Deficiency Rept,Item 131 Re Unverified Anchor Bolt Matl. Initially Reported on 830503.Actual Number of Suspected Bolts Approx 2,400.Extension to 840104 for Determination of Reportability Requested
ML20077H619
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 08/05/1983
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-105 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8308110138
Download: ML20077H619 (1)


Text

4 S 00' A>NQ

  • cpat %g+gg,.

Carolina Power & Light Company Mg P. O.'B W ID W i W N-- C 27562 August 5, 1983 4 8 *. [8 Mr. James P. O'Reilly NRC-105 United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900)

Atlanta, Georgia 30303 CAROLINA POWER & LIGHT COMPANY .

SilEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 UNVERIFIED ANCHOR BOLT MATERIAL TYPE - ITEM 131

Dear Mr. O'Reilly:

On May 3, 1983, Mr. N. J. Chiangi notified the NRC (Mr. A. Hardin) of a potentially

, reportable item per the provisions of 10CFR50.55(e). It had been determined that verification'of anchor bolt material type was not being performed when identifying tags were lost, but instead a dimensional check of the bolt against the design drawings was used.

Since several different ASTM grades of anchor bolts were being installed, and some of these were dimensionally identical, all a'rk,r bolts were suspect.

On June 1, 1983, we stated in our memo NRC-83 that an investigation of the problem had reduced the number of suspect bolts to approximately 250, and that these were being evaluated by engineering. Our evaluation program consisted of taking hard-ness readings and/or doing a chemical analysis of each bolt to identify it.

We have subsequently realized that we had a misunderstanding of the scope of the problem. Instead of 250 bolts, we narrowed the scope to 250 bolt numbers, i.e.

AB 1, AB 12, etc. Since there are over 100 each of some bolt numbers, the actual total number of individual bolts now suspect is approximately 2,400.

Based on this change in the scope of the evaluation. required, we request an extension until January 4, 1984 for submitting a report on the reportability of this item.

Thank you for your consideration in this matter. -

Yours very truly, us, b kg R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/bc cc: Mr. G. Maxwell /R. Prevatte (NRC-SHNPP)

Mr. R. C. DeYoung (NRC) 8308110138 830805 MC C PDR ADOCK 05000 fM- g