ML20078K040

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Reflecting Removal of Stroke Times for SG PORVs from Tables 3.6-2a & 3.6-2b
ML20078K040
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/31/1994
From:
DUKE POWER CO.
To:
Shared Package
ML20078K037 List:
References
NUDOCS 9411220205
Download: ML20078K040 (3)


Text

'

t b

h

?

E ATTACIIMENT 4 PROPOSED TECIINICAL SPECIFICATION AMENDMENTS FOR CATAWBA i

i

?

l i

i l

1 9411220205 941031 PDR ADOCK 05000413 P

PDR

9 TABLE 3.6-26 (Continued) 2 CONTAINMENT ISOLATION VALVES p

MAXIMUM E VALVE N'JMBER FUNCTION ISOLATION TIME is) 2.

Phase "B" Isolation (Continued)

RN-437B Supply to NC Pumps and LCVU Supply Outside' Containment Isolation s 60 RN-484A Return from NC Pumps and LCVU Return Inside Containment Isolation s 60 l

RN-487A Return from NC Pumps and LCVU Return Outside Containment Isolation s 60-i RN-404B Supply to Upper Containment Sepply Ventilation Units Containment s 10 Isolation (Outside) l RN-4298 Return from Upper Containment Ventilation Units Containment Isolation s 10 (Inside)

RN-432B Return from Upper Containment Ventilation Units Containment Isolation s10 (Outside)

W.

Instrument Air Containment Outside Isolation s 10 VI-77B 0

SM-1 #

Main Steam ID Isolation NA SM-3 #

Main Steam IC Isblation NA O

SM-5 #

Main Steam IB Isolation NA b

SM-7 #

Main Steam 1A Isolation NA l

SM-9 #

Main Steam 10 Isolation Bypass Ctrl.

NA s

SM-10 #

Hain Steam IC Isolation Bypass Ctrl.

NA L

SM-11 #

Hain Steam IB Isolation Bypass Ctr1.

NA i

((

SM-12 #

Main Steam 1A Isolation Bypass Ctrl.

NA y

a=

SS SV-19 #.

Main Steam 1A PORY M No SV-13 #

Main Steam IB PORV

$5 t/h l

SV-7 #

Main Steam IC PORV

$6 NA ff SV-1 #

Nain Steam ID PORY-

% NA WL-867A**

Containment Vent Unit Drains Inside Containment Isolation s10 WL-869B**

Containment Vent Unit Drains Outside Containment Isolation s 10 l

EE 2;

l 50 l

l

TABLE 3.6-2b (Continuedl es 21 UNIT 2 CONTAINMENT ISOLATION VALVES MAXIMUM gg VALVE NUMBER FUNCTION ISOLATION TIME (s) lb 2.

Phase "B" Isolation (Continued) 7-RN-437B Supply to NC Pumps and LCVU Supply Outside Containment Isolation s 60 na RN-484A Return from NC Pumps and LCVU Return Inside Containment Isolation s 60 RN-487A Return from NC Pumps and LCVU Return Outside Containment Isolation s 60 t

RN-404B Supply to Upper Containment Supply Ventilation Units Containment s 10 Isolation (Outside)

RN-4298 Return from Upper Containment Ventilation Units Containment Isolation s 10 (Inside)

RN-4328 Return from Upper Containment Ventilation Units Containment Isolation slo (Outside)

R VI-77B Instrument Air Containment Outside Isolation s 10 ai 52 SM-1 #

Main Steam 2D Isolation NA 5

SM-3 #

Main Steam 2C Isolation NA SM-5 #

Main Steam 2B Isolation NA NA SM-7 #

Main Steam 2A Isolation NA ll SM-9 #

Main Steam 2D Isolation Bypass Ctrl.

SM-10 #

Main Steam 2C Isolation Bypass Ctrl.

NA

)

SM-ll #

Main Steam 2B Isolation Bypass Ctrl.

NA

][F SM-12 #

Hain Steam 2A Isolation Bypass Ctrl.

NA mm hh SV-19 #

Main Steam 2A PORV

$5 IvA I

gg SV-13 #

Main Steam 2B PORV 4W5 toi SV-7 #

Main Steam 2C PORV ep5 onS jfgf SV-1 #

Main Steam 20 PORV

$W$ o/tt WL-867A**

Containment Vent Unit Drains Inside Containment Isolation s 10 WL-859B**

Containment Vent Unit Drains Outside Containment Isolation s 10

>~

22 E. S.

on

-