Monthly Operating Rept for Sept 1994 for Jm Farley Units 1 & 2
ML20076H047
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/30/1994
From: Hill R
SOUTHERN NUCLEAR OPERATING CO.
To:
Shared Package
ML20076H044 List:
References
NUDOCS 9410210054
Download: ML20076H047 (8)


Text

_,

Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations September 1994 There were no unit shutdowns or major power reductions during the month.

The following safety related maintenance was conducted during the month:

Replaced failed universal card (A313) in the solid state protection system. The 3,

function for " Containment Pressure Safety Injection" was bad.

2.

Performed repairs and modifications to the 1B Post Accident Hydrogen Analyzer.

l l

l 9410210054 941012 PDR ADOCK 05000348 R

PDR

I OPERATING DATA REPORT DOCKET NO.

50-348 DATE October 7,1994 COMPLETED 11Y R. D. Hill TELEPilONE (205) 899-5156 i

i i OfERATINGSTAT11S 1.

Unit Name:

Joseph M. Farley - Unit 1 Notes 2.

Reporting Period:

September 1994

1) Cumulative data since12-01-77, 3.

Licensed Thermal Power (MWt):

2,652 date of commercial operation.

l 4.

Nameplate Rating (Gross MWe):

860 f

5.

Design Electrical Rating (Net MWe):

829 6.

Maximum Dependable Capacity (Gross MWe):

855.7 7.

Maximum Dependable Capacity (Net MWe):

812 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since l

Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted,'If Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

N/A This Month Yr,to Date Cumulative

11. Ilours in Reporting Period 720.0 6,551.0 147,551.0
12. Number Of flours Reactor Was Critical 720.0 5,383.9 117,047.8
13. Reactor Reserve Shutdown 11ours 0.0 0.0 3,650.0
14. Ilours Generator On-line 720.0 5,338.3 115,244.9
15. Unit Reserve Shutdown flours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (M Wil) 1,909,440.0 13,794,243.4 296,286,648.6,
17. Gross Electrical Energy Generated (MWil) 621,629.0 4,478,044.0 95,493,090.0
18. Net Electrical Energy Generated (MWH) 590,771.0 4,233,894.0 90,174,048.0
19. Unit Service Factor 100.0 81.5 78.1
20. Unit Availabilty Factor 100.0 81.5 78.1
21. Unit Capacity Factor (Using MDC Net) 101.0 79.6 75.0 l
22. Unit Capacity Factor (Using DER Net) 99.0 78.0 73.7
23. Unit Forced Outage Rate 0.0 0.0 6.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down at End Of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Status (Prior To Commercial Operation):

Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/18/77 i

Commercial Operation 12/01 <77 12/01/77

I i..

DOCKET NO.

50-348 l

UNIT 1

l DATE October 7,1994 l

COMPLETED Iw R. D. Hill TELEPilONE (205) 899-5156 MONTII _ September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 817 17 818 2

816 18 816 3

820 19 821 4

825 20 825 5

824 21 824 6

821 22 823 i

l 7

819 23 821

(

8 819 24 821 9

818 25 822 l

10 818 26 822 11 817 27 824 l

12 819 28 821 1

13 820 29 821 i

821 30 824 14 15 816 31 N/A 16 818 INSTRUCTIONS i

On this format, list the average daily unit power level in MWe-Net for each day in the l reporting period. Compute to the nearest uhole megawatt.

i l

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-348 UNIT NAME J. M. Farley - Unit 1 DATE October 7.1994 COMPl.ETED BY R. D. Ilill REPORT MONTil September TELEPilONE (205) 899-5156

,__-.,_-.__.-----.-r_.-.

METilOD Or LICEN51.E CAUSE AND CORRECrlVE q

DURAllON SillTITING EVENT SYSTEM COMPONENT ACllON TO PREVENT RECURRENCE NO.

.[_

DATE TYPIT (1)

IlOURS REASON (2) DOWN REACTOR (3)

R1 PORT #

CODE (Q_

COf]E (5)

~

~~

u

-~

[lhere were no shutdowns or power reductions during the month.

i l

i

__ L l

1:

2:

3:

4:

5:

F: Forced Reason Method Exhibit G-Instructions for Exhibit I - Same Source S: Scheduled A - Equipmen Failure (Explain) 1 - Manual Preparations of Date Entry

(

B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (L ER) File (NUREG-0161)

D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & L.icense Examination F-Administrative G - Operational Error (Explain) 11 - Other (Explain) i l

Joseph M. Farley Nuclear Plant i

Unit 2 Narrative Summary of Operations September 1994 There were no unit shutdowns or major power reductions during the month.

The following safety related maintenance was conducted during the month:

1.

Replaced failed radiation monitor R-24B " Containment Purge Monitor" i

OPERATING DATA REPORT DOCKET NO.

50-364 DATE October 7,1994 COMPLETED llY R. D. Hill TELEPHONE (205) 899 5156 t

@PERAIINGjSIAIll.S l1.

Unit Name:

Joseph M. Farley - Unit 2 Notes

,2, Reporting Period:

September 1994

1) Cumulative data since 07-30 81, 3.

Licensed Thermal Power (MWt):

2,652 date of commercial operation.

4.

Nameplate Rating (Gross MWe):

860

5.

Design Electrical Rating (Net MWe):

829

~6.

Maximum Dependable Capacity (Gross MWe):

863.6 i7.

Maximum Dependable Capacity (Net MWei:

822 l8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A l9.

Power Level To Which Restricted, if Any (Net MWe):

N/A j 10. Reasons For Restrictions, If Any:

N/A l

This Month Yr.to Date Cumulative l

l 11. Hours in Reporting Period 720.0 6,551.0 115,464.0 l12. Number Of Hours Reactor Was Critical 720.0 6,537.0 99,490.7

!13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0

14. Hours Generator On-line 720.0_

6,519.8 98,081.6 l15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l 16. Gross Thermal Energy Generated (MWH) 1,909,440.0 17,213.685.7 250,749,038.5 l 17. Gross Electrical Energy Generated (MWH) 626,525.0 5,660.636.0 82,210,097.0

18. Net Electrical Energy Generated (MWH) 597,193.0 5,392.312.0 77,967,401.0
19. Unit Service Factor 100.0 99.5 84.9 1
20. Unit Availabilty Factor 100.0 99.5 84.9
21. Unit Capacity Factor (Using MDC Net) 100.9 100.1 82.3 122. Unit Capacity Factor (Using DER Net) 100.1 99.3 81.5
23. Unit Forced Outage Rate 0.0 0.5 4.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Refueling /Afaintenance outage. Afarch 10,1995. Approximately 44 days.

25. If Shut Down at End Of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Status (Prior To Commercial Operation):

Forecast Achieved initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81

l l

DOCKET NO.

50-364 i

UNIT 2

DATE October 7,1994 COMPLETED HY_

R. D. Hill TELEPilONE (205) 899-5156 MONTH September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l

(MWe-Net)

(MWe-Net) l 1

826 17 826 i

2 825 18 825 1

3 829 19 831 I

4 833 20 836 5

834 21 833 6

832 22 832 7

829 23 829 8

828 24 829 9

827 25 831 10 828 26 831 11 826 27 832 12 828 28 830 13 829 29 831 14 830 30 832 15 822 31 N/A 16 824 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SIlUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-364 UNIT NAME J. M. Farley - Unit 2 DATE October 7,1994 COMPLETED 13Y R. D. Ilill REPORT MONTil September TELEPilONE (205) 899-5156 MLTIIOD OF EXCENSITE CAUSE AND CORRECIIVE DURAllON SillTI'llNG EVENT SYSTEM COMPONENT ACTION TO NO DATE TYPI:(1)

IlOURS REASON (2JJDOWN REACIOR (3)

REPORT #

CODE (4)

CODE 15)

PREVENT RFCURRI~NCE jThere were no shutdowns or power reductions during the month.

i l,

w 1:

2:

3:

4:

5:

F: Forced Reason Method Exhibit G-Instructions for Exhibit I-Same Source S: Scheduled A - Equipment l'ailure (Explain) 1 - Manual Preparations of Date EnL9 II - Maintenance or Test 2 - Manual Scram Sheets for Licensee Esent C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161)

D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & License Esamination F-Administrative G - Operational Error (Explain) 1I-Other (Explain)

- -