K !.V T~
e-q p\\
c.
(
f/
3 v.
g.
x ?
i7 '
D UNITED STATES 03 AMERICA
'Q N%: LEAR RE"CULATORY /10MMISSION
,Mk
.,3.,.
~..'
h DOCKETED
- /
1 MonC 4
.s l i
h.
s BEFORE THij NUCCEAR REGULATORY COMMISSION s
'83 El 15 A10 :12 4
p' In 4he Matter of4
)
bl.
)
i 87 -
METROPOLITAh EDISON COMPANY
)'
)
Docket No ' ~50-289 b
(Tliree Mile Island Nuclear
)
(Rdstart)
'- ' Station, Unit tfc/. 1)
)
/
\\
)
1..
N4 J
UNION OF CONCERNED SCIENTISTS' PET! TION FOR REVIEW OF ALAB-729 1
1.
The Decision as to Which Review is Sought s
[
f i
- ~
~
ALAB-729, docketed May 26, 1983 and served May 27, 1983, represents the
~
Appeal Poard's resolution of the issues concerning TMI-1 plant design and y
\\
v proceduree-treated in LBP-81-59, 14 NRC'1211 (1981), with the exception of the s
~
i NEPA/ Class 9 accidents cor.tention raised by UCS, which was treated in e
?;
ALAB-697,! December 10, 1982.
(
- A,
si
^
,~
u s
2.
Statement of Matters as to Which Review is Sought and as to Which V
s 1
Rulings sere Erronecus.
6 9
\\
a.' Are procedures in place at:TMI-1 which provide reasonable assurance of reliable decay heat removal?
3 The single most significant issue treated by ALAB-729 was the adequacy and reliability of the means of decay heat removal available at TMI-1.
This
'is, of course, the core question: Are systems and procedures in place which pr ide assurance that TMI-1 could cope with a TMI-2 accident? Unfortunately,
\\
i
,- jj
+e, e
<',, 8306160604 830613 PDR ADOCK 05000289 g3 Q
PDR y
'h
r -
. the Appeal Board did not answer this question.
To begin with, the Appeal Board refused to postulate an accident that might cause or involve core d amage.
It held that "[w]hile analysis of the TMI-2 accident can provide valuable information to improve the safety of nuclear power plants, the actual
' scenario of events that occurred during the accident should be considered a typical LOCA."
ALAB-729, Sl. Op. at N. 67, p. 41.
Having excluded core damage from consideration, the Board looked only at
" typical" small break LOCA's and loss of feedwater events. However, as we will discuss below, some of the considerations crucial to determining the reliability of decay heat removal even for these events were ruled outside the scope of the Appeal Board's review.
The ASLB had found the DMI-1 emergency feedwater (EFW) system not 1
sufficiently reliable for long-term decay heat removal purposes based on the fact that it is not safety-grade and on a quantitative reliability analysis.
14 NRC at 1360-73 The Appeal Board reversed this finding.
It rejected the quantitative reliability analysis on specious grounds ( ALAB-729, Sl. Op. at 29-31) and failed to adequately consider the fact that the EFW system is not safety-grade.
Most importantly however, the Appeal Board failed to examine the seismic and environmental qualification of the EFW system while the evidence of record to the extent that UCS was allowed to present it, shows that the EFW system is neither seismically nor environmentally qualified, and thus fails to meet the
. Commission's minimum requirements for such systems. if The Appeal Board felt itself constrained by Commission decisicns removing these crucial questions from its purview. ALAB-729, S1. Op. at 7-9.
Because the Appeal Board's ruling as to EFW reliability was so narrow, and because it is abundantly clear that the EFW system does not meet the Commission's minimum requirements for a system important to safety, the Board was required to " consider the possibility that reliance may have to be placed on other plant systems (i.e. " feed and bleed") to provide adequate core cooling." ALAB-729, S1. op, at 8.
In other words, can feed and bleed be relied upon to compensate for failure of the EFW system?
On this issue, the Appeal Board, after four days of reopened evidentiairy hearings, agreed with UCS: "[W]e are unable on this record to endorse feed and bl8bd as a reliable backup system of decay heat removal." Id.
at 8-9 Therefore, the Appeal Board was unable to resolve the central issue of reliable decay heat removal and expressly left it to the Commission to decide:
In light of the bifurcation of issues between the Commission, on the one hand, and the adjudicatory boards, on the other, the Commission nust determine--after examining all systems and considering the information that is both within and outside the record before us--whether there is reasonable assurance
[
that Three Mile Island Unit No. 1 can be operated without i
endangering the health and safety of the public.
Id. at 9, emphasis added.
Under these circumstances, the Commission cannot refuse review of 1# The EFW system is not seismically qualified. Transcript before the Appeal Board on Reopened Proceedings, p. 341-9 (Wermiel) (hereinaf ter " App. Tr.").
As to the question of environmental qualification, see LBP-81-59,14 NRC 1211, at paragraphs 1150-1162.
UCS was prevented from pursuing either of these issues in any detail as a consequence of rulings that they were beyond the l
i scope of this proceeding. Id. at paragraph 1162, (environmental qualification); App. Tr. 355 ff.; (seismic qualification).
. this portion of ALAB-729.S# While the ASLB and Appeal Board may have had limited jurisdiction (although we believe they unnecessarily restricted their scope in some cases) the Commission cannot avoid its fundamental duty; considering all of the facts, to ensure that operation of TMI-1 does not pose undue risk. We submit that, even had there never been a restart proceeding, the NRC could not permit TMI-1 to operate without sufficiently reliable means of decay heat removal.
b.
The pressurizer heater and PORV should be safety-grade.
UCS Contentions 3 and 4 call for the requirement of safety-grade pressurizer heaters for THI-1.
Contention 5 would require the PORV to be safety-grade.
The pressurizef heaters are used to maintain reactor pressure during natural circulation. ALAB-729, Sl. Op. at 88-89.
No party contested the fact that they are at least the " preferred" method of doing so. Id. at 44.
If the heaters fail, pressure can be controlled by use of the HPI pumps with the primary system in a water-solid condition. While certainly possible, this mode of operation has serious safety drawbacks and the Appeal Board agreed E#
Because this issue in its totality must be reviewed by the Commission, and because of the 10-page limit on this petition, UCS has not enumerated in detail our differences with the Appeal Board's resolution of other critical subissues. These include those concerning 1) the main steam line rupture detection system (compare ALAB-729, Sl. Op. at 34-35 with UCS Response to ALAB-708 at 3-4, June 19,1983); 2) the Appeal Board's finding that the pressurizer safety valves can be relied upon to perform the " bleeding" function for feed and bleed. (Compare ALAB-729, Sl. Op. at 82-84 with UCS Proposed Findings of Fact and Conclusion of Law on Reopened Hearing, April 12, 1983, paragraphs 57-71 and transcript references therein) and 3) the fact that feed and bleed poses a clear risk of overpressurizing the reactor vessel (compare ALAB-729, S1. Op. at 86-7 with UCS Proposed Findings of Fact and Conclusions of Law as Reopened Hearing, paragraphs 105-108). The Board refused to permit UCS to present evidence on this last question, yet proceeded, incredibly, to consider and resolve it against UCS in ALAB-729
. that it "should be avoided." Id. at 47.
The heaters and their circuitry are not safety-grade.
The Staf f's short-term fix provided for connection of some non-safety grade heater banks to the emergency power supply.
The failure of the heaters must be postulated. UCS's testimony was that, not only are the heaters important to safety and their failure would make maintenance of natural circulation extremely difficult, their failure could also imperil the integrity of the power supply to vital emergency safety equipment during an accident; the connection between the heaters and the emergency busses is not safety grade and would allow transference of a fault in the heater circuits to the emergency power supply. Pollard, ff. Tr. 8582, Pollard ff. TR. 960-7.
See ALAB-729, Sl. Op. at 88 ff.
On the other hand, if the necessary heaters were safety-grade, they*could be relied upon to maintain natural circulation and there would be no fear of endangerment to the emergency power supplies.
The Appeal Board ruled that although the function of maintaining natural circulation is "important to safety", the pressurizer heaters are not because "other methods exist" for pressure control. ALAB-729, S1. Op. at 51.
This ruling requires Commission review because it would establish the important precedent that a system is not "important to safety" within the meaning of the NRC rules if there is some other way of performing its function, even if the alternative means (in this case, operation of the plants in a water-solid condition) poses substantial problems as detailed by UCS in its testimoqL and Brief on Exceptions at 18-19.E' Moreover, the Appeal Board was actually in error in rejecting UCS's 2'
The Appeal Board also seems to rely on the fact that it "may be possible" to achieve cold shutdown before the bubble in the pressurizer is lost. See ALAB-729 at 48.
This is purely speculative; the opposite could just as easily be true. In addition, there is not at TMI-1 a safety-grade enviromentally qualified path to cold shutdown.
. position that the breakers provided for connecting the non-safety heaters to the emergency power supply emperil the integrity of vital safety systems which may be needed during an accident. While the Board ruled that Regulatory Guide 1.75 and GDC 17, which require such breakers to be safety-grade and which are not met by the design in question, do not apply to "reconnection" of the heaters (Id. at 98), it never elucidated a rational destinction in terms of the condition of the plant between those situations where Regulatory Guide 1.75 applies and those where it does not. The fact is that the non-safety heaters may be connected to the vital safety power supply while that power supply is needed and that a fault in the heater circuits could be transferred to the emergency power supply.
As to the PORV, UCS presented testimony detailing the number of functions important to safety which it is required to perform.
Pollard, ff.
Tr. 9027.
The PORV is part of the reactor coolant pressure boundary, it is n
used to limit challenges to the ECCS, prevent overpressurization of the reactor coolant system at low temperatures, and to depressurize the reactor coolant system under inadequate core cooling conditions. Pollard, ff. Tr.
9027 at 5-4 to 5-5.
There can be no dispute that the PORV is part of the reactor coolant pressure boundary and that GDC 14 applies, requiring an " extremely low probability of abnormal leakage" or other failure. See ALAB-729, S1. Op. at 103 UCS cannot fathom how the non-safety grade PORV with its non-safety grade circuitry and with the history of PORV operation could possibly be said to present an " extremely low probability" of leakage or failure.
The Appeal Board seems to find it on the basis of the speculation that, sometime in the future, GPU will show that the PORV will open in less than 5% of overpressure transiets. Id. at 104.
First, this demonstration has not been made on this
O
, record. Second, the Board completely ignores the fact that the PORV may inappropriately open because its circuitry and instrumentation is not safety-grade. See UCS Brief on Exceptions, p. 48.
In rejecting UCS' evidence regarding the role of the PORV in overpressure protection, the Board characterized it as a " backup to operator action." ALAB-729 at 109.
This ignores testimony indicating that under some plant conditions, the PORV is the only way to limit overpressure. UCS Brief on Exceptions, p. 42-44.
The use of the PORV during inadequate core cooling is deemed outside the scope of the proceediing. ALAB-729 at 110.
This ruling is amazing in view of the fact that TMI-2 was an inadequate core cooling event and'that the TMI-1 procedures which call for use of the PORV under these conditions were required as a direct result df the accident. Moreover, the Board is simply wrong th'at the steam generators provide an alternative mechanism for depressurization (Id. at 110) since the operator must use the PORV to control system pressure within 50 psi of steam generator pressure, both the steam generators and PORV are needed. UCS Brief on Exceptions, p. 44-45.
The Appeal Board's resolution of the PORV issue is similar to its approach to the pressurizer heaters: a system need not be safety grade if there is any conceivable alternative means available to perform its concededly important safety function, even if this alternative does not correspond to the operators' training, is clearly not preferable and even poses significant risks. As a matter of policy, this is an extremely unfortunate precedent which the NRC would certainly regret in the future when it is cited by applicants. The Commission should fully consider its implications rather than allow it to stand out of expediency.
. CONCLUSION The Commission should review ALAB-729 The difficult issues concerning the adequacy.of decay heat removal were explicitly not resolved by the Appeal Board but were instead presented to the Commission. On one central question--EFW reliability--the Appeal Board's ruling is clearly erroneous and in conflict with the ASLB ruling. Finally, the questions surrounding the safety classification of the pressurizer heaters and PORV pose significant policy considerations warranting the Commission's review. We hope, further, that the Commission will review this entire decision, as originally i
contemplated.
Respectfully submitted, S.
Ellyn R. Weiss General Counsel Union of Concerned Scientists
I
\\
e
)
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE NUCLEAR REGULATORY COMMISSION In the Matter of
)
)
METROPOLITAN EDISON COMPANT
)
Docket No. 50-289
)
(Restart)
(Three Mile Island Nuclear
)
Station. Unit No. 1)
)
CERTIFICATE OF SERVICE I hereby certify that copies of " UNION OF CONCERNED SCIENTISTS' PETITION FOR REVIEW OF ALAB-729" have been served on the follow-ing persons by deposit in the United States mail, first class postage, this 13th day of June, 1983.
Nunzio Palladino, Chairman Dr. Linda W. Little U.S. Nuclear Regulatory Comission Atomic Safety and Licensing Washington, D.C. 20555 Board Panel 5000 Hermitage Drive Raleigh, North Carolina 27612 John Ahearne, Comissioner U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Processor Gary L. Milhollin 4412 Greenwich Parkway James Asselstine. Commissioner Washington, D.C. 20007 U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Judge Gary J.
Edles, Chairman Atomic Safety and Licensing Victor Ctlinsky, Comissioner Appeal Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 Thomas Roberts, Commissioner Judge John H. Buck U.S. Nuclear Regulatory Comission Atomic Safety and Licensing Washington, D.C. 20555 Appeal Board Panel U.S. Nuclear Regulatory Comission Washington D.C. 20555 Ivan W. Smith, Chairman Atomic Safety and Licensing Judge Reginald L. Cotchy Board Panel U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Washington, D.C. 20555 Appeal Board Panel U.S. Nuclear Regulatory Commission Washington D.C. 20555 Dr. Walter H. Jordan Atomic Safety and Licensing Judge Christine H.
Kohl Board Panet Atomic Sa fety and Licensing 881 Vest Outer Drive Oak Ridge. Tennessee 37830 Appeal Board Panel U.S. Nuclear Regulatory Commission Washington.
D.C.
20555
~.
k.
, i Hr s. Harjoric Aamod t ns. Gail D.
Phelps R. D.
- 5 245 West Philadelphia Street Coatsville, Pennsylvania 19320 York, Pennsylvania 17404 Steven C. Sholly Asbsrt Adler, Esq.
Assistant Attorney General Union of Concerned Scientists 505 Executive Ibuse 1346 Connecticut Ave., N.V.
P.O. Dor 2357 Suite 1101 Harrisburg, Pennsylvania 17120 Washington, D.C. 20036 Louise Brad ford Joseph R. Cray Orrice of Executive Legal Director Three Mile Island Alert U.S.' Nuclear Regulatory Commission 325 Perrer Street Harrisburg, Pennsylvania 17102 Vashington, D.C. 20555 Tliomas Baxter Es Jsedtn D. Cunningham, Esq.
Shaw,Pittman,PoEtsk. Trowbridge For, Farr & Cunningham 2320 North Second Street 1800 H Street, N.W.
Herrisburg, Pennsylvania 17110 Wa-hington, D.C. 20036 Docketing and Service Section Dr. Judith H. Johnsrud Dr. Chauncey Kepr6cd 4
Orrice of the Secretary U.S. Nuclear Regulatory Commission Envir:nmental Coalition on Vashington, D.C. 20555 Nuclear Power 433 Orlando Avenue State College, PA 16801 William S. Jordan. III H raon & Weiss 1725 I Street, N.W.
Suite 506
/'
Washington, D.C. 20006 Jshn A. Levin Esq.
Astigtant Counsel Parnsylvania Public Utility i
Commission P.O. Box 3265 Hncrisburg, Pennsylvania 17120 l