!pn asc Ic,
!Y
% @21[' i UNITED STATES 4
NUCLEAR REGULATORY COMMISSION
- m g; sj(f WASHINGTON, D.C. 20$55 0001 TEXAS UTILITIES ELECTRIC COMPANY COMANCHE PEAK STEAM ELECTRIC STATION. UNIT 1 DOCKET NO. 50-445 AMEN 0 MENT TO FACILITY OPERATING LICENSE Amendment No.30 License No. NPF-87 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Texas Utilities Electric Company (TV Electric, the licensee) dated November 15, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as
)
amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I;
{
B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance:
(1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-87 is hereby amended to read as follows:
9410270319 941019 PDR ADOCK 05000445 P
PDR j
2.
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.30, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated in the license.. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
The license amendment is effective as of its date of issuance, to be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION f.4A (O S h William D. Beckner, Director Project Directorate IV-1 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: October 7,1994 L
---m a
y_e,y
p anc %
[i'l I'o
@;4f ig s,7,!
UNITED STATES m,
NUCLEAR REGULATORY COMMISSION j
WASHINGTON. D.C. 20555-0001 TEXAS UTILITIES ELECTRIC COMPANY COMANCHE PEAK STEAM ELECTRIC STATION. UNIT 2 DOCKET NO. 50-446 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.16 License No NPF-89
)
1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Texas Utilities Electric Company (TV Electric, the licensee) dated November 15, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-89 is hereby amended to read as follows:
4 0
-=
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.16, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.
TU Electric shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance, to be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION W
LO h
William D. Beckner, Director Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: October 7,1994 i
j
ATTACHMENT TO LICENSE AMENDMENT N05,30 AND 16 FACILITY OPERATING LICENSE N05. NPF-87 AND NpF-89 DOCKET NOS. 50-445 AND 50-446 Replace the following page of the Appendix A Technical Specifications with the attached page. The revised page is identified by Amendment number and contains a marginal line indicating the area of change.
The corresponding overleaf page is also provided to maintain document completeness.
REMOVE INSERT 3/4 2-12 3/4 2-12 l
l l
l
POWER DISTRIBUTION LIMITS SURVElllANCE REOUIREMENTS 4.2.4.1 The QUADRANT POWER TILT RATIO shall be determined to be within the limit above 50% of RATED THERMAL POWER by:
a.
Calculating the ratio at least once per 7 days when the alarm is OPERABLE, and b.
Calculating the ratio at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during steady-state operation when the alarm is inoperable.
4.2.4.2 The QUADRANT POWER TILT RATIO shall be determined to be within the limit when above 75% of RATED THERMAL POWER with one Power Range channel inoperable by using the movable incere detectors to confirm indicated QUADRANT POWER TILT RATIO at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by either:
a.
Using the four pairs of symmetric thimble locations or b.
Using the Movable Incore Detection System to monitor the QUADRANT POWER TILT RATIO.
i em -
t CDMANCHE PEAX - UNITS 1 AND 2 3/4 2-11
POWER DISTRIBUTION LIMITS 3/4.2.5 DNB PARAMETERS LIMITING CONDITION FOR OPERATION 3.2.5 The following DNB-related parameters shall be maintained within the stated limits:
Indicated Reactor Coolant System T,, s 592*F a.
b.
Indicated Pressurizer Pressure 2 2219 psig*
c.
Indicated Reactor Coolant System (RCS) Flow 2 403,400 gpm** for Unit 1 2 395,200 gpm** for Unit 2 APPLICABILITY: MODE 1.
ACTION:
With any of the above parameters exceeding its limit, restore the parameter to within its limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 5% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.2.5.1 Each of the above parameters shall be verified to be within its limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.2.5.2 The RCS total flow rate shall be verified to be within its limits at least once per 31 days by plant computer indication or measurement of the RCS elbow tap differential pressure transmitters' output voltage.
4.2.5.3 The RCS loop flow rate indicators shall be subjected to a CHANNEL CAllBRATION at least once per 18 months. The channels shall be normalized based on the RCS flow rate determination of Surveillance Requirement 4.2.5.4.
4.2.5.4 The RCS total flow rate shall be determined by precision heat balance measurement after each fuel loading and prior to operation above 85% of RATED l
THERMAL POWER. The feedwater pressure and temperature, the main steam pres-sure, and feedwater flow differential pressure instruments shall be calibrated within 90 days of performing the calorimetric flow measurement.
- Limit not applicable during either a THERMAL POWER ramp in excess of 5% of RATED THERMAL POWER per minute or a THERMAL POWER step in excess of 10% of RATED THERMAL POWER.
- Includes a 1.8% flow measurement uncertainty.
COMANCHE PEAK - UNITS 1 AND 2 3/4 2-12 Unit 1 - Amendment No. ++re1J0 Unit 2 - Amendment No. 7,16 i