ML20076H042

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Sept 1994 & Revised Monthly Operating Repts for Aug 1994
ML20076H042
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/12/1994
From: Woodard J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20076H044 List:
References
NUDOCS 9410210050
Download: ML20076H042 (1)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Southern Nuclear Operating Company Post Off ce Box 1295 Birmingham, Alabama 35201 Telephone (205) 868 P086 m

Southern Nudear Operating company

10. meu,o Executive Vice President the southem electnc system October 12, 1994 Docket 'Nos.

50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthlv Operating Data RepoJ1 Gentlemen:

Attached are the September 1994 Monthly Operating Reports for Joseph M. Farley Nuclear Pla it Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

Also attached is the August Operating Status sheet for Unit 1, which has been revised due to a transcription error. The Eumulative Unit Service Factor and the Cumulative Unit Availability Factor have been revised from 78.4% to 78.0%. The Cumulative Unit Capacity Factor (Using DER Net) has been revised from 74.0% to 73.6%.

If you have any questions, please advise.

I Respectfully submitted, dA m

I

(

J.

. Woodard b

RWC:jgp(mor)

Attachments i

i cc:

Mr. S. D. Ebneter Mr. B L. Siegel Mr. T. M. Ross 1C.f,f-1U 9410210050 941012 t

PDR ADOCK 05000348 R

PDR

--_