POINT BEACH NUCLEAR PLANT IT-01

, INSERVICE TESTS MAJOR Revision 24 JuY30,1991 HIGH HEAD SAFETY INJECTION PUMPS AND VALVES (MONTHLY)

UNIT 1 Date DSS 1.0 PURPOSE 1.1 The purpose of this test is to perform the following periodic inservice tests as required by Technicai 3pecifications and/or the ASME Boler & Pressure Vessel Code,Section XI, ' Rules for Inservice inspection d Nuclear Power Plant Components /

1.1.1 MontNy functional test of the Si pumps as per Technical Specification 15.4.5.II.A.1.

1.1.2 MontNy functional test of 1SI 825A&B, SI pump RWST suction valves, as required by Technical Specification 15.4.5.II.B.1.

1.1.3 MontNy functional test of 1SI-826A, B & C, Si pump BAT suc:lon valves, as required by Technical Specification 15.4.5.II.B.4.

1.1.4 Ouarterly full stroke test of 1SI 826B & C as required by ASME Section XI. This test wDI be performed montNy with 1.1.3 above.

1.1.5 Quarterly partial stroke of 1SI-889A&B, SI pump discharge check valves, as required by ASME Section XI. This test will be done montNy along with the pump -

test.

1.1.6 Ouarteriy full stroke of 1SI 891 A&B, Si pump mini-recire check valves, as required by ASME Section XI. TNs V Il be done montNy along with the pump test.

1.1.7 Quarteriy leak test of 1S18424 4B. recumulator discharge check valves, as required by ASME Section XI. This test w"i e done montNy dunng the pump test.

1.2 The functional test of the Si pumps also satisfies environmental qualification requirements.

2.0 PRECAUTIONS AND LIMITATIONS i.1 1f there is any problem in performing this test, immediately notify the duty shift superintendent.

Operation d this equipment is a Technical Specification requirement.

2.2 Monitor accumulator levels whle the SI pumps are running. A level increase wul Indicate leakage past the accumulator check valve, 2.3 Tne suction pressurr gaugR shall be isciated except for the time requimd to take readings.

2.4 There is no installed Instrumentation to measure the flow through 1SI 891 A or B, Si pump recirc line check valves. Satisfactory operation of an Si pumo for 15 minutes without overheating is positive indication that its respective recirc I!ne check vaive is operable.

2.5 Technical Specifications prohlblt the testinj # a safeguards component if the opposite train's diesel generator is out of service.

9110110244 910918 DR ADOCK0500{gA6

POINT BEACH NUCLEAR PLANT IT-01 .

INSERVICE TESTS MAJOR ReWsion 24  :

' Juy30,1991 HIGH HEAD SAFETY INJECTION PUMPS AND VALVES (MONTHLY)

UNIT 1 f

2.6 ff at any time pump suction pressure is less than the NPSH required, this test must be discontinued unti the problem is corrected.

3.0 INITIAL CONDmONS ._ INITIALS 3.1 This test is being done to satisfy: '

The normally scheduled callup. Task Sheet No.

Post maintenance operabilty test for (equip. ID)

MWR No.(s) .

Task Sheet No.(s) ,

Special test no numbers Explain:

3.2 SIS is aligned for critical operation as per CL 7A or the valve lineup for mini-recirculation operation is checked.

3.3 G01 & G02, emergency diesel generators, are in service.Qt the component (s) to be tested is/are in the same ',,afeguards train as the diesel generator that is out of service.

3.4 Permission to Perform Test

=

The condhions required by this test are consistent with required plant conditions including equipment operability. Permission is granted to perform this test.

DSS TIME DATE 4.0 PROCEDUBE 4.1 Pre-Test Valve Poshion Verification /Allanment Position 1SI476A 1P15A mini-recire Open ISI476B IP15B mini-recirc Open ISI897A Si test line AOV Gag Open 1SI 8978 Si test line AOV Gag Open 1SI 828 Blender to RWST Shut  ;

1WL 1729 9CDT pump to RWST Shut

{ ISF 811 P33 to RWST

' Shut 1RH-742A RHR to RWST low flow Shut 1SI 884 Containment Si test line _ Open

. IS1425A 1P15A&B RWST suction MOV Open IS1425B 1P15A&B RWST suction MOV Open Page 2 of 12

POINT BEACH NUCLEAR Pl. ANT IT 01 INSERVICE TESTS MAJOR Revision 24 July 30,1991 HIGH HEAD SAFETY INJECTION PUMPS AND VALVES (MONTHLY)

UNIT 1 INITIALS NOTE: When post-maintenance or operaNitty leedng of 1P154 or Train *A*

components is not rendred, then NA all of Secdon 4.2 sebsmps.

4.2 1P15A and Train 'A' Test

' CAUTION *: 1Pl.974, SUCTION PRESSURE GAUGE FOR 1P15A&B, SHA1.L BE ISOLATED EXCEPT FOR THE TIME REQUIRED TO TAKE DATA.

NOTE: Accwnulator level data is rendred 80 determbe the position 1 1SI-842A&B, accwnulator discharge check Vahes, when an Si purrp is <peredng.

4.2.1 Record accumulator level.

1T34A level per IU-938  %

1T34B level per 1U-934  %

4.2.2 Check ol level of 1F15A at or niwe one-half sightglass. Contact the DSS fer the type of replacement o8.

4.2.3 Vertfy open ISI 896A,1PtSA purnp suction MOV.

4.2.4 Record 1P15A static suction pressure on Attachment A.

4.2.5 Start 1P15A. Time start 4.2.6 Verify 1P15A suction pressure is a5 pelg.

4.2.7 Check the mechanical seals and pump for excessive leakage, unusual noise, and overheating.

4.2.8 Check r.Il flanges, packing, and joints, up to the containment penetrations, for leaks.

4.2.9 After a 15-minute run time, record data on A'.tachmer,t A.

Reference Note 2 for pump run time requirements when taking bearing temperature readings.

4.2.10 Record accumulator level and compare with Ster 4.2.1 level.

1T34A level per 1U 938  %  % AL 17348 level per 1U-934 _%-  % AL 4.2.11 , Remove the locking device and open 1SI 8798, containment SI .

test line isolation valve. ,

l 1

Page 3 of 12 l

POINT BEACH NUCLEAR PLANT IT-01

' INSERVICE TESTS MAJOR Revision 24 July 30,1991 HIGH HEAD SAFETY INJECTION PUMPS AND VALVES (MONTHLY)

UNIT 1 INITIALS N' - A now reading gr, ter than o opm wwmos the partial aeoke of TSI-88a4.

, z.12 Record 1FI-929 test line flow on Attachment A, then shut 1SI8798.

4.2.13 Stop 1P15A and observe its coastdown behavior for unusual noiset, vibrations, or other abnormal conditions. Note results on Attachment A. Time stop 4.2.14 Check pump operabiity by comparing the pump data with the limt::, in the Operations Standing Order.

NOTE: When postaannonance or operabHhy testing of 1P158 or Train 'B' cwr90r,6Y,a is not required, then N4 aR of Section 4.3 aub-amps.

4.3 1P158 and Train *B* Test

  • CAUTION *: 1PI-974A, SUCTION PRESSURE GAUGE FOR 1P15A&B, FHALL BE ISOLATED EXCEPT FOR THE TIME REQUIRED TO TAKE DATA.

NOTE: AccturkAstor lent data is required to deterrratu the position of 1SI-842A&B, accumulator discharge check nives, when an Si plarip is operating.

d.3.1 Record accumulator level.

1T34A level per ILI-P38  %

1T348 level per 1LI 934  %

4.3.2 Check 08 level of 1P15B at or above one-half rightgicas. Contact the DSS for the type of replacement oI.

4.3.3 Verify open 1SI-996B,1P15B pump suction MOV.

, 4.3.4 Record 1P158 static suction preswre on Attachment B.

4.3.5 Start 1P15B. Time a: art 4.3.6 Verify 1P15B suction pressure is a5 psig.

4.3.7 Check the mechanical seals and pump for excessive leakage, unusual noise, and overheating.

4.3.8 Check all packing, flanges, and joints, up to the contd,uient penetrations, for leaks.

d Page 4 of 12 l

POINT BEACH NUCLEAR PLANT IT 01 INSERVICE TESTS MAJOR Revisk,n 24 July 30,1991 HIGH HEAD SAFETY INJECTION PUMPS AND VALVEB (MONTHLY)

UNIT 1 INmALS 4.3.9 After a 15-minute run time, record data on Attachment B.

Reference Nou. 2 for pump run time requirements when taLing bearing temperature readings.

4.3.10 Record accumulator level and compare with Step 4.5.1 levr;l.

1734A level per 10-938  %-  % AL IT348 level per 1U-934  %  % AL 4.3.11 Open 1SI-87% containment Si test line isolation valve.

NOTE: A nowsending greater then 0 sprn nnnes the pettials troke d 1SI-0898 4.3.12 Record test line flow on 1FI-929 on Attachment B, then shut ISI 8798.

4.3.13 Stop 1P15B and observe ks coastdown behavior for unusual noises, vibratiorts, or other abnormal conditions. Note results on Attachment B. Time stop 4.3.14 Check pump operabpity by comparing the pump data with the limits in the Operations Starung Order.

NOTE: When post 4naltnenence or operability sosting d 151-8454 or B or E or Fis not required, then N4 all d Secdon 4.4 sub-steps.

NOTE: Test d SI check volves per Sec60n 4.4 aboukt be performed whenent an SI pwrp is operated per Seccan 4.2 arxt/or 4.3.

4.4 Test of ISI-845A. B. E & F NOTE: This sost measures the seat Asakage d the ibur check mAes b a parallet con 6guradon against accwnufator pressure, thereby verifyina check veheicoaldon.

4.4.1 Verify 1S1884 open, then open 1SI 8798, containment Si test !!ne isolation valves.

4.4.2 Observe test line flow and record.

!. 1FI-929 gpm Page 5 of 12

POINT BEACH NUCLEAR PLANT IT 01 INSERVICE TESTS MAJOR I.'

Revision 24 July 30,1991

'HIGH HEAD SAFETY INJECTION PUMPS AND VALVES (MONTHLY)

UNIT 1 INITIALS NOTE: M bdicated now h Snp 4.4.2 was a: a mirdmum discemable Row cd to gwn, then NA Steps 4.4.2 and 4.4.4 and proceed so Smp 4.4.5.

4.4.3 Shut 1S1884 and observe 1PI-929 test line pressure for a period of 2 minutes and record pressure at the end of 2 minutes.

1PI 929 ps:g NOTE: W hdicated preestse h Siep 4.4.2 sees s500 pelg, then NA Step 4.4.4 andproceed to Slep 4.4.5.

4.4.4 Depressurize the test line by throttling open 1SI 883 test line drain until a constant 100 psig test line pressure is indicated on IPI-929. Measure the drain rate with a gradtunted cylinder and record, then shut 1SI 883.

Drain Rate seem 4.4.5 Shut and lock contahment Si test line isolation valves:

1SI-879B Shut, Lock No.

1S1-884 Shut, Lock No.

  • NOTE: When post-ma]ntenance or operability testing of 1S1-8264 0, w C h not required, then NA all of SecDon 4.5 sub-steps.

4.5 Stroke Test of 1SI-826A B & C 4.5.1 Shut 1S1426A.

Check the rising stem position Indicator for shut indication.

4.5.2 Opea 1SI 8268.

a. Time to open, seconds
b. Check the rising stem position indicator for open Indication.

4.5.3 Shut 1S1826B.

a. Time to shut, seconda
b. Check the rising stem position indicator for shut indicatiort 4.54 Check valve operability by comparing the valve data with the limits in the Operations Standing Order.

Page 6 of 12

POINT BEACH NUCLEAR Pl. ANT IT-Oi INSERVICE TESTS MAJOR Revision 24 July 30,1991 HIGH HEAD SAFETY INJECTION PUMPS AND VALVES (MONTHLY)

UNIT 1 INmALS 4.5.5 Open 1S1426C.

a. Time to open. seconds
b. Check the rising stem position Indicator for open Indication.

4.5.6 Shut IS1426C

a. Time to shut. seconds
b. Check the rising stem position indicator for shut indication.

4.5.7 Open ISI-82rA

a. Time to open. seconds
b. Check the rising stem position indicator for open indication.

4.5.8 Check valve operabElty by comparing the valve data with the limits in the Operations Standing Order.

4.5.9 Record stop watch ID No. .

4.5.10 Shut 1P 15 A&B Si pump suction form RWST MOV 1SI-825A.

4.5.11 Shut 1P 15 A&B SI pump suction from RWST MOV 1S14258.

4.6 Post-Test indeoendent Ooerator Verifcation:

l Ya! Nit Position ISI-825A 1P 15A&B Si pump suction from RWST MOV Auto-Shut 1S1425B IP 15A&B SI pump suction from RWST MOV Auto-Shut IS1426A IP 15A&E SI pump suction from BAT MOV Auto-Open 1S1426B 1P 15A&B Si pump suction from BAT MOV Auto-Shut 1SI426C 1P 15A&B SI pump suction from BAT MOV Auto-Shut 1SI 879B ' Containment Si test line manual Locked Shut 1SI-884 Containment Si test line manual ~

Locked Shut 1SI-DbC 1PI 974 gauge isolation Shut Safety injectlan/ spray ready status panet lights normal Off Page 7 of 12

POINT BEACH NUCLEAR PLANT IT-01 INSERVICE TESTS MAJOR

.' Revision 24 July 30,1991 HIGH HEAD SAFETY INJECTION PUMPS AND VALVES (MONTHLY)

UNIT 1 INmALS 5.0 ANALYSIS l NOTE: To be csri' ^-i within 96 hows by manegar- Operations or Ns W-5.1 Comparisons with allowable ranges of test values and analysis of deviations complete.

12 Any requirements for corrective action: '

Yes No (If yes, give detaDs in the remarks section.)

5.3 Data ana'yzed by Time and date Remarks:

4 l

i Page 8 of t2

i POINT BEACH NUCLEAR PLANT IT-01 INSERVICE TESTS MAJOR Revision 24 l July 30,1991 HIGH HEAD SAFETY INJECTION PUMPS AND VALVES (MONTHLY)

UNIT 1 ATTACHMENT A DATA SHEET j 1P15A, 'A' SAFETY INJECTION PUMP 1

PARAMETERS INSTRUMENT UNITS READING Motor Current C01 Amp amps Pump Discharge Pressure 1PI-923 psig RWST Lovel During Test 1LI-972  %

Pump Suction Pressure Before Test 1PI-974 psig Pump Suction Pressure During Test IPI-974 psig Pump Differentia! Pressure Note 3 psid l

l mRs _ los Pump inboard Vertical C Note 1,5 mRs/lps Vibration Bearing Horizontal D Note 1,5 mas /ips Axial E Note 1, 5 mHs/ips Outboard Vertical A Note 1, 5 mus/ips l Bearing Horizontal B Note 1,5 mHs/ips Pump inboard H Note 1, 5 'F Beanng Outboard J Note 1,5 *F Temp-Motor Inboard F Note 1, 5 *F (Note 2) Outboard G Note 1,5 'F Ambient Air Temperature Note 1, 4 'F RWST Temperature 1T1-960 *F Coastdown Behavior Check (v) If OK N/A N/A Valve Stroke Vertfication Data INSTRUMENT UNITS READING 1SI-889A Test une Flow 1FI-929 gpm i

Page 9 of 12 l*

i POINT BEACH NUCLEAR PLANT IT 01 INSERVICE TESTS MAJOR Revision 24 July 30,1991 HIGH HEAD SAFETY INJECTION PUMPS AND VALVES (MONTHLY)

UNIT 1 ATTACHMENT B DATA SHEET 1P15B, 'B' SAFETY INJECTION PUMP PARAMETERS INSTRUMENT UNITS READING Motor Current COI Amps amps Pump Discharge Pressure 1PI-922 psig RWST Level During Test 1LI-972  %

Pump Suction Pressure Before Test 1PI-974 psig Pump Suction Pressure During Test 1PI-974 psig Pump Differential Pressure Note 3 psid Pump mits ins inboard Vertical C Note 1,5 mus/ips Vibration Bearing Horizontal D Note 1,5 mis /lps Axial E Note 1,5 mas /ips Outboard Vertical A Note 1,5 mils /ips Bearing Horizontal B Note 1, 5 mEs/lps Pump inboard H Note 1,5 *F eadng Outboard J Note 1,5 *F Temp.

Motor Inboard F Note 1,5 'F (Note 2) Outboard G Note 1,5 'F Arnbient Air Temperature Note 1,4 *F Coastdown Behavior Check (v) If OK N/A __

N/A S

Valve Stroke Verification Data INSTRUMENT UNITS READING 1SI-889B Test Line Flow 1F1-929 gpm PARAMETEFt TEST INSTRUMENT ID NO.

Vibration Bearing Temperature Ambient Air Temperature Page 10 of 12

{

_ _ _ _ - _ _ _ _ - -_ l

POINT BEACH NUCLEAR PLANT IT-01

, INSERVICE TESTS MAJOR Revision 24 July 30,1991 HIGH HEAD SAFETY INJECTION PUMPS AND .

VALVES (MONTHLY)

UNIT 1 NOTES NOTE 1: Log the identMcedon rumber of the portable kstnsnent being used.

NOTE 2: Reedags taken or& during the first sta of Jarnary, anerpurrp rnaineanence, or when esamblishing new reference nives. These readings wtM be saken aner bearing sercperanses have stabilked. Slabilkedis deRned as being three w% readings taken at 10 minute bwvals that do not wry by snore than 3% (W-i , i? 13 *F).

NOTE 3: DitTcrendalpressure = Ptap discharge pressure - Planp suc60n pressure during test.

NOTE 4:

Amblert air temperature is taken appnnimately one foot above the purry inboard bearing NOTE 5:

Vibration readings will be taken atlacedons A, B, C, O and E as shown on Figure 1.

Temperanee readings will be >1.en at loce00ns f, G, H and J.

Page 11 of 12

l 1l l

3 5 =9 2 zC , ,h5 ,6 "

@2nxsmmsy)

.P5

.$:ga $

.R g-

-  ! z8 W 2t--

g ,C5v>>8

$: 2o E y

l 28Qa,E'

!r O , "

g 7

0 7

o t

.(,sm o 2 n -

@ @ u.

./,

a*

c si 0

9 T

o A D

q E T

! . A C

O L

E R

A

,l E

o w D

N

- A o O n .

. o D

n

@h@ v. .

7" cu S T

N

- " s I O

P 4 Y

- L o N s 3 O

B 5

1

? P I

R O

F o ( s c

l

?Ing I' >ll!l