ML20072F193

From kanterella
Jump to navigation Jump to search

Amend 63 to License DPR-72,exempting Certain Containment Isolation Valves,After Valves Placed in Containment Isolation Position,From Provisions of Tech Spec 3.0.4
ML20072F193
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/10/1983
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Florida Power Corp, City of Alachua, FL, City of Bushnell, FL, City of Gainesville, FL, City of Kissimmee, FL, City of Leesburg, FL, City of New Smyrna Beach, FL, Utilities Commission, City of New Smyrna Beach, FL, City of Ocala, FL, City of Orlando, FL, Orlando Utilities Commission, Sebring Utilities Commission, Seminole Electric Cooperative, City of Tallahassee, FL
Shared Package
ML20072F197 List:
References
TAC 49540, DPR-72-A-063 NUDOCS 8303230409
Download: ML20072F193 (11)


Text

..

s MQ s

e/

UNITED STATES NUCLEAR REGULATORY COMMISSION o

3

.,I WASHINGTON, D. C. 20666

'%..... P FLORIDA POWER CORPORATION CITY OF ALACHUA CITY OF BUSHNELL CITY OF GAINESVILLE~

CITY OF KISSIMMEE CITY OF LEESBURG CITY OF NEW SMYRNA BEACH AND UTILITIES COMMISSIblh CITY OF NEW SMYRNA BEACH CITY OF OCALA ORLANDO UTILITIES COMMISSION AND CITY OF ORL?.NDO SEBRING UTILITIES COMMISSION SEMIN0LE ELECTRIC COOPERATIVE, INC.

CITY OF TALLAHASSEE DOCKET NO. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT AMENDMENT TO FACILITY OPERATING LICENSE

~

Amendment No.6 3 License No. DPR-72 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A*

The application for amendment by Florida Power Corporation, et al (the licensees) dated January 11, 1980, as revised Hovember 2, 1981, complies with the standards and re Energy Act of 1954, as amended (the Act)quirements of the Atomic and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in, compliance with the Commission's regulations; D.

The issuance of this amendment'will'not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

4*

e 8303230409 830310 PDR ADOCK 05000302 P

PDR m

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-72 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 6 3, are hereby incorporated in the license.

Florida Power Corporation shall operate the -facility in accordance with the Technical Specifications.

l 3.

This license amendment is effective as of the date of its' issuance.

FORJHE,NUCLEARREGLLATORYCOMMISSION ohri F. Stolz; Chief Ope ating Reactors Brt.h #4

  • ision of Licensing,

Attachment:

Changes to the Technical Specifications Date of Issuance: MAR 101983

'"j-e s

5: **

r 8

4

' ~... -

ATTACHMENT TO LICENSE AMENDMENT NO.6 3 FACILITY OPERATING LICENSE NO. DPR-72 P9CKET NO. 50-302 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change., The corresponding overleaf pages are also provided to maintain document completeness.

~

Pages 3/4 6-15 3/4 6-17 3/4 6-18 3/4 6-19 3/4 6-20

^

3/4 6-21a e

G e

4 e

I E

m e

O e

e e

O

s CONTAINMENT SYSTEMS 3/4.6.3 CONTAINMENT ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.6.3.1 The containment isolation valves specified in Table 3.6-1 shall be OPERABLE with isolation times as shown in Table 3.6-1.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With one or more of the isolation valve (s) specified in Table 3.6-1 inoperable, either:

a.

Restore the inoperable valve (s) to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, o.r b.

Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one deactivated automatic valve secured in the isolation position, or c.

Isolate each affected penetrat' ion within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one closed manual valve or blind flange; or d.

Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS l

4.6.3.1.1 The isolation valves specified in Table 3.6-1 shall be demonstrated OPERABLE prior to returning the valve to service 'after weinten-ance, repair or replacement work is performed on the valve or its associated actuator, control or power circuit by performance. of a cycling test and verification of isolation time.

1 CRYSTAL RIVER - UNIT 3 3/4 6-15 Amendment No. JJ,59',6 3

.g CONTAINMENT SYSTEMS SURVEILLANCE REQL'IREMENTS (Continued) i

4. 6. 3.1. 2 Each isolation valve specified in Table 3.6-1 shall be demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at least once per 18 months by:

Verifying that on a containment isolation test signal,' each a.

automatic isolation valve actuates to its isolation position.

b.

Verifying thini. on a containment radiation-high test sign,al, each purge and exhaust automatic valve actuates to its isolation position.

o O

e e

e e

O W

4 e

U CRYSTAL RIVER - UNIT 3 3/4 6-16

~

TABLE 3.6-1 CONTAINMENT ISOLATION VALVES VALVE NUMBER.

FUNCTION, ISOLATION TIME (seconds)

A.

CONTAINMENT ISOLATION 1.

BSV-27 check #

closed dur. nor, operation NA and open dur. RB spray BSV-3 #

~60 BSV-26 check #

NA BSV-4 #-

60 2.

CAV-126(A)*

iso. CA sys. fr. RC.letdn.

60 CAV-1 (A)*

iso. CA sys. fr. pzr.

60 CAV-3 (A)*

60 CAV-2 (B)*

iso. CA sys. fr. RB 60 CAV-4 # (A)*

isolate liquid sampling 60 system CAV-6 1 (B)*

60 CAV-5#(A)*

60 CAV-7 # (B)*

60.,

3.

CFV-20 check iso. N2 supply fr. CFT-1A NA l CFV-28(A/B)*-

60 CFV-18 check iso. MU system fr. CFT-1B NA CFV-26 (A/B)*

60 l CFV 19 check iso. MU system fr. CFT-1A NA CFV-25 (A/B)*

60 CFV-42(B)*.

iso. liquid sampling fr.

60 CF system CFV-15 (A)*

iso. WD sys. fr. CF tanks 60 CFV-16 (A)*

60 CFV-29 (B)*

60 CFV-11(A)*

iso. CF tanks fr.' liquid 60 F

sampling system

,CFV-12 (A)*

60 CFV-17 check iso. N2 supply fr. CFT-1B NA CFV-27 (A/8)*

60 l i

CRYSTAL

  • RIVER - UNIT 3 3/4 6-17 Amendment No. Xs,6 3 v

TABLE 3.6-1 (Continued)

CONTAINMENT ISOLATION VAi.VES VALVE NUMBER FUNCTION ISOLATION TIME

- (seconds) r 4.

CIV-41*

iso'. CI sys. fr. RB 60 CIV-40*

60 CIV-34*

60 CIV-35*.

60.

5.

DHV-93 check iso. DH system fr. pzr.

NA DHV-91*

60 l DHV-43 #

iso. DH sys. fr. RB sump.-

120 l

DHV-42 #

120 l

l.

DHV-4# & 41#

iso. DH sys. fr. RC 120 DHV-6 #

iso. DH system from 60 Reactor Vessel DHV-5 #

60 6.

DWV-162 check iso. DW system fr. RB NA DWV-160 (A/B)*

60

~

7.

FWV-44 check #

iso. feedwater NA from RCSG-1A FWV-45 check #

NA FWV-43 check i -

iso. feedwater NA from RCSG-1B FWV-46 check #

NA 8.

MSV-130 f(A/B)*

iso. MDT-1 from RCSG-1A 60 MSV-148 #(A/B)*

iso. MDT-1 from RCSG-1B 60 MSV-411 #

60 from,RCSG-1B

\\

CRYSTAL. RIVER - UNIT 3 3/4 6-18 Amendment No. 38',6 3 e

TABLE 3.6-1 (Continued)

CONTAINMENT ISOLATION. VALVES FUNC. ION ISOLATION TIME VALVE NUMBER T

- (seconds) 9.

MUV-40(A)*

iso.'MU system from RC 60 MUV-41 ( A)*

60 MUV-49 (B) 60 MUV-261 iso. MU system from 60 control bleed-off MUV-260 60 MUV-259 G0-MUV-258 60

!!UV-253 GO l MUV-163 check #

open during HPI and NA closed dur. nor, operation MUV-25 #

60 MUV-164 check #

NA MUV-26 #

60 MUV-160 check #.

NA MUV-23 #

60 MUV-161 check #

NA MUV-24 #

60 MUV-27 #

open dur. nor. operation 60 and closed during RB Isolation

~

iso. NSCCC from AHF-1C 60

10. SWV-39 #

SWV-45 #

60 SW-35 #

iso. NSCCC from AHF-1A 60 SW-41 #-

60 SWV-37 #

iso. NSCCC from AHF-1B 60 SWY-43 #

60 SW-48 #*

isolate NSCCC from 60 MUHE-1A & 18 and WDT-5 SWV-47 #*

60 SWV-49 #*

60 SWV-50 #*

60 SWV-80'#

iso. NSCCC from RCP-1A 60 l

SWV-84 #

60 SWV-82 #

iso. NSCCC from RCP-3C 60 SW-86 #

60 CRYSTAL RIVER - UNIT 3 3/4 6-19 Amendment No. M M X 6 3 l

e TABLE 3.6-1 (Continued)

CONTAINMENT IS0'LATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME

.(seconds)

SWV-81 #

iso. NSCCC from RCP-1D 60 SWV-85 #

60 SWV-79 #

iso. NSCCC from RCP-1B 60 SWV-83 #

60

  • SWV-109 #

iso. NSCCC from DRRD-1 60 SWV-110 #

60

11. WDV-4 (B) iso. WDT-4 from RB sump 60 WDV-3(A) 60 WDV-60(A)*

iso. WDT-4 from WDT-5 60 WDV-61 (B)*

60 WDV-94(A) iso. WDT-4 from WDP-8 60 WDV-62 (B) 60 WDV-40.6 ( A)*

iso. waste gas disposal 60 from vents in RC system WDV-405(B)*

60

12. WSV-3 iso.' containment monitoring.

60 WSV-4 system from RB 60 WSV-5 60 WSV-6 60 B.

CONTAINMENT PURGE AND EXHAUST 1.

AHV-1C(A) iso pur. sup. system fr. RB 60 AHV-10(B) 60 AHV-1B(A) iso, pur. exhaust system fr. RB 60 AHV-1A (B) 60 C.

MANUAL 1.

IAV-28 iso. IA from RB NA l

IAV-29 NA i

l 2.

LRV-50 iso leak rate test system NA.

l fmm M LRV-36 NA l

CRYSTAL RIVER - UNIT 3 3/4 6-20 Amendment No. 3876 3 l

i

~

TABLE 3.6-1 (Continued)

CONTAINMENT ISOLATION VALVES

)

VALVE NUMBER _

FUNCTION ISOLATION TIME

~

(seconds)

LRV-51 iso.. atmos. vent and RB NA LRV-35 & 47 purge exhaust system from RB NA LRV-49 iso. atmos. vent from RB NA LRV-38 & 52 NA -

LRV-45 iso. LR test panel from_RB NA LRV-44 NA LRV-46 NA -

3.

MSV-146#

iso. misc. waste storage NA tank from RCSG-1B 4.

NGV-62 iso. NG system from NA steam generators

  • NGV-81l'#

NA NGV-82 iso. NG system from pzr.

NA 5.

SAV-24 iso. SA from RB NA SAV-23 & 122 NA,

~

6.

SFV-18 is'o. SF system

~

NA NA-SFV-19 SFV-119 i iso. Fuel Transfer tubes N'A

~

from F.T. Canal

~

SFV-120 #

NA 7.

WSV-1 iso. containment monitoring NA system from RB WSV-2 NA D.

PENETRATIONS REQUIRING TYPE B TESTS Blind Flange 119 iso. RB NA-Blind Flange 120 NA

' Blind Flange 202 NA

~.

l CRYSTAL RIVER - UNIT 3 3/4 6-21 Amendment No..R'J438 w

~.,

TABLE 3.6-1 (Continued) '

CONTAINMENT ISOLATION VALVES VALVE NUMBER

' FUNCTION ISOLATION TIME (seconds)

Blind Flange 348 iso fuel transfer tube from NA' Transfer' Canal Blind Flange 436 NA Equipment Hatch iso. RB NA Personnel Hatch iso. RB NA

  1. Not subject to Type C Leakage Test
  • The provisions of Specification 3.0.4 are not applicable.

s

~

(A)

Isolates on Diverse Isolation Actuation Signal A (B)

Isolatas on Diverse Isolation Actuation Signal B (A/B)

Isola'tes on Diverse Isolation Actuation Sigrial A or B

'R V

\\

CRYSTAL RIVER - UNIT 3 3/4 6-21a Amendment No. 4 3 e

o

. _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _