ML20071E998

From kanterella
Jump to navigation Jump to search

Advises That Info Per Re Exemption from 10CFR50.44(c)(3)(iii), Installation of Reactor Vessel Head Vent, Requirements Will Be Submitted by 830513
ML20071E998
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/09/1983
From: Westafer G
FLORIDA POWER CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
3F-0383-12, 3F-383-12, TAC-44363, TAC-49060, NUDOCS 8303150407
Download: ML20071E998 (1)


Text

??e 1

(Gr5 no

_._w %, v.0 v:,o p ;g y%@ml%g 37 ione M

Power C O A P O A A f e o es March 9,1983 3F-0383-12 Director of Nuclear Reactor Regulation Attention:

Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Exemption to 10CFR50.44(c)(3)(iii)

Installation of Reactor Vessel Head Vent

Dear Sir:

Florida Power Corporation (FPC) has received and reviewed your letter, dated February 22,1983, on :he subject exemption request. You asked for a reply in fifteen days from the date or the letter (i.e., March 9,1983) even though the letter was not received by FPC until March 1,1983.

Florida Power Corporation will submit the information requested by your four (4) items on or before May 13, 1983. This time will allow for verifying that the necessary tests and evaluations will be performed; that the hot leg vents will be installed and necessary training scheduled; and for developing the requested Safety Analysis.

Sincerely, f'

G. R. Westafer 0I Manager 0

Nuclear Licensing and Fuel Management RMB:mm cc:

Mr. 3. P. O'Reilly, Regional Administrator Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30303 EGO 3150407 830309 PDR ADOCK 05000 ourth Street South e P O Box 14042. St. Petersburg, Florda 33733 e 813-866-5151