Davis-Besse Initial License Exam 2020 Simulator JPM S1
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 R1 NUREG-1021, Revision 11 Page 1 of 7 Facility: Davis-Besse Task No: 004-051-01-0100 Task
Title:
Boron equalize Purification Demineralizer 3, isolate letdown K/A
Reference:
(004) A4.06 3.6/3.1 Job Performance Measure No: S1 (NEW)
Examinee:
NRC Examiner:
Date:
Method of testing:
Simulated Performance ___
Actual Performance _X_
Classroom ___
Simulator _X_
Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues Task Standard:
Line-up to boron equalize Purification Demineralizer 3 Isolate letdown due to rising letdown pressure Required Materials:
DB-OP-06001 Section 4.3 starting at step 4.3.11 DB-OP-06006 Section 3.14 DB-OP-02002 Annunciator 2-2-A Letdown Press Hi DB-OP-02007 Annunciator 7-3-B CLN WST SYSTEM TRBL General
References:
None Initiating Cue:
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Time Critical Task:
No Alternate Path:
Yes Validation Time:
15 minutes
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 R1 NUREG-1021, Revision 11 Page 2 of 7 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Line-up to boron equalize Purification Demineralizer 3 then isolate letdown due to high letdown pressure INITIAL CONDITION:
Mode 1 ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Place Purification Demin 2 in service with Purification Demins 1 and 3 unisolated and in standby Initialize Makeup Tank level at 80 inches and 35 psig. Letdown at 65-70gpm.
Ensure Batch Controller is "stopped" after each JPM reset MALFUNCTIONS/FAILURE TO INSERT:
None
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 R1 NUREG-1021, Revision 11 Page 3 of 7 EXAMINER COPY INITIAL CONDITIONS:
All plant systems are in a normal alignment Purification Demineralizer 2 is in service Purification Demineralizers 1 and 3 are in standby (NOT isolated)
The resin in Purification Demineralizer 3 has been replaced INITIATING CUES:
The Unit Supervisor directs you to;
- Begin equalizing boron in Purification Demineralizer 3 in accordance with section 4.3 of DB-OP-06001, Boron Concentration Control beginning with step 4.3.11
- Stop equalizing PD #3 when Makeup Tank Level is at 65 inches Makeup Tank level has been raised to 80 inches in preparation for PD #3 Boron Equalization Chemistry does NOT require a sample All steps have been completed and verified through step 4.3.10 (Provide examinee a copy of Section 4.3 starting with step 4.3.11 of DB-OP-06001 and Section 3.14 of DB-OP-06006)
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 R1 NUREG-1021, Revision 10 Page 4 of 7 CANDIDATE COPY INITIAL CONDITIONS:
All plant systems are in a normal alignment Purification Demineralizer 2 is in service Purification Demineralizers 1 and 3 are in standby (NOT isolated)
The resin in Purification Demineralizer 3 has been replaced INITIATING CUES:
The Unit Supervisor directs you to;
- Begin equalizing boron in Purification Demineralizer 3 in accordance with section 4.3 of DB-OP-06001, Boron Concentration Control beginning with step 4.3.11
- Stop equalizing PD #3 when Makeup Tank Level is at 65 inches Makeup Tank level has been raised to 80 inches in preparation for PD #3 Boron Equalization Chemistry does NOT require a sample All steps have been completed and verified through step 4.3.10
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 R1 NUREG-1021, Revision 11 Page 5 of 7 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
- 1.
PERFORMANCE STEP: Divert Letdown to Cleanwaste
........C........
STANDARD: Depress CLN WST on HIS MU11, observe WHITE light goes OFF and AMBER light comes ON COMMENT: The candidate should monitor letdown pressure as indicated on computer point P719 CUE: None SAT UNSAT
- 2.
PERFORMANCE STEP: Switch in-service Purification Demineralizers STANDARD: Refer to section 3.14 of DB-OP-06006, Makeup Purification System CUE: If asked, Purification Demin 3 is NOT manually isolated SAT UNSAT
- 3.
PERFORMANCE STEP: Place Purification Demineralizer 3 in service
........C........
STANDARD: Depress OPEN on HIS MU1903, observes GREEN light goes OFF and RED light comes ON CUE: None SAT UNSAT
- 4.
PERFORMANCE STEP: Remove Purification Demineralizer 2 from service
........C........
STANDARD: Depress CLOSE on HIS MU10B, observes RED light goes OFF and GREEN light comes ON CUE: None SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 R1 NUREG-1021, Revision 11 Page 6 of 7 Alternate Path Starts here.
- After MU10B is closed, MU 11 will FAIL as is.
- Letdown pressure will rise due to the in-service primary demin filter becoming clogged causing annunciator 7-3-B, CLN WST SYSTEM TRBL first. No action is required for 7-3-B.
- Then annunciator 2-2-A, Letdown Press Hi to alarm ~ 3 minutes later.
- 5. PERFORMANCE STEP: Reference Alarm Response Procedure (ARP) for annunciator 7-3-B, CLN WST SYSTEM TRBL STANDARD: Refers to ARP for annunciator 7-3-B, CLN WST SYSTEM TRBL NOTE: Candidate may attempt to go back to original line-up. Attempt will fail since MU11 is Failed to the CLN WST position. If it is determined that MU11 is failed, the candidate may close MU2B (JPM Step 9).
CUE: When ARP 7-3-B is located, then hand candidate a copy of DB-OP-02007 Annunciator 7-3-B, CLN WST SYSTEM TRBL If asked, Continue with Purification Demin #3 Boron Equalization.
SAT UNSAT
- 6.
PERFORMANCE STEP: Dispatch an operator to the Radwaste Control Panel to determine the cause of the alarm at Radwaste Alarm Panel 50 STANDARD: Contacts Zone 3 EO to investigate Alarm CUE: Role play as EO: Understand go to Radwaste Control Panel to determine cause of CLN WST SYSTEM TRBL.
SAT UNSAT
- 7.
PERFORMANCE STEP: Reference Alarm Response Procedure (ARP) for annunciator 2-2-A Letdown Press Hi STANDARD: Refers to ARP for annunciator 2-2-A Letdown Press Hi CUE: When ARP 2-2-A is located, then hand candidate a copy of DB-OP-02002 Annunciator 2-2-A Letdown Press Hi SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 R1 NUREG-1021, Revision 11 Page 7 of 7
- 8.
PERFORMANCE STEP: Verify MU 4, PRESSURE REDUCING VALVE, is closed.
STANDARD: Verifies GREEN light ON, RED light OFF CUE: None SAT UNSAT
- 9.
PERFORMANCE STEP: CLOSE MU 6, LETDOWN FLOW CONTROL VALVE
........C........
STANDARD: Adjust MU6 knob to zero letdown flow by rotating knob counterclockwise NOTE: Closing MU2B is also acceptable.
CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
Davis-Besse Initial License Exam 2020 Simulator JPM S2
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S2 R1 NUREG-1021, Revision 11 Page 1 of 7 Facility: Davis-Besse Task No: 013-021-04-0100 Task
Title:
Reset an SFAS Level 2 Actuation with RCS Pressure < 1650 psig K/A
Reference:
013 A4.02 (4.3/4.4)
Job Performance Measure No: S2 (JPM-164)
Examinee:
NRC Examiner:
Date:
Method of testing:
Simulated Performance ___
Actual Performance _X_
Classroom ___
Simulator _X_
Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues Task Standard:
Block SFAS CH 1 RC Pressure Lo Trip and Reset Tripped Output modules in all 4 SFAS Channels Required Materials:
Signed copy of DB-OP-06405 Section 3.7 General
References:
None Initiating Cue:
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Time Critical Task:
No Alternate Path:
No Validation Time:
15 minutes
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S2 R1 NUREG-1021, Revision 11 Page 2 of 7 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Reset an SFAS Level 2 Actuation with RCS Pressure < 1650 psig INITIAL CONDITION:
Mode 3 with RCS pressure 1500 psig ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Trip RC PRESSURE LO TRIP bistable in SFAS Channel 1 BLOCK and STOP both HPI Pumps BLOCK and OPEN MU 3 and MU 2A Stabilize PZR Level prior to each JPM such that RCS Pressure is stable or slowly lowering to prevent Auto Reset of SFAS MALFUNCTIONS/FAILURE TO INSERT:
Deenergize RC2A4, SFAS Channel 2 RCS pressure transmitter: IMF L616T
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S2 R1 NUREG-1021, Revision 11 Page 3 of 7 EXAMINER COPY INITIAL CONDITIONS:
A plant shutdown and cooldown were in progress to repair SFAS Channel 2 RCS pressure transmitter SFAS Channel 2 RCS pressure transmitter has been deenergized During the cooldown, SFAS Channel 1 tripped on low RCS Pressure prior to being Blocked, causing an actuation of SFAS Levels 1 and 2 INITIATING CUES:
The Unit Supervisor directs you to reset SFAS Channel 1 in accordance with Section 3.7 of DB-OP-06405, SFAS Procedure (Provide the examinee a copy of Section 3.7 of DB-OP-06405)
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S2 R1 NUREG-1021, Revision 11 Page 4 of 7 CANDIDATE COPY INITIAL CONDITIONS:
A plant shutdown and cooldown were in progress to repair SFAS Channel 2 RCS pressure transmitter SFAS Channel 2 RCS pressure transmitter has been deenergized During the cooldown, SFAS Channel 1 tripped on low RCS Pressure prior to being Blocked, causing an actuation of SFAS Levels 1 and 2 INITIATING CUES:
The Unit Supervisor directs you to reset SFAS Channel 1 in accordance with Section 3.7 of DB-OP-06405, SFAS Procedure
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S2 R1 NUREG-1021, Revision 11 Page 5 of 7 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
START TIME: ________
- 1.
PERFORMANCE STEP: Obtain the door keys for all four SFAS channels STANDARD: SFAS cabinet keys obtained NOTE: It is desired NOT to sign the Key Log to help maintain exam security CUE: If necessary, DO NOT SIGN KEY LOG for this JPM SAT UNSAT
- 2.
PERFORMANCE STEP: Verify power to SFAS channels to be reset STANDARD: Visual check of red power lights lit at top of SFAS Channel 1 cabinet CUE: None SAT UNSAT
- 3.
PERFORMANCE STEP: Check the shutdown bypass power available green LEDs on SFAS Channel 1 cabinet are lit STANDARD: Visual check of green LED on each S/D bypass section CUE: None SAT UNSAT
- 4.
PERFORMANCE STEP: Block the SFAS Channel 1 RC low pressure trip
........C........
STANDARD: Verify RCS pressure is less than 1650 psig Depress the BLOCK pushbutton on the RC PRESSURE LO BLOCK bistable in SFAS Channel 1 CUE: None SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S2 R1 NUREG-1021, Revision 11 Page 6 of 7
- 5.
PERFORMANCE STEP: Reset the tripped output modules in all SFAS channels
........C........
STANDARD: Depress the RESET pushbutton on all tripped output modules in SFAS channel 1 CUE: None SAT UNSAT
- 6.
PERFORMANCE STEP: Reset the tripped output modules in all SFAS channels
........C........
STANDARD: Depress the RESET pushbutton on all tripped output modules in SFAS channel 2 CUE: None SAT UNSAT
- 7.
PERFORMANCE STEP: Reset the tripped output modules in all SFAS channels
........C........
STANDARD: Depress the RESET pushbutton on all tripped output modules in SFAS channel 3 CUE: None SAT UNSAT
- 8.
PERFORMANCE STEP: Reset the tripped output modules in all SFAS channels
........C........
STANDARD: Depress the RESET pushbutton on all tripped output modules in SFAS channel 4 CUE: None SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S2 R1 NUREG-1021, Revision 11 Page 7 of 7
- 9.
PERFORMANCE STEP: Verify status of 1/5 lights in each SFAS Channel STANDARD: Visual check of Output Module 1/5 lights COMMENT: 1/5 lights will be ON due to SFAS Channel 2 being tripped CUE: None SAT UNSAT
- 10. PERFORMANCE STEP: Verify SFAS cabinet doors closed and locked STANDARD: Doors CLOSED and LOCKED CUE: None SAT UNSAT
- 11. PERFORMANCE STEP: Return the SFAS door keys STANDARD: Door keys returned to key cabinet CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the evaluator)
END TIME
Davis-Besse Initial License Exam 2020 Simulator JPM S3
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S3 R1 NUREG-1021, Revision 11 Page 1 of 6 Facility: Davis-Besse Task No: 076-003-04-0100 Task
Title:
Perform Attachment 15 of DB-OP-02511, Loss of Service Water K/A
Reference:
076 A2.01 (3.5/3.7) Job Performance Measure No: S3 (JPM-083)
Examinee:
NRC Examiner:
Date:
Method of testing:
Simulated Performance ___
Actual Performance _X_
Classroom ___
Simulator _X_
Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues Task Standard:
Isolate TPCW SW Header, start Emergency Instrument Air Compressor (EIAC) and Lockout Station Air Compressors (SAC) 1 and 2 Required Materials:
DB-OP-02511 Attachment 15 General
References:
None Initiating Cue:
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Time Critical Task:
No Alternate Path:
No Validation Time:
10 min
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S3 R1 NUREG-1021, Revision 11 Page 2 of 6 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Service Water Non-Seismic Line Rupture INITIAL CONDITION:
Mode 3 with the Reactor and Turbine tripped MDFP in-service Service Water Pumps 1 & 2 in-service Service Water Train 2 on Primary ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Verify SW 1399 open and SW 1395 closed Run Schedule for each JPM MALFUNCTIONS/FAILURE TO INSERT:
Fail Service Water Side 1 pressure (PT2808) - KEP8E Fail CT 2955 closed - KEP8E
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S3 R1 NUREG-1021, Revision 11 Page 3 of 6 EXAMINER COPY INITIAL CONDITIONS:
The plant is in Mode 3 The Motor Driven Feed Pump is on Service Water Pumps 1 and 2 are in service with Loop 2 providing primary loads INITIATING CUES:
The following alarm has just been received:
- Computer alarm P945, SW HDR 1 PRESS (LOW)
An equipment operator reports a SW pipe rupture at the Turbine Plant Cooling Water Heat Exchangers The Unit Supervisor directs you to perform Attachment 15 of DB-OP-02511, Loss of Service Water Pumps/System (Provide the trainee a copy of Attachment 15 of DB-OP-02511)
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S3 R1 NUREG-1021, Revision 11 Page 4 of 6 CANDIDATE COPY INITIAL CONDITIONS:
The plant is in Mode 3 The Motor Driven Feed Pump is on Service Water Pumps 1 and 2 are in service with Loop 2 providing primary loads INITIATING CUES:
The following alarm has just been received:
- Computer alarm P945, SW HDR 1 PRESS (LOW)
An equipment operator reports a SW pipe rupture at the Turbine Plant Cooling Water Heat Exchangers The Unit Supervisor directs you to perform Attachment 15 of DB-OP-02511, Loss of Service Water Pumps/System
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S3 R1 NUREG-1021, Revision 11 Page 5 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
START TIME: _______
- 1.
PERFORMANCE STEP: Verify SW 1399 is closed
........C........
STANDARD: Push CLOSE pushbutton on HIS 1399, SW Header 1 to TPCW Hx, observes RED light goes OFF and GREEN light comes ON CUE: None SAT UNSAT
- 2.
PERFORMANCE STEP: Verify SW 1395 is closed STANDARD: Check SW 1395 CLOSED using HIS 1395, SW Header 2 to TPCW Hx, observes GREEN light ON CUE: None SAT UNSAT
- 3.
PERFORMANCE STEP: Verify CT 2955, is closed STANDARD: Check CT 2955 CLOSED using HIS 2955, TPCW Hx Supply From Circ Water, observes GREEN light ON CUE: None SAT UNSAT
- 4.
PERFORMANCE STEP: Verify SW 78, Service Water Header from TPCW Heat Exchanger Isolation, is closed STANDARD: Direct an Equipment Operator to verify SW 78 is closed CUE: EO reports, SW78 has been Closed.
SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S3 R1 NUREG-1021, Revision 11 Page 6 of 6
- 5.
PERFORMANCE STEP: Place the EIAC in service
........C........
NOTE: EIAC has a 10 second start delay STANDARD: Rotate EIAC handswitch HIS 813 to ON, observe GREEN light goes OFF and RED light comes ON CUE: (If asked) A temporary diesel air compressor is NOT available If necessary, acknowledge Emergency Instrument Air Compressor did not start.
SAT UNSAT
- 6.
PERFORMANCE STEP: Stop and Lockout Station Air Compressor 2
........C........
STANDARD: Place the control switch HIS 1494 for SAC 2 in LOCKOUT, observe RED light goes OFF, GREEN and AMBER (lockout) lights come ON CUE: None SAT UNSAT
- 7.
PERFORMANCE STEP: Lockout Station Air Compressor 1
........C........
STANDARD: Place the control switch HIS 812 for SAC 1 in LOCKOUT, observe RED light is OFF, GREEN light is ON, and AMBER (lockout) light comes ON CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator)
END TIME
Davis-Besse Initial License Exam 2020 Simulator JPM S4
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S4 R1 NUREG-1021, Revision 11 Page 1 of 7 Facility: Davis-Besse Task No: 005-012-04-0100 Task
Title:
Start Decay Heat Removal Pump 1 following a loss of DHR K/A
Reference:
(005) A2.04 2.9/2.9 Job Performance Measure No: S4 (JPM288)
Examinee:
NRC Examiner:
Date:
Method of testing:
Simulated Performance ___
Actual Performance _X_
Classroom ___
Simulator _X_
Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues Task Standard:
Place Decay Heat Pump 1 in service Throttle DH1B, in response to high flow, due to DH14B, DH Cooler 1 Outlet valve failing open Required Materials:
DB-OP-02527, Attachment 1 DB-OP-02003, 3-2-H General
References:
None Initiating Cue:
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Time Critical Task:
No Alternate Path:
Yes Validation Time:
20 minutes
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S4 R1 NUREG-1021, Revision 11 Page 2 of 7 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Place Decay Heat Pump 1 in service Throttle DH1B, in response to high flow, due to DH14B, DH Cooler 1 Outlet valve failing open INITIAL CONDITION:
Mode 5 DH Loop 1 in STBY DH Mode per DB-OP-06012, DH and LPI Operating Procedure, Section 3.5 DH Pump 2 was in service per DB-OP-06012, DH and LPI Operating Procedure, Section 3.8 (DH Loop 2 STBY DH Mode Section 3.6 completed prior to placing in service)
Decay Heat Pump 2 tripped DH11 and DH12 open with control power removed CC1467 closed CCW non-essential header is being supplied from CCW Loop 1 ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Isolate CCW loads or throttle CC172, DH Cooler Outlet as required to maintain Loop 1 CCW flow less than 7800 gpm when CC1467 is opened per ATT 1 Step 6.3 Ensure Annunciator 3-2-H LP INJ 1 FLOW HI will come in when DH14B fails open, it has a variable setpoint (3750 gpm per DB-OP-06904)
Hang information tags indicating open on DH1517 and DH1518 MALFUNCTIONS/FAILURE TO INSERT:
When DH Pump 1 is started, DH Cooler 1 outlet valve, DH14B, will fail open REQUIRED MATERIALS:
DB-OP-02527, Attachment 1 DB-OP-02003, 3-2-H
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S4 R1 NUREG-1021, Revision 11 Page 3 of 7 EXAMINER COPY INITIAL CONDITIONS:
Mode 5 Decay Heat Pump 2 breaker AD112 tripped due to a 50/51 Instantaneous Overcurrent INITIATING CUES:
The Command SRO directs you to perform Attachment 1, Starting Decay Heat Pump 1 of DB-OP-02527, Loss of Decay Heat Removal There were NO signs of cavitation on either DH Pump (Provide examinee a copy of DB-OP-02527 Attachment 1)
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S4 R1 NUREG-1021, Revision 11 Page 4 of 7 CANDIDATE COPY INITIAL CONDITIONS:
Mode 5 Decay Heat Pump 2 breaker AD112 tripped due to a 50/51 Instantaneous Overcurrent INITIATING CUES:
The Command SRO directs you to perform Attachment 1, Starting Decay Heat Pump 1 of DB-OP-02527, Loss of Decay Heat Removal There were NO signs of cavitation on either DH Pump
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S4 R1 NUREG-1021, Revision 11 Page 5 of 7 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
- 1.
PERFORMANCE STEP: Verify closed DH14B, DH CLR 1 OUTLET STANDARD: Press AUTO for DH14B using HIS DH14B. Rotate knob to Close DH14B using HIC DH14B. Observe GREEN light ON, RED light OFF COMMENT: DH14B will already be closed per standby lineup CUE: If asked, Instrument Air is in a normal lineup SAT UNSAT
- 2.
PERFORMANCE STEP: Verify closed DH13B DH CLR 1 BYPASS STANDARD: Press AUTO for DH13B using HIS DH13B. Rotate knob to Close DH13B using HIC DH13B. Observe GREEN light ON, RED light OFF COMMENT: DH13B will already be closed per standby lineup CUE: None SAT UNSAT NOTE: Decision step here to vent pump based on cavitation. The initial cue states no evidence of cavitation on either pump, so venting is NOT required. The Candidate should GOTO Step 6.0.
- 3.
PERFORMANCE STEP: Verify DH1517 is open STANDARD: Verify DH1517 DH PUMP 1 SUCTION, is open using HIS 1517 per Operations Information Tag providing valve position CUE: None SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S4 R1 NUREG-1021, Revision 11 Page 6 of 7
- 4.
PERFORMANCE STEP: Verify DH Drop Line valves are open using HIS DH11 and HIS DH12 STANDARD: Verify DH Drop Line valves are open using HIS DH11 and HIS DH12 CUE: None SAT UNSAT
- 5.
PERFORMANCE STEP: Verify Decay Heat Train 1 CCW/SW cooling is available
........C........
STANDARD: Observes CCW Pump 1 in service. Amps indicated. RED light ON Open CC1467 using HIS1467. RED light ON, GREEN light OFF Observes SWP 1 in service. Amps indicated. RED light ON COMMENT: Opening CC1467 is the only Critical portion of this step CUE: If asked, CC172 has been throttled to maintain CCW flow <7800 gpm If asked, DH Pump 1 will NOT be placed on DH/LPI Injection line 2 SAT UNSAT
- 6.
PERFORMANCE STEP: Verify DH1B is open STANDARD: Observes HIS DH1B RED light ON, GREEN light OFF CUE: None SAT UNSAT Alternate Path Starts here. When Decay Heat Pump 1 is started, DH14B will fail open.
Annunciator 3-2-H LP INJ 1 FLOW HI will alarm. Alarm procedure DB-OP-02003 will be referred to and will direct throttling of DH1B to 3000 gpm.
- 7.
PERFORMANCE STEP: Start Decay Heat Pump 1
........C........
STANDARD: Rotate HIS DH6B to start. Observe Decay Heat Pump 1 amps increase.
Observe RED light ON, GREEN light OFF. Release HIS DH6B.
CUE: If alarm procedure DB-OP-02003 is referred to provide guidance for annunciator 3-2-H SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S4 R1 NUREG-1021, Revision 11 Page 7 of 7
- 8.
PERFORMANCE STEP: Respond to Annunciator 3-2-H, LP INJ 1 FLOW HI STANDARD: Refer to DB-OP-02003, Annunciator 3-2-H LP INJ 1 FLOW HI Recognize DH14B has failed open COMMENT: Annunciator 3-1-H LP INJ 1 FLOW LO should have been expected.
CUE: When found, hand candidate a copy of DB-OP-02003, Annunciator 3-2-H LP INJ 1 FLOW HI If asked, EO reports DH14B can NOT be operated manually, indicates full open locally SAT UNSAT
- 9.
PERFORMANCE STEP: Throttle flow with DH1B
........C........
STANDARD: Press HISDH1B-2 ON to turn on DH1B control power.
Press close to throttle DH1B using HIS DH1B to obtain 3000 GPM or less (DB-PF-06703 curves CC6.2 and CC6.4 not applicable)
(Not required to REFER TO DB-OP-06912 for JPM)
CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
END TIME
Davis-Besse Initial License Exam 2020 Simulator JPM S5
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 R1 NUREG-1021, Revision 11 Page 1 of 8 Facility: Davis-Besse Task No: 000-058-05-0100 Task
Title:
Manually start Containment Spray pumps 1 and 2 K/A
Reference:
026 A2.03 4.1/4.4 Job Performance Measure No: S5 (JPM-289)
Examinee:
Examiner:
Date:
Method of testing:
Simulated Performance ___
Actual Performance _X_
Classroom ___
Simulator _X_
Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Start both Containment Spray Pumps and open their respective discharge valves Stop CTMT Spray pump 2 and close its discharge valve when leak develops Required Materials:
DB-OP-06013 Section 5.2 and 5.3 DB-OP-02003 for alarm 3-4-J General
References:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues Time Critical Task:
No Alternate Path:
Yes Validation Time:
15 minutes
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 R1 NUREG-1021, Revision 11 Page 2 of 8 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Start both Containment Spray Pumps Stop CTMT Spray pump 2 and close its discharge valve when leak develops INITIAL CONDITION:
A LOCA has occurred. Containment pressure has exceeded the SFAS Level 4 setpoint and containment spray pumps have not started.
ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Insert malfunction that inhibits start of both containment spray pumps and opening of CS discharge valves. Both containment spray pump discharge valves, (CS1530 and CS1531) are closed.
MALFUNCTIONS/FAILURE TO INSERT:
Insert pipe rupture in Train 2 Containment Spray Header when Containment Spray Pump 2 is started REQUIRED MATERIALS:
DB-OP-06013 Section 5.2 and 5.3 DB-OP-02003 for alarm 3-4-J
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 R1 NUREG-1021, Revision 11 Page 3 of 8 EXAMINER COPY INITIAL CONDITIONS:
A LOCA has occurred. Containment pressure has exceeded the SFAS Level 4 setpoint and the containment spray pumps have not started INITIATING CUES:
The Unit Supervisor has directed you to manually start Containment Spray pumps 1 and 2 and spray containment in accordance with DB-OP-06013, Section 5.2 and 5.3 (Provide examinee a copy of DB-OP-06013, Section 5.2 and 5.3)
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 R1 NUREG-1021, Revision 11 Page 4 of 8 CANDIDATE COPY INITIAL CONDITIONS:
A LOCA has occurred. Containment pressure has exceeded the SFAS Level 4 setpoint and the containment spray pumps have not started INITIATING CUES:
The Unit Supervisor has directed you to manually start Containment Spray pumps 1 and 2 and spray containment in accordance with DB-OP-06013, Section 5.2 and 5.3
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 R1 NUREG-1021, Revision 11 Page 5 of 8 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
Note 1: Unrelated secondary plant annunciators should be cued, The BOP Reactor Operator will respond to secondary plant annunciators.
Note 2: Spray pumps can be started in either sequence.
If CTMT Spray Pump 2 is selected to be started first, go to step 5.
- 1.
PERFORMANCE STEP: Verify DH7B, BWST ISOLATION VALVE, is OPEN STANDARD: Observes DH7B RED light ON, GREEN light OFF CUE: None SAT UNSAT
- 2.
PERFORMANCE STEP: OPEN CS1530, CTMT SPRAY DISCH
........C........
STANDARD: Presses OPEN on HIS 1530. Observes RED light ON, GREEN light OFF CUE: None SAT UNSAT
- 3.
PERFORMANCE STEP: Start CTMT SPRAY PUMP 1
........C........
STANDARD: Rotates HIS 1533 to Start and releases. Observes amp increase, RED light ON and GREEN light OFF.
CUE: None SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 R1 NUREG-1021, Revision 11 Page 6 of 8
- 4.
PERFORMANCE STEP: Verify flow indicated on FI1547, CS PUMP 1 DISCH FLOW STANDARD: Observe flow indication between 1100 GPM and 1900 GPM. Acknowledge Alarms 3-1-J, CS PMP 1 DISCH FLOW LO, and/or 3-3-J CS PMP 1 DISCH FLOW HI, as applicable. Observe alarm annunciators extinguish.
CUE: None SAT UNSAT Note: If CTMT Spray Pump 2 was started first. JPM is complete
- 5.
PERFORMANCE STEP: Verify DH7A, BWST ISOLATION VALVE, is OPEN STANDARD: At SFAS panel verifies that DH7A GREEN light OFF and RED light ON CUE: None SAT UNSAT
- 6.
PERFORMANCE STEP: OPEN CS1531, CTMT SPRAY DISCH
........C........
STANDARD: Presses OPEN on HIS 1531. Observes RED light ON, GREEN light OFF CUE: None SAT UNSAT Alternate Path Starts here. When the CTMT Spray Pump 2 is started a leak will develop in Train 2 CTMT Spray Header. Alarm 3-4-J will sound and Alarm Panel 3 Procedure DB-OP-02003 will direct stopping CTMT Spray Pump 2 and closing CS1531.
- 7.
PERFORMANCE STEP: Start CTMT SPRAY PUMP 2
........C........
STANDARD: Rotates HIS 1532 to Start and releases. Observes amp increase, RED light ON and GREEN light OFF CUE: None SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 R1 NUREG-1021, Revision 11 Page 7 of 8
- 8.
PERFORMANCE STEP: Verify flow indicated on FI 1535, CS PUMP 2 DISCH FLOW STANDARD: Observe flow above 1900 GPM. Acknowledge Alarms 3-2-J, CS PMP 2 DISCH FLOW LO, and 3-4-J CS PMP 2 DISCH FLOW HI. Observe alarm 3-2-J extinguishes and 3-4-J CS PMP 2 DISCH FLOW HI remains in alarm (light ON).
CUE: None SAT UNSAT
- 9.
PERFORMANCE STEP: Respond to Alarm 3-4-J, CS PMP 2 DISCH FLOW HI STANDARD: Locate Alarm Panel 3 Procedure DB-OP-02003 for alarm 3-4-J CUE: Provide examinee a copy of Alarm Panel 3 Procedure DB-OP-02003 for alarm 3-4-J SAT UNSAT
- 10. PERFORMANCE STEP: Check for flow rate high at FI 1535 located on Panel C5716 STANDARD: Observe flow above 1900 GPM alarm setpoint CUE: None SAT UNSAT
- 11. PERFORMANCE STEP: Check the Containment Spray Header 2 outside Containment for a piping break or leak STANDARD: Contact Equipment Operator to look for leaks CUE: Equipment Operator reports, Water is spraying from the CTMT Spray line just upstream of CS 1531, CTMT Spray Discharge Valve.
(If asked) The SM directs, continue with step 3.3.
SAT UNSAT
- 12. PERFORMANCE STEP: Stop CTMT Spray Pump 2
........C........
STANDARD: Turn HIS 1532 to Stop and release. Observe amps decrease with GREEN light ON and RED light OFF COMMENT: May press block push button but SFAS is failed for this pump CUE: None SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 R1 NUREG-1021, Revision 11 Page 8 of 8
........C........
STANDARD: Press Close on HIS 1531. Observe GREEN light ON and RED light OFF COMMENT: May press block push button but SFAS is failed for this pump CUE: None SAT UNSAT NOTE: If CTMT Spray Pump 2 was started first, return to step 1 for placing CTMT Spray Pump 1 in service.
Cue (If required, another SRO will verify leak has been isolated and refer to Tech Specs)
TERMINATING CUES: This JPM is complete (Terminated by the examiner)
END TIME
Davis-Besse Initial License Exam 2020 Simulator JPM S6
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 R1 NUREG-1021, Revision 11 Page 1 of 8 Facility: Davis-Besse Task No: 062-005-01-0100 Task
Title:
Transfer Essential 4160 Kv Bus C1 to Alternate and respond to Annunciator 1-2-H, XFMR BD DNGR/TRBL K/A
Reference:
(062) A4.01 3.3/3.1 Job Performance Measure No: S6 (NEW)
Examinee:
NRC Examiner:
Date:
Method of testing:
Simulated Performance ___
Actual Performance _X_
Classroom ___
Simulator _X_
Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Transfer Bus C1 to Alternate, respond to Annunciator 1-2-H, XFMR BD DNGR/TRBL and unload BD Transformer Required Materials:
DB-OP-06315 Sections 3.27 with prerequisites completed DB-OP-02001 Annunciator 1-2-H DB-OP-02104 Annunciator 104-2-C DB-OP-06315 Sections 3.28 DB-OP-06315 Sections 3.29 General
References:
None Initiating Cue: The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Time Critical Task:
No Alternate Path:
Yes Validation Time:
12 Minutes
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 R1 NUREG-1021, Revision 11 Page 2 of 8 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Transfer Bus C1 to Alternate and respond to Annunciator 1-2-H, XFMR BD DNGR/TRBL INITIAL CONDITION:
Mode 1 ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Open the schedule file prior to each JPM MALFUNCTIONS/FAILURE TO INSERT:
Temp Alarm 30 seconds after AC110 is open
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 R1 NUREG-1021, Revision 11 Page 3 of 8 EXAMINER COPY INITIAL CONDITIONS:
The Plant is in Mode 1 All systems are in a normal lineup INITIATING CUES:
The Unit Supervisor directs you to perform a live transfer of Bus C1 ONLY from the normal to the alternate power supply, using Section 3.27 of DB-OP-06315, 4160 V Switching Procedure.
All prerequisites have been completed (Provide examinee Section 3.27 of DB-OP-06315, 4160 V Switching Procedure with prerequisites completed)
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 R1 NUREG-1021, Revision 11 Page 4 of 8 CANDIDATE COPY INITIAL CONDITIONS:
The Plant is in Mode 1 All systems are in a normal lineup INITIATING CUES:
The Unit Supervisor directs you to perform a live transfer of Bus C1 ONLY from the normal to the alternate power supply, using Section 3.27 of DB-OP-06315, 4160 V Switching Procedure.
All prerequisites have been completed
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 R1 NUREG-1021, Revision 11 Page 5 of 8 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
- 1.
PERFORMANCE STEP: Notifies Shift Manager to refer to Tech Specs STANDARD: Notifies Shift Manager to refer to Tech Specs CUE: The Shift Manager is referring to Tech Specs SAT UNSAT
- 2.
PERFORMANCE STEP: Close ABDC1, BUS TIE XFMR BD and hold
........C........
STANDARD: Positions HIS 6220, ABDC1 to CLOSE and holds in the close position.
Observes breaker ABDC1 RED light ON, GREEN light OFF CUE: None SAT UNSAT
- 3.
PERFORMANCE STEP: Open AC110, BUS TIE FROM C2 BUS
........C........
STANDARD: Positions HIS 6223, AC 110 to Trip and releases. Observes GREEN light ON, RED light OFF CUE: None SAT UNSAT
- 4.
PERFORMANCE STEP: Release HIS 6220, ABDC1 STANDARD: Release HIS 6220 CUE: None SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 R1 NUREG-1021, Revision 11 Page 6 of 8 Alternate Path Starts here, 30 seconds after AC110 is open, Annunciator 1-2-H, XFMR BD DNGR/TRBL will alarm due to a High winding temperature at Transformer BD
- 5.
PERFORMANCE STEP: Reference Alarm Response Procedure (ARP) for Annunciator 1-2-H, XFMR BD DNGR/TRBL STANDARD: Refers to ARP for Annunciator 1-2-H, XFMR BD DNGR/TRBL CUE: When DB-OP-02001 is located, then hand candidate a copy of DB-OP-02001 Annunciator 1-2-H, XFMR BD DNGR/TRBL SAT UNSAT
- 6.
PERFORMANCE STEP: Send an Operator to Transformer BD to check the alarm and determine the cause.
STANDARD: Dispatches an Operator to Transformer BD to determine the cause COMMENT: Alarm 104-2-C Caution 3.5 Do not operate Transformer BD at any time with a winding temperature above 140°C CUE: TRANSFORMER BD ALARM 104-2-C, WINDING TEMP DANGER is in alarm The winding temperature is at 140°C and slowly rising All the transformer fans are running SAT UNSAT
- 7.
PERFORMANCE STEP: Perform the applicable section of DB-OP-02104, Transformer BD Alarm Panel 104 Annunciators, to correct the problem.
STANDARD: Refers to DB-OP-02104, Transformer BD Alarm Panel 104 Annunciators CUE: When DB-OP-02104 is located, then hand candidate a copy of DB-OP-02104 Annunciator 104-2-C, WINDING TEMP DANGER SAT UNSAT
- 8.
PERFORMANCE STEP: REFER TO DB-OP-06315,4160 Volt Switching Procedure to transfer loads to transformer AC STANDARD: Refers to DB-OP-06315, 4160 Volt Switching Procedure CUE: When DB-OP-06315, 4160 Volt Switching Procedure is located, then hand candidate a copy of DB-OP-06315, 4160 Volt Switching Procedure sections 3.28 and 3.29 NOTE: Sections 3.28 and 3.29 can be done in any order SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 R1 NUREG-1021, Revision 11 Page 7 of 8
- 9.
PERFORMANCE STEP: Transfer C1 to Normal (C2). Verify Bus C2 is energized STANDARD: Checks breaker alignment and proper voltage CUE: If necessary, Role play as the SM, Pre-evolution brief and Technical Specification evaluation can be signed as complete based on initial briefing.
SAT UNSAT
- 10. PERFORMANCE STEP: Close AC110, Bus Tie from C2 Bus
........C........
STANDARD: Positions HIS 6223, AC110 to CLOSE. Observes breaker AC110 RED light ON, GREEN light OFF CUE: None SAT UNSAT
- 11. PERFORMANCE STEP: Trip ABDC1, Bus Tie XFMR BD
........C........
STANDARD: Positions HIS 6220, ABDC1 to Trip. Observes breaker Observes GREEN light ON, RED light OFF CUE: If asked, winding temperature is still slowly rising SAT UNSAT
- 12. PERFORMANCE STEP: Transfer D1 and D2 to Alternate (AC XFMR). Verify BD XFMR is energized STANDARD: Checks breaker alignment and proper voltage CUE: None SAT UNSAT
- 13. PERFORMANCE STEP: Verify AD110, TIE BREAKER TO BUS D2, is closed STANDARD: Observes breaker AD110 RED light ON, GREEN light OFF CUE: None SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 R1 NUREG-1021, Revision 11 Page 8 of 8
- 14. PERFORMANCE STEP: Close AACD1, BUS TIE XFMR AC, using HIS 6230, AACD1
........C........
STANDARD: Positions HIS 6230, AACD1 to CLOSE. Observes breaker AACD1 RED light ON, GREEN light OFF CUE: None SAT UNSAT
- 15. PERFORMANCE STEP: Verify ABDD2, BUS TIE TRANSFORMER BD NORMAL, is
........C........
tripped using HIS 6228, ABDD2 NOTE: This step is critical only if ABDD2 is tripped opened using HIS 6228 (if auto trip does not occur)
STANDARD: Observes breaker ABDD2 RED light OFF, GREEN light ON. If required, use HIS 6228, ABDD2 to trip ABDD2, BUS TIE TRANSFORMER BD NORMAL CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
END TIME
Davis-Besse Initial License Exam 2020 Simulator JPM S7
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S7 R1 NUREG-1021, Revision 11 Page 1 of 6 Facility: Davis-Besse Task No: 087-005-01-0100 Task
Title:
Placing ARTS in MFP Bypass and resetting all four ARTS channels K/A Reference (012) A4.03 3.6/3.6 Job Performance Measure No: S7 (JPM-234)
Examinee:
NRC Examiner:
Date:
Method of testing:
Simulated Performance ___
Actual Performance _X_
Classroom ___
Simulator _X_
Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues Task Standard:
Place ARTS in MFP Bypass and reset all four ARTS channels Required Materials:
DB-OP-06404, section 4.1 General
References:
None Initiating Cue:
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Time Critical Task:
No Alternate Path:
No Validation Time:
15 minutes
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S7 R1 NUREG-1021, Revision 11 Page 2 of 6 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Place ARTS in MFP Bypass and reset all four ARTS channels INITIAL CONDITION:
Establish stable post-trip conditions with all four ARTS channels tripped and the MDFP supplying main feed water Verify all steps through Step 5.5 of DB-OP-06910, Trip Recovery have been completed ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Maintain RCS Pressure and control PZR Level during JPM MALFUNCTIONS/FAILURE TO INSERT:
None.
ACTION/CUES:
None.
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S7 R1 NUREG-1021, Revision 11 Page 3 of 6 EXAMINER COPY INITIAL CONDITIONS:
The plant was at 100% power An automatic reactor trip occurred INITIATING CUES:
The operating crew is at Step 5.5, DB-OP-06910, Trip Recovery You are a spare operator. The Unit Supervisor directs you to place ARTS in MFP Bypass and reset all four ARTS channels in accordance with DB-OP-06404, section 4.1 All prerequisite steps are complete (Provide the examinee a copy of section 4.1 of DB-OP-06404 with prerequisites complete)
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S7 R1 NUREG-1021, Revision 11 Page 4 of 6 CANDIDATE COPY INITIAL CONDITIONS:
The plant was at 100% power An automatic reactor trip occurred INITIATING CUES:
The operating crew is at Step 5.5, DB-OP-06910, Trip Recovery You are a spare operator. The Unit Supervisor directs you to place ARTS in MFP Bypass and reset all four ARTS channels in accordance with DB-OP-06404, section 4.1 All prerequisite steps are complete
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S7 R1 NUREG-1021, Revision 11 Page 5 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".
START TIME: _______
- 1.
PERFORMANCE STEP: Inform Control Room Operator which ARTS Channel(s) are to be reset, AND the ARTS cabinet doors will be opened STANDARD: Communicates with the Reactor Operator CUE: Acknowledge communication SAT UNSAT
- 2.
PERFORMANCE STEP: Open the ARTS cabinet door
........C........
STANDARD: Opens all four doors or one door at a time depending on how he/she chooses to complete the task CUE: None SAT UNSAT
- 3.
PERFORMANCE STEP: Verify the MAIN FEED PUMP OPERATE/TRIP Switches are in
........C........
the TRIP position STANDARD: Places each MAIN FEED PUMP OPERATE/TRIP Switch in the TRIP position CH No. 1 _____
CH No. 2 _____
CH No. 3 _____
CH No. 4 _____
CUE: None SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S7 R1 NUREG-1021, Revision 11 Page 6 of 6
- 4.
PERFORMANCE STEP: Verify the MFP NORMAL/BYPASS Switch in the BYPASS
........C........
position STANDARD: Places each MFP NORMAL/BYPASS Switch in the BYPASS position CH No. 1 _____
CH No. 2 _____
CH No. 3 _____
CH No. 4 _____
CUE: None SAT UNSAT
- 5.
PERFORMANCE STEP: Verify the 1/5 lights STANDARD: Verifies all 1/5 lights OFF EXCEPT for the MFP on each channel CUE: None SAT UNSAT
- 6.
PERFORMANCE STEP: Reset all ARTS channels
........C........
STANDARD: Depresses RESET pushbutton on each channel AND verify the Trip light goes off CH No. 1 _____
CH No. 2 _____
CH No. 3 _____
CH No. 4 _____
CUE:
None SAT UNSAT
- 7.
PERFORMANCE STEP: Close and lock the ARTS Cabinet doors STANDARD: Closes and locks each cabinet CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the Evaluator)
END TIME __________
Davis-Besse Initial License Exam 2020 Simulator JPM S8
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S8 R1 NUREG-1021, Revision 11 Page 1 of 6 Facility: Davis-Besse Task No: 008-004-01-0100 Task
Title:
Transfer Non-Essential CCW Isolation Valves from Line 1 to Line 2 K/A Reference (008) A4.01 3.3/3.1 Job Performance Measure No: S8 (JPM184)
Examinee:
NRC Examiner:
Date:
Method of testing:
Simulated Performance ___
Actual Performance _X_
Classroom ___
Simulator _X_
Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues Task Standard:
Transfer Non-Essential CCW Isolation Valves from Line 1 to Line 2 Required Materials:
DB-OP-06262 Section 3.16 and L&P 2.2.11 General
References:
None Initiating Cue:
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Time Critical Task:
No Alternate Path:
No Validation Time:
15 minutes
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S8 R1 NUREG-1021, Revision 11 Page 2 of 6 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Transfer Non-Essential CCW Isolation Valves from Line 1 to Line 2 INITIAL CONDITION:
100% Power CCW Surge Tank 51 to 53 inches ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
CCW pump 1 running.
CCW pump 2 running.
CCW Loop 1 supplying non-essential loads Open CC 1469, CCW from DH Cooler 2 MALFUNCTIONS/FAILURE TO INSERT:
None ACTION/CUES:
As written in body of JPM
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S8 R1 NUREG-1021, Revision 11 Page 3 of 6 EXAMINER COPY INITIAL CONDITIONS:
CCW Pump 1 is being shutdown for preventative maintenance.
CCW Pump 1 and CCW Pump 2 are running.
INITIATING CUES:
The Unit Supervisor directs you to transfer Non-Essential CCW Isolation Valves from Line 1 to Line 2 in accordance with section 3.16 of DB-OP-06262.
The Shift Manager has determined that thermal cycling of RCP seals is NOT a concern.
(Provide candidate with a copy of DB-OP-06262 Section 3.16)
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S8 R1 NUREG-1021, Revision 11 Page 4 of 6 CANDIDATE COPY INITIAL CONDITIONS:
CCW Pump 1 is being shutdown for preventative maintenance.
CCW Pump 1 and CCW Pump 2 are running.
INITIATING CUES:
The Unit Supervisor directs you to transfer Non-Essential CCW Isolation Valves from Line 1 to Line 2 in accordance with section 3.16 of DB-OP-06262.
The Shift Manager has determined that thermal cycling of RCP seals is NOT a concern.
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S8 R1 NUREG-1021, Revision 11 Page 5 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".
START TIME: _______
- 1.
PERFORMANCE STEP: N/A step to warmup oncoming loop due to concern for RCP seals thermal cycling STANDARD: Mark step N/A. Oncoming loop is in operation and already warmed up CUE: If necessary, The SM has determined thermal cycling of RCP seals is NOT a concern. (Initiating Cue)
SAT UNSAT
- 2.
PERFORMANCE STEP: Open CC2649, CCW from Aux Building to Line 2 Isolation.
........C........
STANDARD: Depress OPEN on HIS2649, observe GREEN light goes OFF and RED light comes ON NOTE: Steps 2 and 3 can be performed in any order. (Bulleted procedure steps)
CUE: None SAT UNSAT
- 3.
PERFORMANCE STEP: Open CC5098, CCW Line 2 Return Isolation.
........C........
STANDARD: Depress OPEN on HIS5098, observe GREEN light goes OFF and RED light comes ON CUE: None SAT UNSAT
- 4.
PERFORMANCE STEP: When CC2649 and CC5098 are open then Open CC 5096, CCW
........C........
Line 2 Discharge Isolation.
STANDARD: Observe CC2649 and CC5098 RED lights ON then Depress OPEN on HIS5096 observe GREEN light goes OFF and RED light comes ON CUE: None SAT UNSAT
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S8 R1 NUREG-1021, Revision 11 Page 6 of 6
- 5.
PERFORMANCE STEP: Close CC1469, CCW from DH Cooler 2 Outlet valve
........C........
STANDARD: Depress CLOSE on HIS1469, observe RED light goes OFF and GREEN light comes ON CUE: None SAT UNSAT
- 6.
PERFORMANCE STEP: When CC5096 is Open then Close CC5095, CCW Line 1
........C........
Discharge Isolation STANDARD: Observe CC5096 RED light ON then Depress close pushbutton on CC5095, observe RED light goes OFF and GREEN light comes ON NOTE: Annunciator 11-4-B, CCW PMP 1 FLOW LO is an expected alarm CUE: If necessary, Annunciator 11-4-B, CCW PMP 1 FLOW LO is an expected alarm, another operator will verify Annunciator 11-4-B is expected.
SAT UNSAT
- 7.
PERFORMANCE STEP: When CC5095 is closed, Close CC 2645 CCW from Aux Building
........C........
to Line 1 Isolation.
STANDARD: Observe CC5095 GREEN light ON then Depress CLOSE pushbutton on HIS2645, observe RED light goes OFF and GREEN light comes ON NOTE: Steps 7 and 8 can be performed in any order. (Bulleted procedure steps)
CUE: None SAT UNSAT
- 8.
PERFORMANCE STEP: When CC5095 is closed, Close CC5097 CCW Line 2 Return
........C........
Isolation.
STANDARD: Observe CC5095 GREEN light ON then Depress CLOSE pushbutton on CC5097, observe RED light goes OFF and GREEN light comes ON CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the Evaluator)
END TIME__________