s C:mmonw:alth Edis;n
(
) 1400 opus Place I
I 1 o y Downers crove,imnois 6051s V
April 23,1991 Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regule. tory Commission Washington, DC 20555
Subject:
Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 Generic Letter 8817 Supplemental Information Loss of Decay Heat Removal TAC Nos. 69725,69726,69727 NBOAocket Nosm50 454/455.and_50 456/.45L j
Reference:
January 22,1990 letter from a) T.K. Schuster to T.E. Murley 1
Dear Dr. Murley:
Commonwealth Edison 3rovided status on the implementation of Generic Letter 8817, Loss of Decay Heat Removal, for Byron and Braidwood Stations in reference (b)R) system leonic display at Byron and Braldwood Stations.. This lette removal (RH Byron Station staff has designed a com auter gra ahic for the Main Control Room. The graphic displays data in real time anc reflects uhe status of the refueling water level and RHR pump parameters. The display is a mimic of the reactor vessel, steam generator, pressurizer and RCP, and is to scale with respect to plant elevation.
The screen displays bar graphs and literal values for the four refueling level instruments and a pressurizer levelinstrument. Also shown are the RHR pump suction and discharge pressures, discharge temperature and motor bearing temperatures.
I This display software installation has been com 31sted at Byron Station.
Braldwood Station was scheduled to install the display so'tware on both units by January 15,1991, however, this modification has not yet been completed. When the sof tware was installed it would not load properly and was returned to the computer group for revision. The installation of th s modification is expected to be completed b July 1,1991. Please direct any further questions regarding this matter to this office. y Very truly yours, hh 8
Allen R. Checca 4
Nuclear Licensing Administrato-ZNLD/897 cc: Resident inspector - Byron 3
Resident inspector - Braidwood e
A.H. Hsia NRR R.M. Pulsifer - NRR Region lli Office Office of Nuclear Facility -lDNS 910426o133 910423 PDR ADOCK 0500o4".4
[()[/
P.
PDN fjp
_