ML20077P378

From kanterella
Jump to navigation Jump to search
Amended Response to Util Interrogatory II-50
ML20077P378
Person / Time
Site: Harris  
Issue date: 09/08/1983
From: Eddleman W
EDDLEMAN, W.
To:
CAROLINA POWER & LIGHT CO.
Shared Package
ML20077P308 List:
References
82-468-01-OL, 82-468-1-OL, ISSUANCES-OL, NUDOCS 8309130357
Download: ML20077P378 (1)


Text

p-- _ n-.-_

UNITED STATES OF AMERICA Sept 8, 1983 NUCLEAR REGULATOBY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD Glenn O. Bright Dr. James H. Carpenter James L. Kelley, Chairman In-the Matter of J

Dockets 50 400 OL CAROLINA POWER AND LIGHT CO. et al.

)

50-401 OL (Shearon Harris Nuclear Power Plant.

-)

Units 1 ani 2)

)

ASLBP No. 82-1468-01

)

OL JOINT INTERVENORS AIM DED RESPONSE TO APPLICANTS INTERROGATORY NO. II-50 Nuclides omitted fron dose calculation include (1) those omitted from source ter a as " trivial" or otherwise; (2) those formed by decay of other radionuclides, the source tern only including primary fission products; (3) non-fission product radionuclides (e.g. transuranics leaking fron fuel rods into primary coolant); (14) the nuclides stated to be onitted (all but a very few, e.g. Sr-90, I-131 and Os-137) as identified in the saummary of TOWARD A TIEALISTIC FISSION DOSE ESTIt%TE, published by LAND Educational Associates Foundation, Stevens Point, WI.

A cony of the part of this in possession of Jo$nt Intervenors is being made available to Applicants' legal personnel today.

YtsMv 8 September 1983 Wells Eddleman b

h kmW is os sacs 8309130357 830908 PDR ADOCK 05000400 0

PDR

- -