g GPU Nuclear Q

g7 P.O. Box 388 Forked River, New Jersey 08731 609-693-6000 Writer's Direct Dial Number.

Direct or May 17, 1983 Of fice of Management Information U.S. Nuclear Regulatory Commission Wa shing ton, D.C.

20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report In accordance with the Oyster Creek Nuclear Generating Station Operating Licence Nc. DPR-16, Appendix A, Section 6.9.1.C, enclosed are two copies of the Monthly Operating Data (gray book information) for the Oyster Creek Nuclear Generating Station. Beginning with this report, the tabular summaries of QASL instrument, electrical and mechanical maintenance activities will be deleted.

As was customary in past reports, those stunmaries provided maintenance information which, for the most part, were minor in nature. Significant maintenance items will continue to be incorporated in the Operations Summary.

If you should have any questions, please contact Mr. Michael Laggart at (609) 971-4643.

Very truly yours,

k. J Y 0-ter B. Fiedler U ice President and Director Oyster Creek PBF:PFC:ja1 Enclosure s cc: Director (10)

Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission g

)

Wa shing ton, D.C.

20555 L-i Regional Administrator (1)

Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 NRC Resident Inspector (1)

Oyster Creek Nuclear Generating Station Forked River, NJ 08731 8305230436 830517 DR ADOCK 05000 lear is a part of the General Pubhc Utihties System

The following Licensee Event Reports were submitted during April 1983:

Reportable Occurrence No. 50-219/83-08/03L: Core Spray Booster. Pump NZO3A was found to be inoperable when given a manual start signal as a result of the failure of the static time delay.undervoltage tripping device. The failure was due to the incorrect replacement of the undervoltage trip coil.

Reportable Occurrence No. 50-219/83-12 /01T:

Secondary Containment integrity was violated when the door to the Main Steam Line Tunnel Room was lef t open.

Reportable Occurrence No. 50-219/83-13 /01T: A degradation of Secondary Containment integrity occurred when both doors of a Reactor Building personnel access airlock were open simultaneously for approximately 30 seconds.

Reportable Occurrence No. 50-219/83-14/0lP and O1T: A design deficiency was discovered in that the control power circuitry for the heating coils in the Standby Gas Treatment System were found to receive power f ror. a single source.