TABLE 2.2-1

~

E --

REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS i

fjlNITIONAL UNIT TRIP SETPOINT ALLOWABL VALUES E

3

1. Manual Reactor Trip N.A.

N.A.

i 1

D{ [

2. Power Range, Neutron Flux

. Low Setpoint - S 25% of RATED Low Setpoint - s 26% of RATED THERMAL POWER THERMA POWER o,,

N HighSetpoint - 1 110% of RATED x5 High Setpoint - s 109% of RATED THERMAL POWER THERMA POWER 89

'f.-
1. Power Range, Neutron Flux, s 5% of RATED THERMAL POWER with 5 5.5% of RATED THERMAL POWER.

5 High Positive Rate a time constant 2 2 seconds with a time constant 2_2 seconds t E,4 e-*

4. Intermediate Range, Neutron S 25% of RATED THERMAL POWER s 30% of RATED THERMAL POWER Flux
5. Sour:e Range, Neutron Flux s 10 counts per second s 1.3 x 10 counts per second

[

5 5

6. Overtemperature AT See Note 1 See Note 3 I
7. Overpower AT See Note 2 See Note 4
8. Pressurizer Pressure--Low 1 1945 psig 2 1935 psig
9. Pressurizar Pressure--High

& 2385 psig s 2395 psig

=

kk gg

10. Pressurizer Water Level--High 5 92% of instrument span S 93% of instrument span 91 f, W4 ff
11. Low Reactor Coolant Flow 1995 of minimum measured 2 tereE of minimum measured flow per loop
  • flow per loop
  • I Ej h3 55
  • Minimum measured flow is 95,500 gpm per loop.-

l L

.~

m.

.,w

,4,

.._ =

J l

~

a-TABLE 4.3-1 (Continued) r TABLE NOTATION (11) -

The TRIP: ACTUATING DEVICE OPERATIONAL TEST shall independently verify

.the OPERABILITY of the undervoltage and shunt trip circuits for the Manual Reactor Trip Function.

(12) -

The TRIP ACTUATING DEVICE OPERATIONAL TEST shall independently verify the OPERABILITY of the undervoltage and shunt trip attachments of the Reactor Trip. Breakers.

(13) -

Prior to placing breaker in service,'a local manual shunt trip shall be performed.

(14) -

The automative undervoltage trip capability shall be verified operable.

(15) -

Overtemperature setpoint, overpower setpoint, and T,yg channels re-quire an 18 month channel calibration.

Calibration of the AT channels is required at the beginning of each cycle upon completion of the precision heat balanceccf Serv:fil:::c 4.2.3.5.

RCS loop AT values shall'be determined by precision heat balance measurements at the beginning of each cycle,in ::::::tien with Serv;ill;.7;e 4.2.3.5.

t 4

t J

(

i McGUIRE - UNITS 1 and 2 3/4 3-14a Amendment No. 131 (Unit 1)

Amendment No. 113 (Unit 2)

...