ML20073D202

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Change Increasing Instrumentation Channels Available for River Discharge Monitoring Sys. Discharge Valve Position Indication Added to Determine River Discharge Flow Rate
ML20073D202
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 04/07/1983
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20073D192 List:
References
NUDOCS 8304130408
Download: ML20073D202 (3)


Text

. .

amm .

4 FT 58 .:-

i g og Rs

,j l' ,

- TABLE 3.3.7.10-1 h *@ RADI0 ACTIVE LIQUID EFFLUENT HONITORING INSTRUMENTATION l'

in Om '

' gu HINIMUM

! h,'oa qEudS CilANNELS Ol'ERABLE ACTION ,

!* INSTRUMENT e 1 :. ,

GAINA' SCINTILLATION HONITOR PROVIDING ALARM AND AUTOMATIC '

TERMINATION OF RELEASE 1 100

a. ' Liquid Radwaste Effluent Line (0018-R802)
2. GAM 4A SCINTILLATION HONITORS PROVIDING ALARM BUT N0f PROVIDING AUTOMATIC,. TERM.INATION OF RELEASE 1 101 l
a. Service Water System Effluent Line (1018-K608) 101 m 1

) b. RilR Service Water (Line A) Effluent Line (1018-K604) 1 101 y c. RilR Service Water (Line B) . Effluent Line (1018-K605) 1 101 l .

d. Service Water System Effluent'Line (2 DI8-K608) a n
3. FLOW RATE HEASUREMENT DEVICES

' t- 102 1

i a. Liquid Radwaste Effluent Line (OFIT-WF-017 and 018) 1 102

< b. iRiver: Discharge - Blowdown Pipe (Oi! L'0^1-)

i OFT Cdl Col aMd M 00 i

!i

' l; '

i g- '

' I, ', I i' a . .

5 7

j .

$ i l

1:

li i + e  ; i ,

i

] f l, ', f.

i ,

4.

' ' I ._.J______.__.... .

. [_ . ._ . - - ..

INSTRUMENTATION TABLE 3.3.'7.10-1 (Continued)

TABLE NOTATION -

ACTION 100 -

With the number of OPERABLE channels less than required by the Minimum Channels OPERABLE requirement, effluent releases may continue for up to 14 days provided that i, prior to initiating a release:

1

a. At least two independent samples are analyzed in accordance with Specification 4.11.1.1.3, and j
b. At least two technically qualified members of the i

Facility Staff independently verify the release rate

calculations and discharge line valving; i

Otherwise, suspend release of radioactive effluents via this pathway.

ACTION 101 -

With the number of channels OPERABLE less than required 1 by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue for up to 30 days provided that, at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, grab samples are l' collected and analyzed at a limit of detection of at least.

i.O 10-7 microcuries/ml or gamma spectrometric analysis, j b ACTION 102 -

  • \ e number of channels OPERABLE less than re by the '

Channels OPERABLE requirem luent releases via s may con r up to 30 days i provided the flow te i at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during ses. Pump for Instru- -

ment 3 or k va positions for Inst b e used stimate flow.

I Action 102 - With the number of channels operable less than required by the

, Minimum Channel operable requirement:

J I

a. For 3a, Radioactive releases via this pathway may continue up ji to 30 days provided pump curves are used to estimate flow rate at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during the release.

i ,

b. For 3b , suspend all radioactive discharges via this pathway until either the flow transmitter or valve indication is operabic.

i l

ii h

+ \

i LA SALLE - UNIT 1 3/4 3-83

. And p ---

.c- , ,

s' l ,

ATTACHMENT B Status of License Change Requests Change Request Description Status NPF-11/82-14 Rad Effluent Tech Specs revision Submitted to of reporting, etc. NRC 4-08-82.

Telecon 12/82 awaiting CECO resubmittal per agreement in telecon.

NPF-ll/83-01 Add position of Project Manager Submitted to NRC 2-24-83.

NPF-11/83-02 Revise CO2 tank level require- Issued Amend-l ment ment 13 NPF-ll/83-03 Delete license condition 2.C.(26) Submitted to and revise Tech Spec Section 6.1.D NRC.3-ll-83.

regarding RCT qualifications to be effec-tive 6-01-83.

NPF-ll/83-04 Blowdown Pipe Valve Position for Submitted to j Flow Determination NRC 4-07-83.

I 6329N

. . -l