Text
_ _ _ _ _ _ _ - _ _ _ - -
Wisconsin Electnc POWER COMPANY 2n w u,enganao to. :9.n wouw e m *
!4'41:'25 23e l
VPNPD-91-387 NRC-91-128 November 7, 1991 U.
S.
NUCLEAR REGULATORY CCMMISSION Document Control Desk Mail Station P1-137 Washington, D.
C.
20555 I
Gentlemen:
QQCEE_TS 50-266 AND 50-301 140NTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Attacited are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of October 1991.
Very truly yours,
[
/
y A
U Ja9esJ.fZac /
i Vice President Nuclear Power Attachments Copies to L.
L.
Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector
/ (Q G
-s = r, - n 10 0 U ' ' e 1111-o m 10m.
em waa magpe I
i H
,1 whnfam ofIIhwnun beq1 (irriwa?w i
OPERATING DATA REPORT DOCKET NO. 50-266
[
DATE: November 5, 1991 COMPLETED BY: D. C.
Peterson a
TELEPHONE:
414/755-2321 i
OPERATING STATUS I
1.
UNIT NAME:
POINT' BEACH NUCLEAR PLANT UNIT 1 NOTES
'(
2.. REPORTING PERIOD:
OCTOBER 1991
- 3. LICENSED THERMAL POWER (MWT):
1518.5 l
'4.
NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)*
509.
l
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485..
.8.
IF CHANGES OCCUR IN CAPACITY' RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
f NOT APPLICABLE 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE I
THIS MONTH YR TO DATE CUMULATIVE
- 11. HOUR 5.IN REPORTING PERIOD 745 7,296 183,960
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 728.G 6,221.6 151,989.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 652.7
- 14. HOURS GENERATOR ON LINE.
719.0 6,137.6 149,041.2
- 15. UNIT RESERVE SHUT 00t'N liUURS 9.G-9.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,058,783 9,194,137 208,600,832-
- 17. GROSC ELECTRICAL ENERGY. GENERATED (MWH) 351,110 3,108,270
'70,410,650 t
- 18. NE*i ELECTRICAL ENERGY GENERATED (MWH)-
334,633 2,966,472 67,087,512 l
- 19. UNIT SERVICE FACTOR 96.5 84.1 81.0
- 20. UNIT AVAILABILITY FACTOR
'97.7 C4.2 81.5
[
- 21. UNIT CAPACITY FACTOR ~(USING MDC NET) 92.6 83.8 74.8
- 22. UNIT CAPACITY FACTOR (USING DER NET) 90.4 81.8 73.4'
- 23. UNIT FORCED OUTAGE RATE.
O.0 0.4 1.7 24.' SHUTDOWNS SCHEDULED OVER NEXT'6 MONTHS'(TYPE, DATE, AND DURATION OF ECH):
l j
U1R19-Unit 1 Refueling / Maintenance ShutdO n 04/10/92 to 05/22/92 (42 days)
- 25. IF SHUTDOWN.AT END OF REPORT PERIOD, ESTIMATED DATE CF ST7RTUP: NOT SHUTDOWN
+
,l DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
POINT BEACII NUCLEAR PLANT DOCKET NO.
M2t,6 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 1 -
- MONTil OCTOBER - 1991 DATE November 5.1991 COMPLETED BY D. C. Peterson 1
TELEPHONE 414/755-2321 AVERAGE
' AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
479 11 492 21 493
.]
2 476 12 490 22 494 l
3 476
.13 187 23 493 4
463 14 491 24 493 5
280 15 494 25 472 6
493 16 495 26
-2 7
495 17 492 27 249 8
494 18 493 28 494 9
494 19 493 29 4'M i
10 494 20 494 30 494 31 494 I
r PDF-002Ea wm
POIKi' BEACH NUCLEAR PIANT Docket No.
50-266 Unit Name Point Beach. Unit 1 UNIT SIIUTDOWNS AND POWER REDUCTIONS Date November 5. PM1 Completed By D. C. Peterson REPORT MONTli OCTOBER - 1991 Telephone No.
414n55-2321. Ext. 361.
i*
Method c4
. Shutting No.
Date Type' Duration Reason Down 1xensee Event System Component Cause and Correctin Actin 2
5 911005 5
16 II 5
N/A Si lh Repair and return to service d LP hearer 4A and optional testing of main steam isolation vahrs and non-return vahes.
6 911013 5
25 II 5
N/A IB Instru.
Load reduction to repair N44, power range detector. Shutdown aborted taanse the Kewaunec Nuclear Plant tnpped off-tme on that date, causing concern over gno stabdity.
7 911026 S
1-II 1
N/A IB Instru.
Shutdown to replace N44, power range detector and inspect MSIV vabe operators.
t i
l t
2
'F: Forced Reason:
' Method:
' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced lead F-Administrative 6 - Other (explain)
' Exhibit I - Same Source G - Operational Error (explain)
H - Other (explair) i PBr-00285 (03 00)
~. -...
... - -.. -.. ~.
. ~.
.. ~..-
- + -
DodKET NO.
50-266 UNIT NAME Point Beach Nuclear Plant, Unit 1 DATE November 5, 1991 COMPLETED BY D.
C.
Peterson TELEPHONE 414-755-2321, Extension 361 UnLt 1 operated at approximately 449 MWe not throughout this report period, with two significant load reductions and one turbine runback.
During this time period, Unit 1 experienced one reportable event described in LER 91-013, Nuclear Instrumentation Turbine Runback Caused by a Voltage Spike on Power Range Channel N44.
Safety-related maintenance included the following:
Tightened two fittings and repressurized E-28 penetration to 15 psig, repaired bistable in the over-temperature rod stop alarm, replaced card for _ inputs to both thtlt 1 and Unit 2 rod bank step counters, raised regulator setting on excess letdown heat exchanger shell side outlet valve to preferred setting of 50 psi to meet requirements of timed valve stroke, cleaned and replaced operator seals and air cylinder seals on both main steam isolation valve (MSIV) operating cylinders, and replaced N-44 power range detector.
4 7
a--
.+
-3 u-
-~~ ~-
OPERATING DATA REPORT DOCKET NO. 50-301.
DATE: November 5, 1991
. COMPLETED BY:
D.
C.
Peterson TELEPHONE:
414/755-2321 OPERATING STATUS
- 1. UNIT NAME:
POINT BEACH NUCLEAR PLANT. UNIT 2
. NOTES
- 2. REPORTING PERIOD:
OCTOBER 1991 l
- 3. LICENSED THERMAL POWER (MWT):
1518.5 4.
NAMEPLATE RATING.(GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING-(NET MWE):
497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
509.
7.
MAXIPUM DEPENDABLE CAPACITY (NET MWE):
485.
8.
IF r.HANGE5 OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH.7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IP.ANY (NET MWE): NOT APPLICABIE 4
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATs CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 745 7,296 168,745
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL O.0 6,481.0 147,565.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 216.7 5
- 14. HOURS GENERATOR ON LINE O.0 a,481.0 145,400.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 9,761,879, 207,926,288
.17.
GROSS ELECTRICAL ENERGY GENERATED (MWH)
O 3,337,890 70,635,150 f
.18. NET ELECTRICAL, ENERGY GENERATED (MWH?.
0 3,190,015
'67,322,081 i
- 19. UNIT SERVICE FACTOR O.0 88.8 86.2
[
3
- 20. UNIT AVAILABILITY FACTOR O.0-88.8 86.3'
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 90.2 81.6
[
I l
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 88.0 80.3
- 23. UNIT FORCED OUTAGE RTTE-0.0 0.0 1.1-
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
.j NONE r
25 IF SHUTDOWN AT END.OF REPORT PERIOD,. ESTIMATED-DATE OF STARTUP: November 10, 1991 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 l
POINT BEACil NUCLEAR PLANT DOCKET NO.
50-301 AVERAGE DAIIX UNIT POMT:R LEVEL UNTT NAME Point Beach' Unit 2 '
MONTII OCTOBER ' E DATE November 5.1991 COMPLL~ RED BY D. C. Peterson TELEPHONE
_414n55-2321 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POW 11R LEVEL RAY MWe NET DAY MWe NET DAY MWe NET l
1
-3 11
-2 21 4
2
-2 12
-2 22
-2 3
-2 13
-?
23
-2 4
-2 14
-2 24
-2 5
-2 15
-2 25
-2 6
-2 16
-1 26
-2 7
-2 17
-2 27
-2 8
-2 18
-2 28
-2 9
-2 19
-2 29
-2 10
-2 20
-2 30
-2 31
-2
,e (03 90) 7
~
POINT BEACII NUCLEAR PIANT Docket No.
' 4 301 Unit Name Point Beach. Unit 2 UNIT SifUTDOWNS AND POWER REDUCTIONS Date November 5. l'N1 Completed By D. C. Peterson REPORT MONTil OCTOBER - 1991 Telephone No.
414/755-2321. Ext. 361
- Method of Shutting Cause and 'brective Acton No.
Date Type' Duration Reason IAmn Ucensee Event System Comprnent 2
filou M Resctor' Remrt No.
Code
- Code' To Peent Recurrence Scheduled refueling and maintenance outage. U2R17. Marx work i* ems include inspection 1
910928 S
744 C
1 and eddy current testing of steam generators,instanation of fullikw test Imes for residual heat removal, safety injection as containment spray pump and increase of the steam-driven avriltary feedwater pump mini-recircu:stion i ne.
l l
'F: Forced
" Reason:
' Method-
' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of Previous Shutdown E - Operator Training &
Licensing Exam 5 - Reduced lead F - Administrative 6 - Other (expla n)
' Exhibit I - Sara Source i
G - Operational Error (explain)
II - Other (explain)
PBF4mb (03-90)
. - ~. -.. - - -.
e DOEKET NO.
50-302 UNIT NAME ~
~ Point Beach Nuclear Plant, Unit 2 DATE November 5, 1991 COMPLETED BY D.
C.
Peterson TELEPHONE 414-755-2321, Extension 361 Unit 2 was shut down for refueling and maintenance (Outage U2R17) throughout this period.
LER 91-001, Failure of Main Steam' Isolation Valves To Close, was issued as a result of the MSIV failure event on September 29, 1991.
During this period, Unit 2 experienced three reportable events:
LER 91-002, Steam Generator Tube Degradation; LER 91-003, Containment flatch Temporary Third' Door Blocked Open During Fuel Movement; and LER 91-004, Containment Isolation Valve Leakage in j
Excess of Technical-Specification Limits.
Safety-related maintenance included the following:
Performed wire rerouting and channel separation for subcooling meter selector switches and indicating lights; replaced variable adjust pot and lamp assembly-on N-36, the intermediate range detector
. channel; replaced bistable indicating module for Loops A and B low - reactor coolant flow indication; replaced I/P and regulators on residual heat removal heat exchanger outlet. flow controls; replaced status light module for pressurizer high/ low level bistable; and replaced valve disc on refueling water storage tank outlet to safety injection pump suction and residual heat removal pump suction.
1 l
_