MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
_ _ _ _ _ _ _ - _ _ _ - - _
Wisconsin Electnc POWER COMPANY 2n w u,enganao to. :9.n wouw e m * !4'41:'25 23e l
VPNPD-91-387 NRC-91-128 November 7, 1991 U. S. NUCLEAR REGULATORY CCMMISSION Document Control Desk Mail Station P1-137 Washington, D. C. 20555 I
Gentlemen:
QQCEE_TS 50-266 AND 50-301 140NTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Attacited are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of October 1991.
Very truly yours,
['
/
y A i U Ja9esJ.fZac Vice President
/
Nuclear Power Attachments Copies to L. L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector
-s = r, - n 10 0 U ' ' e
/ (Q G 1111-o m 10m . i em H
waa magpe I
,1 whnfam ofIIhwnun beq1 (irriwa?w i .
OPERATING DATA REPORT '
DOCKET NO. 50-266 [
DATE: November 5, 1991 COMPLETED BY: D. C. Peterson
- a TELEPHONE: 414/755-2321 i OPERATING STATUS I
- 1. UNIT NAME: POINT' BEACH NUCLEAR PLANT UNIT 1 . NOTES .
2.. REPORTING PERIOD: OCTOBER 1991 . .
- 3. LICENSED THERMAL POWER (MWT): 1518.5 . .
l
'4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)* 509. . . l
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.. . . . . . . . . . . . . . . . . . . . . . . . ;
.8. IF CHANGES OCCUR IN CAPACITY' RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE *
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE ,
I THIS MONTH YR TO DATE CUMULATIVE
- 11. HOUR 5.IN REPORTING PERIOD 745 7,296 183,960
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 728.G 6,221.6 151,989.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 652.7
- 14. HOURS GENERATOR ON LINE. 719.0 6,137.6 149,041.2
- 15. UNIT RESERVE SHUT 00t'N liUURS 9.G- 9.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,058,783 9,194,137 208,600,832-
- 17. GROSC ELECTRICAL ENERGY. GENERATED (MWH) 351,110 3,108,270 '70,410,650 t
- 18. NE*i ELECTRICAL ENERGY GENERATED (MWH)- 334,633 2,966,472 67,087,512
- 19. UNIT SERVICE FACTOR 96.5 84.1 81.0 ;
- 20. UNIT AVAILABILITY FACTOR '97.7 C4.2 81.5 [
- 21. UNIT CAPACITY FACTOR ~(USING MDC NET) 92.6 83.8 74.8
- 22. UNIT CAPACITY FACTOR (USING DER NET) 90.4 81.8 73.4' !
- 23. UNIT FORCED OUTAGE RATE. O.0 0.4 1.7 24.' SHUTDOWNS SCHEDULED OVER NEXT'6 MONTHS'(TYPE, DATE, AND DURATION OF ECH):
l j U1R19- Unit 1 Refueling / Maintenance ShutdO n 04/10/92 to 05/22/92 (42 days)
- 25. IF SHUTDOWN.AT END OF REPORT PERIOD, ESTIMATED DATE CF ST7RTUP: NOT SHUTDOWN +
DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 ,l
POINT BEACII NUCLEAR PLANT DOCKET NO. M2t,6 -
AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 1 -
- MONTil OCTOBER - 1991 DATE November 5.1991 '
COMPLETED BY D. C. Peterson 1
TELEPHONE 414/755-2321 AVERAGE ' AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 479 11 492 21 493
.]
2 476 12 490 22 494 l 3 476 .13 187 23 493 4 463 14 491 24 493 5 280 15 494 25 472 6 493 16 495 26 -2 7 495 17 492 27 249 8 494 18 493 28 494 9 494 19 493 29 4'M ;
i 10 494 20 494 30 494 31 494 :
I PDF-002Ea !
wm ;
POIKi' BEACH NUCLEAR PIANT Docket No. 50-266
- Unit Name Point Beach. Unit 1 .
UNIT SIIUTDOWNS AND POWER REDUCTIONS Date November 5. PM1 Completed By D. C. Peterson .
REPORT MONTli OCTOBER - 1991 Telephone No. 414n55-2321. Ext. 361 .
i Method c4
. Shutting ,
No. Date Type' Duration Reason2 Down 1xensee Event System Component Cause and Correctin Actin .
5 911005 5 16 II 5 N/A Si lh Repair and return to service d LP hearer 4A and optional testing of main steam isolation vahrs and non-return vahes.
6 911013 5 25 II 5 N/A IB Instru. Load reduction to repair N44, power range detector. Shutdown aborted taanse the Kewaunec Nuclear Plant tnpped off-tme on that date, causing concern over gno stabdity. ,
7 911026 S 1- II 1 N/A IB Instru. Shutdown to replace N44, power range detector and inspect MSIV vabe operators.
t i
l t 2
'F: Forced Reason: ' Method: ' Exhibit G - Instructions !
S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced lead F- Administrative 6 - Other (explain) ' Exhibit I - Same Source ;
G - Operational Error (explain)
H - Other (explair) i PBr-00285 (03 00)
.. - -..--. ~ . - .. . . - . . - . . . - - . . - . . ~ . . - - - . ~ . . . . - . . . ~ ..-
-+-
DodKET NO. 50-266 UNIT NAME Point Beach Nuclear Plant, Unit 1 DATE November 5, 1991 COMPLETED BY D. C. Peterson TELEPHONE 414-755-2321, Extension 361 UnLt 1 operated at approximately 449 MWe not throughout this report period, with two significant load reductions and one turbine runback.
During this time period, Unit 1 experienced one reportable event described in LER 91-013, Nuclear Instrumentation Turbine Runback Caused by a Voltage Spike on Power Range Channel N44.
Safety-related maintenance included the following: Tightened two fittings and repressurized E-28 penetration to 15 psig, repaired bistable in the over-temperature rod stop alarm, replaced card ,
for _ inputs to both thtlt 1 and Unit 2 rod bank step counters, raised regulator setting on excess letdown heat exchanger shell side outlet valve to preferred setting of 50 psi to meet requirements of timed valve stroke, cleaned and replaced operator seals and air cylinder seals on both main steam isolation valve (MSIV) operating cylinders, and replaced N-44 power range detector.
4 7
a-- .+_ -3 , .. . < . . . , . . , u- -~~ ~-
OPERATING DATA REPORT DOCKET NO. 50-301.
DATE: November 5, 1991
. COMPLETED BY: D. C. Peterson TELEPHONE: 414/755-2321 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT. UNIT 2 . NOTES .
- 2. REPORTING PERIOD: OCTOBER 1991 . .
l 3. LICENSED THERMAL POWER (MWT): 1518.5 .
- 4. NAMEPLATE RATING.(GROSS MWE): 523.8 .
- 5. DESIGN ELECTRICAL RATING-(NET MWE): 497. . .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . .
- 7. MAXIPUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . . . . .
- 8. IF r.HANGE5 OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH.7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE 4
- 9. POWER LEVEL TO WHICH RESTRICTED, IP.ANY (NET MWE): NOT APPLICABIE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATs CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 745 7,296 168,745
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL O.0 6,481.0 147,565.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 216.7 5
- 14. HOURS GENERATOR ON LINE O.0 a,481.0 145,400.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 9,761,879, 207,926,288
.17. GROSS ELECTRICAL ENERGY GENERATED (MWH) O 3,337,890 70,635,150
.18. NET ELECTRICAL, ENERGY GENERATED (MWH?. 0 3,190,015 '67,322,081 3
- 19. UNIT SERVICE FACTOR O.0 88.8 86.2
- 20. UNIT AVAILABILITY FACTOR O.0- 88.8 86.3'
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 90.2 81.6 I
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 88.0 80.3
- 23. UNIT FORCED OUTAGE RTTE- 0.0 0.0 1.1-
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): .j NONE 25 IF SHUTDOWN AT END.OF REPORT PERIOD,. ESTIMATED-DATE OF STARTUP: November 10, 1991 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
POINT BEACil NUCLEAR PLANT DOCKET NO. 50-301 AVERAGE DAIIX UNIT POMT:R LEVEL UNTT NAME Point Beach' Unit 2 '
MONTII OCTOBER ' E DATE November 5.1991 COMPLL~ RED BY D. C. Peterson TELEPHONE
_414n55-2321 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POW 11R LEVEL RAY MWe NET DAY MWe NET DAY MWe NET l 1 -3 11 -2 21 4 2 -2 12 -2 22 -2 3 -2 13 -? 23 -2 4 -2 14 -2 24 -2 5 -2 15 __
-2 25 -2 6 -2 16 -1 26 -2 7 -2 17 -2 27 -2 8 -2 18 -2 28 -2 9 -2 19 -2 29 -2 10 -2 20 -2 30 -2 31 -2
,e 7 (03 90)
~
Docket No. ' 4 301 ,
POINT BEACII NUCLEAR PIANT Unit Name Point Beach. Unit 2 -
Date November 5. l'N1 UNIT SifUTDOWNS AND POWER REDUCTIONS Completed By D. C. Peterson OCTOBER - 1991 Telephone No. 414/755-2321. Ext. 361
- REPORT MONTil Method of Shutting Comprnent Cause and 'brective Acton No. Date Type' Duration Reason2 IAmn Ucensee Event System Code' To Peent Recurrence filou M Resctor' Remrt No. Code
l l
' Method- ' Exhibit G - Instructions
'F: Forced " Reason:
for preparation of S: Scheduled A - Equipment Failure (explain) 1 - Manual 2 - Manual Scram data entry sheets B - Maintenance or Testing C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced lead 6 - Other (explai n) ' Exhibit I - Sara Source F - Administrative G - Operational Error (explain)
II - Other (explain)
PBF4mb (03-90)
.- - . . . - . . . . - . . . - ~ . - .. - - - . . .. - - - - - . . - . . . . .
e ..
DOEKET NO. 50-302 UNIT NAME ~ ~ Point Beach Nuclear Plant, Unit 2 DATE November 5, 1991 COMPLETED BY D. C. Peterson TELEPHONE 414-755-2321, Extension 361 Unit 2 was shut down for refueling and maintenance (Outage U2R17) throughout this period.
LER 91-001, Failure of Main Steam' Isolation Valves To Close, was issued as a result of the MSIV failure event on September 29, 1991.
During this period, Unit 2 experienced three reportable events:
LER 91-002, Steam Generator Tube Degradation; LER 91-003, ,
Containment flatch Temporary Third' Door Blocked Open During Fuel l Movement; and LER 91-004, Containment Isolation Valve Leakage in j Excess of Technical-Specification Limits.
Safety-related maintenance included the following: Performed wire rerouting and channel separation for subcooling meter ;
selector switches and indicating lights; replaced variable adjust pot and lamp assembly-on N-36, the intermediate range detector
. channel; replaced bistable indicating module for Loops A and B low - reactor coolant flow indication; replaced I/P and regulators on residual heat removal heat exchanger outlet. flow controls; replaced status light module for pressurizer high/ low level bistable; and replaced valve disc on refueling water storage tank outlet to safety injection pump suction and residual heat removal pump suction.