Proposed Tech Specs Revising Figure 3.4-2, Beaver Valley Unit 1 RCS Heatup Limitations Applicable for First 16 Efpy
ML20079G185
Person / Time
Site: Beaver Valley
Issue date: 09/30/1991
From:
DUQUESNE LIGHT CO.
To:
Shared Package
ML20079G012 List:
References
NUDOCS 9110090012
Download: ML20079G185 (1)


Text

a

.O i

MATERIAL PROPERTY BASIS CONTROLLING MATERIAL; INTERMEDIATE SHELL PLATE B6607-2 NDT AFTER 10 EFPY; 1/4T,224*F RT 3/4T,188'F 2500 LEAK TEST LIMIT 2000

^Ok'

~5EATUPiiATES TO 00 *F/HR 8

$1250 n.

UNACCEPTABLE CRITICALITY O

OPERATION 1000 LIMIT FOR THE o

SERVICE PERIOD O 750 UP TO 16 EFPY (BASED ON 500 M

INSERVICE ACCEPTABLE OPERATION 250 TEST TEMP.

OF 351'F) 1 0

0 50 100 150 200 250 300 350 400 450 500 INDICATED TEMPERATURE (*F) l FIGURE 3,4 2 Beaver Valley Unit 1 Reactor Coolant System Heatup 1

Limitations Applicable for the First 10 EFPY BEAVER VALLEY - UNIT 1 3/4424 PROPOSED 92too9oo m 920930 F(DR ADOCK 05000i34 pg

-