ML20073T191

From kanterella
Jump to navigation Jump to search
Forwards Updated Apps B & E to Util 830117 Proposed Partial Initial Decision.Schedule for Completion of Plant Continues to Indicate Physical Readiness to Load Fuel by Aug 1983
ML20073T191
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 05/04/1983
From: Reveley W
HUNTON & WILLIAMS
To: Brenner L, Carpenter J, Morris P
Atomic Safety and Licensing Board Panel
References
ISSUANCES-OL, NUDOCS 8305100391
Download: ML20073T191 (105)


Text

IIuxTox & WILL d+ ' "

7o7 EAsf MAIN Statti P x15g5 D

. . . , u,6 o . Racitwoxn,Vanoin 3 212 Mib ..tv. .. ea,u,,....

. o. .o. ,o.

[ 4

~~~

..o..c.o. ..no c..ou . ,,.o, tc.a .o..

7,,,,,,,, ,o,

,f,i-f,,,ohPOgm

>,'.".'.",a'o~

o c ' " '-

,..,v,.o........ ... g

. .o.....

.o roun, vi

.o........o, o.. . ,,.i.

May 4, 1983 ~(N /a$74 b

~% <. u $- . . . o.

o,.,c,o,., . . ,...

q l l\ 55 Lawrence Brenner, Esq. Dr. James L. Carpenter Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 Dr. Peter A. Morris Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

In the Matter of LONG ISLAND LIGHTING COMPANY (Shoreham Nuclear Power Station, Unit 1)

Docket No. 50-322 (OL)

Pursuant to the Board's request at Tr. 20)361,we report that LILCO's schedule for the completion of Shoreham continues to indicate that the plant will be physically ready to load fuel by August 1983.

Accompanying this letter are updated copies of Appendices B to E of LILCO's proposed partial initial decision l of January 17, 1983.

Very truly yours, Y

W. ay1 Reveley, III cc: All Parties k 0305100391 830504 -  %

PDR ADDCK 05000322 O PDR l

i 5/4/82-4/8/83 r o B-S  %

Act APPENDIX B: #3h [ ,g l day 0 SEQUENCE OF SETTLEMENTS ,-- 9 Z 1963 3

$i s' h,:2 'o Settleinehr l dL '

Accepted Begins at Witness (Party) by Board Transcript

1. Dirt in Diesel McCaffrey (LILCO) 5/7/82 1626 Generator Relays Giardina (NRC)

SC 2 Goldsmith (SC)

2. Fire Protection McCaffrey (LILCO) 5/7/82 1626 SC 17 Eberly (NRC)

Capstick (SC)

3. Turbine Orientation Kascsak (LILCO) 5/7/82 1626 SOC 19(j) Schiffgens (NRC)
4. Clad Swelling Hill (LILCO) 6/11/82 4305 and Flow Blockage Meyer (NRC) 7/22/82 7872 SOC 16
5. Iodine Monitoring Schmitt (LILCO) 6/15/82 4329 SC 28(a)(iii)/ SOC 7A(3); Chandrasekaran (NRC)

SC 27(c)/ SOC 3(c) Minor (SC)

6. SPDS Price (LILCO) 7/8/82 6038 SC 28(a)(iv)/ SOC 7A(4) Eckenrode (NRC)

Minor (SC)

7. Notice of Disabled Steiger (LILCO) 8/5/82 9138 Safety System Mauck (NRC)

SOC 9

8. ECCS Cutoff Stark (LILCO) 8/5/82 9138 SC 28 (a)(i)/ Hodges (NRC)

SOC 7A(1) Minor (SC)

Bridenbaugh (SC)

s B-2

'N Date Settlement Accepted Begins at Witness (Party) by Board Transcript

9. ECCS Pump Blockage Rascsak (LILCO) 8/25/82 9502 SC 9 Hodges (NRC)

Goldsmith (SC)

10. Human Factors -- Notaro (LILCO) 10/14/82 11,677 Procedures Clifford (NRC)

SC 19 Eckenrode (NRC)

Rivenbark (NRC)

Goldsmith (SC)

Ball (SC)

Crosse (SC)

Mazour (SC)

11. Human Factors -- Bengston (LILCO) 10/14/82 11,677 Simulator Rottkamp (L1LCO)

SC 20 Deliso (NRC)

12. RPV Integrity Barry (LILCO) 10/14/82 11,677 and Testing Ranganath (LILCO)

SC 25/ SOC 19(a) Seaman (LILCO)

Hazelton (NRC)

Cheng (NRC)

Hum (NRC)

Smith (NRC)

Walton (NRC)

Hinson (NRC)

Bridenbaugh (SC)

13. ALARA Fortier (LILCO) 10/14/82 11,677 SC 26 Miele (LILCO)

Hinson (NRC)

Wing (NRC)

Goldsmith (SC)

Bridenbaugh (SC)

Barlit (SC)

14. Post Accident Rigert (LILCO) 10/14/82 11,677 Monitoring Mauck (NRC)

SC 27/ SOC 3 Hubbard (SC)

(Partially Minor (SC)

Settled)

s B-3

'\

Date Settlement Accepted Begins at Witness (Party) by Board Transcript

15. Phase I Emergency Planning SC/ SOC /NSC 1-14 (Partially Settled)

Ef fect of Weather 11/23/82 14,719 on Sirens EP 1(A)

Federal Resources 11/23/82 14,719 EP 3 Notification 11/23/82 14,719 with Emergency Classification EP 5(C)

Training of Offsite 11/23/82 14,719 Agencies EP 6 Emergency Director 11/23/82 14,719 and Response Manager EP 7(A)

Emergency Operations 11/23/82 14,719 Facility EP 8 Radiological Exposure 11/23/82 14,719 EP 9 Field Monitoring 11/23/82 14,719 EP 10(A)

Redundant Power 11/23/82 14,719 Supplies EP 11(D)

9 B-4 i.

Date Settlement Accepted Begins at Witness (Part_y} by Board Transcript Pommunications 11/23/82 14,719 through Beepers EP 11(E)

NAWAS 11/23/82 14,719 EP 11(F)

Personnel Assignments: 11/23/82 14,719 A. Number of Personnel in EOF EP 12(A)

16. Security Planning 12/3/82 --

SC Security 1-9

17. Loose Parts Price (LILCO) 12/7/82 15,480 Monitoring Hsii (NRC)

SC 5 Goldsmith (SC)

18. Human Factors -- Poltrino (LILCO) 12/7/82 15,481 Eauipment Eckenrode (NRC)

SC 18 Goldsmith (SC)

Minor (SC)

19. Remote Shutdown 12/21/82 17,198 Panel SC 1
20. Inadequate Hill (LILCO) 12/22/82 17,519 Core Cooling Rigert (LILCO)

SC 3 and 27(k)/ Sun (NRC)

SC2 3(k) and 8 Goldsmith (SC)

Minor (SC)

21. Electrical Separation McCaffrey (LILCO) 1/12/83 17,818 SC 31/ SOC 19(g) Eberly (NRC) (Amendment)

Knox (NRC) 1/19/83 18,596 Mauck (NRC) (Agreement)

Hubbard (SC)

Minor (SC)

r B-5

'w Date Settlement Accepted Begins at Witness (Party) by Board Transcript

22. Cracking of Materials Kascsak (LILCO) 1/19/83 18,597 SC 24/ SOC 19(c) Smith (NRC) and (d) Anderson (SC)

Bridenbaugh (SC)

23. Environmental Etzweiler (LILCO) 1/26/83 19,299 Qualification Gleason (LILCO)

SC 8/ SOC 19(h) Kascsak (LILCO)

(Partially Najuch (LILCO)

Settled) , Shosho (LILCO)

Woodward (LILCO)

Kennedy (NRC)

Noonan (NRC)

Minor (SC)

24. Seismic Qualification 1/26/83 19,299 SOC 19(i)
25. Containment Isolation 2/24/83 20,311 SC 23
26. Electrical Penetration 2/24/83 20,311 SC 32/ SOC 19(f)
27. Quality Assurance -- Alexander (LILCO) 4/8/83 21,000 Operations Arrington (LILCO)

SC 13(d) Baldwin (LILCO)

Burns (LILCO)

Eifert (LILCO)

Gerecke (LILCO)

Kelly (LILCO)

Long (LILCO)

Muller (LILCO)

Museler (LILCO)

Youngling (LILCO)

Gallo (NRC)

Gilray (NRC)

Higgins (NRC)

Narrow (NRC)

Riverbark (NRC)

Hubbard (SC)

. .g 5/4/82-4/8/83

'!l /

APPENDIX C: e' Y\

SEQUENCE OF TESTIMONY y

Il'

/iN/

_ _ , ,, Begins at Witness (Party)

L7 Date Transcript

1. Safety Classification Goldsmith (SC/ SOC) 5/4/82 1104 and Systems Interation 4/7/83 20882 SC/ SOC 7B and SOC 19(b) Harwood (SC/ SOC) 5/4/82 1104 Hubbard (SC/ SOC) 5/4/82 1104 4/7/83 20882 Minor (SC/ SOC) 5/4/82 1104 4/7/83 20882 Burns (LILCO) 6/15/82 4340 6/25/82 5632 Dawe (LILCO) 6/15/82 4340 4/8/83 21035 Garabedian (LILCO) 6/15/82 4340 Ianni (LILCO) 6/15/82 4340 Joksimovich (LILCO) 6/15/82 4340 6/25/82 5632 Kascsak (LILCO) 6/15/82 4340 6/25/82 5632 McGuire (LILCO) 6/15/82 4340 Rigelhaupt (LILCO) 6/15/82 4340 Robare (LILCO) 6/15/82 4340-Roths (LILCO) 6/17/82 4576 Pollock (LILCO) 4/8/83 21035 Rivello (LILCO) 4/8/83 21035 McCaffrey (LILCO) 4/8/83 21035 Museler (LILCO) 4/8/83 21035 Speis (NRC) 7/9/82 6347 Haass (NRC) 7/9/82 6347 Rossi (NRC) 7/9/82 6347 4/7/83 20807 Conran (NRC) 7/9/82 6347 4/5/ 3 20394 Hodges (NRC) 7/9/82 6347 Kirkwood (NRC) 7/9/82 6347 Thadani (NRC) 7/13/82 6452 7/21/82 7436 4/7/83 20807 Coffman (NRC) 4/7/83 20807 Mattson (NRC) 4/7/83 20807 Vollmer (NRC) 4/7/83 20807
2. Water Hammer Fortier (LILCO) 5/25/82 1933 SC 4 Hill (LILCO) 5/25/82 1933 Hodges (NRC) 5/25/82 1933 Goldsmith (SC) 5/27/82 2377

e C-2 Begins at Witness (Party) Date Transcript

3. ECCS Core Spray Hill (LILCO) 5/28/82 2523 SC 10 Sun (NRC) 5/28/82 2523
4. Loose Parts Monitoring Price (LILCO) 6/1/82 2691 SC 5 Hsii (NRC) 6/1/82 2691 Goldsmith (SC) 6/3/82 3176
5. Valve Failure ,

Bridenbaugh (SC) 6/4/82 3540 SC 11 Minor (SC) 6/4/82 3541 6/8/82 3585 Fortier (LILCO) 6/8/82 3626 3739 Kreps (LILCO) 6/8/82 3626 3739 Kirkwood (NRC) 6/8/82 3739

6. Seismic Design Lucks (LILCO) 6/9/82 3966 SOC 19(e) Kim (NRC) 6/9/82 3966 Rothman (NRC) 6/9/82 3966 Wong (LILCO) 6/9/82 3966
7. SRV Tests and Crawford (LILCO) 7/27/82 7949 Challenges Smith (LILCO) 7/27/82 7949 SC/ SOC 22; SC 28 Stark (LILCO) 7/27/82 7949 (a)(vi)/ SOC 7A(6) Boseman (LILCO) 7/27/82 7949 Hayes (LILCO) 7/27/82 7949 Kreps (LILCO) 7/27/82 7949 Malovrh (LILCO) 7/27/82 7949 Wright (NRC) 7/27/82 7963 Hodges (FRC) 7/27/82 7963 Cherny (NRC) 7/27/82 7963 Bridenbaugh (SC) 8/3/82 8702 Minor (SC) 8/3/82 8702
8. ATWS Calone (LILCO) 8/4/82 8906 SC 16 Carter (LILCO) 8/4/82 8906 Eckert (LILCO) 8/4/82 8906 Pfefferlen (LILCO) 8/4/82 8906 Rigert (LILCO) 8/4/82 8906 Sullivan (LILCO) 8/4/82 8906 Hodges (NRC) 8/4/82 8906

, lll C-3 Begins at Witness (Party) Date Transcript

9. Post Accident Baron (LILCO) 8/24/82 9451 Monitoring ___ Kreps (LILCO) 8/24/82 9451 SC 27/ SOC 5 Rigert (LILCO) 8/24/82 9451 Schmitt (LILCO) 8/24/82 9451 Mauck (NRC) 8/24/82 9451 Rossi (NRC)
  • 8/24/82 9451 Minor (SC) 8/25/82 9579
10. Mark II Chau (LILCO) 8/26/82 9729 SC 21 Davis (LILCO) 8/26/82 9729 Malovrh (LILCO) 8/26/82 9729 Metcalf (LILCO) 8/26/82 9729 Townsend (LILCO) 8/26/82 9729 Eltawila (NRC) 8/26/82 9729 Fields (NRC 8/26/82 9729 Tan (NRC) 8/26/82 9729 Terao (NRC) 8/26/82 9729
11. Quality Assurance Alexander (LILCO) 9/14/82 10075 SC/ SOC 12, 11/17/82 14315 SC 13-15 Arrington (LILCO) 9/14/82 10075 2/22/83 19748 Baldwin (LILCO) 9/14/82 10075 11/9/82 13292 Burns (LILCO) 9/14/82 10075 10/14/82 11709 10/29/82 12405 11/9/82 13292 Eifert (LILCO) 9/14/82 10075 11/9/82 13292 Gerecke (LILCO) 9/14/82 10075 11/9/82 13292 Kelly (LILCO) 9/14/82 10075 11/9/82 13292 11/11/82 13686 2/22/83 19748 Kubinak (LILCO) 11/17/82 14315 Long (LILCO) 9/14/82 10075 10/12/82 11365 11/9/82 13292 McCaffrey (LILCO) 11/17/82 14315 Muller (LILCO) 9/14/82 10075 9/17/82 10488 9/22/82 10795 9/24/82 11191 11/2/82 12587

. N C-4 Begins at Witness (Party) Date Transcript 11/12/82 13953 Museler (LILCO) 9/14/82 10075 10/28/82 12236 11/9/82 13292 2/22/83 19748 Youngling (LILCO) 9/14/82 10075 9/22/82 10893 11/2/82 12587 11/12/82 13953

, Hubbard (SC) 12/2/82 15224 1/25/83 19062 Gallo (NRC) 12/14/82 16238 Gilray (NRC) 12/14/82 16238 2/23/83 20141 Higgins (NRC) 12/14/82 16238 2/22/83 19748 Narrow (NRC) 12/14/82 16238 Rivenbark (NRC) 12/14/82 16238 Johnson (LILCO) 1/10/83 17586 Novarro (LILCO) 1/10/83 17586 Samaniego (SC) 1/25/83 19062 Greenman (NRC) 2/22/83 19748 Caphton (NRC) 2/23/83 20141

12. Environmental Etzweiler (LILCO) 1/26/83 19301 Qualification Gleason (LILCO) 1/26/83 19301 SC 8/ SOC 19(h) Kascsak (LILCO) 1/26/83 19301 Najuch (LILCO) 1/26/83 19301 Shosho (LILCO) 1/26/83 19301 Woodward (LILCO) 1/26/83 19301 Kennedy (NRC) 1/26/83 19309 Noonan (NRC) 1/26/83 19309 Minor (SC) 1/31/83 19665

5/4/82-4/8/83 1

.G'

APPE D . qy 9

WITNESSES IN 4LPHABOSIC'AL O D R ICf Y\

!hl MAYO gggg3 ,

(. jace ct n,3,,, / Following Witness \ f 3"jff asu. f,j Transcript Page Alexander, John F.

" Testimony of John F. Alexander, 10,080 T. Tracy Arrington, Frederick B. [Not Bound In]

Baldwin, Robert G. Burns, William [LILCO Ex. 21)

F. Eifert, T. Frank Gerecke, Joseph M. Kelly, Donald G. Long, Arthur R.

Muller, William J. Museler, and Edward J. Youngling for the Long Island Lighting Company Regarding Suffolk County and Shoreham Opponents Coalition Contention 12 and Suffolk County Contentions 13, 14, and 15" Arrington, T. Tracy

" Testimony of John F. Alexander, 10,080 T. Tracy Arrington, Frederick B. [Not Bound In)

Baldwin, Robert G. Burns, William [LILCO Ex. 21]

F. Eifert, T. Frank Gerecke, Joseph M. Kelly, Donald G. Long, Artht?r R.

Muller, William J. Museler, and

~

Edward J. Youngling for the Long Island Lighting Company Regarding Suffolk County and Shoreham Opponents Coalition Contention 12 and Suffolk County Contentions 13, 14, and 15"

" Supplemental Testimony of Messrs. 19,757 Museler, Arrington, and Kelly Concerning I&E Inspection Report No. 50-322/83-02" l

l.

- ._ , _ _ . .- - _ . - _ =. .=. -. - __ __ . . . _ - -

I D-2 Following Witness Transcript Page Baldwin, Frederick B.

3

! " Testimony of John F. Alexander, 10,080 i T. Tracy Arrington, Frederick B. [Not Bound In)

! - Baldwin, Robert G. Burns, William (LILCO Ex. 21]

F. Eifert, T. Frank Gerecke, Joseph M. Kelly, Donald G. Long, Arthur R. i Muller, William J. Museler, and Edward J. Youngling for the Long Island Lighti.ng Company Regarding Suffolk County and Shoreham (

Opponents Coalition Contention 12 and Suffolk County Contentions 13, 14, and 15" 4

Baron, Joseph S.

" Professional Qualifications" 9455 Boseman, John J.

"LILCO's Motion to Join J. J. 7954 Boseman and C. A. Malovrh with R. M. Crawford, J. L.

Smith and S. J. Stark to Support LILCO's Testimony on SC/ SOC Content' ion 22--

SRV Tests"

" Professional Qualifications" 7954

" Testimony of John J. Boseman, 7959 Raymond M. Crawford, Fred Hayes, John J. Kreps, and Jeffrey L.

Smith for the Long Island Lighting Company on Suffolk County Contention i

28a(vi) and SOC Contention 7A(6) --

Reduction of Challenges to SRV's" l " Supplemental Testimony of 15,506 Jeffrey L. Smith, John J. [Not Bound In]

Boseman and Richard (LILCO Ex. 46]

Gutmann Concerning Maintenance of Safety / Relief Valves at Shoreham Nuclear Station" i

f

. . _ . _ . _ _ _ . . _ _ __ . _ . . - . _ _ _ _ _ _ . . _ , _ . _ . _ - . . _ , . _ . . . _ . _ _ _ . . , ~ , _ . . . _ . . . _ _ _ . . , _ , . . - . . . _ _ - . _ . - . , _ . _ . . _ . - . _ . . . _ _ , _ . _ . - .

! D-3 i

Following Witness Transcript Page u

j " Supplemental Testimony of 15,506 John J. Boseman on Behalf [Not Bound In]

of Long Island Lighting [LILCO Ex. 47]

Company Concerning Polymeriza-tion of SRV Lubricants" "Further Supplemental Testimony 15,506 of John J. Boseman on Behalf [Not Bound In] '

of Long Island Lighting [LILCO Ex. 48]

Company Concerning Polymerization of SRV Lubricants" Bridenbaugh, Dale G.

" Professional Qualifications 3543 of Dale G. Bridenbaugh"

" Prepared Direct Testimony of 3545 Dale G. Bridenbaugh and Gregory

, C. Minor on Behalf of Suffolk County Regarding suffolk County Contention 11, Passive Mechanical Valve Failure"

" Prepared Direct Testimony of 8704 Dale G. Bridenbaugh and Gregory C. Minor on Behalf of Suffolk County Regarding Suffolk County i Contention 22, SRV Test Program"

" Prepared Direct Testimony of 8709 Dale G. Bridenbaugh and Gregory C. Minor on Behalf of Suffolk County Regarding Suffolk County Contention 28(a)(vi) and SOC Contention 7A(6), Reduction of SRV Challenges" l

r i

i P

t , -__ _ _ _ , , - - _

D-4 Following Witness Transcript Page Burns, Edward T.

" Testimony of Edward T. Burns, 4346 George F. Dawe, George Garabedian, Pio W. Ianni, Vojin Joksimovich, Robert M. Kascsak, Paul J. McGuire, Paul W. Rigelhaupt and David J.

Robare for the Long Island Lighting Company Regarding Suffolk County /

Shoreham Opponents Coalition Contention 7B and Shoreham Opponents Coalition Contention 19(b)"

Burns, Robert G.

" Testimony of John F. Alexander, 10,080 T. Tracy Arrington, Frederick B. [Not Bound In]

Baldwin, Robert G. Burns, William [LILCO Ex. 21]

F. Eifert, T. Frank Gerecke, Joseph M. Kelly, Donald G. Long, Arthur R.

Muller, William J. Museler, and Edward J. Youngling for the Long Island Lighting Company Regarding Suffolk County and Shoreham Opponents Coalition Contention 12 and Suffolk County Contentions 13, 14, and 15" Calone, Leonard J.

" Testimony of Leonard J. Calone, 8870 Harry T. Carter, Eugene C. Eckert, Henry C. Pfefferlen, John A. Rigert and William P. Sullivan for Long

, Island Lighting Company on Suffolk County Contention 16--ATWS" Caphton, Donald L.

" Donald L. Caphton, Professional 20,148 Qualification, Region I, U.S.

Nuclear Regulatory Commission"

D-5 Following 3 Witness Transcript Page

+

1 i ' Carter, Harry T.

" Testimony of Leonard J. Calone, 8870 Harry T. Carter, Eugene C. Eckert, Henry C. Pfefferlen, John A. Rigert and William P. Sullivan for Long Island Lighting Company on Suffolk County Contention 16--ATWS" l

Chau, Hancock .

" Testimony of Hancock Chau, 9735 Charles A. Malovrh and William M. Davis for the Long Island i '

Lighting Company on Suffolk County Contention 21--Mark II Containment" I

"Professiont.1 gualifications" 9735 Cherny, Frank C.

l "NRC Staff Motion To Supplement 7967 The Witness Panel On S/RV Contentions"

" Frank C. Cherny -- Professional 7967 Qualifications" Coffman, Jr., Franklin D.

"NRC Staff Supplemental Testi- 20,810 i mony on Contention 7B By l

Roger J. Mattson, Richard H.

Vollmer, Charles E. Rossi, Ashok C. Thadani and Franklin D.

Coffman, Jr."

i

_ - _ - . _ _ _ _ . .. ~ .-. . _ . . . -

i . .

D-6  ;

, Following Witness Transcript Page

'Conran, Sr., James H.

"NRC Staff Testimony of Themis 6357 P. Speis, Walter P. Haass, l Marvin W. Hodges, C. E. Rossi, James H. Conran, Sr. and Robert Kirkwood on Safety Classification and Analysis of Structures, Systems and' Components (SC/ SOC Contention 7B) (SOC Contention 19(b))"

"NRC Staff Testimony of James H. 6368 Conran, Sr. in Rebuttal to Applicant's Testimony on Safety

. Classification and Analysis of Structures, Systems and Components

(SC/ SOC Contention 7B) (SOC Contention 19(b))"

" Affidavit of James H. Conran" 20,401 i

! Crawford, Raymond M.

" Testimony of Raymond M. Crawford, 7954 i Jeffrey L. Smith and Steven J.

Stark for the Long Island l

~

Lighting Company on Suffolk County and SOC Contention 22 --

SRV Test Program"

" Testimony of John J. Boseman, 7959 Raymond M. Crawford, Fred Hayes, John J. Kreps, and Jeffrey L. Smith for the Long Island Lighting Company on Suffolk County Contention 28a(vi) and SOC Contention 7A(6) --

Reduction of Challenges to SRV's" l

D-7 Following Witness Transcript Page

' Davis, William M.

" Testimony of Hancock Chau, 9735 Charles A. Malovrh and William M. Davis for the Long Island Lighting Company on Suffolk County Contention 21--Mark II Containment"

" Professional Qualifications" 9735 Dawe, George F.

" Testimony of Edward T. Burns, 4346 George F. Dawe, George Garabedian, Pio W. Ianni, Vojin Joksimovich, Robert M. Kascsak, Paul J. McGuire, Paul W. Rigelhaupt and David J.

Robare for the Long Island Lighting Company Regarding Suffolk County /

Shoreham Opponents Coalition Contention 7B and Shoreham Opponents Coalition Contention 19(b)"

Eckert, Eugene C.

" Testimony of Leonard J. Calone, 8870 Harry T. Carter, Eugene C. Eckert, Henry C. Pfefferlen, John A. R1gert and William P. Sullivan for Long Island Lighting Company on Suffolk County Contention 16--ATWS" Eifert, William F.

" Testimony of John F. Alexander, 10,080 T. Tracy Arrington, Frederick B. [Not Bound In]

Baldwin, Robert G. Burns, William [LILCO Ex. 21]

F. Eifert, T. Frank Gerecke, Joseph M. Kelly, Donald G. Long, Arthur R.

Muller, William J. Museler, and Edward J. Youngling for the Long Island Lighting Company Regarding Suffolk County and Shoreham Opponents Coalition Contention 12 and

D-8 Following Witness Transcript Page Suffolk County Contentions 13, 14, and 15" Eltawila, Farouk "NRC Staff Testimony-of Farouk 9741 Eltawila, Mel B. Fields, and Chen P. Tan on Mark II Contain-ment (Suffolk County Contention 21)," professional qualifications, l and portions of SER and SER Supplements that pertain to this contention Memorandum from T. Speis to 9744 R. Tedesco, " Assessment of NRC Consultant's Report on the Chugging Load Specifications for Mark II Containments," June 1, 1982; and Memorandum from T. Speis to R. Tedesco, " Supplement to the Safety Evaluation Report for Shoreham Nuclear Power Station,"

June 24, 1982 s

Etzweiler, Joan F.

" Testimony of Robert M. Kascsak, 19,305 Joan F. Etzweiler, James F.

Gleason, Robert J. Najuch, William R. Shosho, and Newell K. Woodward for the Long Island Lighting Company on SC Contention 8/ SOC Contention 19(h) -- Environmental Qualification" Fields, Mel B.

"NRC Staff Testimony of Farouk 9741 Eltawila, Mel B. Fields, and Chen P. Tan on Mark II Contain-ment (Suffolk County Contention 21)," professional qualifications and portions of SER and SER Supplements that pertain to this contention

D-9 i

! Following l Witness Transcript Page Memorandum from T. Speis to 9744 T. Novak, " Supplement to the Safety Evaluation Report for Shoreham Nuclear Station, Unit 1"

Fortier, Raymond E.

" Testimony of Raymond 1935 E. Fortier and Richard A. Hill for the Long Island Lighting Company on Suffolk County Contention 4 -- Water Hammer"

" Testimony of Raymond 3629 E. Fortier for the Long Island Lighting Company on SC Contention 11 -- Passive Mechanical Valve Failure" Gallo, Robert M.

"NRC Staff Testimony of 16,248 Robert Gallo, John Gilray, [ Qualifications George Rivenbark, James Only Bound In Higgins, and Lewis Narrow at 16,245]

Regarding Quality Assurance, (Staff Ex. 8]

SC Contentions 12, 13, 14 and 15" with " Professional Qualifications of Robert M.

Gallo," " Professional Qualifications of James C.

Higgins," " Professional Qualifications of Lewis Narrow,"

" Professional Qualifications

of George W. Rivenbark," and

" Qualifications and Experience of John William Gilray" and 10 attachments

" Supplemental NRC Staff 16,260 Testimony of Robert Gallo, [ Bound In John Gilray, George at 16,411-A]

Rivenbark, James Higgins, and [ Staff Ex. 9]

Lewis Narrow Regarding Quality Assurance, SC Contentions

D-10 Following Witness Transcript Page 12, 13, 14, and 15" Garabedian, George

" Testimony of Edward T. Burns, 4346

, George F. Dawe, George Garabedian, Pio W. Ianni, Vojin Joksimovich, Robert M. Kascsak, Paul J. McGuire, Paul W. Rigelhaupt and David J.-

Robare for the Long Island Lighting Company Regarding Suffolk County /

Shoreham Opponents Coalition Contention 7B and Shoreham Opponents Coalition Contention 19(b)"

Gerecke, T. Frark

" Testimony of John F. Alexander, 10,080 T. Tracy Arrington, Frederick B. [Not Bound In]

Baldwin, Robert G. Burns, William [LILCO Ex. 21]

F. Eifert, T. Frank Gerecke, Joseph M. Kelly, Donald G. Long, Arthur R.

Muller, William J. Museler, and Edward J. Youngling for the Long Island Lighting Company Regarding Suffolk County and Shoreham Opponents Coalition Contention 12 and Suffolk County Contentions 13, 14, and 15" Gilray, John William "NRC Staff Testimony of 16,248 Robert Gallo, John Gilray, [ Qualifications George Rivenbark, James Only Bound In Higgins, and Lewis Narrow at 16,245]

Regarding Quality Assurance, [ Staff Ex. 8]

SC Contentions 12, 13, 14 and 15" with " Professional Qualifications of Robert M.

Gallo," " Professional Qualifications of James C.

Higgins," " Professional Qualifications of Lewis Narrow,"

" Professional Qualifications p -.-, , - , or .%- yy- - * - g *.i m --

wmmyrrw---w+w----' e--5-=vm--m--ee' -~------wm v--

D-11 Following Witness Transcript Page of George W. Rivenbark," and

" Qualifications and Ex,erience of John William Gilray" and 10 attachments

" Supplemental NRC Staff 16,260 Testimony of Robert Gallo, [ Bound In John Gilray, George at 16,411-A]

Rivenbark, James Higgins, and (Staff Ex. 9]

Lewis Narrow Regarding Quality Assurance, SC Contentions 12, 13, 14, and 15" Gleason, James F.

" Testimony of Robert M. Kascsak, 19,305 Joan F. Etzweiler, James F.

Gleason, Robert J. Najuch, William R. Shosho, and Newell K. Woodward for the Long Island Lighting Company on SC Contention 8/ SOC Contention 19(h) -- Environmental Qualification" Goldsmith, Marc W.

" Professional Biography of 1113 Marc W. Goldsmith"

" Prepared Direct Testimony of 1114 Marc W. Goldsmith, Susan J.

Harwood, Richard B. Hubbard, and Gregory C. Minor on behalf of Suffolk County and the Shoreham Opponents Coalition Regarding Contention 7B"

" Direct Testimony of Marc W. 2381 Goldsmith on Behalf of Suffolk County Regarding Suffolk County

Contention No. 4 - Water Hammer"

" Addendum to Testimony of Marc W. 2381 Goldsmith on Behalf of Suffolk County Regarding Suffolk County Contention No. 4 - Water Hammer"

D-12 i

Following Witness Transcript Page

" Direct Testimony of Marc W. 3180 Goldsmith on Behalf of Suffolk County Regarding Suffolk County Contention No. 5-Loose Parts Monitoring" "Suffolk County Supplemental 20,903 Testimony on Contention 7B By Marc W. Goldsmith, Richard B.

Hubbard and Gregory C. Minor" Greenman, Edward G.

" Professional Qualifications 19,753 of Edward G. Greenman" t

Gutmann, Richard

" Supplemental Testimony of 15,506 Jeffrey L. Smith, John J. [Not Sound In]

Boseman and Richard [LILCO Ex. 46]

Gutmann Concerning Maintenance of Safety / Relief Valves at Shoreham Nuclear Station" Haass, Walter P.

"NRC Staff Testimony of Themis 6357 P. Speis, Walter P. Haass,

! Marvin W. Hodges, C. E. Rossi, l James H. Conran, Sr. and Robert Kirkwood on Safety Classification and Analysis of Structures, Systems and Components (SC/ SOC Contention 7B) (SOC Contention 19(b))"

Harwood, Susan J.

"The Professional Biography 1113 of Susan J. Harwood" l

I D-13 Following Witness Transcript Page

" Prepared Direct Testimony of 1114 Marc W. Goldsmith, Susan J.

Harwood, Richard B. Hubbard, and Gregory C. Minor on behalf of Suffolk County and the Shoreham Opponents Coalition Regarding Contention 7B" Hayes, Fred

" Testimony of John J. Boseman, 7959 Raymond M. Crawford, Fred Hayen, John J. Kreps, and Jeffrey L. Smith for the Long Island Lighting Company on Suffolk County Contention 28a(vi) and SOC Contention 7A(6) --

Reduction of Challenges to SRV's" Higgins, James C.

"NRC Staff Testimony of 16,248 Robert Gallo, John Gilray, [ Qualifications George Rivenbark, James Only Bound In Higgins, and Lewis Narrow at 16,245]

Regarding Quality Assurance, [ Staff Ex. 8]

SC Contentions 12, 13, 14 and 15" with " Professional Qualifications of Robert M.

Gallo," " Professional Qualifications of James C.

Higgins," " Professional Qualifications of Lewis Narrow,"

" Professional Qualifications of George W. Rivenbark," and

" Qualifications and Experience of John William Gilray" and 10 attachments

" Supplemental NRC Staff 16,260 Testimony of Robert Gallo, (Bound In John Gilray, Gecrge at 16,411-A]

Rivenbark, James Higgins, and (Staff Ex. 9]

Lewis Narrow Regarding Quality Assurance, SC Contentions 12, 13, 14, and 15" I

D-14 Following Witness Transcript Page l

l

~ Hill, Richard A.

" Testimony of Raymond E. 1935 Fortier and Richard A. Hill for the Long Island Lighting Company on Suffolk County Contention 4 -- Water Hammer"

" Testimony of Richard A. Hill 2524 for the Long Island Lighting Company on Suffolk County Contention lO--ECCS Core Spray" Hodges, Marvin W. (Wayne)

"NRC Staff Testimony 1940 of Marvin W. (Wayne) Hodges Concerning Water Hammer (Suffolk County Contention 4)"

"NRC Staff Testimony of Themis 6357 P. Speis, Walter P. Haass, Marvin W. Hodges, C. E. Rossi, James H. Conran, Sr. and Robert Kirkwood on Safety Clacsification and Analysis of Structures, Systems and Components (SC/ SOC Contention 7B) (SOC Contention 19(b))"

"NRC Staff Testimony of Marvin 7966 W. (Wayne) Hodges Regarding Reduction of SRV Challenges, SC Contention 28(a)(vi),

SOC Contention 7(a)(6)"

"NRC Staff Testimony of Marvin 8872 W. Hodges on Anticipated Transients Without Scram (ATWS)

(SC Contention 16)"

- .. . _ - . _ _ - - . . - _ - . . ~ .

i D-15 1 ,

l Following Witness Transcript Page

'Hsii, Yi-Hsiung "NRC Staff Testimony of 2701 Yi-Hsiung Hsii Regarding

, Loose Parts Monitoring i (Suffolk County Contention 1

5)"

Hubbard, Richard B.

~

" Professional Qualifications of 1113 Richard B. Hubbard"

" Prepared Direct Testimony of 1114 Marc W. Goldsmith, Susan J.

Harwood, Richard B. Hubbard, and Gregory C. Minor on behalf of Suffolk County and the Shoreham Opponents Coalition Regarding Contention 7B" f " Prepared Direct Testimony of 9587 l Richard B. Hubbard and Gregory C. Minor on Behalf of Suffolk

! County and the Shoreham Opponents Coalition Regarding Suffolk County Contention 27 and SOC Contention 3--Post-Accident Monitoring"

" Prepared Direct Testimony 15,234 of Richard B. Hubbard on [Not Bound In]

Behalf of Suffolk County [SC Ex. 89A]

Regarding Suffolk County Contentions 12, 13, 14 and 15, Quality Assurance /

Quality Control" I

" Attachments to Prepared 15,234 Direct Testimony of Richard (Not Bound In]

B. Hubbard on Behalf of [SC Ex. 89B]

Suffolk County Regarding Suffolk County Contentions 12, 13, 14 and 15, Quality Assurance / Quality Control" I

l l _ _ _ -_ ___- _

D-16 i

Following Witness Transcript Page J

" Errata to Prefiled Direct 15,234 Testimony of Richard B. [Not Bound In]

Hubbard on Suffolk County [SC Ex. 89C)

Contentions 12 through 15" l " Supplemental Direct Testimony 15,362 '

of Richard B. Hubbard in [Not Bound In]

l Response to Board Question" [SC Ex. 89D]

1  :

c

" Direct Testimony of Richard B. 19,068 Hubbard and Dr. Francisco J.

Samaniego Regarding Torrey Pines Technology's Inspection of Shoreham Nuclear Power Station" "Suffolk County Supplemental 20,903 Testimony on Contention 7B By Marc W. Goldsmith, Richard B.

Hubbard and Gregory C. Minor" I a.n n i , Pio W.

" Testimony of Edward T. Burns, 4346 George F. Dawe, George Garabedian, Pio W. Ianni, Vojin Joksimovich,

, Robert M. Kascsak, Paul J. McGuire, Paul W. Rigelhaupt and David J.

Robare for the Long Island Lighting i Company Regarding Suffolk County /

Shoreham Opponents Coalition

, Contention 7B and Shoreham Opponents Coalition Contention 19(b)"

Johnson, Louis D.

" Testimony of Louis D. Johnson 17,590 Regarding Torrey Pines Technology's [Not Bound In]

Independent Verification of [LILCO Ex. 56]

Shoreham Nuclear Power Station"

" Supplemental Testimony of Louis 18,313 D. Johnson Regarding Torrey Pines Technology's Independent Verification of Shoreham Nuclear

i D-17 Following Witness Transcript Page Power Station," as corrected i

Joksimovich, Vojin

" Testimony of Edward T. Burns, 4346 l George F. Dawe, George Garabedian, l Pio W. Ianni, Vojin Joksimovich, Robert M. Kascsak, Paul J. McGuire, Paul W. Rigelhaupt and David J.

l Robare for the Long Island Lighting Company Regarding Suffolk County /

! Shoreham Opponents Coalition

Contention 7B and Shoreham l Opponents Coalition Contention j 19(b)"

Kascsak, Robert M.

" Testimony of Edward T. Burns, 4346 George F. Dawe, George Garabedian, Pio W. Ianni, Vojin Joksimovich, i Robert M. Kascsak, Paul J. McGuire, Paul W. Rigelhaupt and David J.

Robare for the Long Island Lighting Company Regarding Suffolk County /

I Shoreham Opponents Coalition Contention 7B and'Shoreham i

Opponents Coalition Contention 19(b)"

" Testimony of Robert M. Fascsak, 19,305 Joan F. Etzweiler, James F.

Gleason, Robert J. Najuch, William R. Shosho, and Newell K. Woodward for the Long Island Lighting Company on SC Contention 8/ SOC Contention 19(h) -- Environmental Qualification" Kelly, Joseph M.

" Testimony of John F. Alexander, 10,080 T. Tracy Arrington, Frederick B. [Not Bound In]

Baldwin, Robert G. Burns, William (LILCO EX. 21]

F. Eifert, T. Frank Gerecke, Joseph M. Kelly, Donald G. Long, Arthur R.

D-18 Following Witness Transcript Page Muller, William J. Museler, and Edward J. Ycungling for the Long Island Lighting Company Regarding Suffolk County and Shoreham Opponents Coalition Contention 12 and Suffolk County Contentions 13, 14, and 15"

" Supplemental Testimony of Messrs. 19,757 Museler, Arrington, and Kelly Concerning I&E Inspection Report No. 50-322/83-02" Kennedy, James E.

"NRC Staff Testimony of James E. 19,311 Kennedy and Vincent S. Noonan on Environmental Qualification (SC Contention 8/ SOC Contention 19(h))"

Kim, Sang Bo "NRC Staff Testimony of Sang 3979 Bo Kim and Robert L. Rothman on Seismic Design (SOC Conten-tion 19(e))"

Kirkwood, Robert "NRC Staff Testimony of Robert 3741 Kirkwood Regarding Passive Mechanical Valve Failures (Suffolk County Contention 11)"

and " Professional Qualifications" "NRC Staff Testimony of Themis 6357 P. Speis, Walter P. Haass, Marvin W. Hodges, C. E. Rossi, James H. Conran, Sr. and Robert Kirkwood on Safety Classification and Analysis of Structures, Systems and Components (SC/ SOC Contention 7B) (SOC Contention 19(b))"

._- .~ - . . _ . - -- . . - . - - . .. .. . - - . _ . - . _---__ - _ _ .

t l

! D-19 l

Following Witness Transcript Page l 'Kreps, Johnny J.

j " Professional Qualifications" 3629

" Testimony of John J. Boseman, 7959 i Raymond M. Crawford, Fred i Hayes, John J. Kreps, and

! Jeffrey L. Smith for the Long Island Lighting Company on Suffolk County Contention 28a(vi) i and SOC Contention 7A(6) --

Reduction of Challenges to SRV's" i

" Testimony of Johnny J. Kreps 15,506 and Jack A. Notaro for the [Not Bound In]

{ Long Island Lighting Company [LILCO Ex. 45]

j on Water Hammer Procedures I and Training" i

j Kubinak, Robert A.

" Professional Qualifications" 14,320 1

(Not Bound In]

r [LILCO Ex. 35, j Item 3]

Long, Donald G.

I

" Testimony of John F. Alexander, 10,080 T. Tracy Arrington, Frederick B. [Not Bound In]

Baldwin, Robert G. Burns, William [LILCO Ex. 21]

F. Eifert, T. Frank Gerecke, Joseph l M. Kelly, Donald G. Long, Arthur R. '

Mu3ler, William J. Museler, and Edward J. Youngling for the Long Island Lighting Company Regarding Suffolk County and Shoreham Opponents Coalition Contention 12 and Suffolk County Contentions 13, 14, and 15" Lucks, A. Stanley

" Professional Qualifications" 3970

~ _ _ - _ _ _ - _ _ _ _ _ _ - _ _ _ _ - _ . _ _ . _ _ _ _ _ _

D-20 l

Following Witness Transcript Page

-Malovrh, Charles A.

"LILCO's Motion to Join J. J. 7954 Boseman and C. A. Malovrh with R. M. Crawford, J. L.

! Smith and S. J. Stark to i Support LILCO's Testimony i on SC/ SOC Contention 22 --

SRV Tests" l " Professional Qualifications" 7954

' Testimony of Hancock Chau, 9735 l Charles A. Malovrh and William l M. Davis for the Long Island Lighting Company on Suffolk County Contention 21--Mark II l Containment" i

" Professional Qualifications" 9735 l Mattson, Roger J.

t l "NRC Staff Supplemental Testimony 20,810 on Contention 7B By Roger J.

Mattson, Richard H. Vollmer, Charles E. Rossi, Ashok C. Thadani and Franklin D. Coffman, Jr."

Mauck, Jerry L.

"NRC Staff Testimony of 9462 Jerry L. Mauck on Instru-mentation for Post-Accident Monitoring (SC Contention 27)

(SOC Contention 3)"

"NRC Staff Reply Testimony of 9462 Charles E. Rossi and Jerry L. Mauck on Instrumentation for Post-Accident Monitoring (SC Contention 27)

(SOC Contention 3)"

. _ _ _ _ . _ . . . . _ _ _ _ . . . _ . _ _ . - - . . _ _ . - - . . _ . . . _ - - ~ _ . _ . _ _ _ _ . _ . _ - _ _ _ - _ _ _ _ . . . - . _ - . -

D-21 Following Witness Transcript Page

'McCaffrey, Brian 1

" Professional Qualifications" 14,320

[Not Bound In]

[LILCO Ex. 35, Item 4]  !

I McGuire, Paul J.

" Testimony of Edward T. Burns, 4346 George F. Dawe, George Garabedian, ,

Pio W. Ianni, Vojin Joksimovich, Robert M. Kascsak, Paul J. McGuire, Paul W. Rigelhaupt and David J.

Robare for the Long Island Lighting ,

Company Regarding Suffolk County /

Shoreham Opponents Coalition Contention 7B and Shoreham Opponents Coalition Contention 19(b)"

Metcalf, James E.

" Professional Qualifications" 9735 Minor, Gregory C.

" Professional Qualifications of 1113 Gregory C. Minor"

" Prepared Direct Testimony of 1114 Marc W. Goldsmith, Susan J.

Harwood, Richard B. Hubbard, and Gregory C. Minor on behalf of Suffolk County and the Shoreham Opponents Coalition Regarding Zontention 7B"

" Prepared Direct Testimony of 3545 Dale G. Bridenbaugh and Gregory C. Minor on Behalf of Suffolk County Regarding Suffolk County Contention 11, Passive Mechanical Valve Failure"

- - _. . . - . - - . - - . . - . - = . _ _ - - -

D-22 i

Following Witness Transcript Page

, " Prepared Direct Testimony of 8704 Dale G. Bridenbaugh and Gregory C. Minor on Behalf of Suffolk

! County Regarding Suffolk County Contention 22, SRV Test Program"

" Prepared Direct Testimony of 8709 4 Dale G. Bridenbaugh and Gregory j C. Minor on Behalf of Suffolk I County Regarding Suffolk County i

Contention 28(a)(vi) and SOC Contention 7A(6), Reduction of

, SRV Challenges"

, " Prepared Direct Testimony of 9587 Richard B. Hubbard and Gregory i C. Minor on Behalf of Suffolk County and the Shoreham Opponents Coalition Regarding Suffolk County Contention 27 and SOC Contention 3--Post-Accident Monitoring"

! " Direct Testimony of Gregory C. 19,665

! Minor on Behalf of Suffolk l

County Regarding SC Contention 8 and SOC Contention 19(h) -- Environmental Qualification" "Suffolk County Supplemental 20,903 Testimony on Contention 7B By Marc W. Goldsmith, Richard B.

Hubbard and Gregory C. Minor" Muller, Arthur R.

" Testimony of John F. Alexander, 10,080 T. Tracy Arrington, Frederick B. [Not Bound In}

Baldwin, Robert G. Burns, William [LILCO Ex. 21]

l F. Eifert, T. Frank Gerecke, Joseph M. Kelly, Donald G. Long, Arthur R.

Muller, William J. Museler, and Edward J. Youngling for the Long Island Lighting Company Regarding Suffolk County and Shoreham Opponents Coalition Contention 12 and Suffolk County Contentions 13, 14,

\ _. _ _ _ _ _ - _ - _ _ _ _ _ _

D-23 Following Witness Transcript Page i and 15" Museler, William J.

" Testimony of John F. Alexander, 10,080 T. Tracy Arrington, Frederick B. [Not Bound In]

Baldwin, Robert G. Burns, William [LILCO Ex. 21]

F. Eifert, T. Frank Gerecke, Joseph M. Kelly, Donald G. Long, Arthur R.

- Muller, William J. Museler, and Edward J. Youngling for the Long Island Lighting Company Regarding Suffolk County and Shoreham Opponents. Coalition Contention 12 and Suffolk County Contentions 13, 14, and 15"

" Supplemental Testimony of Messrs. 19,757 Museler, Arrington, and Kelly i Concerning I&E Inspection Report l No. 50-322/83-02" i

i Najuch, Robert J.

" Testimony of Robert M. Kascsak, 19,305 g

Joan F. Etzweiler, James F.

Gleason, Robert J. Najuch, William R. Shosho, and Newell K. Woodward for the Long Island Lighting Company on SC Contention 8/ SOC Contention 19(h) -- Environmental Qualification" Narrow, Lewis "NRC Staff Testimony of 16,248 l . Robert Gallo, John Gilray, [ Qualifications George Rivenbard, James Only Bound In Higgins, and Lewis Narrow at 16,245]

Regarding Quality Assurance, (Staff Ex. 8]

SC Contentions 12, 13, 14 and 15" with " Professional Qualifications of Robert M.

Gallo," " Professional Qualifications of James C.

Higgins," " Professional

d . . t 4

i D-24 i

Following Witness Transcript Page i

i Qualifications of Lewis Narrow,"

, " Professional Qualifications i of George W. Rivenbark," and

" Qualifications and Experience l of John William Gilray" and 10 j attachments j " Supplemental NRC Staff 16,260 l Testimony of Robert Gallo, [ Bound In John Gilray, George at 16,411-A]

Rivenbark, James Higgins, and [ Staff Ex. 9]

Lewis Narrow Regarding i Quality Assurance, SC Contentions l 12, 13, 14, and 15" Noonan, Vincent S.

i

"NRC Staff Testimony of James E. 19,311 Kennedy and Vincent S. Noonan on i Environmental Qualification (SC Contention 8/ SOC Contention i

i 19(h))"

Notaro, Jack A.

" Testimony of Johnny J. Kreps 15,506 and Jack A. Notaro for the [Not Bound In]

Long Island Lighting Company (LILCO Ex. 45]

on Water Hammer Procedures

! and Training" l Novarro, Joseph P.

l " Testimony of Joseph P. Novarro 17,588 Regarding Torrey Pines Technology's [LILCO Ex. 55]

Independent Verification of Shoreham Nuclear Power Station" l

! Pfefferlen, Henry C.

" Testimony of Leonard J. Calone, 8870 Harry T. Carter, Eugene C. Eckert, Henry C. Pfefferlen, John A. Rigert and William P. Sullivan for Long Island Lighting Company on Suffolk County Contention 16--ATWS" l

I D-25

Following ,

j Witness Transcript Page i 1

I f ' Price, Gregory Kent

' I

" Testimony of Gregory Kent Price 2693 (

for The Long Island Lighting i Company on Suffolk County l Contention 5 -- Loose Parts i

Monitoring System" Rigelhaupt, Paul W.

" Testimony o5 Edward T. Burns, 4346 George F. Dawe, George Garabedian, ,

Pio W. Ianni, Vojin Joksimovich,

! Robert M. Kascsak, Paul J. McGuire, Paul W. Rigelhaupt and David J.

Robare for the Long Island Lighting Company Regarding Suffolk County /

Shoreham opponents Coalition Contention 7B and Shoreham Opponents Coalition Contention j 19(b)"

Rigert, John A.

" Testimony of Leonard J. Calone, 8870

Harry T. Carter, Eugene C. Eckert, 4

Henry C. Pfefferlen, John A. Rigert and William P. Sullivan for Long Island Lighting Company on Suffolk County Contention 16--ATWS"

" Testimony of John Rigert for the 9455 i Long Island Lighting Company on Suffolk County Contention 27 and Shoreham opponents Coalition Con-tention 3--Regulatory Guide 1.97"

D-26 Following Witness Transcript Page

'Rivenbark, George W.

"NRC Staff Testimony of 16,248 Robert Gallo, John Gilray, [ Qualifications George Rivenbark, James Only Bound In Higgins, and Lewis Narrow at 16,245]

Regarding Quality Assurance, [ Staff Ex. 8]

SC Contentions 12, 13, 14 and 15" with " Professional Qualifications of Robert M.

Gallo," " Professional Qualifications of James C.

Higgins," " Professional Qualifications of Lewis Narrow,"

" Professional Qualifications of George W. Rivenbark," and

" Qualifications and Experience of John William Gilray" and 10 attachments

" Supplemental NRC Staff 16,260 Testimony of Robert Gallo, [ Bound In John Gilray, George at 16,411-A]

Rivenbark, James Higgins, and [ Staff Ex. 9]

Lewis Narrow Regarding Quality Assurance, SC Contentions 12, 13, 14, and 15"

,R o b a r e , David J.

" Testimony of Edward T. Burns, 4346 George F. Dawe, George Garabedian, Pio W. Ianni, Vojin Joksimovich, Robert M. Kascsak, Paul J. McGuire, Paul W. Rigelhaupt and David J.

Robare for the Long Island Lighting Company Regarding Suffolk County /

Shoreham Opponents Coalition Contention 7B and Shoreham Opponents Coalition Contention 19(b)"

D-27 I

I Following I Witness Transcript Page

'Rossi, Charles E.

"NRC Staff Testimony of Themis 6357 P. Speis, Walter P. Haass, Marvin W. Hodges, C. E. Rossi, James H. Conran, Sr. and Robert '

Kirkwcod~on Safety Classification and Analysis of Structures, Systems and Components (SC/ SOC Contention 7B) (SOC Contention 19(b))"

"NRC Staff Reply Testimony of 9462 Charles E. Rossi and Jerry L. Mauck on Instrumentation for Post-Accident Monitoring (SC Contention 27)

(SOC Contention 3)"

"NRC Staff Supplemental Testimony 20.810 I on Contention 7B By Roger J.

Mattson, Richard H. Vollmer, Charles E. Rossi, Ashok C. Thadani and Franklin D. Coffman, Jr."

Rothman, Robert L. l t

"NRC Staff Testimony of Sang 3979 Bo Kim and Robert L. Rothman on Seismic Design (SOC Conten-tion 19(e))"

Samaniego, Francisco J.

" Direct Testimony of Richard B. 19,068 Hubbard and Dr. Francisco J.

Samaniego Regarding Torrey i Pines Technology's Inspection j of Shoreham Nuclear Power '

Station" i

Schmitt, John F.

" Professional Qualifications" 9455 ,

h i

' D-28 r

Following Witness Transcript Page

-Shosho, William R.

" Testimony of Robert M. Kascsak, 19,305 Joan F. Etzweiler, James F.

Gleason, Robert J. Najuch,

} William R. Shosho, and Newell K. Woodward for the Long Island Lighting Company on SC Contention 8/ SOC Contention 19(h) -- Environmental Qualification" Smith, Jeffrey L.

" Testimony of Raymond M. Crawford, 7954 Jeffrey L. Smith and Steven J. Stark for the Long Island Lighting Company on Suffolk County and SOC Contention 22--SRV Test Program" and

" Professional Qualifications"

" Testimony of John J. Boseman, 7959 Raymond M. Crawford, Fred Hayes, John J. Kreps, and Jeffrey L. Smith for the Long Island Lighting Company on Suffolk County Contention 28a(vi) and SOC Contention 7A(6) -- Reduction of Challenges to SRV's"

" Supplemental Testimony of 15,506 Jeffrey L. Smith, John J. [Not Bound In]

Boseman and Richard [LILCO Ex. 46]

Gutmann Concerning Maintenance of Safety / Relief Valves at Shoreham Nuclear Station" Speis, Themis P.

"NRC Staff Testimony of Themis 6357 P. Speis, Walter P. Haass, Marvin W. Hodges, C. E. Rossi, James H. Conran, Sr. and Robert Kirkwood on Safety Classification and Analysis of Structures, Systems and Components (SC/ SOC Contention

. - . _ . _ _ _ _ _ _ . - . _ _ - = _ . _ _ .-

f i

, D-29

Following i Witness Transcript Page i
7B) (SOC Contention 19(b))"

I 1 4

Stark, Steven J.

" Testimony of Raymond M. Crawford, 7954 ,

Jeffrey L. Smith and Steven J. Stark  ;

for the Long Island Lighting Company on Suffolk County and SOC Contention i 22 -- SRV Test Program" and l l " Professional Qualifications" Sullivan, William P.

" Testimony of Leonard J. Calone, 8870 l Harry T. Carter, Eugene C. Eckert,  ;

Henry C. Pfefferlen, John A. Rigert 6 and William P. Sullivan for Long i Island Lighting Company on Suffolk '

County Contention 16--ATWS" '

Sun, Summer B.

"NRC Staff Testimony of Summer 2527 B. Sun on ECCS Core Spray (Suffolk County Contention 10)" ,

Tan, Chen P.

"NRC Staff Testimony of Farouk 9741 Eltawila, Mel B. Fields, and Chen P. Tan on Mark II Contain- i ment (Suffolk County Contention j 21)," professional qualifications, j and portions of SER and SER Supplements that-pertain to this  !

contention i I

" Supplement 3 to SER, Shoreham 9924 Unit 1, Docket No. 50-322,"

Section 3.8.1 and 3.8.2 Terao, David "NRC Staff Motion to Supplement 9741 the Witness Panel on Suffolk County Contention 21" 1

D-30 Following Witness Transcript Page

" David' Terao-Professional 9741 Qualifications" Thadani, Ashok C.

" Professional Qualifications" 6453 "NRC Staff Supplemental Testimony 20,810 on Contention 7B By Roger J.

Mattson, Richard H. Vollmer, Charles E. Rossi, Ashok C. Thadani and Franklin D. Coffman, Jr."

Townsend, Harold E.

" Professional Qualifications" 9735 Vollmer, Richard H.

"NRC Staff Supplemental Testimony 20,810 on Contention 7B By Roger J.

Mattson, Richard H. Vollmer, Charles E. Rossi, Ashok C. Thadani and Franklin D. Coffman, Jr."

Woodward, Newell K.

"Testmony of Robert M. Kascsak, 19,305 Joan F. Etzweiler, James F.

Gleason, Robert J. Najuch, William R. Shosho, and Newell K. Woodward for the Long Island Lighting Company on SC Contention 8/ SOC Contention 19(h) -- Environmental Qualification" Wong, Albert Yao Chee

" Testimony of Albert Yao 3970 Chee Wong for the Long Island Lighting Company on SOC Conten-tion 19(e) --

Seismic Design"

? . o l

1

! D-31 j Following

! Witness Transcript Page  !

! I l

1 j ' Wright, Robert J.

j "NRC Staff Testimony of 7964 i Robert J. Wright Relative j to Performance Testing of

{ Safety / Relief Valves Required

! By Item II.D.1 of NUREG-0737

! (SC Contenton 22)"

Youngling, Edward J.

l " Testimony of John F. Alexander, 10,080 j T. Tracy Arrington, Frederick B. [Not Bound In]

Baldwin, Robert G. Burns, William [LILCO Ex. 21]

F. Eifert, T. Frank Gerecke, Joseph M. Kelly, Donald G. Long, Arthur R.

Muller, William J. Museler, and Edward J. Youngling for the Long Island Lighting Company Regarding Suffolk County and Shoreham Opponents Coalition Contention 12 and

. Suffolk County Contentions 13, 14, l and 15" i

q, g 5/4/82-4/8/83 f y $2

'f

' k. ,

y APPENDIX.E: -

M'W O 9 ma, .. :

EXHIBITS BY PARTY AND NUMBER' '-fg

,ceef n g ,,

5$.(y402 Exhibit Number Description

\dj dent q 'at Admitted at Page Transcript Page Board Ex. 1 Long Island Lighting 2975 2975 Company, Shoreham (Bound In)

Nuclear Power Station Unit 1, " Final Safety Analysis Report,"

Figure 4.2.2-1: "Re-actor Vessel Internals (Schematic)," Undated Board Ex. lA Long Island Lighting 3322 3322 Company, Shoreham (Bound In)

Nuclear Power Station Unit 1, " Final Safety Analysis Report,"

Figure 4.2.2-1: "Re-actor Vessel Internals (Schematic)," marked by LILCO, Undated Board Ex. 2 U.S. Nuclear Regula- 17,107 tory Commission, Office of Inspection and Enforcement, Re-port No. 50-322/82-20 for inspection on October 12-15, 1982, cover letter dated November 16, 1982 Board Ex. 3 U.S. Nuclear Regula- 19,553 tory Commission, (Bound In)

" Environmental Quali-fication of Electric Equipment Important to Safety for Nuclear Power Plants: Final Rule," 48 Fed. Reg. 2729, January 21, 1983 I

LILCO Ex. 1 Deposition of Robert 1312 M. Kascsak, March 31, (Bound In 1982, pp. 161-163 at 1313)

bg, ...

E-2 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page

(

LILCO Ex. 2 Memorandum from 1356 Thomas F. Dorian, Regulations Divi-sion, Office of Executive Legal Director, NRC, to Steven D. Richardson, OSD, NRC, March 15, 1980 LILCO Ex. 3 U.S. Atomic Energy 1487-A 1487-A Commission, " Quality (Bound In)

Group Classifications and Standards for Water , Steam , and Radioactive-Waste-Containing Components of Nuclear Power Plants," Regulatory Guide 1.26, Revision 1, September 1974 LILCO Ex. 4 Long Island Lighting 1588 1588 Company, " Loss of (Bound In)

Off-Site Power Emer-gency Procedure,"

SP 29.015.01, Revi-sion 1, July 21, 1981 LILCO Ex. 5 Long Island Lighting 1696 1697 Company, " Transient (Bound In)

With Failure to Scram Emergency Procedure,"

SP 29.024.01, Revi-sion E, Undated LILCO Ex. 6 Long Island Lighting 1698 1699 Company, " Emergency (Bound In)

Shutdown Emergency Procedure," SP 29.010.01, kevision 2, November 17, 1980 LILCO Ex. 7 R. C. Cryter and C. W. 3033 3039 Ricker, " Character- (Withdrawn) istics and Perfor-I

a_ . _ _ . _ _ _ _ _ . _ _ _ _ . . _ _ . _ _ _ _

4

s.. ...

i

}

! E-3 i

J j Exhibit Identified at Admitted at i Number Description Transcript Page Transcript Page 1

i i mance Experience of

? Loose Parts Monitor-ing Systems in U. S.

Commercial Power Re-l actors," U. S. Nuclear

{ Regulatory Commission, l

NUREG-0524, pgs. 21-22, March 1979 LILCO Ex. 7A R. C. Cryter and C. W. 3214 Ricker, "Characteris-

{ tics and Performance j Experience of Loose i Parts Monitoring

! Systems in U. S.

j Commercial Power

Reactors," U. S.

j Nuclear Regulatory

Commission, NUREG-0524 j March 1979 j LILCO Ex. 8 R. C. Cryter and 3042

! F. Shahrokhi, "A l Summary of Studies i on Methods for Detecting, Locating

. and Characterizing Metallic Loose Parts in Nuclear Reactor Cooling Systems,"

Oak Ridge National Laboratory for the U. S. Nuclear Regula-tory Commission, NUREG/CR-2344 (cover page, table of contents, and pgs. ix-xii), October 30, 1981 LILCO Ex. 8A R. C Cryter and 3199 F. Shahrokhi, "A Summary of Studies on Methods for Detecting, Locating and Characterizing Metallic Loose Parts

s., ,..

E-4 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Fage in Nuclear Reactor Cooling Systems,"

Oak Ridge National Laboratory for the U. S. Nuclear Regula-tory Commission, NUREG/CR-2344, October 30, 1981 LILCO Ex. 9 Long Island Lighting 3054 Company, Shoreham Nuclear Power Station Unit 1, " Final Safety Analysis Report,"

Figure 5.5.1-1:

" Reactor Recirculation System Elevation and Isometric," Undated LILCO Ex. 10 Long Island Lighting 4120 4121 Company, Shoreham (Bound In)

Nuclear Power Station Unit 1, " Final Safety Analysis Report," Sec-tion 3.7.1A: " Seismic Input," including Figure 3.7.1A-1: "Re-sponse Spectra Design Basis Earthquake,"

Figure 3.7.1A-2: "Re-sponse Spectra Operating Basis Earthquake," and Figure 3.7.1A-5: "Re-sponse Spectra for Various Earthquake Rec-ords," Revision 1, March 1976 LILCO Ex. 11 Long Island Lighting 4560 4560 Company, Shoreham Nuclear Power Station Unit 1, " Final Safety Analysis Report,"

Volumes 1 to 16, through Revision 26, April 1982 I

v. , , ,

E-5 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page LILCO Ex. 12 Long Island Lighting 4560 4560 Company, Shoreham Nuclear Power Station Unit 1, " Environmental Report-Operating License Stage," Volumes 1 to 6, through Revision 4, September 1979 LILCO Ex. 13 Memorandum from 5496 5496 Harold R. Denton, (Bound In)

Director of Nuclear Reactor Regulation, to Carlyle Michelson, Director, Office for Analysis and Evalua-tion of Operational Data, NRC, "AEOD Preliminary Report:

Safety Concern Asso-ciated with Reactor Ves-sel Level Instrumenta-tion in Boiling Water Reactors," October 30, 1981 LILCO Ex. 14 Science Applications, 5988 5989 Inc., Probabilistic (Bound In)

Risk Assessment -

Shoreham Nuclear Power Station -

Long Island Lighting Company, Preliminary Draft, pg. 3-149, March 1982 LILCO Ex. 15 General Electric Com- 7477 pany " General Elec-tric Large Steam Tur-bine Generator Quality Assurance Program,"

GEZ-4982A, Undated LILCO Ex. 16 Long Island Lighting 7533 Company, "SNPS - (Bound In)

Project Procedure

i o *- ,e s l

I E-6 i

! 1

! i i Exhibit Identified at Admitted at I

Number Description Transcript Page Transcript Page i

i No. 4, Shoreham Nu-

) clear Power Station -

I Unit 1, Long Island l Lighting Company," l

[ C-11600.02-7A, pg. 1 and 4, August 20, 1973

{

I LILCO Ex. 17 Memorandum from Eric 7773 i

E. Jakel, Attorney, (Rejected j OELD, NRC, to M. at 7780)  !

Kehnamuyi, AD/GES, (Bound In j DES, OSD, NRC, "Ex- at 7781)  !

l tent of Applicabil-

) ity of Appendix B l

)

to 10 CFR Part 50 i to Structures, Sys-l

tems, and Components l i of Nuclear Power

! Plants," July 25,

! 1978 l LILCO Ex.18 Southwest Research 9298 I Institute, An Anal- (Bound In l ysis of the Reali- at 9299) ability of Light Water Reactor Power-t Actuated Pressure- '

Relieving Valves and Safety (Relief) Valves And Their Component  !

Parts Using The Nuclear Plant Reli-  !

ability Data System (NPRDSJ, Final Report, Prepared for Sandia

(

National Laboratories, cover page, pgs. 20, 24, and A-9/A-10, November 16, 1981 I

LILCO Ex. 19 Long Island Lighting 9728 Company, "LILCO's

, Response to ASLB Information Requests,"

June 25, 1982, in-cluding " Item 1 --

Primary Containment and Suppression Pool Sizes" with attached

I E-7 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Fage ,

letter from J. L.

Smith, Manager, Special Projects, Shoreham Nuclear Power Station, LILCO, to Harold R.

Denton, Director, Office of Nuclear Reactor Regulation, NRC, "Shoreham Nuclear Power-Unit 1, Docket No.

50-322," SNRC-645, December 16, 1981 LILCO Ex. 20 Long Island Lighting 9728 Company, "LILCO's Preliminary Response to Humphrey Concerns,"

and " Preliminary Res-olution of Mark II Applicable Humphrey Concerns for Shore-ham," Drafts, August 25, 1982 LILCO Ex 21 Testimony of John F. 10,080 10,080 Alexander, T. Tracy Arrington, Frederick E. Baldwin, Robert G.

Burns, William F.

Eifert, T. Frank Gerecke, Joseph M.

Kelly, Donald G.

Long, Arthur R.

Muller, William J.

Museler, and Edward J. Youngling for the Long Island Lighting Company Regarding suffolk County and Shoreham Opponents Coalition Contention 12 and Suffolk County Contentions 13, 14, and 15; with Attachments LILCO Ex. 21A Errata to LILCO Ex. 21 10,080 10,080

l E-8 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page LILCO Ex. 22 Long Island Lighting 12,033 12,033 Company, Table (Bound In) entitled "E&DCR Verification Program Statistics," Undated LILCO Ex. 23 Long Island Lighting 13,317 13,317 Company, " Transcript (Bound In)

Corrections on Calculations," 1 page, Undated LILCO Ex. 24 Long Island Lighting 13,319 Company, "Calcula- (Bound In tions," 4 pages, at 13,320)

Undated LILCO Ex. 25 Long Island Lighting 13,442 Company, " Drawings," (Bound In) 1 page, Undated LILCO Ex. 26 Long Island Lighting 13,465 13,465 Company, " Transcript (Bound In)

Corrections Document Control," 1 page, Undated LILCO Ex. 27 Long Island Lighting 13,467 Company, " Document (Bound In Control," 5 pages, at 13,474)

Undated LILCO Ex. 28 Long Island Lighting 13,550 Company, "E&DCRs," (Bound In 3 pages, Undated at 13,551)

LILCO Ex. 29 Long Island Lighting 13,689 Company, "Shoreham (Bound In Plant Configuration at 13,694)

Review," I page, Undated LILCO Ex. 30 Long Island Lighting 13,707 Company, 4 graphs (Bound In) entitled "E-51 RCIC System," "E-41 HPCI System," "E-51 RCIC

E-9 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page System," and "SPCR Finding C41 (01-2)"

LILCO Ex. 31 Long Island Lighting 13,734 Company, a document (Bound In) ,

listing audit obser- l vations related to '

storage with the headings " Group I -

, Storage History Cards," " Group II -

Protection Against Weather," " Group III - Covers and Caps for Material and Equipment,"

and " Group IV -

Environmental Pro-tection," 9 pages, Undated i

LILCO Ex. 32 Long Island Lighting 13,791 13,791 l Company, "Miscella- (Bound In) l neous Transcript l Corrections," 1 page, i Undated LILCO Ex. 33 Letter from Thomas 13,798 T. Martin, Director, Division of Engi-neering and Tech-nical Programs, NRC, I

to M. S. Pollack, LILCO, on the Staff .

response to the CAT Report, November 4, 1982 LILCO Ex. 34 Long Island Lighting 14,318 14,318 Company, a booklet including Nuclear Operations Corporate Policy, No. 22, de-scribing the Indepen-dent Safety Engineering Group (ISEG); Charter

'i E-10 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page i

of ISEG for LILCO; I Administrative Pro-cedures for ISEG, NOSD Series 19.1 through 19.5; and resumes of ISEG Group Leader and Engineers, Undated LILCO Ex. 35 Long Island Lighting 14,320 14,320 Company, Response to ASLB Information Request, including Items 3 and 4, resumes of Kubinak and McCaffrey,  ;

November 10, 1982 l

LILCO Ex. 36 Long Island Lighting 14,323 14,323 Company, Chart (Bound In) entitled " Nuclear Operations Support,"

dated 10/82; Chart showing reporting of Off-Site Nuclear Review Board, Undated; and Chart -

showing reporting  ;

of Review Operations  !

Committee, entitled  !

Figure 13.1. 2-1,

" Station Organiza-tion," FSAR, Revi-sion 27, August 1982 LILCO Ex. 37 Long Island Lighting 14,440 14,443 Company, " Resumes of l Outside Consultant  ;

Me-bers of the Nu-  !

clear Review Board," ,

including " Resume of David C. Rorer,"

" Resume of Richard Bowers," " Resume of Robert C.

Christenson," " Resume j of Dr. Raymond M. [

Crawford," and "Re- k I

I t

1 i

j E-11 1

Exhibit Identified at Admitted at l Number Description _ Transcript Page Transcript Fage i sume of Francis E.

! Duval," Undated LILCO Ex. 38 U.S. Atomic Energy 14,680 i Commission, "Guid- (Bound In ance on Quality at 14,681) l Assurance Require- (

ments During the j 1 Operations Phase of i

! t Nuclear Power Plants,"

i WASH-1284, Figure l 2 following Page  !

D-4, October 26, 1973 l

l LILCO Ex. 39 Long Island Lighting 14,835 14,836 l l

Company, " Transcript (Found In) ,

J Corrections for OQA [

Testimony," 1 page, j Undated '

i i

i LILCO Ex. 40 Long Island Lighting 14,882 14,882 Company, " Station (Bound In) l, Operational Quality f l Assurance (OQA) Stop (

i Work Authority," l l QAPS 01.2, Rev. 2, [

April 16, 1981 (

(

LILCO Ex. 41 Long Island Lighting 14,945 [

Company, " Fluke 8000A (Bound In l Calibration," SF at 14,958) j 46.050.12, Rev. 9, ,

Nov. 25, 1981 f i

LILCO Ex. 42 Long Island Lighting 14,945 l Company, "Transma- (Bound In {

tion Model 1040 at 14,958) [

Digital Calibrator Calibration," SP }

46.050.06, Rev. 4,  !

May 19, 1981 j

LILCO Ex. 43 U.S. Nuclear Regu- 25,428 latory Commission,

" Instrument Set-points," Regulatory i I

t

[

t b

.. -. .. - - . .. . . _ . . . . . --:____ _ _ . _ ,g_, ,, .,.y__

E-12 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page Guide 1.105, Rev. 1, November 1976 LILCO Ex. 44 U.S. Nuclear Regu- 15,430 latory Commission,

" Periodic Testing of Powel and Pro-tcction Systems,"

Regulatory Guide 1.119, Rev 2, June 1978 LILCO Ex. 45 Testimony of Johnny 15,505 15,506 J. Kreps and Jack A.

Notaro for the Long Island Lighting Company on Water Hammer Procedures and Training, July 9, 1982 LILCO Ex. 46 Supplemental Testi- 15,505 15,506 mony of Jeffrey L.

Smith, John J.

Boseman and Richard Gutmann Concerning Maintenance of Safety / Relief Valves at Shoreham Nuclear Station, August 19, 1982 LILCO Ex 47 Supplemental Testi- 15,505 15,506 mony of John J.

Boseman on Behalf of Long Island Light-ing Company Concern-ing Polymerization of SRV Lubricants, August 19, 1982 LILCO Ex. 48 Further Supplemental 15,505 15,506 Testimony of John J. Boseman on Behalf of Long Island Light-ing Company Concern-ing Polymerization

E-13 s

i Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page of SRV Lubricants, August 31, 1982 LILCO Ex. 49 Long Island 15,709 Lighting Company, (Bound In Shoreham Nuclear at 15,710)

Power Station, Final Safety Analysis Report, Table 223.12-3,

" Cable Tray Sepa-ration in Nonhaz-ardous Areas," 1 page, April 1979 ,

1 LILCO Ex. 50 U.S. General Account- 15,815 l ing Office, The  ;

Nuclear Regulatory  ;

Commission Needs to j Aggressively Monitor l

and Independently l Evaluate Nuclear l Power Plant Construc-  !

tion, EMD-78-80, pages 12,13, and 31, f

September 7, 1978 l l

LILCO Ex. 51 U.S. House of Repre- 15,906 e sentatives, Committee (Bound In) l on Interior and 1 Insular Affairs, 3 Subcommittee on Energy and the Environment, Oversight Hearing held l November 19, 1981 on  !'

Quality Assurance in Nuclear Powerplant Construction, Serial No. 97-26,  !

pgs. 121-122, 1982  !

LILCO Ex. 52 U.S. Nuclear Regu- 17,182 17,500 .

A latory Commission, Office of Inspection and Enforcement, Report No. 50-322/

79-04 for inspection ,

1

' 1 I

i i 1 1

E-14

(

Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page on March 27-30, April 2-4, 1979, cover letter dated July 12, i 1979; pages 1 and 2 of the cover letter l

and 1-2, 9-11 of the report l

l LILCO Ex. 53 Long Island Lighting 17,294 Company, " Question" (Bound in and " Subject," a list at 17,297) l of question numbers

and subjects from the l FSAR, 1 page, Undated i LILCO Ex. 54 Memorandum from W. J. 17,301 Museler and E. J. (Bound in Youngling, LILCO, at 17,303) to All Department l

Heads, Superinten-dents, Supervisors l and Contractors, i " Housekeeping and A

Cleanliness Zone j

. Requirements,  ;

Shoreham Nuclear Power Station- i i

Unit 1, WO10-48923,"

March 8, 1982  !

l I

LILCO Ex. 55 Testimony of Joseph 17,587 17,588 l l P. Novarro Regarding (Bound In) '

Torrey Pines Tech-i nology's Independent  !

Verification of l l Shoreham Nuclear Power Station, December 7, 1982

l j LILCO Ex. 56 Testimony of Lewis D. 17,589 17,590 l Johnson Regarding  ;

l Torrey Pines Tech-nology's Independent Verification of Shoreham Nuclear

, Power Station, December 7, 1982 5

i i

-.n.,w-----,-----,.,n . - - , . , - - - - - - . , _ _ - - - , _ , - , . _ - _ _ . . - - , , - - - . - - - . . - _ - , . - _ _ - -

E-15 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page I LILCO Ex. 57 Deposition of 17,613 17,616 Louis D. Johnson, 236 pgs., January 3, 198a LILCO Ex. 57A Memorandum from 17,614 Lewis F. Powell, III, (Bound In to Alan R. Dynner, at 17,616) l Esq. and Michael i

S. Miller, Esq., l

, " Additional Cor- l rections to Deposi- I tion of Louis D.

Johnson," January 7, ,

1983 LILCO Ex. 57B Memorandum from 17,614 Lewis F. Powell, III (Bound In to Alan R. Dynner, at 17,616)

Esq. and Michael S. 3 Miller, Esq., "LILCO's l Initial Designation  :

of Portions of the Deposition of Louis D. Johnson," January  ;

6, 1983 (

l LILCO Ex. 58 Deposition of Joseph 17,617 17,621  :

P. Novarro, 187 pgs., l December 30, 1982  !

LILCO Ex. SSA Memorandum from 17,617 17,621  !

Anthony F. Earley, Jr. (Bound In) [

to Alan R. Dynner, t Esq. and Michael S. Miller, Esq.,

"Novarro Deposition,"  !

January 5, 1983 LILCO Ex. 58B Memorandum from 17,618 17,621  !

Anthony F. Earley, Jr. (Bound In) '

to Alan R. Dynner, j Esq., and Michael S.  !

Miller, Esq., "LILCO's j Initial Designation of Portions of the Deposi- ,

tion of Joseph P.

i i

r i

l k

eee , *e E-16 Exhibit Identified at Admitted at l Number Description Transcript Page Transcript Page Novarro," January 4, 1983 LILCO Ex. 59 Torrey Pines Techno- 17,660 17,662 logy, " Final Report, Independent Verifi-cation, Shoreham Nuclear Power Station,"

Volume 2, Program I Results; Volume 3, Potential Finding i Reports, Book 1; and  ;

Volume 3, Potential Planning Report, Book 2, GA-C16873, l September 30, 1982 j LILCO Ex. 60A Agreement Regarding 18,134 Results of Study (Bound In Ferformed Pursuant at 18,133) to Resolution of SC Contention 28(a)(i) l and SOC Contention 7.A(1)--ECCS Cutoff l LILCO Ex. 60B General Electric 18,134 l Company, Report of {

study performed  ;

pursuant to resola- l tion of SC 28(a)(i) and SOC Contention 7.A(1)--ECCS Cutoff, 50 pgs., Undated LILCO Ex. 61 Letter from Gregory 19,180 19,190  ;

J. Blass, Legislator, (Bound In (Rejected) l County of Suffolk, at 19,181) l to MHB Associates, j September 21, 1982 A

LILCO Ex. 62 Letter from James L. 19,184 19,190 l Larocca, New York (Bound In (Rejected) i

! State Energy Office, at 19,185)  ;

to Paul Harenberg,  !

j New York State i 1 Assembly, July 9, j I

4 1982 i

i o

w. -,--n.--~.---n--r,..----,,v - - , - - - - , ___new. m-w_-- _ . _

E-17 i

j Exhibit Identified at Admitted at j Number Description Transcript Page Transcript Page LILCO Ex. 63 Long Island Lighting 19,300 Company, " Environ-

, mental Qualification l

Report for Class IE

Equipment, Shoreham

! Nuclear Power i Station Unit 1,"

2 volumes, Revision 4, October 1982 LILCO Ex.,64A Long Island Lighting 20,021 Company, " Responses to the Board's Re-t quest for Informa-

! tion Concerning

! Certain I&E Reports,"

December 21, 1982 LILCO Ex. 64B Letter from William 20,021 20,022 J. Museler, LILCO, (Item 4 only to Anthony J. admitted into Earley, Jr. and evidence)

Timothy S. Ellis Hunton & Williams, enclosing four numbered item responses to ASLB

! information re-

! quest on Shoreham Nuclear Power Station, December 18, 1982 LILCO Ex. 65 Illustration on 20,071 cover hold-downs, (Bcund In labeled " Factory at 20,072)

Supplied," "Ap-proved E&DCR,"

" Field Modifica-tion-1," " Field Modi-fication-2"

,! LILCO Ex. 66 Memorandum from 20,584 l Richard W. (Bound In Starostecki, Di- at 20,586) l rector, Division of Project and Resident i

i 1

I

l E-18 Exhibit Identified at Admitted at j Number Description Transcript Page Transcript Page i

i

, Programs, Region I,

) NRC, to Walter P.

i Haass, Chief, Quality Assurance Branch, Division of Engineering, NRC

" Comments on EGSG l

Report (EGG-EA- l l

6109 - November, -

! 1982-Draft)", f j January 6, 1983 l I

LILCO Ex. 67 Letter from L. C. 20,589 l f Dail, Vice Presi- (Bound In j l

dent, Design En- at 20, 595) i i gineering, Duke [

Power Company, i to Walter P. Haass, {

Deputy Chief, Qual-  !

ity Assurance Branch, Division l of Engineering, ,

Office of Nuclear '

Reactor Regulation, NRC, " Comments on I EGSG-EA-6109-

' Identification and i Ranking of Nuclear l Plant Structures,  !

Systems and Com- l ponents and Graded l Quality Assurance i Guidelines,' Draft, {

November 1982," l February 23, 1983 l LILCO Ex. 68 U. S. Nuclear 20,628 Regulatory Com- (Bound In  ;

mission, Remarks at 20,641) l Presented (Ques-tions/ Answers Dis-cussed) at Public .

Regional Meetings I To Discuss Regula- f tions (10 CFR Part [

21) For Reporting l of Defects and Noncom-  ;

E r

i

, i i

E-19 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page pliance, NUREG-0302, Rev. 1, cover page and pages 21.3(a)-1 and 21.3(a)-2,  ;

July 12-26, 1977 l 1

LILCO Ex. 69 Letter from M. S. 20,653 20,654 Pollock, Vice (Bound In)  ;

President-Nuclear, i LILCO, to Darrell G.  !

l Eisenhut, Director, l Division of Licens-ing, NRC, SNRC-844, March 2, 1983 LILCO Ex. 70 Letter from M. S. 20,653 20,654

Pollock, Vice (Bound In) '

l President-Nuclear,  !

! LILCO, to Darrell G.

Eisenhut, Director, '

i Division of Licens- l j ing, NRC, SNRC-854, with attachments, March 8, 1983 LILCO Ex. 71 U.S. Nuclear Regula- 20,934 20,953 tory Commission, (Bound In)

Office of Nuclear Reactor Regulation, Identification of Unresolved Safety Issues Relating to Nuclear Power Plants, NUREG-0510, cover page and pages A-12, A-13, B-4, and B-5, January 1979 LILCO Ex. 72 " Portions of I&E 20,998 Report 50-322/ (Bound In)  !

83-02 Admitted Into Evidence," 2 pages, Undated l l

LILCO Ex. 73 " Resolution of 21,000 21,000 Subsection (d) (Bound In) t I

of SC Contention I

I

-- - - -.. - _ _. _ _ . - . , , , - - - . - , - _ . . _ , . - ~ , , . - . - _ , , . . _ - _ -

c.. ...

E-20 Exhibit Identified at Admitted at ,

Number Description Transcript Page Transcript Page l I

13 -- Quality Assurance / Quality  :

Contrcl -- Opera-tions," March 31, 1983 ,

t LILCO Ex. 74 " List of LILCO/ 21,033 21,033 S&W Audits (Bound In  !

Reviewed by NRC at 21,034) l Staff Witnesses i in Preparation j for Oral Testimony,"  !

1 page, Undated i LILCO Ex. 75 Memorandum from 21,043 21,043 M. S. Pollock, (Bound In)  :

Vice President- t Nuclear, LILCO, to I All Officers, Department and l Division Managers I and Supervisors, j " Organization

! Change-Office of i Vice President-Nuclear," March 28, i 1983 l LILCO Ex. 76 Letter from Walter H. 21,165 21,165-69 D'Ardenne, Chairman, (Bound In (Rejected) l Ad Hoc Committee on at 21,169) [

Important to Safety, j ANS, to George L. l Wessman, with  !

attachments, March  !

30, 1983 .

i i SC Ex. 1 Memorandum from 1790 5373 l Carlyle Michelson, (Bound In)

Director, Office for Analysis and Evaluation of Opera-tional Data, NRC, to j Harold R. Denton, i Director, Office of Nuclear Reactor Regulation, NRC, I

l 1

E-21 l

1 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page

" Safety Concern Associated with Reactor Vessel Level Instrumenta-tion in Boiling Water Reactors,"

January 20, 1982 SC Ex. 2 Quadrex Corporation, 2149 2149

" Evaluation of Water

, Hammer Events in Light Water Reactor Plants, 1 March 1982," Draft i Revision 0, March 10, l

1982 (Chapter 5 t deleted.) '

l I

SC Ex. 3 EG&G - Idaho, Inc., 2150 2150 j

" Compilation of Data i Concerning Known and Suspected Water Hammer Events in Nuclear l Power Plants, April 1982" (Preliminary Draft -- Interim Report) (Appendices B &  ;

C, and "PWR Non-Steam -

Generator Events" deleted.) ,

SC Ex. 4 Memorandum from Robert 2621 2623 L. Tedesco, Assistant (Bound In) '

Director for Licensing, Division of Licensing, NRC, to The Atomic Safety and Licensing Board for the Shoreham  !

Nuclear Power Station, j

" Board Notification - i Japanese Core Spray I Distribution Tests on j a Simulator BWR/5 Con- .

I figuration (BN-81-49),"  !

I December 11, 1981 A

SC Ex. 5 Letter from Richard 2726 2733 W. Starostecki, Di- (Bound In)  ;

l l

ese e**

E-22 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page rector, Division of Resident and Project Inspection, NRC, to M. S. Pollock, Long' Island Lighting Company, " Inspection 50-322/82-02,"

L February 2, 1982 l SC Ex. 6 U. S. Nuclear Regu- 2738 2878 latory Commission, (Bound In)

Office of Nuclear l Regulatory Research,

" Loose-Part Detection Program for the l

Primary System of Light-Water-Cooled Reactors," Regulatory Guide 1.133, Revision 1, May 1981 SC Ex. 7 ENDEVCO, "Isobase 2908 2977 l' High Temperature (Bound In)

Accelerometer,"

General Description and Specifications for Models 2273AM1 and 2273AM20, Page 1 of 4, June 1975 SC Ex. 8 Technology for Energy 2914 2977 Corporation, "TEC 500 (Bound In)

Remote Charge Conver-ter Specifications,"

Undated SC Ex. 9 Long Island Lighting 2979 2979 Company, Shoreham Nuclear Power Station Unit 1, " Final Safety Analysis Report,"

Revision 19, Section 4.4.6, pg. 4.4-25, September 1980 l

L_.. __ . _ _ _,

i E-23 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page i

SC Ex. 10 Letter from Boyce H. 3107 Grier to Long Island Lighting Company, en-closing I & E Bulletin i No. 80-7, "BWR Jet Pump

! Assembly Failure,"

i April 4, 1980

\

! SC Ex. 11 Long Island Lighting 3118 Company, Shoreham Nuclear Power Station ,

Unit 1, " Final Safety  !

Analysis Report," l Figure 5.5.1-5, Undated  :

1 SC Ex. 12 U.S. Nuclear Regulatory 3794  ;

j Commission, I&E In- ,

! formation Notice 81-28, " Failure of f Rockwell - Edward l l Main Steam Isolation l

}

Valves (MSIV)," Sep- l tember 3, 1981  ;

SC Ex. 13 Long Island Lighting 3858 3863 Company, " Memorandum (Bound In) ,

to File A21.650: NRC ,

IE Information Notice 81-28, Failure of  ;

Rockwell - Edward j Main Steam Isolation [

Valves (MSIV) Shore-  !

ham Nuclear Power l Station - Unit 1, {

W.O. 44430/48923," i March 31, 1982 i l

SC Ex. 14 U.S. Nuclear Regulatory 3872 i Commission, " Licensee  !

Event Report Compila- i tion for the Month of i February 1982,"

NUREG/CR-2000, (Ex-cerpts) e i

SC Ex. 15 U.S. Atomic Energy Com- 4030 4123 mission, " Design Re- (Bound In) f i

f

. _ _ _ _ _ _ . _ _ _ _ _ _ - . _ _ _ _ . - _ . , .a

l c.. ...

i j E-24 1

Exhibit Identified at Admitted at Number Description Transcript Page Transcript Fage i sponse Spectra for i Seismic Design of

' Nuclear Power Plants,"

l Regulatory Guide l 1.60, Revision 1, December 1973 SC Ex. 16 Long Island Lighting 4145 4147.

Company, Shoreham (Bound In)

Nuclear Power Station Unit 1, " Final Safety Analysis Report,"

Table 3.7.2A-1:

" Natural Frequencies of Vibration (Cycles /

Sec)," Undated SC Ex. 17 Institute of Nuclear 4648 i Power Operations, Nuclear Safety Analy-l sis Center, " Screening

{

! and Evaluation of 1979 Licensee Event Re-ports," pgs. 4-6 l through 4-10, Undated SC Ex. 18 Long Island Lighting 4863 Company, Shoreham Nuclear Power Station Unit 1, " Final Safety Analysis Report,"

Figure 7.1.1-1: " Plant Instrumentation and Control Systems--

Classification,"

Revision 22, July 1981 SC Ex. 19 Lawrence Livermore 5025 Laboratory, " State-of-the-Art Review and Methods Evaluation Performed," NUREG/CR-1859, pgs. xvi-xix and 53, January 1981 SC Ex. 20 Institute of Nuclear 5262 5318 Power Operations, Nu- (Bound In) clear Safety Analysis

E-25 Exhibit Identified at Admitted at

Number Description Transcript Page Transcript Page 1

i l Center, " Analysis of Incomplete Control Rod l

j Insertion at Browns l Ferry 3," INPOf3, 1 NSAC/20, cover page

! through pg. 5, December l 1980 SC Ex. 21 Institute of Nuclear 5605 Power Operations, Nuclear Safety Analy-sis Center, "High Pressure Core Cooling i

System Malfunctions at Hatch," April 1981

}

SC Ex. 22 Science Applications, 5666 5903 Inc., Probabilistic (Bound In)

Risk Assessment -

Shoreham Nuclear Power Station - Long Island Lighting Company, Pre-liminary Draft, pgs.

2-32 through 2-36, March 1982 SC Ex. 23 Science Applications, 5688 5903 Inc., Probabilistic (Bound In)

Risk Assessment -

Shoreham Nuclear Power Station -

Long Island Lighting I

Company, Preliminary l Draft, pgs. 3-172 and 4-3, March 1982 SC Ex. 24 Science Applications, 5741 5903 Inc., Probabilistic (Bound In)

Risk Assessment -

Shoreham Nuclear Power Station - Long Island Lighting Company, Pre-liminary Draft, pg.

3-150, Figure 3.6.6:

" Comparison of the Contributing Accident Sequences to the Cal-

E-26 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page culated Frequency of Core Melt from WASH-1400 and the Shore-ham Analysis," March 1982 SC Ex. 25 Probabilistic 5773 5903 Risk Assessment for (Bound In)

Limerick Nuclear Power Station, pg.

3-96, Figure 3.5.2:

" Summary of the Acci-I dent Sequence Fre-quencies Leading to l Degraded Core Condi-  !

tions Summed Over All  !

Accident Sequences Within a Class,"

March 1981 SC Ex. 26 Probabilistic 5792 5903 Risk Assessment for (Bound In)

Limerick Nuclear Power Station, pg. 3-100, i Figure 3.5.4: "Com- j parison of the Con- i tributing Accident l Sequence to the Cal- l culated Frequency of [

i Core Melt from WASH-1400 and the Limerick I Analysis," March 1981 SC Ex. 27 Science Applications, 6057 6057 Inc., Probabilistic (Bound In) ,

Risk Assessment -

(

Shoreham Nuclear j Power Station - Long  ;

Island Lighting Com-  ;

pany, Preliminary l Draft, pg. 3-9, Table [

3.3.1: " Generic ,

Accident Sequence ,

Classes," March 1982 l I

1 t

I E-27 Exhibit Identified at Admitted at Number Description Transcript Fage Transcript Fage SC Ex. 28 L. G. Frederick, 6265 6326 General Electric (Bound In)

Co., " Comparison (Rejected) of PRA Results --

Shoreham & Limeriek,"

4/29/82 SC Ex. 29 U.S. Nuclear Regu- 6710 latory Commission, (Bound In Reliability and at 6742)

Risk Assessment Branch, Division of Safety Tech-nology, Office of Nuclear Reactor Regu-lation, " Initial Guidance for the Per-formance of Systems Interaction Analyses at Selected LWRS (Guidance for Interim Use and Comment),"

Draft, cover and pg.

5-2, January 7, 1982 SC Ex 30 "Fifth Iteration 6719 of the TMI Action (Bound In Plan Tracking at 6742)

System," two pages of this computer printout on II.F.5 and II.G.1 of NUREG-0737, April 1, 1982 SC Ex. 31 J. W. Minarick and 6727 C. A. Kukielka, (Bound In

" Precursors to Po- at 6742) tential Severe Core Damage Acci-dents: 1969-1979 --

A Status Report,"

Oak Ridge National Laboratory for the U.S. Nuclear Regu-latory Commission, NUREG/CR-2497, Vol.

i

E-28 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Fage 1, pgs. v-ix, xi-xiv, 1982 SC Ex. 32 Memorandum from 6989 .

Walter P. Haass, (Bound In Chief, Quality at 7009)

Assurance Branch, Division of Pro-ject Management, NRC, to W. M. Morri-son, Assistant Di-rector for General Engineering Stan-dards, Division of Engineering Stan-dards, SD, NRC, "QAB Comments on Proposed Regula-tory Guide 1.XXX (RS-704-4)," July 24, 1979 SC Ex. 33 Oak Ridge National 8110 Laboratory for the (Bound In NRC, " Licensee at 8311)

Event Report (LER)

, Compilation for the Month of April 1982,"

NUREG/CR-2000, ORNL/NSIC-200, Vol. 1, No. 4, pg. 1.2 , Undated SC Ex. 34 Letter from A. Schwen- 8264 cer, Chief, Licensing (Bound In Branch No. 2, Division at 8312) of Licensing, NRC, to M. S. Pollock, Vice President -

Nuclear, Long Island Lighting Company,

" Request for Addi-tional Information -

Shoreham Nuclear Power Station," July 8, 1982 SC Ex. 35 General Electric Com- 8463 pany Nuclear Fuel and (Bound In Services Division, at 8480)

E-29 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Fage Information Letter:

" Recommendations Applicable to the Target Rock Main Steam Safety / Relief Valve, Model #7567F (2-Stage SRV Design)," SIL No.

196, Supplement 11, Category 2, April 1982 SC Ex. 36, Long Island Lighting 9012 Company, "Shoreham (Bound In Transient With Fail- at 9042) ure to Scram Emer- (Rejected gency Procedure," at 9248)

SF 29.024.01, Enclo-sure 4, pgs. 21-23, Undated SC Ex. 37A Memorandum from Joel J. 9015 9251 Kramer, Deputy Director, (Bound In Division of Human at 9249)

Factors Safety, NRC, to Robert L. Tedesco, Assistant Director for Licensing, Division of Licensing, NRC, " Safety Evaluation Report Input:

Shoreham Nuclear Power Station - Unit 1 (SNPS-1), Emergency Operating Procedures and Anticipated Transients Without Scram," February 11, 1982 SC Ex. 37B Division of Human Fac- 9015 9252 tors Safety, NRC, (Rejected)

" Safety Evaluation Re- (Bound in port Input, Shoreham at 9249)

Nuclear Power Station, Unit 1, Operating and Maintenance Procedures and Anticipated Trans-ients Without Scram,"

Draft, Attachment to

.o ... 1 i

I E-30 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Fage SC Ex. 37A, February j 11, 1982 SC Ex. 38 U. S. Nuclear Regula- 9054 I l tory Commission, (Bound In j

j office of Inspection at 9252)

and Enforcement,

" Failure of 76 of 185 Control Rods to Fully l Insert During a Scram i at a BWR," I&E Bulle-tin 80-17, Enclosure 1, July 3, 1980 SC Ex. 39 Four handwritten 9171 9173 charts all indi- (Bound In) cating " Time After Start of ATWS (Min.),"

and having as other variables " Reactor ,

Power (% Rated),"  ;

" Reactor Pressure  ;

(psig)," " Water Level (Inches Above TAF)," and "Supp.

Pool Temp.," Undated SC Ex. 40 Long Island Lighting 9189 l Company, " Emergency (Bound In Shutdown Emergency at 9253)

Procedure," SP 29.010.01, Revision 3, Pg. 1, May 14, 1982 SC Ex. 41 Long Island Lighting 9229 Company, " Residual (Bound In Heat Removal (RHR) at 9254)

System," SP 23.121.01, Revision 1, pgs. 1, f 8 and 9, October 23, L 1980 (

SC Ex. 42 Memorandum from 9815 Robert L. Tedesco, (Bound In i for the Atomic at 9998)  !

Safety and Licensing l Boards, for Shoreham i-1 l i

.o ...

! E-31 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page i

Nuclear Power Station, Unit 1, Enrico Fermi Atomic Power Plant, Unit 2, William H.

Zimmer Nuclear Power Station, Unit 1,

" Board Notification -

Air Pressure Loads on the Drywell - Wetwell Vacuum Breakers During Pool Swell Following a Postulated LOCA (Board Notification 82-55)," June 10, 1982 l

l SC Ex. 43 Long Island Lighting 9832 I Company, Shoreham (Bound In Nuclear Power Station, at 9998)

Unit 1, Design Assess-ment Report, " Appendix A -- Lead Plant Accep-tance Criteria (NUREG-l 0487, Appendix D) Pos-

{ itions," pgs. A-1 2

through A-14, Revision 5, December 1981 SC Ex. 44 Letter from Robert L. 9848 l Tedesco, Assistant (Bound In i

Director for Licens- at 9998) l ing, NRC, to M.S.

Pollock, Vice Presi-dent - Nuclear, LILCO,

" Concerns Regarding the Adequacy of the Design Margins of the Mark I and II Containment Systems," enclosing document entitled "Humphrey Containment Concerns," July 8, 1982 SC Ex. 45 Letter from J. L. 9884 10,000 Smith, Manager, (Bound In)

Special Projects, Shoreham Nuclear Power Station, LILCO, i

i l

E-32 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page to Harold R. Denton, Office of Nuclear Re-actor Regulation, NRC, "NUREG-0808 Load Eval-uation Justification of Selected Piping Sub-systems, Shoreham Nu-clear Power Station -

Unit 1, Docket No.

50-322," SNRC-714, with attachments, July 9, 1982 SC Ex. 46 Long Island Lighting 9965 10,000 Company, Shoreham (Bound In)

Nuclear Power Station Unit 1, Design Assess-ment Report, pgs. L-11 and L-12, Revision 5, December 1981 SC Ex. 47 Long Island Lighting 9969 10,000 Company, Shoreham (Bound In Nuclear Power Station at 9978)

Unit 1, Design Assess-ment Report, pgs. L-4 and L-5, Figures L-25, L-27, L-29, L-32, L-33, and L-34, Revision 5, December 1981 SC Ex. 48 Stone & Webster, 10,283 Shoreham Project j Audit No. 0 (an Engineering Assurance Audit), December 31, 1969 SC Ex. 49 Stone & Webster, 10,283 Shoreham Audit No. 00, July 1, 1970 SC Ex. 50 Stone & Webster, 10,283 I p Shoreham Project  !

Audit 1, September I I

l t

E-33 9

I' Exhibit Identified at Admitted at j l Number Description Transcript Page Transcript Fage l l  !

1970 SC Ex. 51 Stone & Webster, 10,285 Engineering Assurance Audits 2 through 40, March 1971 - June 4, 1982 l SC Ex. 52 Letter from R.S. 10,705 .

, Costa, Project QA (Bound In l Manager, Stone & at 10,726) I Webster, to T. F. Gerecke, QA Manager, LILCO, ,

" Quality Assurance  !

Progrr.m Report -

l Shoreham Nuclear Power Station,"

October 2, 1979 SC Ex. 53 Memorandum from 10,711 D.C. Shelton, (Bound In Stone & Webster, to at 10,726)

E. J. Brabazon and J. Carney (SEO),

" Engineering Assurance Audit Report, Shoreham SEO Audit 11," May 5,  ;

1981 I I

I SC Ex. 54 Long Island Lighting 10,838 Company, Three surveillance reports on mechanical equipment, electrical equipment, and i

instrumentation,  !

Undated f

( SC Ex. 55 Long Island Lighting 10,867 Company, Field Audit (Bound In [

(FA) Report 602, at 10,982) [

July 5, 1977 SC Ex. 56 Stone & Webster, 11,024 11,423 l Field Quality Control (FQC) Audits f

I

l 1

! E-34 i

! Exhibit Identified at Admitted at 1 Number Description Transcript Page Transcript Page l

l 8 through 41, Un-l dated. FQC 26, l Finding L.3, 6/78; I FQC 34, Finding N.1, l 6/80; FQC 35, Attach-ment 2, Observation l

2.4, 9/80; and FQC 38,

p. 2, Item B at top  :

and Attachment 1, l Observation 1.2, 6/81  !

were received into  !

evidence. [See also SC Ex. 65 and SC  !

! Ex. 67]

SC Ex. 57 Long Island Lighting 11,056 11,423 f Company and Stone & (Bound In F Webster, Field Audit at 11,122) 654, November 16, -

i 1977. Findings 4.6 [

l and 4.7 were received t into evidence. .

f t

SC Ex. 58 Long Island Lighting 11,121 11,422 Company and Stone & (Bound In Webster, Field Audit at 11,138) 718, March 13, 1978.

Findings 3.1, 4.3, and 4.4 were received into evidence.

11,42.

SC Ex. 59 Long Island Lighting 11,127 Company, Field Audit (Bound In 842, November 16, at 11,138) t 1978. Finding 4.1 I was received into  !

evidence. ,

SC Ex. 60 Memorandum from 11,271  !

R. L. Bernard, LILCO, (Bound In) .

i to J. M. Kelly, LILCO, " Sample Inspection of Safety -

Related ESDCR's,"  ;

September 8, 1977 [

t I

i h

l

.e ...

I j E-35 i

Exhibit. Identified at Admitted at Number Description Transcript Page Transcript Page l

I' SC Ex. 61 Kirkpatrick, 11,369 l

l Lockhart, Hill, (Bound In l l Christopher & at 11,423)  !

Phillips, " Courter  !

E&DCR Deficiencies," l'

! 3 pages, Undated i

SC Ex. 62 Long Island Lighting 11,362 11,422 Company, Field (Bound In Audit 970, July 12, at 11,481) 1979. Finding 4.3 l was received into ,

~

evidence. l SC Ex. 63 Long Island Lighting 11,363 11,422 Company, Quarterly Reports to Manage-ment, 12 reports ,

covering, but not I completely, the period May 4, 1978 through j

December 3, 1981. The following reports were received into evidence

5/78, pg. 1, section 3; 8/31/78, pg. 1, last j section; 11/3/78, t pg. 1, section 3; f 1/29/79, pg. 1, sec- I tion 2; 4/16/79, pg. 1, section 3; and 8/20/79,  ;

pg. 1, last section. j Also, May 30, 1980 .

Quarterly Report: pg. 1, f first full paragraph; July 22, 1980: pg. 2, second paragraph; i November 13, 1980: pg. 1,  ;

bottom paragraph; Feb-  !

ruary 17, 1981: pg. 1, paragraph following "Fol-  !

lowup on previously re-ported items;" August 31,  ;

1981: pg. 2, paragraph starting " Failures to provide;" and December 31, 1981: pg. 1, last ,

i l

l i

. , _ _ - _ . . . ~ , , , _ _ _ _ _ . _ _ _ _ _ . - . . ~ . _ _ _ _ _ _ _ _

E-36 Exhibit Identified at Admitted at Number Description Transcript Fage Transcript Fage paragraph. l Stone & Webster, 11,446 SC Ex. 64 E&DCR Implementation (Bound In

(

Verification Program, at 11,481)

Revision No. 4, November 5, 1979.

SC Ex. 65 Material related 11,478 i to storage and labeled Storage l Groups 1 through 5 concerning, in sequence: storage card deficiencies, failure to protect against weather, covering and cap-ping, environmental protection, and lit-ter and debris.

Those items received into evidence are listed below. l Field Audit (FA) 11,556 376, Finding 4.8; i FA 601, Finding 4.4; .

FA 1016, Findings  !

4.1, 4.3; FA 1213, [

Findings 4.1, 4.2;  ;

FA 1425, Finding l 4.1; FA 679, Find-  !

f ing 4.2; FA 934, Finding 4.1; and FA 980, Finding 4.1 <

l FA 699, Finding 4.1 11,585 f i

Field Quality Con- 11,586 ,

trol (FQC) Audit  ;

13, Finding D.7; ,

FA 238, Finding 4.3; i FQC 15, Finding D.8; FA 443, Finding 4.4; FA 1086, vind-A

E-37 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page ing 4.4 FQC 13, Finding D.4; 11,596 and FQC 21, Finding D.11 FA 1016, Finding 11,598 4.2 FQC 13, Finding D.5; 11,616 FA 226, Findings 4.4, 4.14; EQC 23, Finding D.7; and FQC 40, observation 1.3, Subpart 4 with l

l Attachment 1 i

FA 371, Findings 11,635 4.2, 4.3, 4.4; FA 444, Findings 4.1, 4.2; FA 340, Find-ing 4.3: FQC 23, Finding D.5.2; FA 803, Finding 4.2; and FA 1183, Find-ings 4.1, 4.2, 4.3 FA 371, Finding 4.1- 11,654 FQC 23, Finding D.5.1; FA 648, Find-ing 4.3; FA 1275, Finding 4.2; FA i 443, Finding 4.4; FQC 36, Finding l 1.3; FA 425, Find-ing 4.1; and FQC 34, Finding N.2.A FA 376, Finding 4.4; 11,661 FA 425, Finding 4.3; FA 470, Finding 4.2; FQC 23, Finding D.6; and FQC 24, Finding K.7 L _ _ . . _ - -_ _ _ __ __ _

E-38 s

l

] Exhibit Identified at Admitted at Number . Description Transcript Page Transcript Fage l

FA 238, Finding 4.9; 11,668 and FA 44, Finding

) 4.4 FQC 13, Finding D.8; 11,727

. FA 934, Finding J

4.1; FA 1301, Find-ing 4.1; FA 1313, Find-ing 4.1; and FQC >

28, Finding D.7 FQC 15, Finding D.7; 11,754 FA 470, Finding 4.9; FA 601, Findings 4.1, 4.2, 4.3; FQC 23, Finding D.5.3; FA 656, Finding 4.2; FA 721, Find-ings 4.1, 4.2; FA 803, Findings 4.3, i 4.4; FA 934, Findings 4.2, 4.3; FA 980,

. Findings 4.2, 4.3; FA 1026, Findings 4.1, 4.2; FQC 33, pg. 2 of 3 and Find-ing D.4; FA 1086, Finding 4.2; FQC 34, Finding N.2; FA 1180, Findings 4.1, 4.3; and FA 1234, Find-ing 4.1

, FQC 17, Finding D.4; 11,805 and FQC 21, Finding D.7 FA 980, Finding 4.1 11,809 t 1 FQC 34, Finding K.3 11,811 FQC 35, Paragraph 11,815 3.2.1 and Attachmerit 2

i

E-39 a

Exhibit Identified at Admitted at Number Description Transcript Page Transcript Face FQC 20, Finding 11,824 D.4; FA 425, Find-ing 4.4; FA 470, 3

Finding 4.3 FQC 24, Finding D.5; FA 740, Findings 4.1

and 4.2; FA 1086, Finding 4.1; and FA 1313, Finding 4.2 FQC 23, Finding 11,827
D.8 FA 340, Finding 11,848 4.1; FA 376, Find-ing 4.3; FQC 21, Finding D.15; FQ FA 648, Finding 4.3; FA 699, Finding

, 4.1; and FA 721, Finding 4.3 FA 679, Finding 11,857

4.2
FA 226, Find-ing 4.1; and FA 803, Finding 4.1 FA 1301, Finding 11,861 4.2 FQC 21, Findings 11,867 B.9, D.14, D.16,

, and D.17 l FA 226, Finding 11,959 4.3: FA 425, Find-ing 4.2; FA 444, Finding 4.1; FA 470, Findings 4.1 and 4.5; j FQC 21, Finding

D.13A; FQC 23, Find-ing K.5; FA 803, Finding 4.4; FA 1275, Finding 4.1; FA 1325, Findings 3.2 and 4.1; FQC l

1

o~ ...

E-40 Exhibit Identified at Admitted at i Number Description Transcript Page Transcript Page 40, Finding 1.3.A.5; and FA 740, Finding 4.1 FQC 20, Finding 11,965 D.5; FA 721, Finding 4.1; FA 1086, Find-

ing 4.2; and FQC 34, Finding N.2.C SC Ex. 66 Storage and handling 11,479 field audits (listed in SC Ex. 65)

SC Ex. 67 Document control 11,977 summaries (handed out in 10/11/82 SC pleading), pages 2 through 39 i The following items 11,996 were received into evidence: Field Qual-ity Control (FQC) 23, Finding F.3; FQC 25, Finding K.1; FQC 26, Finding K.3; FQC 27, Finding K.2;.FQC 28, Finding K.2; FQC 29, Finding K.2; FQC 30, Finding K.2; and FQC 31, Finding K.2 EA 19, Finding 12,050 2.B.2; EA 22, A.O.

l 021(2); EA 23, A.O.

037; EA 27, A.O. 078;

{

and FQC 14, Finding A.1

FQC 14, Findings B.2, 12,051 l D.2, D.3; FQC 16, i Findings B.2.A-B.2.E, D.4; FQC 18, Finding B.1; EA 18, pg. 2, #4; i EA 24, A.O. 050, #1; l EA 30, #0972A, and i

i 1

5

E-41 1

1 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page 1

  1. 104, Parts 2 and 4; and EA 38, A.O. 141, Findings 1 and 2 i EA 22, A.O. 020(4), 12,069 A.O. 021(1); EA 26, A.O. 066, Parts 2 and 3, A.O. 067, Part 2: EA 30, A.O. 104, Part 1; EA 39, A.O.

152; and EA 40, A.O.

155 and 159 EA 19, A.O. 2.B.3; 12,086 EA 27, A.O. 074; FQC 9, Finding 06676(1); FQC 16, Finding D.2; and FQC'19, Finding K.1 i FQC 20, Finding L.4; 12,098 and FQC 26, Finding L.4B SC Ex. 68 Suffolk County, "Ad- 12,107

ditional Audits Re-porting Document Con-trol Problems,"

Undated

, site QA Audit 7; 12,175 No. 4 Audit of LILCO 1

Purchasing Depart-ment, pg. 1, bot-tom paragraph; Audit 1 S&W, FQC Attachment, Item 1.A.1; S&W PQC Audit 1, Attached pg. 1, bottom portion re training; QA Audit 6, LILCO Purchasing Dept.,

pg. 3 re recom-mendation A;

E-42 Exhibit. Identified at Admitted at Number Description Transcript Page Transcript Fage Audit 81-11, LILCO Purchasing Dept.,

pg. 4, open item 1; and April 8, 1981 memo-randum from Gerecke, thru next to last paragraph, pg. 1 QA Audit 77-8, Find- 12,193 ings 3 and 4 (Tab 19)

EA 00, pg. 7, 12,216 under the portion

" drawings" EA 1, pg. 7, 12,216 under the portion

" drawings" EA 2, pg. 7, the 12,216 portion relating to drawings EA 29, A.O. 093 12,216 EA 34, A.O. 121 12,216 EA 37, A.O. 137, 12,216 Item 2 EA 4, pgs. 2&3 12,216 relating to draw-ings EA 40, pg. 2, the 12,224 -

portion discussing A.O. 156, and A.O.

156 EA 8, pg. 2, Items 12,234 C.2 and C.4 EA 13, pg. 2, 12,234 Item C.3

E-43 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page EA 30, A.O. 103 12,234 EA 33, A.O. 115 12,234 4

EA 21, A.O. 008, 12,381 Item 2 EA 33, pg. 1, 12,381 Item (a) and A.O.

114 f SC Ex. 69' Kirkpatrick, Lock-l hart, Hill, Chris-topher & Phillips, "Torrey Pines Docu-ments":

Tab 1 - Program 12,237 Plan for Indepen-dent Verification of Shoreham Nu-clear Power Plant, f June 1982 Tab 2 - Status Re- 12,237 port, June 18, 1982 t

Tab 3 - Status Re- 12,237 port, July 16,

! 1982 Tab 4 - Status Re- 12,237 port, August 20, 1982 Tab 5 - Status Re- 12,237 port, September 17, 1982

~

SC Ex. 70 Letter from Long 12,337 12,533 Island Lighting l Company to Martin,

NRC, response to CAT inspection, 21 pgs., SNRC-743, July 28, 1982 f

y __ m __ , _ - .n._-,.- , _ _ _ . . , _ . - . . . . . . , - . _ _ _ _ . _ _ - _ _ - , _ --

. . . = = _ .

P E-44 Exhibit Identified at Admitted at

, Number Description Transcript Page Transcript Page SC Ex. 71 Kirkpatrick, Lock- 12,372 13,870 hart, Hill, Chris-topher & Phillips, "Shoreham Plant Configuration Re-ports," 7 documents tabbed 1 through 7 Tab 1 - Plant Con-figuration Report for the Reactor Water Recircula-

] tion System Tab 2 - Plant Con-figuration Report for the Control Rod Drive, Hydrau-lic Centrol System Tab 3 - Plant Con-

. figuration Report l

for the Standby Liquid Control i System (C-41)

Tab 4 - Plant Con-figuration Report for the Core Spray System (E-21)

Tab 5 - Plant Con-figuration Report for the Main Steam Isolation Valve Leakage Control System (E-32)

Tab 6 - Plant Con-figuration Report for the High Pres-sure Coolant Injec-tion System (E-41)

Tab 7 - Plant Con-figuration Report for the Reactor l

. - - .= _ -

i E-45 i

Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page l

Core Isolation Cooling System (E-51)

SC Ex. 72 T. Frank Gerecke, 12,395 "NRC Nonconfor-mances," handwritten, 3 pgs., Undated SC Ex. 73 " Column Heading 12,460 13,855 Abbreviations,"

Stipulation on in-strumentation, me-chanical equipment, and electrical equip-ment surveillances for short-term stor-1 age, 14 pgs., Un-

{ dated SC Ex. 73A Suffolk County, 13,854 13,855 "Suffolk County Explanation of Queries Relative to suffolk County Exhibit 73,"

Undated SC Ex. 74 Memorandum from 12,501 H. F. Faery, Jr.,

to Peter F. Baker, Jr., Stone & Web-ster, "CONSAP Sta-tus Report No. 20,"

August 18, 1982 (in-cludes CONQUIP sta-tus report)

SC Ex. 75 Memorandum from 12,522 H. F. Faery, Jr.,

to Peter F. Baker,

] Jr., Stone & Web-ster, " CAB TRAP Status Report No.8,"

August 26, 1982

.----~---c--- -.. -, , - - - --. , -n . --

,- -, ,--,._w_,,,,

- - - - - - - - - . , ~ - > , . - - - - --

1~ ...

i E-46 1

4 1

Exhibit Identified at Admitted at-Number Description Transcript Page Transcript Page SC Ex. 76 Long Island Lighting 12,721 13,268 Company, " Opera-tional Quality l Assurance OQA Pro-

, cedure Development,"

l QA PS 5.2, Revision

3, October 6, 1981 SC Ex. 77 Ellery Hammond, Man- 12,987 15,176 ager, Nuclear Oper-1 ations, Iowa Elec-tric Light and Power Company, "EEI Nu-I clear Plant Staf-fing Survey, May 1980," 11 pages, No. 319-398-4180 SC Ex. 78 Suffolk County, 13,577 "Suffolk County Offer of Proof,"

I 2 page document with attachments, November 5, 1982 f

2 SC Ex. 79 Suffolk County, 13,578 (Bound In)

"Suffolk County Offer of Proof (OQA)," 3 pages, November 9, 1982 l SC Ex. 80 Long Island Lighting 13,912

, Company, "SPCR (Bound In Response Summary at 13,913)

Sheet," 3 pages, Undated SC Ex. 81 Suffolk County, 14,544 "Suffolk County (Bound In Submittal of List- at 14,545) ing of Documents to be Moved Into Evidence," Novem-ber 15, 1982 l

l-.- - ---.,. - - _ - , - _ , - -

E-47 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page SC Ex. 82 Suffolk County, 14,562

" Supplemental Cross Examination Plan on Operating QA/QC," as a fur-ther Offer of Proof, 8 pages, Undated SC Ex. 83 Dennis M. Durand, 14,625 15,176 Operating QA En- (Bound In gineer, " Station at 14,627)

Operational Quality Assurance Section Planning Report, May 1980 to July 1982," 1A11.920-LIM-RP-001 SC Ex. 84 Memorandum from J. 14,626 Rivello, Plant Man- (Bound In ager, Shoreham Nu . at 14,627) clear Power Station, to All SNPS Super-visors, " Overtime Control Guidelines,"

January 27, 1981 SC Ex. 85 Long Island Lighting 14,626 15,176 Company, listing (Bound In with headings "Ac- at 14,627) tivities Descrip-tion," " Sept. 81 to Sept. 82," " Sept. 82 l to March 83," and I

" March 83 to March 84," 1 page, Undated SC Ex. 86 Long Island Lighting 14,626 15,176 (Bound In Company, listing en-l titled "OQA Manhour at 14,627)

Projection First Year of Operation,"

including 32 items, identified at bottom as Attachment 2, Undated 1

i

(

E-48 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Fage SC Ex. 87 U.S. Nuclear Regu- 15,056 latory Commission, Office of Nuclear Reactor Regulation,

, " Guidelines for i

Utility Management Structure and Tech-

nical Resources,"

Draft Report for Interim Use and Comment, NUREG-0731,

September 1980 t

- SC Ex. 88 W.P. Haass, "Up- 15,081

! grading Quality As-surance Programmatic j Guidance for Oper-ating Nuclear Power Plants," Nuclear

! Safety 23(3):277-281, May-June 1982 i

SC Ex. 69A Prepared Direct 15,224 15,234 i Testimony of Richard i B. Hubbard on Behalf of Suffolk County

) Regarding Suffolk

]

County Contentions 12, 13, 14, and 15, Quality Assurance /

Quality Control, l June 29, 1982 i

i SC Ex. 89B Attachments to Pre- 15,225 15,234 pared Direct Testi-mony of Richard B.

Hubbard on Behalf of Suffolk County Regarding Suffolk County Contentions 12, 13, 14, and 15, Quality Assurance /

Quality Control, June 29, 1982

- .- . --.. m.m,,

a ws , ... _

. ~ . ..

E-49 i

Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page SC Ex. 89C Errata to Prefiled 15,225 15,234 Direct Testimony of Richard B. Hubbard on Suffolk County Contentions 12 through 15, Undated SC Ex. S9D- Supplemental Direct 15,227 15,362 (Bound In)

Testimony of Richard B. Hubbard in Re-j ,

sponse to Board I Question, Undated i SC Ex. 90 U.S. Atomic Energy 15,512 Commission, (Bound In

, " Licensing of Pro- at 15,513) duction and Utili-nation Facilities--

Quality Assurance Criteria for Nuclear Powerplants,"

10 CFR Part 50,

, 34 Fed. Reg. 6599, April 17, 1969 ,

! SC Ex. 91 U.S. Nuclear Regu- 16,377 16,562 latory Commission, Office of Inspection l' and Enforcement, i Report No. 50-322/

l 82-26 for inspection I on September 9-

October 13, 1982, cover letter dated October 29, 1982 1o l

l l

l P

e 'N-met-1 ----T----mW s P7y--'12T'----m?--t* W TM- g .=7 "9 w e y- pr W-rw->mT=*+--=r---e--W-+-* -F"' wem m**e-w'"er-"***="W'

E-50 4

1 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page i

SC Ex. 92 Letter from Ronald 16,420 17,428 C. Haynes, Regional Administrator, Region I, NRC, to M. S. Pollock, LILCO," Systematic Assessment of Licensee Performance (SALP) and your i Letter, SNRC-716, June 21, 1982,"

with 4 attachments

! including the SALP Report (Enclosure 2), July 22, 1982 SC Ex. 93 U.S. Nuclear Regu- 16,440 16,562 latory Commission,

! Office of Inspec-tion and Enforcement, Report No. 50-322/

82-27 for inspection on October 18-22,

! 1982, cover letter dated November 22, 1982 d

SC Ex. 94 U.S. Nuclear Regu- 16,504 16,562

( latory Commission, Office of Inspec-tion and Enforcement, Report No. 50-322/

i 81-13 for inspec-l tion on August 11-14, 1981, cover letter dated October 8, 1981 SC Ex. 95 U.S. Nuclear Regu- 16,506 16,562 latory Commission,

, Office of Inspec-l tion and Enforcement, l Report No. 50-322/

l 82-02 for inspec-E tion on January 1-31, 1982, cover letter j dated February 2, 1982 y------- , , - , . - . - . .

. - , . ~ . . .- _ _ _

i .. ...

E-51 l

t Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page i SC Ex. 96 U.S. Nuclear Regu- 16,512 16,562

latory Commission, Office of Inspec-tion and Enforcement, Report No. 50-322/

82-08 for inspection

, on March 30-May 10,

{ 1982, cover letter j dated May 27, 1982 i

SC Ex. 97, U.S. Nuclear Regu- 16,539 16,562 latory Commission, Office of Inspec-tion and Enforcement, Report No. 50-322/

81-14 for inspection on August 1-31, 1981, cover letter dated September 14, 1981 SC Ex. 98 U.S. Nuclear Regu- 16,541 16,562 latory Commission, Office of Inspec-tion and Enforcement, i Report No. 50-322/

82-13 for inspection on May 11-June 18, 1982, cover letter

dated July 14, 1982 SC Ex. 99 U.S. Nuclear Regu- 16,543 16,562 latory Commission, i Office of Inspec-l tion and Enforcement, Report No. 50-322/

l 81-20 for inspection on October 20-

< November 22, 1981,

, cover letter dated December 9, 1981 l

i I E-52 i

Exhibit Identified at Admitted at

. Number Description Transcript Page Transcript Page SC Ex. 100 U.S. Nuclear Regu- 16,564 16,610 latory Commission, Office of Inspec-tion and Enforcement, Report No. 50-322/

76-07 for inspection

on July 22-25, 1976, cover letter dated July 12, 1976 SC Ex. 101 U.S. Nuclear Regu- 16,611 16,632 ,

1 latory Commission, Office of Inspection and Enforcement, Report No. 50-322/

82-15 for inspection on June 19 .Tuly 31,.

1982, cover letter dated August 30, 1982 SC Ex. 102 U.S. Nuclear Regu- 16,619 16,632 latory Commission, Office of Inspection and Enforcement,

Report No. 50-322/

82-10 for inspection

. on April 26-29, l 1982, cover letter dated May 24, 1982 l.

SC Ex. 103 U.S. Nuclear Regu- 16,692 16,816 latory Commission, Office of Inspection and Enforcement, Report No. 50-322/

74-02 for inspection on February 26-l March 1, 1974, cover letter dated March 1974 t

i i

l l

~ .-. _ . . . _ , . _ - _ , - - . . , _ _ , - _ _ _

o. ...

E-53 i

Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page

! SC Ex. 104 U.S. Nuclear Regu- 16,696 16,980 latory Commission, Office of Inspection and Enforcement, Report No. 50-322/

81-22 for inspection on November 23-December 31, 1981, cover letter dated January 14, 1982 SC Ex. 105 U.S. Nuclear Regu- 16,712 16,816 latory Commission, Office of Inspection and Enforcement,

Report No. 50-322/

77-05 for inspection r on February 28-March 3, 1977, cover

! letter dated April 7,

1977 1

SC Ex. 106 U.S. Nuclear Regu- 16,750 16,816 i latory Commission, Office of Inspection l~ and Enforcement, i Report No. 50-322/

! 76-06 for inspection on May 24-27, 1976, cover letter dated i June 22, 1976 SC Ex. 107 U.S. Nuclear Regu- 16,892 16,981 latory Commission, Office of Inspection and Enforcement, Report No. 50-322/

77-01 for inspection during January 1977, cover letter dated February 10, 1977 l

l i

i i

<<. a.,

E-54 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page SC Ex. 10S U.S. Nuclear Regu- 16,931 16,981 latory Commission, Office of Inspection and Enforcement, Report No. 50-322/

80-10 for inspection on June 17-20, 1980, cover letter dated August 12, 1980 SC Ex. 109 U.S. Nuclear Regu- 16,966 16,981 latory Commission, ~

Office of Inspection and Enforcement, Report No. 50-322/

82-24 for inspection on September 7-10, 1982, cover letter dated October 15, 1982 SC Ex. 110 Long Island Lighting 18,083 Company, " Plant Configuration Re-view," Project Procedure P-309, Rev. A, 12/3/81, and Rev. E, 5/6/82 SC Ex. 111 Handwritten memor- 18,322 andum from Suffolk (Bound In County to LILCO, at 17,897)

NRC Staff, and ASLB, "Suffolk County Torrey Pines Technology Examination,"

5 pages, January 11 or 12, 1983 SC Ex. 112 Joint Deposition of 19,064 19,064 Richard B. Hubbard and Francisco J.

Samaniego, Volume 1, pgs. 1-74, December 27, 1982; Volume 2, pgs.

E-55 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Fage 75-238, December 28, 1982 SC Ex. 112A Memorandum from 19,066 19,067 Anthony F. Earley, (Bound In)

Jr. to Alan R.

! Dynner, Esq. and Michael S. Miller, Esq., "LILCO's Ini-tial Designation of Portions of the Deposition of Richard B. Hubbard and Francisco J.

Samaniego,"

January 4, 1983 SC Ex. 113 EG&G of Idaho 19,577 for the U.S. Nuclear Regulatory Commis-sion, " Identification and Ranking of Nuclear Plants, Structures,

Systems and Components and Graded Quality Assurance Guidelines,"

Draft, pgs. 1, 79-82,

! and a 14-page table entitled "BWR Structures, Systems and Components and QA Ranking," November 1982 SC Ex. 114 Long Island Lighting 19,603 Company, " Environ- (Bound In mental Qualification at 19,606)

Report for Class 1E Equipment, Shore-ham Nuclear Power Station Unit 1,"

two JIO's: " Equipment Justification," Mark No. 1D11*RE011A,B,C,D on Radiation Moni-toring Detector (GE),

Rev. 3, August 1982;

n. .*,

.i E-56 i

1 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Fage and " Equipment Justification," Mark No. 1D11*RE017A,B on Radiation Monitoring Detector (GE), Rev. 4,

, October 1982 1.

SC Ex. 115 U.S. Nuclear Regu- 19,807 latory Commission, Office of Inspec-tion and Enforce-ment, Report No.

50-322/79-07, cover letter, notice of violation,

. Appendix A, pages

I through 5 of the report, cover sheet signed August 21, i 1979 SC Ex. 116A Three handwritten 19,991 20,003 l pages entitled (Bound In

" Totals Returned at 20,004)

From FQC, Week Ending 1-22-83, Group Summary,"

l " Week Ending l 2-1-83," and " Week Ending 2-8-83,"

Undated SC Ex. 116B One page computer 19,991 20,003 printout entitled (Bound In "Shoreham Nuclear at 20,004)

Power Station Quality and Ac-countability Pro-gram, Generic Dis-position Summary, Report Period 01-27-83" SC Ex. 117 Memorandum from 20,724 James H. Conran to Franklin D.

Coffman, Jr.,

E-57 Exhibit Identified at Admitted at Number Description Transcript Page Transcriot Face

" Differing Professional Opinion," 2 pages with 23-page opinion attached, March 31, 1983 (includes Conran Affidavit as Appendix A) (por-tions read into the record starting at 20,742)

Staff Ex. 1 Robert L. Rothman, 4170 4171 Comparison of Regula-tory Guide 1.60 Spec-trum, anchored at 0.13g, with Shoreham SSE spectrum, anchored at 0.2g, handwork on log-log scale, Un-dated

Staff Ex. 2A U.S. Nuclear Regula- 4560 4560 I tory Commission, Office

! of Nuclear Reactor

Regulation, " Safety l Evaluation Report l Related to the Opera-tion of Shoreham Nu-clear Power Station, Unit No. 1," NUREG-0420, April 1981 Staff Ex. 2B U.S. Nuclear Regula- 4560 4560 tory Commission, Office of Nuclear Reactor Regulation, " Safety Evaluation Report Related to the Opera-tion of Shoreham Nu-clear Power Station, Unit No. 1," Supplement No. 1 to NUREG-0420, September 1981

.. ..e E-58 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page Staff Ex. 2C U.S. Nuclear Reguls- 4560 4560 tory Commission, Office of Nuclear Reactor Regulation, " Safety Evaluation Report Related to the Opera-tion of Shoreham Nuc-lear Power Station, Unit No. 1," Supplement No. 2 to NUREG-0420, February 1982 Staff Ex. 3 Letter from P. Shew- 6226 mon, Chairman, Ad- (Bound In) visory Committee on Reactor Safe-guards, to Nuncio J. Palladino, Chair-man, NRC, " Comments on Proposed Policy Statement on Safety Goals for Nuclear Power Plants (NUREG-0880, A Discussion Paper),"

June 9, 1982 Staff Ex. 4 Memorandum from 6814 William J. Dircks, (Bound In Executive Direc- at 6815) tor for Operations, NRC, to the Com-missioners, "Per-formance of Proba-bilistic Risk As-sessment or Other Types of Sp ecial Analyses at High Population Density Sites," SECY-81-25, January 12, 1981 Staff Ex. 5 Memorandum from 6814 Brian K. Grimes, (Bound In Program Director, at 6815)

Emergency Prepared-ness Program Office,

. .e E-59 l Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page i

NRC, to Harold R.

Denton, Director, Office of Nuclear Reactor Regulation, NRC, " Candidate i Sites for Risk Studies," April 30, 1980 Staff Ex. 6 U.S. Nuclear Regu- 8108 8108 latory Commission (Bound In) filing to the Atomic Safety and Licensing Board Panel on the Shoreham Nuclear Power Station, Unit 1, Operating License Hearing, on the status of SER open items 57.II.D.1 and 57.II.K.3.16 for Shoreham, pgs. 15, 16, and 18, June 29, 1982 Staff Ex. 7 U. S. Nuclear Regu- 9711 9712 latory Commission, (Bound In)

' Office of Standards

! Development, "Instru-mentation for Light-Water-Cooled Nuclear Power Plants To Assess Plant and Environs Conditions During and Following An Accident,"

Regulatory Guide 1.97 -

(Task RS 917-4), Revi-sion 2, December 1980

.s .n E-60 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page Staff Ex. 8 NRC Staff Testimony 16,246 16,248 of Robert Gallo, John (corrected Gilray, George qualifications Rivenbark, James bound in at Higgins, and Lewis 16,245)

Narrow Regarding Quality Assurance, SC Contentions 12, 13, 14, and 15, with Profes-sional Qualifications of Robert M. Gallo, Professional Qualifica-tions of James C.

Higgins, Professional Qualifications of Lewis Narrow, Professional Qualifications of George W. Rivenbark, and Qualifications and Experience of John William Gilray Staff Ex. Letter from Eldon 16,246 16,248 i S-la J. Brunner, Chief, Reactor Operations

and Nuclear Support Eranch, Region I, NRC, to Andrew W.

Wofford, LILCO,

" Inspection 50-322/

79-05," May 4, 1979 Staff Ex. U.S. Nuclear Regu- 16,246 16,248 6-lb latory Commission, Office of Inspection j and Enforcement, l Region I, Report No.

50-322/79-05,

! Inspection on March 27-30, 1979, pgs. 5-6 and cover sheet signed April 30, 1979 and May 3, 1979 i Staff Ex. Letter from Andrew 16,246 16,248

! 8-1c W. Wofford, LILCO, to Eldon J. Brunner,

es .ro E-61 ,

Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page NRC, Region I, "NRC Inspection No. 79-05, Shoreham Nuclear Power Station - Unit No. 1, Docket No.

50-322," SNRC 393, May 24, 1979 Staff Ex. U.S. Nuclear Regu- 16,246 16,248 S-1d latory Commission, Office of Inspection and Enforcement, Region I, Report No.

50-322/80-06, Inspection on March 24-April 27, 1980, page 4 and cover sheet signed May 9, 13, and 14, 1980 Staff Ex. Letter from Eldon J. 16,246 16,248 8-2a Brunner, NRC, Region I, to Andrew W.

Wofford, LILCO,

" Inspection 50-322,.'

4 79-16," January 21, 1 1980 1

i Staff Ex. U.S. Nuclear Regu- 16,246 16,24S 8-2b latory Commission, Office of Inspection and Enforcement, Region I, Report i No. 50-322/79-16, Inspection on October 1-November 6, 1979, pages 4-7 and cover sheet signed December 11, 1979

o- .-. D E-62 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page i

Staff Ex. Letter from Andrew W. 16,246 16,248 8-2c Wofford, LILCO, to Eldon J. Brunner, NRC, Region I, "NRC Inspection No. 79-16, Shoreham Nuclear Power Station - Unit No. 1, Docket No. 50-322,"

SNRC 464, February 21, i 1980 Staff Ex. U.S. Nuclear Regu- 16,246 16,248 8-2d latory Commission, Office of Inspection and Enforcement, Region I, Report No.

)

50-322/80-06, Inspec-tion on March 24-t April 27, 1980, page 3 and cover sheet signed May 9, 13, and 14, 1980 Staff Ex. U.S. Nuclear Regu- 16,246 16,248 8-2e latory Commission, Office of Inspection and Enforcement, Region I, Report No.

50-322/80-09, Inspec-tion on April 28-May 31, 1980, cover sheet signed

June 25 and 30, 1980 i

Staff Ex. A document detailing 16,246 16,248 8-3 the " essential elements of LILCO's QA program description contained in the FSAR which satisfy Appendix B," 30 pages, Undated Staff Ex. 9 Supplemental NRC Staff 16,249 16,260 Testimony of Robert (Bound in Gallo, John Gilray, at 16,411-A)

George Rivenbark, James Higgins, and

we <b E-63 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page h

Lewis Narrow Regarding

! Quality Assurance, SC Contentions 12, 13, 14, and 15 i Staff Ex. 10 Memorandum from R. 17,358 Caruso, Project (Bound In)

Manager, Licensing Branch No. 2, Division of Licensing, NRC, to B. Bordenick, Staff Attorney, Office of Executive Legal

! Director, NRC,

" Resolution of Region I CAT Team Items Regarding HPCI Steam

, Drain Line Isolation Arrangement, and Reduction of Drywell Sprays," December 16, 1982 Staff Ex. 11 Memorandum from 19,295 T.M. Novak, NRC, to (Bound In E. Christenbury, at 19,296)

NRC, "Shoreham-Staff Testimony Regarding Torrey l Pines Report,"

! December 17, 1982 4 Staff Ex. 12 Letter from Richard 19,747 20,294 W. Starostecki, Di- (Bound In) rector, Division of Project and Resident Programs, Region I, NRC, to M. S. Pol-lock, Vice President-Nuclear, LILCO, Janu-

! ary 19, 1983 Staff Ex. 13 U.S. Nuclear Regu- 19,750 20,295 I

latory Commission, Office of Inspec-tion and Enforce-ment, Report No.

. - _ _ _ - , . . , , , _ _ . ---,._--y_.y, - , . . . ,

mm .o E-64 Exhibit Identified at Admitted at Number Description Transcript Page Transcript Page 50-322/83-02 for inspection on Janu-ary 10-15, 1983, cover sheet signed January 19, 1983 Staff Ex. 14 Letter from Darrell 20,811 20,812 G. Eisenhut, Direc- (Bound In) tor, Division of Li-censing, Office of Nuclear Reactor Regulation, NRC, to M. S. Pollock, Vice i President-Nuclear, LILCO, "FSAR Com-mitment for Non-Safety Related Items," February 18, 1983 Staff Ex. 15 Letter from Darrell 20,811 20,812 G. Eisenhut, Direc- (Bound In) tor, Division of Li-censing, Office of Nuclear Reactor Regulation, NRC, to M. S. Pollock, Vice President-Nuclear, LILCO, "FSAR Commitment i

for Non-Safety Re-lated Items,"

March 7, 1983 I

i t

i

, -