TRANSMITTAL OF PROPOSED CHANGES TO GRAND GULF TECHNICAL SPECIFICATIONS
- 1. (GGNS - 687)
SUBJECT:
Technical Specification Table 3.3.7.9-1, pages 3/4 3-77 through 3/4 3-80.
DISCUSSION:
Technical Specification Table 3.3.7.9-1 provides a listing of fire detection instrumentation. The present table is ordered by building and room numbers within a building whereas the Specification (3.3.7.9) governing the table is ordered by zones. One of the changes to Table 3.3.7.9-1 is to order the table by building, zone numbers within the building, and room
.: umbers within the zone. Other changes to the Fire Detection Instrumentation Table 3.3.7.9-1 include the following:
1.
Design Changes 2.
Additions to the Table 3.
Corrections to the Table The changes to the table are discussed in detail in the justification section belou.
JUSTIFICATION: The following changes to Table 3.3.7.9-1 are the result of design changes made to the fire detection system:
1.
In Zone 1-4 for the Control Building, Area OC201 (stairwell) including one smoke detector was added to the table.
Safety related cables pass through this area and appropriate fire detection was added to provide coverage.
2.
In Zone 1-6 for the Control Building, OC216 (West Corridor) with two smoke detectors was added. Safety related cables pass through this area and appropriate fire detection was added.
3.
In Zone 1-23 for the Control Building one smoke detector was added to provide additional coverage.
l l
4.
In Zone 2-9 for the Auxiliary Building, one smoke detector was added to provide additional coverage.
The following changes to Table 3.3.7.9-1 constitute additions of areas / zones (and their associated instrumentation) which were inadvertantly left out of the original Technical Specification.
1.
Add Zone 1-3 at Elevation 93' in the Control Building.
This zone consists of areas OC109 (Decontamination Area),
l OC115 (Corridor), OC116 (Hot Machine Shop), and OC117 (Corridor). These areas have safety related cable and should be included in the table. A total of 12 smoke detectors is added with these areas.
@307210181 830719 PDR ADOCK 05000416 p
PDR G33sp5
2.
Add area OC306 (Electrical Chase) in Zone 1-10 at Elevation 133' in the Control Building. Safety related cable passes through these areas.
3.
Add area OC410 (Battery Room) in Zone 1-14 at Elevation 148' in the Control Building. Specification 3.3.7.9 covers all instrumentation in each Zone listed in Table 3.3.7.9-1 and this area is added to complete the listing for Zone 1-10.
The number of Smoke Detectors for Zone 1-10 increased from 7 to 9 as a result of this change.
4.
Add Zone 1-12 at Elevation 133' in the Control Building.
This zone includes areas OC304 (Electrical Space) and OC305 (Electrical Space). Two additional smoke detectors are added with this change. Safety related cable passes through this zone.
5.
Zone 1-13 at Elevation 133' in the Control Building is added since part of Unit I control room HVAC equipment is in this zone. Zone 1-13 includes area OC303 (HVAC Room) and adds 16 smoke detectors.
6.
Areas OC401 (corridor), OC408 (Corridor), and OC409 (Electrical Chase) are added to Zone 1-15 along with four additional smoke detectors. Specification 3.3.7.9 covers all instrumentation in each Zone listed in Table 3.3.7.9-1 and these areas (OC401, 408, 409) were added to complete the listing for Zone 1-15.
7.
Zone 1-19 at Elevation 166' in the Control Building is added because safety related cable passes through this area. This zone includes area OC514 (Locker Room) and adds 9 smoke detectors.
8.
Zone 1-21 at Elevation 166' in the Control Building is added because safety related cable passes through this l
area. This zone includes area OC518 (Electrical Chase)
I and adds two smoke detectors.
9.
Zone 1-22 at Elevation 177' in the Control Building is added because safety related cable passes through this area. This zrne includes areas 0C601 (Viewing Gallery),
OC603 (Energency Dormitory), and OC608 (Technical Support) and also adds sixteen smoke detectors.
10.
Areas OC706 (West Corridor), OC709 (Electrical Chase) and OC712 (HVAC Room) are added to Zone 1-23 at Elevation 189' in the Control Building. Specification 3.3.7.9 covers all instrumentation in each zone listed in Table 3.3.7.9-1 and these areas are added to complete the listing for Zone 1-23.
The number of smoke detectors in Zone 1-23 is increased from 15 to 21 with one being added as a design change and five added with areas 0C706, OC709, and OC712.
t c33sp6 l
t
11.
Add areas lA128 (RHR "A" Heat Ex Room), 1A129 (RHR "B" Heat Ex Room), and 1A223 (Passage) to Zone 2-4 in the Auxiliary Building. Areas 1A128 and 1A129 are separated by grating from 1A102 and 1A106, respectively, and as such smoke detectors in area 1A102 serve 1A128 and in 1A106 serve 1A129. Area 1A223 is an area already served by Zone 2-4 instrumentation and is included to complete the Zone 2-4 listing.
12.
Add areas 1A524 (Platform) and 1A529 (FPC and CU Room) to Zone 2-9.
These areas are added to complete the listing for Zone 2-9.
13.
Add area 1A101 (Passage) to Zone 2-17.
This area is currently served by Zone 2-17 instrumentation and should be included.
14.
In Zone 2-10 for the Diesel Generator Building, add three smoke detectors due to the addition of the corridor between the Auxiliary Building and Diesel Generator Building.
- 15. The t3pe of fire protection initiated has been added to the Heat detector column. This administrative change indicates that Halon, CO r Deluge is actuated by the 2
heat detector.
- 16. The Control Room HVAC Intake Plenum Mounted Detectors have been added since they involve control room habitability.
The following changes to Table 3.3.7.9-1 constitutes correction of errors in the original Technical Specification:
1.
Area OC308 (Corridor) at Elevation 133' in the Control Building is moved from Zone 1-10 to Zone 1-11.
2.
The number of heat detectors in Zone 1-14 of the Control Building is corrected from present 13 to 12.
This change does not reflect the deletion of a heat detector from the plant but only a correction to the table.
3.
The number of Smoke Detectors in OC503 (Control Room) at Elevation 166' of the Control Building is changed from 17 to 16.
This change reflects the temporary split of Unit 1 and Unit 2 Control Rooms. The detector deleted is on the Unit 2 side of the Control Room.
4.
Area 1A211 [ North Corridor (Partial)] is added to Zone 2-2 of the Auxiliary Building. This area overlaps into Zone 2-2 and also appears in Zone 2-18 as an overlap or interface area.
G33sp7
5.
Area IA314 [ South Corridor (Partial)] is added to Zone 2-6 of the Auxiliary Building. This area overlaps into Zone 2-6 and also appaars in Zone 2-19 as an overlap or interface area.
6.
Area 1A424 [ Set Down Area (Partial)] is added to Zone 2-8.
This area overlaps into Zone 2-8 and also appears in Zone 2-7 as an overlap or interface area. The number of smoke detectors in Zone 2-7 goes from 12 to 11 and the number in Zone 2-8 goes from 24 to 25 due to Zone assignment of instrumentation.
7.
Areas 1A122 [ South Corridor (Partial)] and 1A123 [ North Corridor (Partial)] are added to Zone 2-14 of the Auxiliary Building. These areas overlap into Zone 2-14 and also appear in Zone 2-17 as an overlap or interface area.
8.
Zones 6-9A, 6-9B, and 6-9C for the Diesel Generator Building are corrected to 2-10, 2-11, and 2-12 respectively. Added Corridor between Diesel Generator and Auxiliary Building.
9.
Added area numbers for Standby Service Water Pump House.
These area numbers were inadvertently omitted.
The format change is proposed in order for the Technical Specification to more accurately reflect the operability of each individual smoke detector affects the entire zone, not i
just the area in which it is installed.
SIGNIFICANT HAZARDS CONSIDERATION:
The changes to the Fire Detection Instrumentation Table 3.3.7.9-1 constitute additions, corrections, and changes due to design changes to the plant. The design changes add additional equipment and enhance fire detection capability. The additions to the table also enhance fire detection capability. The corrections to the table do not decrease fire detection capability but reflect actual plant systems and instrumentation arrangements. This change does not involve a reduction of safety margins and no significant increase in the probability or consequences of an accident previously evaluated is involved nor is the possibility of a new or different kind of accident from any accident previously evaluated created. Thus the proposed change to the Technical Specifications does not involve any significant hazards considerations.
i I
G33sp8
I. (GGN5 - Gs 7)
TABLE 3.3.7.9-1 FIRE DETECTION INSTRLDOf7ATION
- a
- ;;;;; IasTid;; s a;
- wir ll}
IEAT(2)
FUWE SMKE%
TRLDENT' LOCATION ZONE a.
tainment Building 1.
Return Duct Mounted NA NA NA tectors N00M ELEV.
ROOM NAE b.
Control 11 ding 1.
4 2.
OC207 l'
DIV I BATTERY W 1-4 NA NA 1
3.
NA 1
SHUTDOWN PANEL ROOM 4.
OC208A lil' IV I REM TE 1-27 NA 1
DOWN PANEL ROOM 5.
OC209 1H' DIV II BATTERY M 1-5 NA kA 1
6.
OC210 111' DIV II SWGR RM 1-4 NA 2
7.
OC211 H1' DIV II bA ERY RM 6
NA NA 1
8.
OC215 111' DIV II SWGR 1-6 7
NA 4
9.
OC307 133' ELECTRICAL 1-10 NA NA 1
- 10. OC308 133' ELECTRICAL CHASE 1-10 NA NA 1
j
- 11. OC302 133' HVAL EQUIP.
1-n MA NA 13
- 12. OC402 148' CA8LE SPREADI AM 1-15 7
NA 10
- 13. OC403 148' COMPUTER 1-14 13 NA 7
- 14. OC407 148' INSTR.
OR GEN ROOM 1 5 2
NA 1
- 15. OC503 QCW 166' CON L ROOM 1-18 NA NA 17
- 16. OC702 189' LE SPREADING RM 1-23 12 NA 14
- 17. OC703 189' CONTROL CAB. R00M 1-24 NA 6
- 18. OC707 189' INSTR WTOR GEN. M 1-23 NA NA 1
The fire de tion instruments located within the primary contai nt are not required be OPERA 8LE during the performance of Type A Containeen Leakage Rate Te s.
ly only to smoke detectors.
(1) Zones (2) Heat, tectors provide warning and activation of automatic extinguishing sy (3) ke detectors provide early warning capability.
7 8
re.<tfe.ermor.ouple,s whie( m nitor ad:emi, a*.c hmpradurE. Will (4
ove e - iy w.,,,,3 e., a tit y,
GRAND GULF-UNIT 1 3/4 3-77
.,~...-,_.m_
- ~, _ _ _. _ _,
1.(sans-wr)
TABLE 3.3.7.9-1 (Continued)
FIRE DETECTION INSTR M EATION
"'"!"J" !"ST*L5'"E S*E***' E*
, 5T*'r :T '."'^?!^"
C33 Il}
B T(2)
FM
$mKE
\\ MON M.
ELEV.
R00N N M ZONE 111ary Building 1.
02 93' RNR ' A' HT EX M 2-4 NA M
~1 2.
l 3.
1A1 93' RCIC PW M 2-4 NA M
2 4.
1A105 3'
RHR'B'PW M 2-4 NA 2
5.
1A106 9
RHR 'B' NT EX M 2-4 NA 1
S.
3A109 93' IPCS Ptar M 2-17 NA NA 2
7.
1A111 93' IPING PENETRATION M 2-17 M
NA 1
S.
3A114 93' F
COIL AREA 2-14 NA 4
i S.
1A115 93' PIPI PENETRATION M 2-14 M
NA 1
- 10. 1A116 93' PIPING ETRATION M 2-14 NA NA 1
- 11. 1A117 93' NISC. EQUI 2-NA NA 4
- 12. 1A118 93' RHR 'C' PLAP
-14 NA NA 2
- 13. 1A119 93' LPCS PLMP 200N 2-14 NA NA 2
- 15. 1A121 103' EAST CORRIDOR 2-17 NA NA 5
M.
3A122 103' SOUTH CORRIDO
-17 NA NA 3
- 17. 1A123 103' NORTN CORRI A 2 7 NA NA 5
18.
3A201 119' EAST C0 00R 2-18 NA NA 6
- 19. 1A202 119' RHR '
HK M 2-4 NA NA 1
20.
1A203 119' PIP PENETRATION M 2-4 NA 2
- 21. 1A204 119' PING PENETRATION M 2-4 M
MA 2
2-4 NA NA 2
- 22. 1A205 119' / PIPING PENETRATION M
- 23. IA206 1~
RHR 'B' HK M 2-4 NA NA
,1
- 24. 1A207 19' ELECT. SW R 200N 2-4 3
2
- 25. 1A208 119' ELECT. SW R 200N 2-4 3
NA 2
26.
115' RWCU RECIRC PLar 'A' M 2-4 NA E
27.
10 115' RWCU RECIRC PtmP 'B' M 2-4 NA M'.,
1, 1A211
}19' NDATH CORRIDOR 2-18 NA NA 14 1A215 119' SOUTH CORRIDOR 2-2 NA NA 5
*10 110' CL;0T. N* E" S:
2 2
- ^
GRAW GULF-UNIT 1 3/4 3-78
,-.a.
nn
---.----.--------_--.---,.n----
l l
- 1. cccus-ser)
\\
TASLE 3.3.7.9-1 (Continued) i FIRE DETECTION INSTRUENTATION i
M;G;;.;s ICMC5 G;GLE^
f iCXXC LC-^J:^,%
II
)
360N'N0.
ELEV.
ROOM NAME M) g(2) pg gg 111ary Su11 ding (Continued) c.
3 1A220 119' PIPING PENETRATION M 2-3 NA NA 32.
21 119' ELECT. SWER M 2-3 2
NA 2
33.
2 119' WEST CORRIDOR 2-2 M
18-
~
- 34. IA301 139' NORTHEAST CORRIDOR 2-6 NA NA 2
- 35. 1A302 39' SOUTHEAST CORRIDOR 2-6 NA NA 1
- 36. 1A303 RHR 'A' NK M 2-6 M
NA 1
- 37. 1A304 139' PIPING PENETRATION M 2-6 NA 1
f
- 38. 3A305 139' TEAN TUNNEL 2-20 NA NA 4 WA t
l
- 39. 1A306 139' P
NG PENETRATION M 2-f, MA M
1 1
- 40. 1A307 139' RHR
' NX M MA NA 1
- 41. 1A308 139' ELECT.
NETRATION M 2-6 3
M 2
- 42. 1A309 139' ELECT. PE RATION M 2-6 3
NA 2
2-6 3
- 43. 1A314 139' SOUTH CORRIDOR 2-19 NA NA 3
- 44. 1A316 139' NORTH CORRID0 2-6 NA NA 13
- 45. 1A318 139' ELECT. PEN TION 2-5 2
NA 2
'A319 139' kW INST. TEST M 2-5 NA NA 1
1 46.
- 47. 1A320 139' ELECT ENETRATION M
-5 2
NA 2
- 48. 1A321 139' NC AREA 2-NA NA 3
49.
1A322 139' NTR! FUGAL CHILLER 2-19 NA NA 4
AREA 50.
1A323 139' SGTS AREA 2-19 NA 1
- 51. 14324 9'
NVAC EQUIP AREA 2-19 E
NA 1
l
- 52. 1A326 139' SGTS AREA 2-19 NA NA 1
53.
166' NORTHEAST CORRIDOR 2-8 NA NA 2
54.
2 166' STEAN TU MEL A00F 2-8 NA 1
- 55. 1A403 166' SOUTHEAST CORRIDOR 2-8 NA NA 2
1A404 166' UNASSIGNED AREA 2-8 NA NA
- 57. 1A405 166' CNTWT VENT. EQUIP W 2-8 NA NA 1
~
- 58. 1A406 166' CNTNT EXHAUST FILTER 2-8 NA NA 1
.2 17 E-F GRAM GULF-UNIT 1 3/4 3-79
- 1. (G4N5-667)
TABLE 3.3.7.9-1 (Continued)
FIRE DETECTION INSTRUENTATION
- === = =
- = :==::: :==:-
1ROON M.
M ROON NAM M) g (2) ggg(3)
II c
iliary Building (Continued) 59.
7 166' NCC AREA 2-8 2
NA 1
60.
0 166' KC AREA 2-8 2
NA l
- 61. 3A41 166' NORTH CORRIDOR 2-8 NA NA 14 l
62.
1A420 166' SOUTH CORRIDOR 2-7 NA 4
- 53. 1A424 SET DOWN AREA 2-7 NA 1
WEST CORRIDOR 2-7 NA NA 4
- 64. 1A428 166 i
1
- 66. 3A434 166' 5 AGE 2-7 NA 1
- 67. 3A519 185' 5T0 E AREA 2-9 NA 4
'68.
1A527 185' LOAD C ER AREA 2-9 NA NA 5
- 69. 3A539 185' CABLE 2-NA NA 1
- 70. 1A602 208'10" $TORAGE 13 NA NA 6
- 71. 1A503 208'10" PASSAGE 2-13 NA NA 3
- 72. IA604 208'10" FUEL HANDLING AR 2-13 NA NA 13
- 73. 1A606 245' HVAC EQUIP AREA 2-13 NA NA 9
d.
Diesel Generator Building 1.
Unit 1 E1. 158'-0" NPCs
-9A 7
6 NA Generator 2.
Unit 1 E1. 158'-0" Bus B 6-7 6
NA Generator 3.
Unit 1 E1. 158'-0" 8 A
6-9C 7
6 NA Generator o.
Staney Service Wate Pump House 1.
Pump House A 2-1 NA NA 1
2.
Valve Room A 2-1 NA NA 1
3.
Pump House 2-1 NA NA 1
4.
Valve B
2-1 NA 1
f.
Charcoal F ter Trains 1.
5 Gas Treatment NA 1
N4 NA 6
Filter Train (Allison Therwis
'r Wire) 111ery' Building
- 1. 139'- P Control Room Staney NA 1
NA NA Fresh Air System Filter (Allison Therwistor Wire Train. Control Building "1. !??' ""
GRAND GULF-UNIT 1 3/4 3-30
1.(ccws-es7)
TABLE 3.3.7.9-1 FIRE DETECTION INSTRUMENTATION MINIMUM INSTRUMENTS OPERABLE
- FLAME ( } SM0KE INSTRUMENT LOCATION HEAT a.
CONTAINMENT BUILDING 3
1.
Return Duct Mounted Detectors ROOM ELEV ROOM NAME b.
CONTROL BUILDING 1.
Zone 1-3 12 0C109 93' Decontaminstion Area 0C115 93' Corridor OC116 93' Hot Machine Shop OC117 95' Corridor 2.
Zone 1-4 6
0C201 111' Stairwell OC202 111' Div I Swgr Rm 6(CO )
2 OC207 111' Div I Battery Rm 3.
Zone 1-5 3
OC209 111' Div III Battery Rm OC210 111' Div III Swgr Rm 4(CO }
2 The fire detection instruments located within the primary containment are not required to be OPERABLE during the performance of Type A Containment Leakage Rate Tests.
(1) Smoke and flame detectors provide only early warning capability with the exception of:
(a) Zone 1-27 detectors trip closed the door between the OC208/0C208A Remote Shutdown panel rooms.
(b) Containment building return duct mounted detectors' trip the containment cooler fans.
(c) Zone 1-11 and 1-13 detectors initiate the control building purge fan system.
(d) Control Room HVAC Intake Plenum Detectors trip the control rcom A/C units unless a control room emergency filtration system isolation mode automatic actuation signal is present.
(2) Heat detectors provide warning and activation of automatic extinguishing systems with the exception of the CO fire Suppression system for the 2
control cabinet room (OC703, Elevation 189' of the Control Building) which requires manual actuation.
GRAND CULF-UNIT 1 3/4 3-77 C33sp9
.I.(6G NS ~687)
TABLE 3.3.7.9-1 FIRE DETECTION INSTRUMENTATION MINIMUM INSTRUMENTS OPERABLE *
)
ROOM ELEV ROOM NAME HEAT FLAME SMOKE 4.
Zone 1-6 7
OC211 111' Div 11 Battery Rm OC215 111' Div II Swgr Rm 7(CO )
2 OC216 111' West Corridor 5.
Zone 1-10 2
OC306 133' Electrical Chase OC307 133' Electrical Chase 6.
Zone 1-11 13 OC302 133' HVAC Equipment Rm OC308 133' Corridor 7.
Zone 1-12 2
OC304 133' Electrical Space OC305 133' Electrical Space 8.
Zone 1-13 16 0C303 133' HVAC Room 9.
Zone 1-14 9
CC403 148' Computer Room 12(Halon)
OC410 148' Battery Room
- 10. Zone 1-15 15 OC401 148' Corridor OC402 148' Lower Cable Spreading 7(CO )
2 Room OC407 148' Instr. Motor Gen Rm 2(C0 )
2 OC408 148' Corridor OC409 148' Electrical Chase
- 11. Zone 1-18 16 0C503 166' Control Rm (Unit 1 Side)
OC504 166' U-1 Inst Rack Area
- 12. Zone 1-19 9
0C514 166' Locker Room GRAND GULF-UNIT 1 3/4 3-78 G33sp10
l
.I.. (GG N S-687}
TABLE 3.3.7.9-1 FIRE DETECTION INSTRUMENTATION MINIMUM INSTRUMENTS OPERABLE
- ROOM ELEV ROOM NAME HEAT FLAME SM0KE
- 13. Zone 1-21 2
OC518 166' Electrical Chase
- 14. Zone 1-22 16 0C601 177' Viewing Gallery 0C603 177' Emergency Dormitory OC608 177' Technical Support
- 15. Zone 1-23 21 OC702 189' Upper Cable Spreading Room 12(CO )
2 OC706 189' West Corridor OC707 189' Instr. Motor Gen Rm OC709 189' Electrical Chace OC712 189' HVAC Room
- 16. Zone 1-24 6
0C703 189' control Cabinet Area 4(CO )
2
- 17. Zone 1-27 2
OC208 111' Div I Remote Shutdown Panel 1(CO )
2 OC208A 111' Div II Remote Shutdown Panel 1(CO )
2
- 18. Control Roon HVAC Intake Plenum Mounted Detectors 2
c.
AUXILIARY BUILDING 1.
Zone 2-2 23 1A211 119' North Corridor (Partial) 1A215 119' South Corridor 1A222 119' West Corridor 2.
Zone 2-3 5
1A219 119' Electrical Swgr Rm 2(CO )
2 1A220 119' Piping Penetration Rm 1A221 119' Electrical Swgr Rm 2(C0 )
GRAND GULF-UNIT 1 3/4 3-79 G33sp11
/
- 1. (GG N s - 6 87)
TABLE 3.3.7.9-1 FIRE DETECTION INSTRUMENTATION MINIMUM INSTRUMENTS OPERABLE
- HEAT ( }
FLAME ( } SM0KE ROOM ELEV ROOM NAME 3.
Zone 2-4 22 1A102 93' RHR "A" Heat Ex Rm 1A103 93' RHR "A" Pump Rm 1A104 93' RCIC Pump Rm 1A105 93' RER "B" Pump Rm 1A106 93' RHR "B" Heat Ex Rm 1A128 108' RHR "A" Heat Ex Rm 1A129 108' RHR "B" Heat Ex Rm lA202 119' RHR "A" Heat Ex Rm 1A203 119' Piping Penetration Rm 1A204 119' Piping Penetration Rm 1A205 119' Piping Penetration Rm 1A206 119' RHR "B" Heat Ex Rm 1A207 119' Electrical Swgr Rm 3(C0 )
1A208 119' Electrical Swgr Rm 3(C0 )
1A209 115' RWCU Recire Pump "A" Rm 1A210 115' RWCU Recirc Pump "B" Rm 1A223 128' Passage 4.
Zone 2-5 5
1A318 139' Electrical Penetration Room
?.(CO )
2 1A319 139' RPV Instr Test Rm lA320 139' Electrical Penetration Room 2(CO )
2 5.
Zone 2-6 26 i
1A301 139' East Corridor 1A302 139' Southeast Corridor 1A303 139' RHR "A" Heat Ex Rm 1A304 139' Piping Penetration Rm t
1A306 139' Piping Penetration Rm 1A307 139' RHR "B" Heat Ex Rm 1A308 139' Electrical Penetration Room 3(CO )
2 1A309 139' Electrical Penetratio'n Room 3(CO )
2 1A314 139' South Corridor (Partial) 1A316 139' North Corridor
(
GRAND GULF-UNIT 1 3/4 3-80 G33sp12
1.(GGNS-687)
TABLE 3.3.7.9-1 FIRE DETECTION INSTRUMENTATION MINIMUM INSTRUMENTS OPERABLE
- SMOKE (
ROOM ELEV ROOM NAME HEAT FLAME 6.
Zone 2-7 11 1A420 166' South Corridor (Partial) 1A424 166' Set Down Area (Partial) 1A428 166' West Corridor 1A432 166' FPC & CU Pump Rm 1A434 166' South Passage 7.
Zone 2-8 25 1A401 166' Northeast Corridor IA402 166' Steam Tunnel Roof 1A403 166' Southeast Corridor 1A404 166' Unassigned Area 1A405 166' Containment Vent. Equip Room 1A406 166' Containment Exhaust Filter Rm 1A407 166' MCC Area 2(C0 )
1A410 166' MCC Area 2(C0 )
1A417 166' North Corridor (Partial) 1A424 166' Ect Down Area (Partial) 8.
Zone 2-9 10 1A519 185' Storage Area 1A524 195' Platform 1A527 185' Load Center Area IA529 185' FPC & CU Rm 9
Zone 2-13 31 1A602 208' Storage Area 1A603 208' Passage 1A604 208' Fuel Handling Area IA606 245' HVAC Equip Area
- 10. Zone 2-14 17 1A114 93' Fan Coil Area IA115 93' Piping Penetration Rm 1All6 93' Piping Penetration Rm 1A117 93' Misc Equip Area lAll8 93' RHR "C" Pump Room GRAND GULF-UNIT 1 3/4 3-80a G33spl3
- 1. CGGN s-se7)
TABLE 3.3.7.9-1 FIRE DETECTION INSTRUMENTATION MINIMUM INSTRUMENTS OPERABLE
- HEAT ( }
FLAME SMOKE ROOM ELEV ROOM NAME 1A119 93' LPCS Pump Room 1A120 93' CCk' Pump & Heat Ex Rm 1A122 103' South Corridor (Partial) 1A123 103' North Corridor (Partial)
- 11. Zone 2-15 1
1A539 185' Cable Chase
- 12. Zone 2-17 16 1A101 93' Passage 1A109 93' HPCS Pump Rm 1A111 93' Piping Penetration Rm 1A121 103' East Corridor 1A122 103' South Corridor (Partial) 1A123 103' North Corridor (Partial)
- 13. Zone 2-18 20 1A201 119' East Corridor 1A211 119' North Corridor (Partial)
- 14. Zone 2-19 13 1A314 139' South Corridor (Partial) 1A321 139' MCC Area 1A322 139' Centrifugal Chiller Area 1A323 139' SGTS Area 1A324 139' HVAC Equip Area 1A326 139' SGTS Area
- 15. Zone 2-20 2
1A305 139' Steam Tunnel d.
DIESEL GENERATOR BUILDING 1.
Zone 2-10 6
3 1D301 133' Corridor 3 (Deluge) 1D306 133' Div III Diesel Gen Room 1D401 158' Div III Diesel Gen Room 7 (Deluge)
GRAND GULF-UNIT 1 3/4 3-80b G33sp14
- 1. (GGNs - 687)
TABLE 3.3.7.9-1 FIRE DETECTICN INSTRUMENTATION MINIMUM INSTRUMENTS OPERABLE *
)
ROOM ELEV ROOM NAME HEAT FLAME SMOKE 2.
Zone 2-11 6
1D308 133' Div II Diesel Gen Room 1D402 158' Div II Diesel Gen Room 7 (Deluge) 3.
Zone 2-12 6
1D310 133' Div I Diesel Gen Room 1D403 158' Div I Diesel Gen Room 7 (Deluge) e.
STANDBY SERVICE WATER PUMP HOUSE 1.
Zone 2-1 4
1M110 133' SSW Pump Rm A IM112 133' SSW Valve Rm A 2M110 133' SSW Pump Rm B 2M112 133' S3W Valve Rm B f.
CHARCOAL FILTER TRAINS 1.
Standby Gas Treatment System Filter Train 1 (Allisen Thermistor Wire)
Auxiliary Building El. 139' 2.
Control Room Standby Fresh Air System Filter Train 1 (Allison Thermistor Wire)
Control Buf1 ding El. 133' l
l l
l GRAND GULF-UNIT 1 3/4 3-80c G33sp15