Fourth Interim Deficiency Rept Re Low Nitrogen Supply Temp. Initially Reported on 820114.Procurement Specs for Nitrogen Heaters & Mechanical Installation Drawings Issued.Next Rept Will Be Issued by 840120
ML20072Q985
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 03/29/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8304050396
Download: ML20072Q985 (2)


Text

-

..r-TENNESSEE VALLEY AUTHORITY-

    • V&tS&dtrH1 YtME YoWe II N

g March 29, 1983

' r.

' -b BLRD-50-i38/82-09 6

BLRD-50-439/82-09 YvA c.3

.W hk U.S. Nuclear Regulatory Connission p

Region II

.?

W

Attn:

Mr. James P. O'Reilly, Regional Administrator P

Y 101 Marietta Street, NW s

Suite 2900 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - TEMPERATURE OF NITROGEN SUPPLY -

BLRD-50-438/82-09, BLRD-50-439/82 FOURTH INTERIM REPORT The subject deficiency was initially reported to NRC-OIE Inspector D. Johnson on January 14, 1982 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 8201. This was followed by our interim reports dated February 17, April 27, and August. 12, 1982. Enclosed is our fourth interim report. We expect to submit our next report on or about January 20, 1984.

If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, nager Nuclear Licensing Enclo ure cc (Enclosure):

Mr. Richard C. DeYoung, Director 1-Office of Inspection and Enforcement U.S.-Nuclear Regulatory Commission.

Washington, D.C.

20555 Mr. James McFarland :

+

Senior _ Project Manager Babcock & Wilcox. Company P.O. Box-1260 DFFICIAL COPE Lynchburg, Virginia -24505

. ^

~

8304050396 830329 PDR ADOCK 05000438 OAer/U

_S PDR An Equal Opportunity Employer :

4

.a

.o y~

ENCLOSURE

.BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 Tl!MPERATURE OF NITROGEN SUPPLY

. NCR BLN BLP 8201'

+

BLRD-50-438/82-09, BLRD-50-439/82-09~

10.CFR 50.55(e) 4 FOURTH INTERIM REPORT Nitrogen is used as a_ covsr gas for various safety-related pieces of equipment, such as the Reactor Coolant System, pressurizer, steam generators, and core floed tanks. B&W document No. 67-1003781-00, " Plant Limits and Precautions," lists the minimum temperature requirements for nitrogen to be supplied to these~ pieces of equipment. Contrary to these requirements, the present nitrogen system'as it is now designed.. supplies

~ nitrogen below the required temperature.

4 B&W document No. 67-1003781-00 was issued in'1978, well after development of the design of the nitrogen system. Since the document did not directly relate to the nitrogen system design, it was not routed to the nitrogen system designers for their review. This condition went unnoticed until the pechlen was discovered during a design review of one of the systems that interfaces with the nitrogen system.

Interim Progress Procurement specifications for the nitrogen heaters and mechanical-installation drawings have been issued. Analysis of the piping to the new higher temperatures and electrical activities connected with.the heaters -

remain to be completed.