ML20076H050

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for Aug 1994 for Jm Farley Nuclear Plant Unit 1
ML20076H050
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/31/1994
From: Hill R
SOUTHERN NUCLEAR OPERATING CO.
To:
Shared Package
ML20076H044 List:
References
NUDOCS 9410210058
Download: ML20076H050 (1)


Text

...

- = _. -

OPERATING DATA REPORT DOCKET NO.

50-348 j

DATE September 7,1994 COMPLETED BY R. D. Ilill TELEPliONE (205) 899-5156 OPERATJNG STATUS l

1.

Unit Name:

Joseph M. Farley - Unit 1 Notes 2.

Reporting Period:

August 1994

1) Cumulative data since 12-01-77, 3.

Licensed Thermal Power (MWt):

2,652 date of commercial operation.

l 4.

Nameplate Rating (Gross MWe):

860 5.

Design Electrical' Rating (Net MWe):

829 6.

Maximum Dependable Capacity (Gross MWe):

855.7 7.

Maximmn Dependable Capacity (Net MWe):

812 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since l

Last Report, Give Reasons:

N/A l

l i

9.

Power Level To Which Restricted, if Any (Net MWe):

N/A l

10. Reasons For Restrictions,If Any:

N/A This Month Yr.to Date Cumulatis e t

i 1.

Hours in Reporting Period 744.0 5,831.0 146,831.0 t

12. Number Of fiours Reactor Was Critical 744.0 4,663.9 116,327.8 l
13. Reactor Reserve Shutdown liours 0.0 0.0 3,650.0
14. Ilours Generator On-line 744.0 4,618.3 114,524.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWI!)

1,972,995.2 11,884,803.4 294,377,208.6

17. Gross Electrical Energy Generated (MWil) 640,329.0 3,856,415.0 94,871,461.0 l 8.

Net Electrical Energy Generated (MWil) 608,163.0 3,643,123.0 89,583.277.0

19. Unit Service Factor 100.0 79.2 78.0
20. Uni: Availabilty Factor 100.0 79.2 78.0
21. Unit Capacity Factor (Using MDC Net) 100.7 76.9 74.9
22. Unit Capacity Factor (Using DER Net) 98.6 75.4 73.6 l
23. Unit Forced Outage Rate 0.0 0.0 6.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

i N/A

25. If Shut Down at End Of Report Period, Estirnated Date of Startup:

N/A

26. Units in Test Status (Prior To Commercial Operation):

Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/18/77 Commercial Operation 12/01/77 12/01/77 I

9410210058 941019 l

h'DR ADOCK C5000348 PDR