Final Deficiency Rept Re Item 136 on Pipe Hanger Frame Base Metal Reduction.Initially Reported on 830606.Frame C-1-195 Will Be Refabricated W/Certified Matl & Will Be Welded Onsite.Also Reported Per Part 21
ML20072N590
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 07/05/1983
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-97, REF-PT21-83-064-000 10CFR-50.55E, PT21-83-064-000, PT21-83-64, NUDOCS 8307150380
Download: ML20072N590 (3)


Text

__

k e

cn\\DU k T h Q 3ht groSh3Pbw r$ Light Company 3

&-c

-, 4 P. O. Box 101, New Hill, N. C.

27562 July 5, 1983

7) [

Mr. James P. O'Reilly NRC-97 United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900)

Atlanta, Georgia 30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 PIPE HANGER FRAME BASE METAL REDUCTION, ITEM 136

Dear Mr. O'Reilly:

Attached is the final report on the subject item which was deemed reportable per the provisions of 10CFR50.55(e) and 10CFR, Part 21, on June 6, 1983. With this report, Carolina Power and Light Company considers this matter closed.

If you have any questions regarding this matter, please do not hesitate to contact me.

Yours very truly, f

x R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh Attachment cc: Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)

Mr. R. C. DeYoung (NRC) 8307150380 830705 gDRADOCK 05000400 PDR coVD 6

o#

f2 Af di ~

)

CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 FINAL REPORT C-1-195 SUPPORT FRAME WELDING DEFECTS ITEM NO. 136 JUNE 30,1983 REPORTABLE UNDER 10CFR50.55(e) AND 10CFR21

~

..,..E_--

4

SUBJECT:

SHNPP Unit No. 1 10CFR50.55(e) and 10CFR21 raportable item - Welding Defects in Pipe Support Frame C-1-195 ITEM:

Shop welding of pipe support frame.

SUPPLIED BY:

Bergen-Paterson Pipesupport Corp., Laconia, New Hampshire NATURE OF DEFICIENCY:

Frame C-1-195 was fabricated by PX Engineering in Boston, Massachusetts working under subcontract to Bergen-Paterson.

The frame was shipped in several large, shop-welded subassemblies.

In order to install these fabricated portions of the frame, it was necessary for us to cut through some of the shop welds. This revealed that weld preparations had been improperly done with torch cuts through the base metal, which had been concealed by the attaching members.

DATE PROBLEM OCCURRED:

DDR-1562 was written on May 23, 1983.

DATE PROBLEM REPORTED:

On June 6, 1983, Mr. N. J. Chiangi notified the NRC (Mr. A. Hardin) that this item was reportable.

SCOPE OF PROBLEM:

Large Pipe Support Frame C-1-195 SAFETY IMPLICATIONS: The damaged base metal which was revealed could have significantly affected the ability of the frame to provide necessary support during a seismic event. Other joints not investigated may have had similar or more serious defects.

CORRECTIVE ACTION:

The frame fabricated by PX Engineering will not be used, and no additional shipments from PX Engineering will be accepted.

Frame C-1-195 will be refabricated using certified material with welding performed on site.