ML20079G009

From kanterella
Jump to navigation Jump to search

Forwards Corrected Figure 3.4-2 Submitted W/Proposed OL Change Request 191
ML20079G009
Person / Time
Site: Beaver Valley
Issue date: 09/30/1991
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20079G012 List:
References
TAC-80559, NUDOCS 9110080365
Download: ML20079G009 (1)


Text

. _ _ _ - - _ _ _ _ _ - _ _ _ _ _ - - . __ . _ - _ _ _ _ . _ _ _ _ _ _ . .. _. _ - - _ _ _ _

q g a r1 h A e.t histo n

. .. , ,, , ...,,, m C.M. .]," (, .~. ,. .. ...

septembn 30, 1991 U. S. Nuclear Regulatory Comnisolon Attnt Document Control Desk Washington, DC 20555 subject: Dcavor Valley Power Station, Unit No. 1 Dochet No. 50-334, leicenso No. DPR-66 Proposed Operating Liconno chango Roquest 191 Correction (TAC No. 110559)

An error has been identified on Figure 3.4-2 that was submitted in the above request for Technical Specification Change. The error was in the inservice hydrostatic test temperature of 329'F stated on the figure for the criticality limit. Attached is a corrected figurn with an inservice hydrostatic test temperature of 351*F. This corrected temperature is consistent with that ntated in the Westinghouse report provided as a basis for the proposed Technical Specification Change and does not introduce any now or different information. Thorofore, please replace the Figure 3.4-2 previously provided with the attached corrected figuro.

Sincerely, l

/ tbt.

b. Slobar ico President Nuclear Group cc Mr. J. Boall, Sr. Resident Inspector Mr. T. T. Martin, NRC Region 1 Administrator Mr. A. W. DeAgazio, Project Manager Mr. T. M. Gerusky, Director BRP/ DER Mr. R. Janati, BRP/ DER Mr. M. L. Bowling (VEPCO)

,;0 \

<;,i i Pos1 oceou,x,r, e vi ov:soe.com PDR 1 P i