e ,n .

.4 M ~

3 g TABLE 2.2-1

~

E -- REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS i

fjlNITIONAL UNIT TRIP SETPOINT ALLOWABL VALUES E '

1 1. Manual Reactor Trip N.A. N.A.  :

i 3

2. Power Range, Neutron Flux . Low Setpoint - S 25% of RATED Low Setpoint - s 26% of RATED '

D{ [

o ,, THERMAL POWER THERMA POWER N

x5 High Setpoint - s 109% of RATED -

HighSetpoint - 1 110% of RATED THERMAL POWER THERMA POWER 89 1. Power Range, Neutron Flux, s 5% of RATED THERMAL POWER with 5 5.5% of RATED THERMAL POWER.

t E,4

'f.-5 High Positive Rate , a time constant 2 2 seconds with a time constant 2_2 seconds e-

4. Intermediate Range, Neutron S 25% of RATED THERMAL POWER s 30% of RATED THERMAL POWER Flux
5. Sour:e Range, Neutron Flux s 105counts per second s 1.3 x 10 5counts per second
6. Overtemperature AT See Note 1 See Note 3 I
7. Overpower AT See Note 2 See Note 4
8. Pressurizer Pressure--Low 1 1945 psig 2 1935 psig

= 9. Pressurizar Pressure--High & 2385 psig s 2395 psig kk gg 10. Pressurizer Water Level--High 5 92% of instrument span S 93% of instrument span

11. Low Reactor Coolant Flow 91 f, W4 2 tereE of minimum measured ff 1995 of minimum measured flow per loop
  • flow per loop
  • I Ej h3 55 .
  • Minimum measured flow is 95,500 gpm per loop.- l .

L

, , , . . , . _ _ .~ m. .,w . . , . ..% .. ., , .-, - . , --.. ,4, .._ = __ , ,_ - - -

J l'

~

a-  ;

TABLE 4.3-1 (Continued) r

, TABLE NOTATION (11) - The TRIP: ACTUATING DEVICE OPERATIONAL TEST shall independently verify

.the OPERABILITY of the undervoltage and shunt trip circuits for the Manual Reactor Trip Function.

(12) - The TRIP ACTUATING DEVICE OPERATIONAL TEST shall independently verify the OPERABILITY of the undervoltage and shunt trip attachments of '

the Reactor Trip. Breakers. '

(13) - Prior to placing breaker in service,'a local manual shunt trip shall be performed. ,

(14) - The automative undervoltage trip capability shall be verified operable.

(15) - Overtemperature setpoint, overpower setpoint, and T,yg channels re- <

quire an 18 month channel calibration. Calibration of the AT channels is required at the beginning of each cycle upon completion of the precision heat balanceccf Serv:fil:::c 4.2.3.5. RCS loop AT values '

shall'be determined by precision heat balance measurements at the  :

beginning of each cycle,in ::::::tien with Serv;ill;.7;e 4.2.3.5.

t 4

t J

(

i McGUIRE - UNITS 1 and 2 3/4 3-14a Amendment No. 131 (Unit 1)

Amendment No. 113 (Unit 2)

. .. .