC. PM:

R. MARTIN ASLB CHAIR L. BRENNER APPLICANT:

PHILADELPHIA ELECTRIC LIC. BC:

A.

SCHWENCER MEMBER is R. COLE LOCATIDM 35 MI NW OF PHILADELPHIA, PA LIC. LA.:

E. HYLTON MEMBER 2:

P. MORRIS REGION:

1 AE:

BECH COUNSEL:

A. HODGDON CONST. INSP S. CHAUDHARY REAC. TYPE: BWR NSSS: GE ANTITRUST B. V0GLER RESID. INSP: J. WIGGINS DESIGN PWR 3440 MWT/1965 MWE CONST: BECH RM ANALYST L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE l

Applicant submitted Probabilistic Risk Assessment with FSAR on March 17, 1981.

SAR was docketed on 07/27/81.

ER DOCKETED:

07/27/81 07/27/81C NUREG/CR on PRA was issued by Board Motification on ER SITE VISIT COMPLETE:

08/20/82 08/20/82C G3/04/83. SER was issued on 08/31/83. ACRS meeting INPUT TO DES TO PM:

06/10/83 06/10/83C

+

.was held 10/13/83. Supplement to SER was issued on ISSUE DES:

06/24/83 06/24/83C December 13, 1983.

RESPONSE TO COMMENTS ON DES:

02/00/84 ISSUE FES:

03/00/84 CURRENT ENV. STATUS:

ER was docketed on 07/27/81. DES was issued on June 24, 1983.

The second part of the DES based on appilcants SAFETY / HEARING MILESTONES:

severe accidents risk assessment submitted April 21, 1983 was issued on December 16, 1983.

APPLICATION TENDERED:

01/08/81 03/17/81C SAR DOCKETED:

07/27/81 07/27/81C SAR O'S RECEIVED BY PM:

07/08/82 02/01/83C SAR APPL. RESPONSE TO 4'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM N/S Notice of Opportunity of Hearing was published in the ISSUE DRAFT SER:

N/S Federal Register on August 21, 1981 A special prehearing INPUT TO SER:

08/05/83 08/05/83C i

conference addressing conditionally admitted contentions ISSUE SER:

08/31/83 08/31/83C

. was held in October. Actions were specified by the Board for all parties. Hearings on pipeline and cooling tower ACRS LETTER RECEIVED 10/18/83 f3/18/83C hazards were held Dec.'12-16, 1983 and will resume on INPUTS TO SE SUPPLEMENT 18 11/04/83 11/04/83C January 9, 1984.

ISSUE SE SUPPLEMENT 12 12/30/83 12/13/83C FEMA LETTER RECEIVED:

02/28/84 CURRENT ANTITRUST Status to be determined.

HEARING STARTED:

12/12/83 12/12/83C ASLB INITIAL DECISION:

03/00/85 COMMISSION EFFECTIVEMESS DECISION: 03/00/85 TECH SPECS COMPLETED:

03/00/85 COMMISSION DECISION:

03/00/85 ISSUE LIC. WITH POWER RESTRICTIDH: 03/00/85 ISSUE FULL POWER LICENSE AMEND:

03/00/85 LATEST AMENDMENT:

Rev. 25, October 31, Rev. 15. August 31, 1983 (ER OL)!

1983 (FSAR);.Rev. 6, September 30, 1983 (EP).

SCHED. DATE ' RECEIPT DATE NEW SLIPS / NOTES:

Applicant estimates construction completion by August 1, CONSTRUCTION COMPLETION - APPL.

08/01/84 10/25/83 1984.

ASLB estimates that 17 months are necessary for hearing.

T

_ _ _ ~

. _ -. ~,.

- _ =

NRR LICENSING SYSTEM PAGE NO: 2-16 MARBLE HILL 1&2 0L CURRENT-

$TATUS REPORT REPORT AS OF 12/31/83 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNEL DOCKET NO:

054680547 LIC. PM:

P. O CONNOR ASLB CHAIR I. SMITH APPLICANT:

PUBLIC SERVICE OF INDIANA LIC. BC:

J. YOUNGBLOOD MEMBER 1:

G.

LINENBERGER LOCATION -

10 MI S OF MADISON, IN LIC. LA.:

M. RUSHBROOK MEMBER 28

0. PARIS REGION:

3 AE:

58L COUNSEL:

E. CHEN CONST. INSP: P. PELKE REAC. TYPE PWR NSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP: J. SCHAPKER l

DESIGN PWR: 3415 MWT/1130 MWE CONST: PSI RM ANALYST:

5. HEDLUND i

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was docketed on 02/25/83. Applicant has laid off most employees except top management. No application ER DOCKETED:

03/01/83 02/25/83C will be taken to respond to NRC requests for information ER SITE VISIT COMPLETE:

07/11/83 07/11/83C or meetings until applicant determines whether the plant INPUT TO DES TO PM:

03/30/84 will be cancelled.

ISSUE DES:

05/30/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

11/30/84 4

CURRENT ENV. STATUS:

Application was docketed on 02/25/83. ER site visit completed on 07/11/83.

SAFETY.'9 EARING MILESTONES:

APPLICATION TENDERED:

12/G1/82 11/23/8?C SAR DOCKETED:

03/01/83 02/25/83C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO 4'S RECEIVED: N/S CURRENT HRG. STATUS:-

INPUT.T0 DRAFT SER TO PM:

03/02/84 Three petitions were received. The petitioners Valley ISSUE DRAFT SER:

04/06/84 Watch Inc.,8 Sassafras Audubon Soc. filed amended petitions INPUT TO SER:

10/05/84

-on 7/26/83 8 7/21/83 respectively. Petitioners supple-ISSUE SER:

12/07/84 zmented contentions to include all contentions on 10/24/83.

By letter 12/22/83 applicant reported the recommendation of ACRS FULL COMMITTEE MEETING:

01/10/85 the governor of Indiana's task force to cancel Marble Hill INPUTS TO SE SUPPLEMENT 18 03/01/85 PSI suggested that the ASLB defer any further action on ISSUE SE SUPPLEMENT 18 04/15/85 this proceeding pending PSI decision on the recommendation.

FEMA LETTER RECEIVED:

CURRENT ANTITRUST Notice of a receipt of antitrust information at OL HEARING STARTED:

09/15/85 stage published 4/6/83.

ASLB INITIAL DECISION:

05/15/86 COMMISSION EFFECTIVENESS DECISIDH 06/00/86 TECH SPECS COMPLETED:

06/00/86 COMMISSION DECISION:

06/00/86 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT *.

ISSUE FULL POWER LICENSE AMEND:

Amendment 29 (10-28-83), 30 (12/01/83)

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

06/00/86 12/15/82

.r k

i t

N 3

<g

?

L I C E N'S I N G S,Y S T E M PAGE N08 2 17 NRR 1

MIDLAND 18,2

\\

OL CURRiNT STA TU$, REP 0RT-REPORT AS OF: 12/11/E3..

PLANT

-C H A R A C T.E R'I 5 T I C S:

K E Y ', P E R S 0 N N E L:

' ASLB CHAIR:

C.

BECNHOEFER LIC. PM:

D. HOOD

~ i DOCKET NO:

033080329 L IC.g BC:

E..ADENSAM MEMBER.1:

F. COWAN APPLICANT:

CONSUMERS POWER s

LOCATION:

ISW BDUNDARY40F MIDLAND, MIC11 LIC. LA.:

M.

DUMCAN,

MEMBER 2 J. HARBOUR

..!i*?

REGION:

3 AE BECy'.

COUNSEL:

W. PATON CONST. INSP: R. LANDSMAN REAC. TYPE: PWR NSSS: B&W \\

ANTITRUST:

B. V0GLER RESID; INSP: R. COOK DESIGN PWR ;q 2452 MWT/0818 MWE CONST: B ECil RM ANALYST:

B.

ST MARY CURRENT SAF.' STATUS:

y 3

ENVIRONMENTAL MILESIONES:

SCHED. DATE ACTUAL DATE i

Utill ation of National Laboratories or other' agencies to complete some review areas is currently insprogress.

ACRS ER DOCKETED 04/01/78 04/14/78C 1

ERSITEVISkT'C6HPLETE:s

) ( 09/18/78 09/08/78C Fell. Committee Moeting was held'06/04/82. SSER #1 responding-to-ACRS letter-was issued 6/30/82. SSER 82 INPUT TO DES TO PM:

('

02/03/82 02/03/82C on soils settlement problems was issued 10/06/82.

ISSUE DES:

02/05/82 02/05/82C BOP safety constructiorCwas halted 12/82 because of QA RESPONSE TO COMMENTS ON DES:

07/08/82 07/08/82C problems and would havo ' ended 10/06/83 with NRC's Order ISSUE FES:

07/30/82 07/30/82C approving a Construction Ccmpletion Plan; however, extensive g

safety construction, stopped 10/22/83 by applicant due to design documentation deficiencies, i s in ef fect.

e CURRENT, ENV.' STATUS:

a

,1m i

- The DES was i ssund 02/05/82. The FES was issued on 4

t i

SAFETY / HEARING MILESTONES:

t July 30, 1982.

w s

s.

(

' APPLICATION' TENDERED:

s 08/31/77 08/31/77C SAR DOCKETED:

'09/30/77 11/18/77C SAR Q'S RECEIVED BY PM:

03/20/78 10/02/78C SAR' APPL. RESPONSE TO Q'S RECEIVED: 12/08/78 12/08/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/01/78 12/01/78C

.Three prehearings ending 04/27-28/81 were held for a ISSUE DRAFT SER:

N/A separate hearing on soils settlement. Nearing on soils INPUT TO SER:

04/23/82 04/23/82C settlement began July 7,.1981 and is continuing. Combined ISSUE SER:

05/11/82 05/11/82C hearings for soils issues and OL issues commenced on 11/15/82 and are continuing.

ACRS LETTER RECEIVED:

06/15/82 06/08/82C INPUTS TO SE SUPPLEMENT 3:

08/16/82 08/16/82C ISSUE SE SUPPLEMENT 38 11/17/83 11/17/83C FEMA LETTER RECEIVED:

01/14/83 01/14/83C CURRENT ANTITRUST:

Proceeding completed. License was amended 10/20/80.

HEARING STARTED:

11/15/82 11/15/82C ASLB INITIAL DECISION:

10/00/85 COMMISSION EFFECTIVENESS DECISION: 10/00/85 TECH SPECS COMPLETED:

09/00/86 COMMISSION DECISION:

09/00/86 ISSUE LIC. WITH POWER RESTRICTIOh 09/00/86 LATEST. AMENDMENT:

ISSUE FULL PUWER LICENSE AMEND:

11/00/86 114 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES -

CFP visit 4/19-21/83 finds appl.-schedule optimistic by more CONSTRUCTION COMPLETION - APPL.:

10/00/84 04/12/83 than

1. year.

On 7/14/83 Dow Chemical decided not to buy

. steam.

Impact on sched. under appl. eval. (see Current Saf.

Status.) Come operation of Unit 2 mav be delaved to mid-86.

t

HRR LICENSING SYSTEM PAGE NO: 2-18 MILLSTONE 3 0L CURRENT STATUS REP 0RT RFPORT AS OF 12/31/83 PLANT C H A R A C T E R I 5 T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000423 LIC, PM:

E. DOOLITTLE ASLB CHAIR: N/A APPLICANT:

NORTHEAST NUCLEAR ENERGY LIC. BC:

B. YOUNGBLOOD MEMBER tr N/A LOCATION:

3.2 MI WSW OF NEW LONDON CT.

LIC.

LA.*

M.

RUSHBROOK MEMBER 2 N/A REGIDH 1

AE:

58W COUNSEL:

M. ROTHSCHILD C.HST. INSP:

REAC. TY'E:

PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP T. REBELOWSKI DESIGN PWR 3565 MWT/1156 MWE CONST: 58W RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety review questions sent to applicant on 05/03/83, 05/31/83 and C6/29/83, and 12/5/83. Responses received ER DOCKETED:

02/01/83 02/03/83C on 7/22/83 and 08/01/63, and on 08/29/83, 09/23/83 and ER SITE VISIT COMPLETE:

07/21/83 07/21/83C 10/03/83. FSAR Amendment 5 was received on 11/29/83.

INPUT TO DES TO PM:

DSER inputs were due to LPM on 11/01/83. DSER was ISSUE DES:

04/17/84 issued on 12/30/83.

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

11/16/84 CURRENT ENV. STATUS:

Environmental site visit completed on 07/20 and 07/21/83.

Probabilistic safety study received on 08/01/83.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

11/01/82 10/29/82C SAR DOCKETED:

02/01/83 02/03/83C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER 12/16/83 12/30/83C Federal Register on March 4, 1983.

No requests for INPUT TO SER:

05/15/84 hearing or petitions for leave to intervene were received.

ISSUE SER:

07/16/84 ACRS FULL COMMITTEE MEETING:

08/15/84 INPUTS TO SE SUPPLEMENT 1 10/15/84 ISSUE SE SUPPLEMENT 1 11/15/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

N/A ASLB INITIAL DECISIDH N/A COMMISSIDH EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

11/00/85 COMMISSION DECISICH:

11/01/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

11/00/85 Amendment 5 to FSAR received 11/29/83. Amendment 4 to ER received 10/04/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

CONSTRUCTION COMPLETION - APPL.:

11/01/85 09/3C/82

_ _ ~ - _ _

MRR LICENSING SYSTEM PAGE NO: 2-19 NINE MILE POINT'2 0L CURRENT STATUS REPORT REPORT AS OF 12/31/83 PLAMT CHARACTERISTICS:

KEY P E R S D N N E La DOCKET NO:

0S000410 LIC. PM:

M. HAUGHEY ASLB CHAIR:

APPLICANT:

NIAGARA M0 HAWK POWER LIC. BC A. SCHWENCER MEMBER 18 LCCATION:

8 MI ME OF OSWEGO, NY LIC. LA.:

E. HYLTON NEMBER 2 q?-

REGION:

1 AE SIW COUNSEL:

B. BORDENICK CONST. INSP: L. MARROW REAC. TYPE: BWR

'NSSS: GE ANTITRUST:

L. DEWEY RESID. INSP R. GRAMM DESIGN PWR: 3489 MWT/1080 MWE CONST: 58W RM ANALYST B. ST MARY CURRENT SAF STATUS:

ENVIRONMENTAL MILESTCHES:

SCHED. DATE ACTUAL DATE The FSAR was tendered on 01-31-83 and docketed on 04/ 2/83.

ER DOCKETED:

03/31/83 04/12/83C

'/

ER SITE VISIT COMPLETE:

08/05/83 08/03/83C

.s INPUT TO DES TO PM:

05/18/84 ISSUE DES:

07/20/84 RESPONSE TO COMMENTS ON DES:

. i IS$UE FES:

12/14/84 F

CURRENT ENV. STATUS:

.The ER was tendered on 01-31-83 and docketed on 04/12/83.

- ER site visit was completed on 8/2-3/83.

Environmental SAFETY / HEARING MILESTONES:

public meeting was held on 08/02/83.

APPLICATI0H TENDERED:

01/31/83 01/31/83C i

SAR DOCKETED:

03/31/83 04/12/83C SAR Q'S RECEIVED BY PM:

01/15/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 12/00/84 (CURRENT HRG. STATUS.

INPUT TO DRAFT SER TO PM:

01/20/84 f'

Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

02/16/84

s Federal Register on 05/13/83. The ASLB ordered on Aequst INPUT TO SER:

08/06/84 r-4, 1983, that no hearing be held in this operating ISSUE SER:

10/05/84 Ilconse application proceeding.

ACRS FULL COMMITTEE MEETING 11/08/84 INPUTS TO SE SUPPLEMENT 1:

12/01/84 ISSUE SE SUPPLEMENT 18 01/J0/85 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISION: 02/00/86 TECH SPECS COMPLETED:

02/00/86 COMMISSION DECISION 02/28/86 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMEMT ISSUE FULL POWER LICENSE AMEND:

02/00/86 CP Extension was issued on February 28, 1983.

SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

CONSTRUCTION COMPLETION - APPL.:

02/00/86 01/31/83 4

M V

e

NRR LICEN$ING SYSTEM PAGE NO: 2-20 PALO VERDE 1,2,3 0L CURREHT STATUS REPQRT REPORT AS OF 12/31/83 PLANT C H A R A O T E R I 5 T I C S:

KEY P E R S 0 N N E La DOCKET NO:

0528-0530 LIC. PM:

E. LICITRA ASLB CHAIR:

R. LAZO

. APPLICANT:

ARIZONA PUBLIC SERVICE LIC. BC:

G. KNIGHTON MEMBER 1 R. COLE LOCATION:

36 MI W OF PHOENIX, AZ LIC. LA.:

J. LEE MEMBER 2:

D. CALLIHAN REGIDH2 5

AE2 BECH COUNSEL:

L. DEWEY CONST. INSP L. VBRUEGGEN REAC. TYPE: PWR NSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP G. FIORELLI DESIGP PWR: 3817 MWT/1304 MWE CONST: BECH RM AHALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Several " Independent Design Review" meetings have been completed. The SER was issued on November 11, 1981 Five ER DOCKETED:

07/01/80 06/20/80C supplements have been issued. Supplement 85 was issued on ER SITE VISIT COMPLETE:

01/30/81 01/30/81C November 28, 1983.

Supplement No. 96 is targeted for 3/84.

INPUT TO DES TO PM:

10/05/81 10/05/81C ISSUE DES:

10/26/81 13/26/81C RESPONSE TO COMMENTS ON DES:

02/25/82 02/25/82C ISSUE FES:

03/11/82 0 3/11/82C CURRENT ENV. STATUS:

The ER COL) review is complete. A site visit was completed on January 30, 1981.

The DES was issued on SAFETY / HEARING MILESTONES:

October 26, 1981 and the FES was issued on March 11, 1982.

APPLICATION TENDERED:

10/05/79 10/05/79C SAR DOCKETED:

06/20/80 06/20/80C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

The hearing started 4/27-30, 1982, resumed on 5/25-28 and ISSUE DRAFT SER:

on 6-22-82.

Hearing record was closed on 6-25-82.

A INPUT TO SER:

10/30/81 10/30/81C late petition, dated 10-13-82 dealing with salt drift on ISSUE SER:

11/11/81 11/11/81C farm crops, was filed by W. Valley Agri. Protection Council. On 12-30-82, the Board issued a favorable ID ACRS LETTER RECEIVED:

12/18/31 12/18/81C but reopened the hearing on Units 2 and 3 to consider INPUTS TO SE SUPPLEMENT 6:

02/29/84 late petition by W. Valley. Board's decision authorizes ISSUE SE SUPPLEMENT 68 03/00/84 full power license for Unit 1.

FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Antitrust OL review for Units 1 8 2 has resulted.n a HEARING STARTED:

04/27/82 04/27/82C finding of no significant antitrust changes since the ASLB INITIAL DECISION:

12/30/82 12/30/82C CP review.

A Federal Register of the finding was COMMISSION EFFECTIVENESS DECISION: 04/27/E3 04/27/83C published 2-9-83.

TECH SPECS COMPLETED:

05/01/84 COMMISSIDH DECISION:

04/00/84 ISSUE LIC. WITH POWER RESTRICTION: 05/01/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

07/00/84 FSAR Amendment No. 11 ER' Supplement No. 4 SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

05/00/84 08/16/83 I

I l

i l

NRR 1 1CENSINC SYSTEM PAGE NO: 2-21 PERRY 1 82 0L CURRENT STATUS REPORT REPORT AS OF 12/31/83 PLANT CHARACTERI5T ICSt KEY PERS0NNEL:

DOCKET NO:

044080441 LIC. PM:

J. STEFAND ASLB CHAIR P. BLOCH APPLICANT:

CLEVELAND ELECTRIC ILLUMINATING LIC. BC:

J. YOUNGBLOOD MEMBER 18 J. KLINE LOCATION:

7 MI NE OF PAINESVILLE, OHIO LIC. LA.:

M. RUSHBROOK MEMBER 2 G. BRIGHT REGION:

3 AE GIL COUNSEL C. WOODHEAD CONST. INSP P. PELKE REAC. TYPE: BWR NSSS: GE ANTITRUST C. WOODHEAD RESID. INSP: M. GILDNER DESIGN PWR 3759 MWT/1205 MWE CONST: KAISER RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

E;4VIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The Safety Evaluation Report was issued in May 1982.

The ACRS Report was issued on July 13, 1982.

SSER Ho. 1 ER DOCKETED:

06/26/81 06/19/81C was issued in August 1982.

SSER No. 2 was issued in ER SITE VISIT COMPLETE:

Jan. 1983.

SSER No. 3 was issued in 4/83.

SSER Ho. 4 is INPUT TO DES TO PM:

01/01/82 01/01/82C scheduled for January, 1984.

ISSUE DES:

32/26/82 02/26/82C RESPONSE TO COMMENTS ud DES:

06/30/82 06/30/82C ISSbE FES:

08/13/82 08/13/82C CURRENT ENV. STATUS:

Environmental acceptance review was completed on June 9,

1981.

The ER was docketed June 19, 1981.

FES SAFETY / HEARING MILESTONES:

Issued in August 1982.

APPLICATION TENDERED:

06/26/80 06/26/80C EAR DOCKETED:

01/09/81 01/30/81C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM 02/24/82 02/24/82C l

Hearing on issun 3 (QA Const. Prog.) completed 4/29/83.

ISSUE DRAFT SER:

02/26/82 02/26/82C Favorable Board decision received on Issue 3.

Issues t INP'JT TO SER:

04/10/82 05/10/82C (EP), 13 (Turbine Missiles), 14 (in-core T/C's) and 15 ISSUE SER:

05/10/82 05/24/82C (Steam Erosion) N/S.

Issue 6 (ATWS-auto SLCS) and 8 (H2 control for degraded core accident) deferred pending Comm.

ACRS LETTER RECEIVED:

07/13/82 07/13/82C rulings. All other issues deleted by summary disposition.

INPUTS TO SE SUPPLEMENT 4:

N/S ISSUE SE SUPPLEMENT 48 01/31/84 FEMA LETTER RECEIVED:

02/00/84 CURRENT ANTITRUST:

CP antitrust review has been completed. OL antitrust HEARING STARTED:

05/23/83 05/23/83C status is under review.

ASLB INITIAL DECISION:

06/00/84 COMMISSION EFFECTIVENESS DECISIDH 07/00/84 TECH SPECS COMPLETED:

10/00/84 COMMISSION DECISION:

11/00/84 ISSUE LIC. WITH POWER RESTRICTION: 12/00/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S Humber 12 (7-9-83).

SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

FEMA Letter of 4/28/83 schedules completion of offsite CONSTRUCTION COMPLETION - APPL.:

12/31/84 03/08/83 emergency plan review by 12/83.

FEMA letter was not received. Hearing on this issue tentatively scheduled 3/84.

+

NRR LICEN5ING SY$ TEM

.PAGE N08 2-22 RIVER BEND 1 4 2-0L C U N R'E N T STATU5 REP 0RT REPORT AS CF 12/31/83 I

PLANT C H A R A C T E R I S T I C 5:

KEY PERS0NNEL8 DOCKET NO:

045880459 LIC. PM:

E. WEINKAM ASLB CHAIR

  • B. COTTER APPLICANT:

GULF !!ATES UTILITIES LIC. BC A. SCHWENCER MEMBER 1 G. LINENBERGER LOCATION:

24 MI HNW OF BATON ROUGE, LA LIC. LA.

E. HYLTON MEMBER 2 R. COLE REGION:

4 AE:

58W COUNSEL:

D. REPKA CONST. INSPs R. FERRELL REAC. TYPE: BWR NSSS: GE ANTITRUST B. V0GLER RESID. INSP D. CHAMBERLAIM DESIGN PWR 3015 MWT/0934 MWE CONST $4W RM ANALYST 8 L. LANIER CURRENT SAF. STATUS:

Ehv!RDhMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Applicant tendered FSAR for docketing on 04/24/81 FSAR was docketed on at/25/81. Offsite Emargency Plan ER DOCKETED:

08/25/81 08/25/81C was submitted 12/28/83.

ER SITE VISIT COMPLETE:

01/22/S2 01/22/82C INPUT TO DES TO PM:

04/16/84 ISSUE DES

  • 05/14/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES8 09/28/84 l

l CURRENT ENV. STATUS:

Appilcant tendered ER for docketing nn 04/24/81.

ER was docketed on 08/25/81. Severe Accident Analysis SAFETY / NEARING MILESTONES:

is due to staff on 01/16/84.

APPLICATION TENDERED:

04/24/81 04/24/81C SAR DOCKETED:

04/23/41 08/25/81C l

SAR 4'S RECEIVED BY PM8 12/07/81 06/01/82C SAR APPL. RESPONSE To t'5 RECEIVED 8 05/14/82 12/01/82C CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

G3/04/83 03/30/83C Prehearing conference held 06/14/83 in Baton Rouge, La.

ISSUE DRAFT SER:

04/30/83 06/01/83C Two contentions admitted, Asiatic Class ano Old River INPUT TO SER:

01/27/84 Control Structure. Intervenors admitted were State of ISSUE SER8 02/24/84 Louisiana and Joint Intervenors Louisiana Consumers League Inc., Louisianans for Safe Energy and Gretchen Reineke ACRS FULL COMMITTEE MEETING 8 04/05/44 Rothschild. Meeting to discuss offsite EP will be INPUTS TO SE SUPPLEMENT 1:

04/00/84 scheduled for Jan/Feb '84.

ISSUE SE SUPPLEMENT 18 05/00/84 FEMA LETTER RECEIVED

  • 05/01/84 CURRENT ANTITRUST:

10/08/84 Updated responses from G5U and Cajun Electric Power FEARING STARTED:

Cooperative requested 8/16/83. Response provided ASLB INITIAL DECISION:

03/06/85 10/26/83 currently under staff review. Availability of COMMISSION EFFECTIVENESS DECISION

  • 04/00/85 updated responses for comment will be noticed in the TECH SPECS COMPLETED:

03/00/85

. Federal Regi ster in the near future.

CCMMISSIUM DECISION 8 04/08/85 1%$UE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

155UE FULL POWER LICENSE AMiND:

04/08/85 Number te, FSAR Supplement 6, ER-OLS.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

DES, FES and SER issuance dates are slipped as COM5TRUCTION CDMPLETION - APPL.:

04/08/85 31/14/33 indicated. No impact on licensing.

i i

NRR LICENSING SYSTEM PAGE NO: 2-23 l

SEABROOK 1 & 2-0L CURRENT STATUS REPORT REPORT AS OFI 12/31/83 f

P'L A N T.CHARACTERISTICSt KEY PERSONNELa DOCKET NO:

044380444 LIC. PM:

V. HERSES ASLB CHAIR:

H. H0YT APPLICANT:

PUBLIC SERVICE OF NEW HAMPSHIRE IIC. BC:

G. KNIGHTON MEMBER 1:

E. LUEBKE LOCATION:

13 MI S OF PORTSMOUTH, NH LIC. LA.:

J. LEE MEMBER 28 J. HARBOUR REGION:

1 AE:

UEC COUNSEL:

R. LESSY CONST. INSP: A. TOTH REAC. TYPE: PWR HSSS: WEST ANTITRUST B. V0GLER RESID. INSP A. CERNE DESIGN PWR: 3411 MWT/1198 MWE CONST: UEC RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The FSAR acceptance review was comoleted in September ?981 The FSAR was docketed October 5, 1981.

Appilcant has ER DOCKETED:

10/05/81 10/05/81C responded to round 1 9's.

SER was issued 03/57/83. ACR$

ER SITE VISIT COMPLETE:

12/02/81 12/02/81C subcommittee meeting was held April 1-2, 1983.

ACRS INPUT TO DES TO PM:

03/01/82 03/01/82C full committee meeting was held on April 15, 1983.

The ISSUE DES:

05/14/82 05/14/82C ACRS letter is contained in SSER 2 which was issued RESPONSE TO COMMENTS ON DES:

08/18/82 09/15/82C 06/30/83.

ISSUE FES:

12/08/82 12/08/82C r

r CURRENT-ENV. STATUS:

ER was tendered June 1981.

ER acceptance review was completed September 1981.

The ER was docketed SAFETY / HEARING MILESTONES:

October 5, 1981 DES was issued in May, 1982.

FES f

was issued in December 1982.

APPLICATION TENDERED 8 OE/29/81 06/29/81C SAR DOCKETED:

10/05/81 10/05/81C SAR 4'S RECEIVED BY PM:

F1/20/82 03/05/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/12/82 04/13/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TD PM:

05/07/82 10/08/82C Notice for Opportunity for Hearing was pubilshed in the Fed-ISSUE DRAFT SER:

07/30/82 08/13/82C eral Register on October 19, 1981.

Prehearir.g conferences INPUT TO SER:

11/30/82 12/29/82C were held May 6-7, 1982, July 15-16, 1982 and April 7-8, ISSUE SER:

01/12/83 03/07/83C 1983. - ASLB Order identifying parties, contentions and pre-hearing schedule was issued September 13, 1982. Hearings ACRS LETTER RECEIVED:

02/17/83 04/19/83C

)

started August-17, 1983. Applicant has requested December INPUTS TO SE SUPPLEMENT 3

i/S 1983 hearings te changed to 3/84.

Prehearing conference ISSUE SE SUPPLEMENT 3*

N/S to discuss hearing.date changes is scheduled for 01/84 FEMA LETTER RECEIVED:

N/S

. CURRENT ANTITRUST: '

Status to be determined.

HEARING STARTED:

08/17/83 08/17/83C 8

ASLB INITIAL DECISION:

09/00/84 COMMISSION EFFECTIVENESS DECISION: N/S t

TECH SPECS COMPLETED:

ggfggfsg COMMISSION DECISION:

09/00/84 ISSUE LIC. WITH POWER RESTRICTION:

LATEST' AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

09/00/84 FSAR Amendment 50 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

Fuel load slipped to 9/84 per appilcant letter of 12/02/82.

CONSTRUCTION COMPLETION - APPL.:

09/30/84 12/02/82 I

. ~

NRR LICEMSING SYSTEM PAGE NO: 2-24 SHOREllAM 0L CUPRENT ST ATUS REPQRT REPORT AS OF 12/31/83 PLANT CHARACTERI5 TICS KEY P E R S 0 N N E La DOCKET Nos.

05000322 LIC. PM:

R. CARUSO ASLB CHAIR:

L. BRENNER APPLICANT:

LONG ISLAND LIGHTING CD.

LIC. BC:

A. SCHWENCER MEMBER 1:

P. MORRIS LOCATIDH:

BROOKHAVEN, NY (LI)

LIC. LA.:

E. HYLTON MEMBER 2:

G. FERGU$0H REGIDH:

1 AE 58W COUNSEL:

B. BORDENICK CONST. INSP L. HARROW REAC. TYPE: BWR HSSS: GE ANTITRUST:

J. RUTBERG RESID. INSP: C. PETRONE DESIGN PWR 2436 MWT/OS20 MWE CONST: S&W RM ANALYST L. LANIER CURRENT SAF. STATUS:

LNVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The ACRS meeting was held in October 1981.

SER Supplement 2 was issued in March 1982.

SSER 83 was ER DOCKETED:

01/26/76 Ot/26/76C issued 02/04/83. SSER 04 was issued 09/30/83.

ER SITE VISIT COMPLETE:

08/06/75 08/03/76C INPUT TO DES TO PM:

11/22/76 11/29/76C ISSUE DES:

03/11/77 93/24/77C RESPONSE TO COMMENTS ON DES:

07/22/77 07/22/77C ISSUE FES:

10/21/77 10/18/77C CURRENT ENV. STATUS:

The environmental review is complete.

gSAFETY/HEARINGMILESTONES:

APPLICATION TENDERED:

09/00/75 09/04/75C SAR DOCKETED:

12/15/77 01/26/76C SAR Q'S RECEIVED BY PM:

06/04/75 07/09/76C SAR APPL. RESPONSE TD Q'S RECEIVED: 07/23/h 07/23/76C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/15/77 08/01/77C A new safety contention regarding emergency diesci "SSUE DRAFT SER:

generators was admitted on 06/22/83. Hearings on diesel INPUT TO SER:

03/10/81 03/10/8tC generator contentions were postponed indefinitely on 755UE SER:

04/10/81 c4 '10/81C 8/16/83, after a crankshaft on one of the EDGs failed during a.! cad test.

Hearings on Emergency Planning began ACRS LETTER RECEIVED:

09/18/81 10/19/81C 12/05/83. The first Partial Initial Decision was issued INPUTS TO SE SUPPLEMENT 4 12/01/85 on 09/21/83.

ISSUE SE SUPPLEMENT 4:

08/15/83 09/30/83C TEMA LETTER RECEIVED:

06/23/83 06/23/83C CURRENT ANTITRUST Not required.

HEARING STARTED:

05/04/82 05/04/82C ASLB INITIAL DECISIDH N/S COMMISSION EFFECTIVENESS DECISION: 05/0D/84 TECH SPECS COMPLETED:

03/OU/34 C0KMISSION DECISION:

05/00/84 ISSUE LIC. WITN POWER RESTRICTION: 05/00/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

07/00/84 FSAR Amendment 31.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Fuel load date has slipped to 05/84 because of the diesel CONSTRUCTION COMPLETION - APPL.:

05/00/84 11/10/83 generator failures.

NRR L ICEN5ING SYSTEM PAGE NO: 2-25 SOUTH TEXAS 1 32 0L CURRENT 5T4 TUS REP 0RT REPORT AS OFI 12/31/83 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E La DOCKET NO:

049810499 LIC. PM:

A.

VIETTI ASLB CHAIR:

C. BECHHOEFER APPLICANT:

HOUSTON LIGHTING & POWER COMPAttY LIC. BC:

G. KNIGHTON MEMBER 1:

J. LAMB LOCATION:

12 MI SSW OF BAY CITY, TEX LIC. LA.:

J.

LEE MEMBER 2:

E. HILL REGION:

4 AE:

BECH COUNSEL:

R. PERLIS CONST. INSP:

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP W. HILL DESIGN PWR 3800 MWT/1250 MWE CONST: EBASCO RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE BRRT has been replaced by Bechtel as the A/E.

BRRT has been replaced by Ebasco as the constructor.

ER DOCKETED:

07/17/78C Non safety related construction restarted on Jur.e 13, 1982.

i ER SITE VISIT COMPLETE:

09/26/78 09/26/78C Safety related construction restarted on August 15, 1932.

INPUT TO DES TO PM:

08/00/85 Current FLD is 12/86. Milestones now reflect a 12/86 FLD.

ISSUE DES:

09/00/85 Applicant plans a series of updates to the FSAR.

Review RESFrNSE TO COMMENTS ON DES:

01/00/86 effort from updated FSAR docket thru applicard responses ISSUE FES:

02/00/86 to Q's.

CURRENT ENV. STATUS:

Schedule revised to reflect new 12/86 FLD.

Ap,ili c a n t plans update to the ER.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

05/10/78 05/10/78C SAR DOCKETED 07/17/78C l

SAR Q'S RECEIVED BY PM:

01/22/79 02/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

02/01/85 As provided in a Commission Order of */22/80, an ISSUE DRAFT SER:

02/01/85 expedited hearing on QA programs and management was INPUT TO SER:

11/01/85 held.

The recerd of this phase of the hearinq ISSUE SER:

12/01/85 was closed on June 17, 1982.

Phasa II of hearing I

will consider all aspects of Quadrex Report.

ACRS FULL COMMITTEE MEETING:

01/00/85 Phase II is expected to begin in the Summer of '84.

INPUTS TO SE SUPPLEMENT 12 01/00/86 ISSUE SE SUPPLEMENT 1:

01/00/86 FEMA LETTER RECEIVED:

"/S CURRENT ANTITRUST:

Memo and Order issued May 6, 1982 approving settlements and HEARING STARTED:

06/00/86 proposed license conditions and dismissing proceeding.

ASLB INITIAL DECISION:

11/00/86 COMMISSION EFFECTIVENESS DECISAON:

12/00/86 TECH SPECS COMPLETED:

12/00/86 COMMISSION DECISION:

12/00/86 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/86 FSAR amendment 835 was issued 11/09/83.

ER amendment 86 was issued 12/01/82.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

All schedules now reflect new official FLD of 12/86.

CONSTRUCTION COMPLETION - APPL.:

12/00/86 03/00/82

NRR LIC2NSING SYSTEM PAGE NO: 2-26 SUSQUEF'.NHA 2 0L CURRENT STATUS REP 0RT REPORT AS OF: 12/31/83 PLANT CHARACTERISTICS:

KEY P E R S 0 N N E L:

DOCKET NO:

05000358

!.IC. PM:

R. PERCH ASLB CHAIR:

J. GLEASON APPLICANT:

PENNSYLVANIA POWER 8 LIGHT LIC. BC:

A. SCHWENCER MEMBER 1:

LOCATION:

7 MI NE OF BERWICK, PA

?.IC. LA.:

E. HYLTON MEMBER 2 P. PURDOM REGION:

1 AF:

BECH COUNSEL:

M. WAGNER CONST. INSP L. HARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:

A. HODGDON RESID. INSP G. RHOADS DESIGN PWR: 3440 MWT/1052 MWE CONST: BECH P.M ANALYST L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued 04/06/81. SSER 81 was issued 07/07/81.

Post ACRS SSER 82 was issued 09/10/81.

SSER 93 was ER DOCKETED:

06/10/78C issued 07/17/82. SSER 84 was issued 11/12/82. SSER 95 FR SITE VISIT COMPLETE:

10/20/78 10/20/78C was issued 3/29/83. SSER 86 is scheduled for 01/84.

INPUT TO DES TO PM:

ISSUE DES:

03/30/81 03/30/8tC l

RESPONSE TO COMMENTS ON DES:

05/21/81 05/21/81C J

ISSUE FES:

06/15/81 07/02/81C I

I CURRENT ENV. STATUS:

DES was issued on 03-30-81.

FES was issuud 07-02-8d.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/05/78 04/10/78C SAR DOCKETED:

07/31/78 07/31/78C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPOKSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

04/07/80 04/07/80C The OL hearing is complete; Initial Decision issued on ISSUE DRAFT SER:

04-12-82.

INPUT TO SER:

03/23/81 03/23/8tC ISSUE SER:

04/06/81 04/06/8tC ACRS LETTER RECEIVED:

08/15/81C INPUTS TO SE SUPPLEMENT 6 02/01/83 02/03/83C ISSUE SE SUPPLEMENT 6 8 01/01/84 FEMA LETTER RECEIVED:

06/0P/82 06/00/82C CURRENT ANTITRUST:

Complete.

HEARING STARTED:

10/06/81 10/06/8tC ASLB INITIAL DECISION:

04/12/82 04/12/82C CCMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

01/00/84 COMMISSION DECISION:

02/00/84 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

06/00/84 FSAR:

No. 30; ER:

No. 5 SCHED. DATE RECEIPT DATE HEW SLIPS / MOTES:

CONSTRUCTION COMPLETION - APPL.*

02/08/84

~ - _.

NRC LICENSING SYSTEM PAGE NO: 2-27 V0GTLE 1 8.2 0L C4RRENT STAYUS REPORT REPORT AS OF 12/31/83 PLANT C H A R A C T E R I S T I C S:

KEY P E R S O N N E L:

DOCKET NO:

0424-0425 LIC. PM:

M. MILLER ASLB CHAIR:

A. ROSENTHAL APPLICANT:

GEORGIA POWER LIC. BC:

E. ADAMSAM MEMBER 1:

LOCATION:

25 MI SSE OF AUGUSTA, GA LIC. LA.:

M. DUNCAN MEMBER 2:

REGION:

2 AE SSC/bECH COUNSEL:

B. BORDENICK CONST. INSP J. RAUSCH REAC. TYPE: PWR NSSS: WEST ANTITRUST RESID. INSP: W. SANDERS DESIGN PWR: 3565 MWT/1210 MWE CONST: GPO RM ANALYST:

B. ST MARY l

l CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR was docketed on 09/16/83. Review is to begin 02/01/84.

ER DOCKETED:

11/30/83 11/30/83C ER SITE VISIT COMPLETE:

03/21/84 INPUT TO DES TO PM:

07/26/84 ISSUE DES:

09/26/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

03/26/85 1

CURRENT-ENV. STATUS:

ER was docketed on November 30, 1983. Review is to bcoin 02/01/84.

~

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/30/83 06/30/83C SAR DOCKETED:

09/16/83 09/16/83C SAR Q'S RECEIVED BY PM 04/15/84 SAR APPL. RESPONSE TO Q'S RECEIVED: 07/15/84 CURRENT HRG. STATUS:

l INPUT TO DRAFT SER TO PM:

10/01/84 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SLRs 11/01/84 Federal Register on December 28, 1983.

INPUT TO SER:

04/01/85 ISSUE SER:

06/01/85 ACRS FULL COMMITTEE MEETING:

07/01/85 INPUTS TO SE SUPPLEMENT 1:

08/01/85 I

ISSUE SE SUPPLEMENT 1:

09/01/85 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

To be determined.

HEARING STARTED:

02/01/86 ASLB INITIAL DECISION:

08/01/86 COMMISSION EFFECTIVENESS DECISION: 09/01/86 4

TECH SPECS COMPLETED:

COMMISSION DECISION:

09/00/86 ISSUE LIC. WITH POWER RESTRICTION:

LATEST APENDMENT:

ISSUE FULL POWER LICENSE AMEND:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

09/00/86 12/31/81 w

~

m aa w

NRR L I C E N $ I 71 G SYSTEM PAGE NO: 7-28 WASHINGTON NUCLEAR 1 0L CURRENT STA TUS REPORT REPORT AS L.: 12/31/83 PLAHT C H A R A C T E R I S T I C S:

%EY PERSONNELa DOCKET NO:

05000460 LIC. PM:

. UNASSIGNED ASLB Cl: AIR:

H. GROSSMAN APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

E. ADENSAM MEMBER 1:

G. BRIGHT LOCATION:

10 MI N OF RICHLAND, WA LIC. LA.:

M.

DUNCAN MEMBER 2:

J. HARBOUR REGION:

S AE:

UEC COUNSEL:

M. WAGNER CONST. INSP: J. OLIN REAC. TYPE: PWR NSSS: Btu ANTITRUST:

J. RUTBERG RESID. INSP: A.

TOTH DESIGN PWR 3760 MWT/1266 MWE CONST: BECH RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIPONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was tendered on 11-25-81.

Applicztlon 4as docketed on July 16, 1982.

The staff reviews will be ER DOCKETED:

07/00/82 07/16/82C performed on " manpower available" basis.

The cons +cucticn ER SITE VISIT COMPLETE:

permit was amended effective 06/16/83, extending fee INPUT TO DES TO PM:

construction completion date from 01/01/82 to 06/01/91.

ISSUE DES:

N/S RESPONSE TO COMMENTS ON DES:

I3 SUE FES:

N/S CURRENT ENV. STATUS:

The staff reviews will be performed on " manpower available" basis.

SAFETY / HEARING MILESTONES:

APPLICATION TENCERED:

11/25/81 ft/25/81C SAR DOCKETED:

07/00/82 07/16/82C I

SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Notice of Opportunity for Hearing was puolished ir. the ISSUE DRAFT SER:

Federal Register on August 16, 1982.

A petition to INPUT TO SER:

intervene has been received from the Coalition for ISSUE SER:

N/S Safe Power.

A prehearing conference was held in Richland, Wa., on January 26 and 27, 1983.

ASL8 ACRS FULL COMMITTEE MEETING:

N/S denied CP amended hearing contention 81, and adm:tted INPUTS TO SE SUPPLEMENT 1 CP contention 82.

The CP extension hearing has been 1SSUE SE SUPPLEMENT 1:

N/S indefinitely delayed due to request for summary disposition.

FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

l HEARING STARTED:

N/S A5LB INITIAL DECISION:

N/S COMMISSION EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:

COMMISSION DECISION:

IS$*JE LIC. WITH POWER RESTRICTIDH LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S ER amend. I dated 02/11/83, received 03/04/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Construction delay of from 2 to 5 years was announced CONSTRUCTION COMPLETI0H - APPL.

N/S 04/29/82 on 4/29/82.

HRR L TCEHSING SYSTEM PAGE NO: 2-29 WASHINGTON NUCLEAR 2 0L CURREHT

%TATUS REP 0RT REPGRT AS OF: 12/31/83 PLAHT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NC:

05000397 LIC, PM R.

AULUCK ASL3 CHAIR:

E. BOWERS APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

A.

SCHWENCER hEMBER 1:

R.

COLE LOCATION:

30 MI NW OF RICHLAND, WASH LIC. LA.

E. HYLTON MEMBER 2:

E. HILL REGION:

S AE:

B&R COUNSEL:

W. PATON CONST. INSP:

A.

TOTH REAC. TYPE: BWR HSSS: GE ANTITRUST:

B. V0GLER RESID. INSP:

R.

FEIL DESIGN PWR 3323 MWT/1103 MWE CONST: BECH MM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was i ssued 3/31/82. Geology / Seismology reviews were included in SSER No. 1 issued August 11, 1982.

ALRS ER DOCKETED:

02/28/77 04/20/77C meeting was held on October 7, 1982.

SSER No. 2 was ER SITE VISIT COMPLETE

  • 07/13/77 07/14/77C issued 12/21/82.

SSER 53 issued on 05/20/83. SSER No.

  • INPUT TO DES TO PM:

06/30/81 06/30/81C was issued on 12/20/83. Full power operating license with ISSUE DES:

07/31/81 07/31/81C 5% condition was also issued on 12/20/83.

RESPONSE TO COMMENTS ON DES:

09/28/81 09/28/81C ISSUE FES:

12/31/81 12/31/81C CURRENT ENV. STATUS:

FES was issued 12-31-81.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/30/76 12/30/76C SAR DOCKETED:

04/01/78 06/22/78C SAR Q'S RECEIVE 0 BY PM:

01/05/79 03/07/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/11/79 07/26/79C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/12/81 10/12/81C A prehearing conference on CP extension order was held ISSUE DRAFT SER:

11/17/81 11/17/81C on January 26, 1983, in Rich ~and, Wa.

On February 22e INPUT TO SER:

05/30/82 05/30/82C 1

1983, the ASLB denied the request for hearino filsd by ISSUE SER:

03/31/82 03/31/82C the Coalition for Safer Power and dismissed the proce.ading.

No OL hearings scheduled.

ACRS LETTER RECEIVED:

11/13/82 11/13/82C IhPUTS TO SE SUPPLEMENT 4:

11/22/82 11/22/82C ISSUE SE SUPPLEMENT 4:

12/20/83 12/20/83C FEMA LETTER RECEIVED:

08/01/83C CURRENT ANTITRUST:

Not required HEARING STARTED:

N/A ASLB INITIAL DECISION:

H/A COMMISSIDH EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

08/30/82 12/20/&3C COMMISSION DECISION:

02/00/84 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

02/00/84 SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETION - APPL.:

12/00/83

~ _ -.

. - ~ _

E i

NRR LICENSENG SYSTEM PAGE NO: 2-30 WASHINGTON NUCLEAR 3 0L CURkChT S1ATUS REP 0RT REPORT AS OF 12/31/83 PLAMT C H A R A C T E R I S T I C S:

KEY P E R S O N N E L:

DOCKET NO:

05000508 LIC. PM:

A. VIETTI ASLB CHAIR:

M. MARQULIES APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SY37EM LIC. BC:

G. KNIGHTON MEMBER 18 F. SHON t

LOCATION:

26 MI W OF OLYMPIA, WA LIC. LA.:

J.

LEE MEMBER 2:

R. FOSTER REGION:

5 AE:

EBASCO COUNSEL:

D. HASSELL CONST. INSP: D. KIRSCH REAC. TYPE: PWR NSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP: W. ALBERT j.

DESIGN PWR 3800 MWT/1242 MWE CONST EBASCO RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ICTUAL DATE Application was tendered on June 2, 1982, and was docketed on 08/27/82. Review effort from F5AR dociet ER DOCKETED:

08/27/82 08/27/82C thru applicant responses to 9's.

ER SITE VISIT COMPLETE:

i INPUT TO DES TO PM:

09/08/83 09/27/83C ISSUE DES:

12/23/83 12/23/83C RESPONSE TO COMMENTS ON DEE:

ISSUE FES:

04/06/84 CURRENT ENV. STATUS:

Application was tendered on June 2, 1982, and was docketed on 08/27/82. The DES was issued in SAFETY / NEARING MILESTONES:

December for comment.

APPLICATION TENDERED:

06/02/82 06/02/G2C l

SAR DOCP.ETED:

08/27/82 08/27/82C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

N/S i

Federal Register on 09/15/82. On February 25, 1983, a INPUT TO SER8 06/05/84 request for a hearing and petition for leave to intervene ISSUE SER:

08/09/84 was received from coalition for Safe Power of Portland, j

Oregon. On April 21, 1983 the Licensing Boaro banded down ACRS FULL COMMITTEE MEETING:

09/00/84 an order to accept its late filed petition. Prehearing INPUTS TO SE SUPPLEMENT 13 11/06/84 was held on August 17, 1983.

On 09/27/83 the ASLB I% SUE SE SUPPLEMENT 18 12/13/84 admitted 9 contentions.

s"'*. LETTER RECEIVED:

CURRENT ANTITRUST:

Notice of receipt of Antitrust Information was published HEARING STARTED:

05/00/85 in the Federal Register on October 27, 1982.

ASLB INITIAL DECISION:

11/00/85 CCMMISSION EFFECTIVENESS DECISION: 12/00/85 TECH SPECS COMPLETED:

12/00/85 COMMISSION DECISION:

06/00/87 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:.

ISSUE FULL POWER LICENSE AMEND:

N/$

FSAR 04 12/06/83 ER Of 12/09/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Letter of 11/18/83 informed the staff the projected fuel CONSTRUCTION COMPLETION - APPL.:

06/00/87 11/01/82 load date for WNP3 ranges anywhere between 06/S7 and 12/89.

A revision to the current licensing review schedule is in oroaress.

i

NRR LICENSING SYSTEM PAGE NO: 2-31 WATERFORD 3 0L CURRENT STATUS REP 0RT REPORT AS OF: 12/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO:

05000382 LIC. PM:

J. WILSON ASLB CHAIR S. WOLFE APPLICANT:

LOUISIANA POWER & LIGHT LIC. BC:

G. KNIGHTON MEMBER 1 W. JORDAN LOCATION:

20 MI W UF NEW ORLEANS, LA LIC. LA.:

J. LEE MEMBER 2:

H.

FOREMAN REGIDH:

4 AE FBASCO COUNSEL:

S.

TURK CONST. INSP:. UNASSIGNED REAC. TYPE: PWR NSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP L. CONSTABLE DESIGN PWR: 3560 MWT/1151 MWE CONST: EBASCG RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SSER Ho. S was i ssued 7/8/83.

Fuel load date was revised to 05/84 in September of 1983.

ER DOCKETED:

12/00/78 12/00/78C ER SITE VISIT COMPLETE:

12/05/80 12/05/80C INPUT TO DES TO PM:

01/06/81 04/06/81C ISSUE DES:

0$/ 01/81 05/01/81C RESPONSE TO COMMENTS ON DES:

07/24/81 08/19/81C ISSUE FES:

09/30/81 09/30/81C CURRENT ENV. STATUS:

The DES was completed in May 1981. FES was completed September 1981.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/28/78 09/28/78C SAR DOCKETED:

12/18/78C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/80 12/15/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/03/80 05/15/81C Constested hearing started 03/82. Partial initial Decision l

ISSUE DRAFT SER:

issued 11/03/82. Nearing for remaining item temergency INPUT TO SER:

05/08/81 05/15/81C preparedness) was held Feb. 7-11, 1983.

Receed closed ISSUE SER:

07/09/81 07/09/81C Feb. 11, 1983.

Appeal Board hearing was held April 19, 1983 to hear rebuttal of 11/03/82 PID.

Second partial initial ACRS LETTER RECEIVED:

09/15/83 09/15/83C decision issued 05/26/83 by ASLB.

ASLAB decision on 1st INPUTS TO SE SUPPLEMENT 68 05/18/83 05/18/83C PID 06/29/83. Commission consent on 1st PID 9/C7/83.

ISSUE SE SUPPLEMENT 62 07/00/84 ASLAB decision on 2nd PID issued 12/09/83.

FEMA LETTER RECEIVED:

03/01/84 CURRENT ANTITRUST:

Staff is reviewing OL antitrust information.

HEARING STARTED:

08/17/83 08/17/83C ASLB INITIAL DECISION:

05/26/83 05/26/83C.

COMMISSION EFFECTIVENESS DECISION: 04/00/84 TECH SPECS COMPLETED:

05/00/84 COMMISSION DECISION:

04/00/84 f

ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

i ISSUE FULL POWER LICENSE AMEND:

12/00/84 ER 83 - 8/81 1

FSAR 833 - 10/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

To date State of Louisiana does not have an approveo CONSTRUCTION COMPLETION - APPL.:

05/00/84 09/00/83 emergency plan.

--..s NRR LICEN$ING SY$ TEM PAGE NO: 2-32 WATTS BAR 1 82 0L CURRENT STATUS REPORT REPORT AS OF 12/31/83 P LANT C H A R A C T E R I S T I C S:

KEY PERSONN2L:

DOCKET NO:

039080391 LIC. PM:

T. KENYON ASLB CHAIR N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM MEMBER 13 N/A LOCATION:

10 MI S OF SPRING CITY, TENN LIC. LA.:

M. DUNCAN MEMBER 28 N/A REGION:

2 AE:

TVA COUNSEL:

M. YOUNG CONST. INSP W. SWAN REAC. TYPE: PWR NSSS: WEST ANTITRUST:

J.

RUTBERG RESID. INSP:

T. HEATHERLY DESIGN PWR: 3411 MWT/1165 MWE CONST TVA RM ANALYST:

L. LAHIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CFP predicted earliest Unit 1 completion date at 06/24.

SER published 07/82.

ACRS subcommittee meetings held ER DOCKETED:

01/05/77 11/23/76C 04/30/82 and 08/10/82. ACRS full committee meetir.q ER SITE VISIT COMPLETE:

03/18/77 02/25/77C held 08/13/82. ACRS letter received 08/16/82. Supple.aent INPUT TO DES TO PM:

07/06/77 08/18/77C U1 to SER published 09/22/82. Supplement 82 to SER ISSUE DES:

11/29/77 06/02/78C scheduled 01/84.

RESPONSE TO COMMENTS ON DES:

N/A ISSUE FES:

11/24/78 12/29/78C l

1 CURRENT ENV. STATUS:

Complete except for environmental tech specs.

APPLICATION TENDERED:

06/30/76 06/30/76C i

SAR DOCKETED:

10/04/76 10/04/76C l

SAR Q'S RECEIVED BY PM:

12/15/76 65/20/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/23/77 02/10/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

06/18/80 12/18/81C No hearings are assumed.

ISSUE DRAFT SER:

12/30/81 12/30/81C INPUT TO SER:

06/04/82 06/04/82C ISSUE SER:

07/01/82 07/01/82C ACRS LETTER RECEIVED:

09/00/82 08/16/82C INPUTS TO SE SUPPLEMENT 2:

P8/27/82 09/03/82C ISSUE SE SUPPLEMENT 28 01/00/84 FEMA LETTER RECEIVED:

03/00/84 CURRENT ANTITRUST:

Complete HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSIDH EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

03/00/84 COMMISSION DECISION:

03/00/84 ISSUE LIC. WITH POWE7 RESTRICIION: 04/00/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

06/00/84 FSAR Ho. 46 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

CONSTRUCTION COMPLETION - APPL.:

04/00/84 10/11/83

NRR L ICENSIHG SYSTEM PAGE NO: 2-33 WOLF CREEK 1 0L CURRENT STA1US REPORT REPORT AS OF 12/31/83 PLANT C H A R A C T E R I 5 T I C S:

KEY PERSONNEL DOCKET NO:

05000482 LIC. PM:

J. HOLONICH ASLB CHAIR:

S. WOLF APPLICANT:

KANSAS GAS 8 ELECTRIC LIC. BC:

B. YOUNGBLOOD MEMBER 1:

G. ANDERSON LOCATION:

3.5 MI NE OF BURLINGTON, KAN LIC. LA.:

M. RUSHBROOK MEMBER 2:

H. PAXTON REGION:

4 AE BECH COUNSEL:

M. KARMAN CONST. INSP:

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP: S. SCHUM DESIGN PWR: 3425 MWT/1150 MWE CONST: CANIEL RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The SER was issued in April 1982.

SSER-1 was issaed an August 1982. SSER-2 in June 1983, SSER-3 in August 1983.

ER DOCKETED:

11/25/80 11/25/80C and SSER-4 in December 1983.

Supplement 5 scheduled for ER SITE VISIT COMPLETE:

07/28/81 04/21/81C issuance in June 1984.

INPUT TO DES TO PM:

10/01/81 10/01/81C ISSUE DES:

01/05/82 01/05/82C RESPONSE TO COMMENTS ON DES:

05/14/82 OS/14/82C ISSUE FES:

06/11/82 06/11/82C l

CURRENT ENV. STATUS:

The DES was issued in January 1982.

The FES was issued in June 1982.

SAFETY / HEARING MILESTONES:

1

(

APPLICATION TENDERED:

02/21/80 02/21/80C SAR DOCKETED:

08/07/80 08/07/80C SAR s'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

03/12/82 03/12/82C I

Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

l Federal Register on 12/18/80. Two petitions for INPUT TO SER:

03/19/82 03/19/82C leave to intervene were filed.

A special combined ISSUE SER:

04/07/82 04/07/82C prehearing cont =<-ance was held on 4/15/81.

A second I

prehearing conference was held on March 10, 1983.

ACRS LETTER RECEIVED:

05/11/82 05/11/82C I

Hearing is tentatively scheduled for Jan. 17-26, 1984 INPUTS TO SE SUPPLEMENT 58 04/30/84 and Feb. 14-23, 1983.

ISSUE SE SUPPLEMENT 53 06/15/84 FEMA LETTER RECEIVED:

01/00/84 CURRENT ANTITRUST l

OL antitrust review is in progress.

HEARING STARTED:

01/17/84 ASLB INITIAL DECISION:

06/00/84 COMMISSION EFFECTIVENESS DECISION: 07/00/84 TECH SPECS COMPLETED:

07/00/84 COMMISSION DECISI0Hz 07/00/84 ISSUE LIC. WITH PCWER RESTRICTION: N/A LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

08/00/84 i

l SMUPPS FSAR - No. 12; Wolf Creek Site Addendum - No. 11; ER - No. 4.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES '

CONSTRUCTION COMPLETION - APPL.:

08/00/84 05/23/83 l

i 1

HRR L1CEN5ING SYSTEM PAGE NO: 2-34 ZIMMER 1 0L CURRENT

$TATUS REPQRT REPORT AS OF 12/31/83 PLANT C H A R A C T E R I $ T I C 5:

KEY P E R S 0 N N E L:

DOCKET NO:

05000358 LIC, PM:

L. KINTNER ASL5 CHAIR J.

FRYE APPLICANT:

CINCINNATI GAS 8 ELECTRIC LIC. BC:

B. YOUNGBLOOD MEMBER 1:

F. HOOPER LOCATION:

24 MI SE OF CINCINNATI, OH LIC. LA.:

M.

RUSHBROOK MEMBER 2 M.

LIVINGSTON REGION:

3 AE:

58L COUNSEL:

C. BARTH CONST. INSP: W.

FORNLY REAC. TYPE: BWR HSSS: GE ANTITRUST S. LEWIS RESID. INSP: T. GWYNN DESIGN PWR: 2436 MWT/0810 MWE CONST: KAISER GM ANALYST:

B.

ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Latest SSER issued 08/23/82. Resolution of open items is continuing. On 11/12/82 Commission issued an order to Show FR DOCKETED:

09/10/75 09/10/75C Cause 8 Order Immediately Suspending Construction due to QA FR SITE VISIT COMPLETE:

10/09/75 10/09/75C concerns. On 10/05/83 in response to Commission's Ordar, 1NPUT TO Lt.S TO PM:

08/20/76 08/19/76C applicant submitted course of action to verify evality of ISSUE DES:

10/15/76 10/15/76C construction and complete construction. NRC staff approved RESFONSE TO COMMENTS ON DES:

03/25/77 04/01/77C course of action on 12/16/83. On 12/16/83 applicant submit-ISSUE FES:

06/10/77 06/10/77C ted plan to verify quality of constructi,on (PVQC).

On 12/22/83 applicant submitted its continuation of construc-tion plan (CCP). Staff is currently reviewing tha PVQC.

CURRENT ENV. STATUS:

Complete SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

08/15/75 05/09/75C

'3AR DOCKETED:

09/15/75 09/10/75C SAR Q'S RECEIVED BY PM:

10/29/76 01/06/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/31/76 07/29/77C CURRENT NRC. STATUS:

15FUT TO DRAFT SER TO PM:

01/28/77 08/11/77C Hearing completed 3/5/82. Licensing Board decision which ISSUE DRAFT SER:

N/A became final on 7/13/83 authorizes fuel loading and low IhPUT TO SER:

05/20/77 12/07/77C power testing up to 5% power but precludes the KRC staff IOSUE SER:

07/29/77 01/31/79C from issuing a full power license and orders additional hearings on emergency plans. Licensing Board denied MVPP ACRS LETTER RECEIVED:

09/16/77 03/13/79C motion to reopen the hearing on quality assurance issues; INPUTS TO SE SUPPLEMENT 3:

06/17/82 08/02/82C MVPP petitioned Licensing Board to reconsider its denial ISSUE SE SUPPLEMENT 38 08/23/82 08/23/82C based on new information.

FEMA LETTER RECEIVED:

04/15/82 04/15/82C CURRENT ANTITRUST Antitrust review is now closed.

!! EARING STARTED:

02/26/82 02/26/82C AStB INITIAL DECISION:

N/S CONMISSION EFFECTIVENESS DECISION: 07/13/83 17/13/83C TECM SPECS COMPLETED:

11/03/84 COMdISSION DECISIDH2 11/00/84 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

IS3UE FULL POWER LICENSE AMEND:

12/00/84 Application amendment 152, FSAR Revision 98.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Applicant letter of 06/01/83 revised estimated construction CCHSTRUCTION COMPLETION - APPL.:

12/00/84 06/01/83 completion date to the fourth quarter of 1984.

Construction' is still suspended by 11/12/82 Order.

~

NRR L1CEN5ING SYSTEM PAGE NO: 2-35 CLINCN RIVER CP C L' R R E N T ST%TUS REPORT REPORT AS OF: 12/31/83 PLANT CNARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:

05000537 LIC. PM:

R. STARK ASLB CHAIR M. MILLER APPLICANT:

PROJECT MANAGEMENT CORP.; DOE;TVA LIC. BC:

H.

GRACE MEMBER 1 G. LINENBERGER LOCATION:

25 MI W OF KNOXVILLE, TN LIC. LA.:

P. SHUTTLEWORTH MEMBER 2:

C. HAND REGION:

2 AE*

B8R COUNSEL:

5. TREBY CONST. INSP:

REAC. TYPE: LMFBR NSSS: WEST ANTITRUST J. RUTBERG RESID. INS 78 DESIGN PWR 0975 MWT/0350 MWE CONST: 58W RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety review was reinitiated in October 1981.

A rsvisica to the Site Suitability Report was issued June 11. 1982.

ER DOCKETED:

04/11/75 04/11/75C On August 17, 1982, HRC issued an order granting Clinch ER SITE VISIT COMPLETE:

River's request to begin site preparation activities.

INPUT TO DES TO PM:

The Site Suitability Report hearing sessions were held in ISSUE DES:

02/12/76C Dak Ridge during the week of 8/23/82. SER issued 3/11/83.

RESPONSE TO COMMENTS ON DES:

ACRS meeting held 4/14/83.

LWA-2 will not be requested.

ISSUE FES:

02/07/77 02/07/77C SSER 1 was issued on 5/02/83 and SSER 2 was issued 5/20/83.

On 12/27/83 applicants filed with the ASLB notificatien of termination of CRBRP.

CURRENT ENV. STATUS:

The FES was issued in February 1977.

A draft supplement to the FES was issued on July 19, 1982.

A final supplement

. SAFETY / NEARING MILESTONES

  • was issued on October 29, 1982.

APPLICATION TENDERED:

10/15/74 10/15/74C SAR DOCKETED:

06/13/75 06/13/75C SAR Q'S RECEIVED BY PM:

04/09/82 04/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/15/82 05/15/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/16/82 07/16/82C Hearings on the SSR held 8/23-27/82. FES hearings were held ISSUE DRAFT SER:

09/27/82 09/27/82C 11/15-19/82, 12/13-17/82 8 1/4-5/83.

PID issued 2/28/83 on INPUT TO SER:

01/14/83 02/04/83C FES hearing. Safety hearirq 8/8-11/83.

Appeal Board htaro ISSUE SER:

03/11/83 33/11/83C oral arguments 9/28/83 on 'me PID. On 12/15/83 ASLE granted intervenor's request for ternination of appellate procecd-ACRS LETTER RECEIVED:

04/19/83 04/19/83C ings for mootness and vacation by Licensing Board's PID in INPUTS TO SE SUPPLEMENT 2:

04/22/83 04/22/83C light of termination of CRBRP. ALAB also determined rsquest IOSUE SE SUPPLEMENT 28 05/20/83 05/20/83C for revocation of LWA issue be left to the Licansing Board.

CURRENT ANTITRUST:

HEAP.ING STARTED:

08/23/82 08/23/82C' ASLB INITIAL DECISIDM 04/01/84 CCMMISSION EFFECTIVEMESS DECISION: 06/00/84 TECH SPECS COMPLETED:

COMMISSION DECISION:

06/00/84 CP ISSUED:

06/00/84 LATEST AMENDMENT:

NEW SLIPS / MOTES:

HRR LICEN5ING SYSTEM PAGE NO: 2-36 (NSS)CESSAR SYSTEM 80 FDA CURRENT STATUC REPQRT REPORT AS OF 12/31/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:

05000470 LIC. PM:

G. MEYER ASLB CHAIR APPLICANT:

COMBUSTION ENGINEERING Lic. BC:

C. THOMAS MEMBER 1 LOCATION:

N/A LIC. LA.:

P. ANDERSON MEMBER 2:

REGION:

0 AE:

CCONSEL:

M. WAGNER CONST. INSP REAC. TYPE: PWR NSSS: COMB ANTITRUST:

RESID. INSP:

DESIGN PWR: 3800 MWT/1295 MWE CONST:

RM ANALYST:

5. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER (NUREG-0852) i ssued 11/81.

SSER-1 was issuod 03/30/83. SSER-2 issued on 09/21/83. AII open tesues E2 DOCKETED:

have been resolved. The FDA was issued on 12/21/83.

ER SITE VISIT COMPLETE:

There are still some outstanding issues to resolva.

IhPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

IS$UE FES:

CURRENT ENV. STATUS:

N/A.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/27/78 10/27/78C SAR DCCKETED:

12e21/79 12/21/79C SAR Q'S RECEIVED BY PM:

09/01/80 09/01/8tC SAR APPL. RESPONSE TO Q'S RECEIVED: 01/01/81 07/15/8tc CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S N/A.

ISSUE DRAFT SER:

N/S INFUT TO SER:

11/01/81 11/13/81C ISSUE SER:

05/01/82 11/10/81C ALRS LETTER RECEIVED:

06/21/82 12/15/81C IHPUTS TO SE SUPPLEMENT 2:

07/15/83 07/27/83C ISSUE SE SUPPLEMENT 28 07/29/83 09/21/83C CURRENT ANTITRUST:

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION DECISION:

12/00/83 12/21/83C SPECIAL PROJECT COMPLETE:

12/00/83 12/21/83C LATEST AMENDMENT:

NEW SLIPS / MOTES:

NRR LICEN$. NG SYSTEN P4GE NO: 2-37 (NSS)GESSAR SEVERE ACC FDA CURRENT STATUS REP 0RT REPORT AS OF 12/31/83 PLANT C H A R A C T E R I $ T I C S:

KEr P E R S 0 N N E L:

DOCKET ND:

00007447 (IC. PM:

D. SCAILETTI ASLB CHAIR: N/A APPLICANT:

GENERAL ELECTRIC COMPANY LIC. BC:

C. THOMAS MEMBER 18 N/A LOCATION:

N/A LIC. LA.:

P. ANDERSON MEMBER 28 N/A REGION:

0 AE BRAUN COUNSELS B. BORDENICK CONST. INSP:

REAC. TYPE: BWR NSSS: GE ANTITRUS's RESID. INSP DESIGN PWR: 3579 MWT/1220 MWE CONST:

RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82; review is in progress.

Dates shown reflect review for the severe accident ER DOCKETED:

. design.

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

i CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C SAR DOCKETED:

02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:

09/01/82 10/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/01/83 02/01/83C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

ISSUE CRAFT SER:

INPUT TO SER:

06/15/84 l

ISSUE SER:

07/15/84 ACRS FULL COMMITTEE MEETING:

09/00/84 INPUTS TO SE SUPPLEMENT 1:

09/00/84 l

ISSUE SE SUPPLdMENT 1:

10/00/84 l.

l CURRENT ANTITRUST:

j FDA antitrust review is in progress.

HEARING STARTED:

N/A ASLD INITIAL DECISION:

N/A COMMISSION DECISION:

N/A l

SPECIAL PROJECT COMPLETE:

10/00/84 LATEST AMENDMENT:

FSAR Amendment.No. 19 was received in July, 1983.

NEW SLIPS / NOTES:

l

NRR LICENSING SYSTEM AS OF 12/30/83 NON-POWER RENEWALS INPUT ISSUE DOCKET EARLIEST ISSUEu TER ISSUE FES OR START ISSUE NON-POWER FACILITY NyMBER DOCKET RE1 TO PM 118 EIA NEARING RE COMMENTS AFRRI 05000170 10/80C N/A 09/81C 01/82C N/A N/S N/S CONTESTED CASE 1000.0000KW TRIGA GE TEST REACTOR 05000070 07/77C N/S N/S N/S N/S N/$

N/S ORDER TO SHOW CAUSE.

50.0000KW TANK ASLAB HEARINGS.

GE, NTR 05000073 11/79C N/A 06/84 08/84 09/84 N/A 09/84 100.0000KW POOL MANNATTAN COLLEGE 05000199 08/83C N/A 08/84 10/84 N/A N/A 10/84

.0001KW CRITI MICHIGAN STATE 05000294 09/77C N/A 04/84 05/84 N/A N/A 06/84 250.0000KW TRIGA NBSR 05000184 12/80C 02/82C 19/S2C 09/83C 09/82C N/A N/S POWER INCREASE TO 20 MW 10.0000KW TANK INCLUDED IN RENEWAL RENSSELAER 05000225 05/79C N/A d5/33C 10/83C 10/83C N/A 12/83C

.0000KW CRITI

.U.

OF KANSAS 05000148 03/80C N/A 12/83C 62/84 N/A N/A 04/84 250.0000KW POOL U. OF MD.

05000166 05/80C N/A t0/83C 02/84 N/A N/A 02/84 250.0000KW TRIGA U. OF MO., ROLLA 05000123 10/79C N/A 02'64 02/84 N/A N/A 03/84 200.0000KW P0OL U. OF UTAN 05000407 05/83C N/A 25/34 07/84 N/A N/A 07/84 100.0000KW TRIGA U. OF VA., CAVALIER 05000396 06/84 N/A 09/E4 11/24 N/A N/A 12/84

.1000KW POOL UCLA, ARGONAUT 05000142 02/80C N/A 10/82C 06/81C 06/81C 09/80C M/S CONTESTED CASE 100.0000KW ARGHT UNION CARBIDE 05000054 05/80C N/A 10/82C 02/S4 N/A P/A 03/84 5000.0000KW POOL VA. POLY. INSTITUTE 05000124 10/79C H/A 04/84 06/84 N/A N/A 06/84 100.0000KW ARGNT WEST., TRAINING REACTOR 05000087 12/81C N/A 01/84 03/84 04/84 N/A 04/84 10.0000KW TANK M FOR TEST REACTORS ONLY

m m-.-

m

,u--

h 4

+

___._.A t

M M

M Z

O M

o i

su W

e l

l I

f f

NRR LICENSING SYSTEM PAGE 63! 2-OL CURRENT STATUS REP 0RT REPORT AS CFa

' PLANT CHARACTERISTICS:

CEY P E R S 0 N N E L:

DOCKET NO:

Docket No.or Project No.,if not docketed LIC. PM:

Licensing Project Manager ASL B CHAIR: ASLB Chairman E

APPLICANT:

Utility LIC BC:

Licensing Branch Chief MEMBER ta on panet LOCATION:

Milos and direction from nearest major town LIC. LA.:

Licensing Assis' ant MEMBER 28 on panet REGION:

1 through 5 AE:

Architect / Engineer COUNSEL:

Attorney assiyted to case CONST. INSP : Construction inspectos REAC. TYPE: PWR, BWR, HTGR or LMFBR NSSF : Nuclear Steam Systems Supplier AMTITRUST:

Antitrust Attorney RESID. INSP Resident inspector DESIGN PWR

_m electric & thermal CGNST: Constructor MP A AN ALYST : MPA analyst assigned to track protect 3

CURP.ENT SAF. STATUS:

ENVIRONMENTAL MALESTONES:

SCHED. DATE ACTUAL DATE Safety status for this reporting period only. It consists of accomplishments and scheduls changes occurring since the last issue of Blue Book. Outstanding issues and late input from ER DOCKETED:

Environmental Report review brandios should be inshcoted, along with indication of the critical path.

P 0

T Project Manager ISSUE DES:

Draft Environrnental Statement RESPONSE TO COMMENTS ON DES:

ISSUE FES:

Final Environmental Statement f

CURRENT ENV. STATUS:

i Environmental status for this reporting period only. It consists of accomplishments and schedule changss occurring since the last issue of Blue Book. Outstanding issues and late SAFETY / HEARING MILESTONES:

I t

input from review brandies should be indicated i

APPLICATION TENDERED:

SAR DOCKETED:

Safety Analysis Report SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TD PM:

Changes in the hearsng nietes since the last issue of Blue Book. Changes in Storventiun and ISSUE DRAFT SER Safety Evaluation Report contentions should be indicated.

ER ACRS LETTER RECEIVED:

Advisory Committee INPUTS TO SE SUPPLEMENT 3:

on Reettor Safeguards ISSUE SE SUPPLEMENT 3:

FEMA LETTER RECEIVED:

Safety Evaluation Supplement CURRENT ANTITRUST:

Changes in the antitrust status since the last issue of Nue Book.

HEARING STARTED:

ASLB INITIAL DECISION:

Atomic Safety & Lacensing Board ASLB FINAL DECISION:

TECH SPECS COMPLETED:

C0f::IISSION DECISION:

ISSUE PARTIAL POWER LICENSE:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

The latest amendment submitted by the applicant.

SCHED. DATE RECEIPT DATE "

probleme thet should be brouglit to management's attention.

CONSTRUCTION COMPLETION - APPL.:

o

_. 3.

completion a v.s. GovutecEXT rs NTING orrIcs: t984-421-2991310

v s wui..

~.um, Cevv*v

...ua r vvei a,Aa m e, r,cc.,

~.

4.*,

=,a,C,,,oa. a.

BIBLIOGRAPHIC DATA SHEET NUREG-0580 Vo.12, No.12 j

L.

.a.C....~,..u.

se.. a

>, e r L.

,,c.., L.

Regulat Licensing Status Summary Report

  • o a '
  • a * ** ' /**" ' ' o j,.a oo~,a

\\

Janua 1984

. ov r e s.

,ou. froar uuio 9

g,..a Jfhuary 1984 pas. C i......va v., ~vo...

9 Pta.Oswe%G geGa%:la f sog Nav go wasgegg aDDaill ff i*er l.p Co##

Office of Resource agement Information Systems B nch io..s,vo.ia U.S. Nuclear Regulator Commission Mashington, D.C.

20555 18 $PON50ai%u OaG A%s/ A f EON NAUT ANC V A'L'Nm 3vM t hb ##wed. ls coes t J. T vPE OF aEPOaf Office of Resource Managemen Information Systems Branch U.S. Nuclear Regulatory Commis 'on iso ria.oo Covean o,.

Washington. D.C.

20555 Dec l',1983 - Dec. 31,1984 13 SvPf LEYt %f A '4 r %0TE S 54 ASST ALY Joo oreg oe vsa; Provide a review of the status of the ro ess of the licensing rev:ews for all construction permits, operating lice es, s cial projects and non-power reactor renewals under review, as reported Congre th at y WOaDS 4%D DUCuvt A N A L v 5s 3 tbo OkhtasPrva5 is huwe 6 FAGti 5 7,$E cua T v CL A55+6 eC A160%

se av asta.sLtT

  • IAftyt%T Two mt)

Unclassified Unlim ted

,'!CT "'"'"" '

\\

Unclassified s

g T

l UNITED STATES

-siest tiass wami Post act a seisra<o I

NUCLEAR REGULATORY COMMISSION WASHINGTON. D C. 20%5

,[5)"3 c 5 '

7 et av T 4. L(L OFFICIAL BUSINESS PENALTY FOR PRIVATE USE. 63tO

=t 6

1 4

I t

f 4

c t

(