Revised Monthly Operating Repts for Aug 1994 for Jm Farley Nuclear Plant Unit 1
ML20076H050
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/31/1994
From: Hill R
SOUTHERN NUCLEAR OPERATING CO.
To:
Shared Package
ML20076H044 List:
References
NUDOCS 9410210058
Download: ML20076H050 (1)


Text

... -. _- - = _. - - -. - .- -

l OPERATING DATA REPORT  !

DOCKET NO. 50-348 j DATE September 7,1994 COMPLETED BY R. D. Ilill TELEPliONE (205) 899-5156 OPERATJNG STATUS l

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: August 1994 1) Cumulative data since 12-01-77,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.

l 4. Nameplate Rating (Gross MWe): 860

5. Design Electrical' Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 855.7
7. Maximmn Dependable Capacity (Net MWe): 812
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since l

! Last Report, Give Reasons: N/A l

l i 9. Power Level To Which Restricted, if Any (Net MWe): N/A

10. Reasons For Restrictions,If Any: N/A l

This Month Yr.to Date Cumulatis e t

i 1. Hours in Reporting Period 744.0 5,831.0 146,831.0 t 12. Number Of fiours Reactor Was Critical 744.0 4,663.9 116,327.8 l

13. Reactor Reserve Shutdown liours 0.0 0.0 3,650.0
14. Ilours Generator On-line 744.0 4,618.3 114,524.9 l
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
l 294,377,208.6
16. Gross Thermal Energy Generated (MWI!) 1,972,995.2 11,884,803.4
17. Gross Electrical Energy Generated (MWil) 640,329.0 3,856,415.0 94,871,461.0  !

l 8. Net Electrical Energy Generated (MWil) 608,163.0 3,643,123.0 89,583.277.0

19. Unit Service Factor 100.0 79.2 78.0
20. Uni: Availabilty Factor 100.0 79.2 78.0
21. Unit Capacity Factor (Using MDC Net) 100.7 76.9 74.9
22. Unit Capacity Factor (Using DER Net) 98.6 75.4 73.6 l
23. Unit Forced Outage Rate 0.0 0.0 6.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

i N/A

25. If Shut Down at End Of Report Period, Estirnated Date of Startup: N/A