g NIAGARA M0llAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE June 1983 The station operated during the month of June with a monthly availability factor of 85.8% and a net design electrical rating capacity factor of 70.8%.
Availability /
capacity factor losses were due to the following:
The unit continued in shutdown from March 19, 1982 for recirc piping replacement.
On June 2 reactor start up commenced, and post-outage surveillance testing was performed. During start up an IRM high flux scram occurred. After post scram analysis, reactor start up began again on June 4, and the turbine / generator placed on line. Electromatic number 121 failed to operate during testing and the plant was shutdown to investigate. Reactor start up commenced again on June 5 and the turbine / generator was placed on line. After turbine trip testing the generator was placed on line and remained in service throughout the remainder of the month.
CLASS I WORK - MAINTENANCE - JUNE 1983 6/4/83 - #21638 - Replaced 121 Electromatic Pilot Valve Internals.
6/4/83 - #21640 - Replaced 111 Electromatic Pilot Valve Internals.
6/4/83 - #21651 - Replaced 113 Electromatic Pilot Valve Internals.
6/7/83 - #20991 - Plugged 8 Tubes in #13 Rx CLC heat exchanger.
6/30/83- #21883 - #15 Condensate Demineralizer inspected and cleaned laterals.
CLASS I WORK - INSTRUMENTATION AND CONTROL - JUNE 1983 R.P.S. Rx High Press Inst.36-07C, Calibration ckt. inop. (replaced trip card).
CLASS I WORK - ELECTRICAL - JUNE 1983 N1-MST-M1 - 125 V DC batteries, cell specific gravities and battery voltage.
WR #15360 - 11 Drywell cooler solenoid valve replaced limit switches.
WR #21374 - Core spray valve 49-11, replaced missing bolt.
CLASS I WORK - PLANNING AND SCHEDULING - JUNE 1983 78 CAM 83 Turb Bld CLC Mod # 78-31; M.0. #1076
Title:
Duplicate Containment Air Monitor This modification consisted of installing a new monitoring unit with piping and valving to also allow an alternate unit to be substituted during maintenance or repairs.
Mod #83-30; M.0. #3503
Title:
Replacement of Turbine Building Closed Loop Cooling Heat Exchanger This modification consisted of installing a new Turbine Building Closed Loop Cooling Heat Exchanger.
It is believed the heat exchanger tubes incurred damage due to flow induced vibration. The replacement heat exchanger was designed to essentially the same original specifications with less susceptibility to vibratory effects. This should therefore improve system reliability and equipment lifetime.
8307150080 830700 d
{
PDR ADOCK 05000220 l
R PDR I
- L _~-
- r* ~ -
- 2.
_ -* -~ ' -" : ~~.: ~ ~ _ __ ; ;.-
- W'T :--._2 K
' ~ ~ '
.l g
OPERATING DATA REPORT 0-220 DOCKET NO.
DATE ~T/87B~~g CO.\\lPLETED BY
'lh' ROMANf peiaA T ELErilONE f3151349-22 OPER A TING STATUS
- l. Unit Name:
Nine Kile Point' Unit #1 Notes
- 2. Reporting Period:
06/01/83 - 06/30/83
- 3. Licensed Thennal Power (31Wr):
1850
- 4. Nameplate Rating (Gross blWe):
640
- 5. D-si;n Electrical Rating (Net blWe):
630
- 6. Staximuns Dependable Capacity (Gross h!We 6 O rf.r
'3= 7.;AlaM6iussrDiidind4EClip$$ff(!7eQhg):yr:
6 Lor::w;C2 : #..."#GD
- w -
.* ". _.m 1._..,
~ ' ~ -
- ~
' S. If Chan;es Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To which Restricted,If Any(Net A!We):
- 10. Reasons For Restrictions.lf Any:
t
~
This.\\!onth Yr..to.Da t e Cumulatise
- 11. Hours la Reportin; Period 720.0 4,343.0 119,759.0
- 12. Number Of Hours Reactor Was Critical 660.2 660.2 81,968.7
- 13. Reactor Resene Shutdown Hours 0.0 0.0 1,204.2
- 14. Hours Generatur On.Line 61R.n 618.0 79.180.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
)
- 16. Gross Therma! Energy Generated (31WH; 984.590.0.
984,590.0 130,358,980.0 17 Gross Electrical Ener:y Generated (alWH) 326,601.9_..,
326,601.9 43,069,691.9 IS. Net Electrican c.nergy Generated (.\\tw H;
'116.038.0 316,038.0 41,708,689.0
- 19. Unit Senice ractor 85.8 14.2 66.1
- 20. Ur.M *.v:!!:t:* :s F:::a:
85.8 14.2 66.1
- 21. Ur.:: Cap.n; Factor (Using.\\lDC Net e 72.0 11.9 57.1
- 22. Unit Capacity FactorIUsing DER Net)
- 23. Unit Forced Outage Rate 70.8 11.7 56.2 14.2 85.8 18.0
- 24. Shutdowns Scheduled Over Nest 6 alonths aType. Date si.d Duration of Eacht:
1
^
1
- 25. If Shut bown At End Of Ileport Period.Esinuated thee of Startup:
l
- 26. Units in Test Status irrior eo Commercial Operationi.
Forecast Achiesed INITIA L CRITICA LITY lNITIA L ELECTRICITY CO\\lalERCI\\L Ol'ER t ION
AVER tGE InlLy UNIT POhCN LEVEL I -
0-220 DOCKET NO.
UNIT 9 Mi'le Pt. #1 DATE 7/8/83 CO\\tPLETEDUy TW ROMAN ev TELErilONE - (31'5)349-2422 AIONTII June. 1983 DAY AVERACE DAILY POWER LEVEL,.
DAY AVERACE DAILY POWER LEVEL tatWe Netl 01We Neil O'
37 593 2
0 15 599 19 565 20 602 5
83 21 606 6
154 22 602 7
269 23 594 S
373 24 584 l
9 438 l
25 592
~
10 435 26 589 11 462 27 584 12
$04 2S 604 13 5 9 1
29 608 3
34 516 30 606 15 501 3l 16 539 INSTR UCT!ONS j
On this fortnai.hst ehe averare dail the ricatest whole megawart.
3 unit p..wer ges ci in sng e.ge, 3,,r t #1' d#' '" '1'*' '#i'""'E '" '"'l'- ( "'ul'une ni l
w (917's o
(4 v'
n,,
3 Ii
- )
!i 50-220 e
UNITS!!UTDOWNS AND POWER REDUCTIONS UNIT NAME -- 9 blile Pt-
"1
.1 DOCKET NO.
.i DATE 2/8/83 g
i REPORT MONiil
. Tune. 1983 COMPLETED BY
'lW ROMAN y&hy g F
TELEPilONE (315)349-2422
- 'S
' p i;
1 "1.
4
- I
.! E "s
.5 Licensee
,E r, No.
Date
{
3g g
,gg d Event
.i Cause & Currective gi 8'1
]
Action to H
5 36c Report sr in O t-Prevent Recurrence 2
4 v
6 5
N 830604 F
23 A
1 lt Plant Shutdown due to failure of Electromatic 121 to operate during testing.
l' l
'[
h.
i,i i
t I
ri;-
t i
l
'?
q l'
'l 1
2 I-i 3
F: Forced Reason:
4 Method:
Exhibit C. !nstructions S: Scheduled A Equipment Failure (Explain) t Manual for Preparation of Dats 3
B Maintenance or Test 2 Manual Scrarn.
Entry Sheets for Licensee i
C Refueling 3 Automatic Scram.
Event Re D Regulatory Restriction 4 Other (Explain) 0161) ' port (LER) File INUREC-
.i
'E Operatur Training & lice nse Examination
{ '.
F Administrative G Operational Error (E,pl.in) j 5
i 01/77)
Il-Olher (Explain )
Exhibit l Same Source l
,l 0
i f-
.N
M V NIAGARA RuMOHAWK w p-m 9 NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE. N Y.13202/ TELEPHONE (315) 474-1511 Jutt) 8, 1983 Dhector 0ffice of Inspection and Enforcement U.S. Nuetear Regulatori Conmission j
Washington, DC 205SS Attention: Document and Conttot Desk RE: Docket No. 50-220 DPR - 63 Dear SLt SubnLtted herewith is the Report af Operating Statistics and Shutdown Experience for June 1983 for.the Nine Mile Point Nuclear Station Unit #1.
Also included is a Narrative report of Opcrating Experience for June Sincerettj y,p a. $