TABLE 2.2-1
~
E --
REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS i
fjlNITIONAL UNIT TRIP SETPOINT ALLOWABL VALUES E
3
- 1. Manual Reactor Trip N.A.
N.A.
i 1
D{ [
- 2. Power Range, Neutron Flux
. Low Setpoint - S 25% of RATED Low Setpoint - s 26% of RATED THERMAL POWER THERMA POWER o,,
N HighSetpoint - 1 110% of RATED x5 High Setpoint - s 109% of RATED THERMAL POWER THERMA POWER 89
- 'f.-
- 1. Power Range, Neutron Flux, s 5% of RATED THERMAL POWER with 5 5.5% of RATED THERMAL POWER.
5 High Positive Rate a time constant 2 2 seconds with a time constant 2_2 seconds t E,4 e-*
- 4. Intermediate Range, Neutron S 25% of RATED THERMAL POWER s 30% of RATED THERMAL POWER Flux
- 5. Sour:e Range, Neutron Flux s 10 counts per second s 1.3 x 10 counts per second
[
5 5
- 6. Overtemperature AT See Note 1 See Note 3 I
- 7. Overpower AT See Note 2 See Note 4
- 8. Pressurizer Pressure--Low 1 1945 psig 2 1935 psig
- 9. Pressurizar Pressure--High
& 2385 psig s 2395 psig
=
kk gg
- 10. Pressurizer Water Level--High 5 92% of instrument span S 93% of instrument span 91 f, W4 ff
- 11. Low Reactor Coolant Flow 1995 of minimum measured 2 tereE of minimum measured flow per loop
- flow per loop
- I Ej h3 55
- Minimum measured flow is 95,500 gpm per loop.-
l L
.~
m.
.,w
,4,
.._ =
J l
~
a-TABLE 4.3-1 (Continued) r TABLE NOTATION (11) -
The TRIP: ACTUATING DEVICE OPERATIONAL TEST shall independently verify
.the OPERABILITY of the undervoltage and shunt trip circuits for the Manual Reactor Trip Function.
(12) -
The TRIP ACTUATING DEVICE OPERATIONAL TEST shall independently verify the OPERABILITY of the undervoltage and shunt trip attachments of the Reactor Trip. Breakers.
(13) -
Prior to placing breaker in service,'a local manual shunt trip shall be performed.
(14) -
The automative undervoltage trip capability shall be verified operable.
(15) -
Overtemperature setpoint, overpower setpoint, and T,yg channels re-quire an 18 month channel calibration.
Calibration of the AT channels is required at the beginning of each cycle upon completion of the precision heat balanceccf Serv:fil:::c 4.2.3.5.
RCS loop AT values shall'be determined by precision heat balance measurements at the beginning of each cycle,in ::::::tien with Serv;ill;.7;e 4.2.3.5.
t 4
t J
(
i McGUIRE - UNITS 1 and 2 3/4 3-14a Amendment No. 131 (Unit 1)
Amendment No. 113 (Unit 2)
...