OPERATING DATA REPORT DOCKET NO.
50-348 j
DATE September 7,1994 COMPLETED BY R. D. Ilill TELEPliONE (205) 899-5156 OPERATJNG STATUS l
1.
Unit Name:
Joseph M. Farley - Unit 1 Notes 2.
Reporting Period:
August 1994
- 1) Cumulative data since 12-01-77, 3.
Licensed Thermal Power (MWt):
2,652 date of commercial operation.
l 4.
Nameplate Rating (Gross MWe):
860 5.
Design Electrical' Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
855.7 7.
Maximmn Dependable Capacity (Net MWe):
812 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since l
Last Report, Give Reasons:
N/A l
l i
9.
Power Level To Which Restricted, if Any (Net MWe):
N/A l
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr.to Date Cumulatis e t
i 1.
Hours in Reporting Period 744.0 5,831.0 146,831.0 t
- 12. Number Of fiours Reactor Was Critical 744.0 4,663.9 116,327.8 l
- 13. Reactor Reserve Shutdown liours 0.0 0.0 3,650.0
- 14. Ilours Generator On-line 744.0 4,618.3 114,524.9
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWI!)
1,972,995.2 11,884,803.4 294,377,208.6
- 17. Gross Electrical Energy Generated (MWil) 640,329.0 3,856,415.0 94,871,461.0 l 8.
Net Electrical Energy Generated (MWil) 608,163.0 3,643,123.0 89,583.277.0
- 19. Unit Service Factor 100.0 79.2 78.0
- 20. Uni: Availabilty Factor 100.0 79.2 78.0
- 21. Unit Capacity Factor (Using MDC Net) 100.7 76.9 74.9
- 22. Unit Capacity Factor (Using DER Net) 98.6 75.4 73.6 l
- 23. Unit Forced Outage Rate 0.0 0.0 6.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
i N/A
- 25. If Shut Down at End Of Report Period, Estirnated Date of Startup:
N/A
- 26. Units in Test Status (Prior To Commercial Operation):
Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/18/77 Commercial Operation 12/01/77 12/01/77 I