Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations September 1994 There were no unit shutdowns or major power reductions during the month.
The following safety related maintenance was conducted during the month:
Replaced failed universal card (A313) in the solid state protection system. The 3,
function for " Containment Pressure Safety Injection" was bad.
2.
Performed repairs and modifications to the 1B Post Accident Hydrogen Analyzer.
l l
l 9410210054 941012 PDR ADOCK 05000348 R
I OPERATING DATA REPORT DOCKET NO.
50-348 DATE October 7,1994 COMPLETED 11Y R. D. Hill TELEPilONE (205) 899-5156 i
i i OfERATINGSTAT11S 1.
Unit Name:
Joseph M. Farley - Unit 1 Notes 2.
Reporting Period:
September 1994
- 1) Cumulative data since12-01-77, 3.
Licensed Thermal Power (MWt):
2,652 date of commercial operation.
l 4.
Nameplate Rating (Gross MWe):
860 f
5.
Design Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
855.7 7.
Maximum Dependable Capacity (Net MWe):
812 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since l
Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted,'If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr,to Date Cumulative
- 11. Ilours in Reporting Period 720.0 6,551.0 147,551.0
- 12. Number Of flours Reactor Was Critical 720.0 5,383.9 117,047.8
- 13. Reactor Reserve Shutdown 11ours 0.0 0.0 3,650.0
- 14. Ilours Generator On-line 720.0 5,338.3 115,244.9
- 15. Unit Reserve Shutdown flours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (M Wil) 1,909,440.0 13,794,243.4 296,286,648.6,
- 17. Gross Electrical Energy Generated (MWil) 621,629.0 4,478,044.0 95,493,090.0
- 18. Net Electrical Energy Generated (MWH) 590,771.0 4,233,894.0 90,174,048.0
- 19. Unit Service Factor 100.0 81.5 78.1
- 20. Unit Availabilty Factor 100.0 81.5 78.1
- 21. Unit Capacity Factor (Using MDC Net) 101.0 79.6 75.0 l
- 22. Unit Capacity Factor (Using DER Net) 99.0 78.0 73.7
- 23. Unit Forced Outage Rate 0.0 0.0 6.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior To Commercial Operation):
Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/18/77 i
Commercial Operation 12/01 <77 12/01/77
I i..
DOCKET NO.
50-348 l
UNIT 1
l DATE October 7,1994 l
COMPLETED Iw R. D. Hill TELEPilONE (205) 899-5156 MONTII _ September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 817 17 818 2
816 18 816 3
820 19 821 4
825 20 825 5
824 21 824 6
821 22 823 i
l 7
819 23 821
(
8 819 24 821 9
818 25 822 l
10 818 26 822 11 817 27 824 l
12 819 28 821 1
13 820 29 821 i
821 30 824 14 15 816 31 N/A 16 818 INSTRUCTIONS i
On this format, list the average daily unit power level in MWe-Net for each day in the l reporting period. Compute to the nearest uhole megawatt.
i l
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-348 UNIT NAME J. M. Farley - Unit 1 DATE October 7.1994 COMPl.ETED BY R. D. Ilill REPORT MONTil September TELEPilONE (205) 899-5156
,__-.,_-.__.-----.-r_.-.
METilOD Or LICEN51.E CAUSE AND CORRECrlVE q
DURAllON SillTITING EVENT SYSTEM COMPONENT ACllON TO PREVENT RECURRENCE NO.
.[_
DATE TYPIT (1)
IlOURS REASON (2) DOWN REACTOR (3)
R1 PORT #
CODE (Q_
COf]E (5)
~
~~
u
-~
[lhere were no shutdowns or power reductions during the month.
i l
i
__ L l
1:
2:
3:
4:
5:
F: Forced Reason Method Exhibit G-Instructions for Exhibit I - Same Source S: Scheduled A - Equipmen Failure (Explain) 1 - Manual Preparations of Date Entry
(
B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (L ER) File (NUREG-0161)
D - Regulatory Restriction 4 - Other (Explain)
E - Operator Training & L.icense Examination F-Administrative G - Operational Error (Explain) 11 - Other (Explain) i l
Joseph M. Farley Nuclear Plant i
Unit 2 Narrative Summary of Operations September 1994 There were no unit shutdowns or major power reductions during the month.
The following safety related maintenance was conducted during the month:
1.
Replaced failed radiation monitor R-24B " Containment Purge Monitor" i
OPERATING DATA REPORT DOCKET NO.
50-364 DATE October 7,1994 COMPLETED llY R. D. Hill TELEPHONE (205) 899 5156 t
@PERAIINGjSIAIll.S l1.
Unit Name:
Joseph M. Farley - Unit 2 Notes
,2, Reporting Period:
September 1994
- 1) Cumulative data since 07-30 81, 3.
Licensed Thermal Power (MWt):
2,652 date of commercial operation.
- 4.
Nameplate Rating (Gross MWe):
860
- 5.
Design Electrical Rating (Net MWe):
829
~6.
Maximum Dependable Capacity (Gross MWe):
863.6 i7.
Maximum Dependable Capacity (Net MWei:
822 l8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A l9.
Power Level To Which Restricted, if Any (Net MWe):
N/A j 10. Reasons For Restrictions, If Any:
N/A l
This Month Yr.to Date Cumulative l
l 11. Hours in Reporting Period 720.0 6,551.0 115,464.0 l12. Number Of Hours Reactor Was Critical 720.0 6,537.0 99,490.7
!13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-line 720.0_
6,519.8 98,081.6 l15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l 16. Gross Thermal Energy Generated (MWH) 1,909,440.0 17,213.685.7 250,749,038.5 l 17. Gross Electrical Energy Generated (MWH) 626,525.0 5,660.636.0 82,210,097.0
- 18. Net Electrical Energy Generated (MWH) 597,193.0 5,392.312.0 77,967,401.0
- 19. Unit Service Factor 100.0 99.5 84.9 1
- 20. Unit Availabilty Factor 100.0 99.5 84.9
- 21. Unit Capacity Factor (Using MDC Net) 100.9 100.1 82.3 122. Unit Capacity Factor (Using DER Net) 100.1 99.3 81.5
- 23. Unit Forced Outage Rate 0.0 0.5 4.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Refueling /Afaintenance outage. Afarch 10,1995. Approximately 44 days.
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior To Commercial Operation):
Forecast Achieved initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81
l l
DOCKET NO.
50-364 i
UNIT 2
DATE October 7,1994 COMPLETED HY_
R. D. Hill TELEPilONE (205) 899-5156 MONTH September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l
(MWe-Net)
(MWe-Net) l 1
826 17 826 i
2 825 18 825 1
3 829 19 831 I
4 833 20 836 5
834 21 833 6
832 22 832 7
829 23 829 8
828 24 829 9
827 25 831 10 828 26 831 11 826 27 832 12 828 28 830 13 829 29 831 14 830 30 832 15 822 31 N/A 16 824 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
UNIT SIlUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-364 UNIT NAME J. M. Farley - Unit 2 DATE October 7,1994 COMPLETED 13Y R. D. Ilill REPORT MONTil September TELEPilONE (205) 899-5156 MLTIIOD OF EXCENSITE CAUSE AND CORRECIIVE DURAllON SillTI'llNG EVENT SYSTEM COMPONENT ACTION TO NO DATE TYPI:(1)
IlOURS REASON (2JJDOWN REACIOR (3)
REPORT #
CODE (4)
CODE 15)
PREVENT RFCURRI~NCE jThere were no shutdowns or power reductions during the month.
i l,
w 1:
2:
3:
4:
5:
F: Forced Reason Method Exhibit G-Instructions for Exhibit I-Same Source S: Scheduled A - Equipment l'ailure (Explain) 1 - Manual Preparations of Date EnL9 II - Maintenance or Test 2 - Manual Scram Sheets for Licensee Esent C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161)
D - Regulatory Restriction 4 - Other (Explain)
E - Operator Training & License Esamination F-Administrative G - Operational Error (Explain) 1I-Other (Explain)
- -