ML20072F117
| ML20072F117 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/22/1983 |
| From: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20072F090 | List: |
| References | |
| NUDOCS 8306270268 | |
| Download: ML20072F117 (3) | |
Text
,
COMMONNEALTH OF PENMSYLVANTA ss.
COUN'i f OF PHILADELPRT A S. L. Daltroff, being first duly sworn, deposes and says:
'T' hat he is Vice President of Philadelphia F.lectric Company, the Apolicant herein; that he has read the foregoing Application for Anendnent of Facility Operating Licenses and knows the contents thereof; and that the statements and natters set forth therein are true and correct to the best o# his knowledae, in formation and belief.
-. /
l 1
i
/ i Subscribed and sworn to before me this 2N day kN of M
.Notarv Public PATRICIA D. SCHOLl' Notry Pubhe, Phi.adelpnia. Philadelphia Co.
My Commission Espires February 10,1G36 8306270268 830622 PDR ADOCK 05000277 P
PBAPS Unit 3 s
TAHr.E 3.11.D.1 Safety Related Shock Suppressors (Snubbers)
HIGH (1)
- ADIATION AREA ESPECTALLY (1)
INACCESSIRIE (1)
SN11RRER SYSTEM DURTNG DT FFICULT DURTNG NORMAL MINRER LOCATION AND ET.EVATION SHUTDOWN TO REMOVE OPERATION TYPE (2)
See 4.11.D.4.d.
l 6-DDNL-S-R Feedwater Drywell 169 Y
Y H
1 i'
6-DDNL-S-9 Feedwater Drywell 168 Y
Y H
6-DDNL-S-10 Feedwater Drywell 168 Y
Y H
6-DDNL-S-11 Feedwater Drywell 155 Y
Y H
6-DDNL-S-12 Feedwater Drywell 155 Y
Y H
1 6-DDNL-S-13 Feedwater Drywell 155 Y
Y H
6-DDNL-S-14 Feedwater Drywell 155 Y
Y H
9-HD-H51 Torus Vac. Rkr.
116 N
N M
4-HR-H53 Torus Vac. Rkr.
116 N
N M
l 10-HB-S-1 RHR Torus Room 45 N
N M
1 10-HR-S-7 RHR R RHR Room 124 N
N H
l 10-HB-S-R RHR Torun Room 45 N
N M
10-GB-S-12 RHR C RHR Room 98 Y
N H
l 10-GB-S-43-1 RHR Torus Room 130 Y
N H
10-GB-S-43-2 RHR Torus Room 130 Y
N H
1 10-GB-S-44 RHR Torus Room 128 Y
N M
-234m-
v 9-PBAPS.
Unit 3 s
TABLE 3.11.D.1 Safetv Pelated Shock Suppressors (Snubbers)
HIGH (1)
MADTATION AREA ESPECTALLY (1)
INACCESSIBLE (1)
SNUBRER SYSTEM DURING DIFFICULT DURING NORMAL NINRER LOCATION AND ET.EVATION SHUTDOWN TO REMOVE OPERATION TYPE (2)
See 4.11.D.4.d.
l 13-HR-S-23 RCIC RCIC Room 103 Y
Y H
23-DBN-S-1 HPCI Torus Room 121 Y
Y H
23-HB-S-1A HPCI HPCI Room 103 Y
Y H
23-HB-S-2A HPCI HPCI Room 103 N
Y H
23-HB-S-3A HPCI HPCI Room 99 Y
Y M
l 23-DBN-S-6-1 HPCI Torus Room 121 Y
N H
23-DBN-S-6-2 HPCI Torus Room 121 Y
N H
23-DBN-S-22 HPCT Drywell 155 Y
Y H
23-DRN-S-23 HPCI Drywell 155 Y
Y H
23-DDN-S-29 HPCI HPCI Room 117 N
N H
23-DDN-S-33 HPCI HPCT Room 93 N
N H
23-DDN-S-47 HPCI Torus Room 121 N
N M
27-HCR-S-1R7 HPCI B/D Core 127.5 N
N M
l Spray Room l
27-HCR-S-188 HPCI Torus Room 122.R N
N M
-234P-I
PRAPS Unit 3-TABLE 3.11.D.1 s
Safoty Related Shock Suppressors (Snubbers)
HIGH (1)
RADIATION AREA ESPECIALLY (1)
INACCESSIBLE (1)
SNURRER SYSTEM DURING
. DI FFICULT DURING NORMAL NINRER LOCATION AND ELEVATION SITUTDOWN TO REMOVE OPERATION TYPE (2)
See 4.11.D.4.d.
l 1-GG-S205-B MSRV Drywell 160 Y
Y M
1-GG-S206-A MSRV Drywell 160 Y
Y M
1-GG-S206-B MSRV Drywell 160 Y
Y M
1-GG-S207-A MSRV Drywell 125 Y
Y M
1-GG-S207-R MSRV Drywell 125 Y
Y M
1-GG-S209-A MSRV Drywell 125 V
Y M
1-GG-S209-R MSRV Drywell 125 Y
Y M
1-GG-S209-A MSRV Drywell 125 Y
Y M
1-GG-S209-B MSRV Drywell 125 Y
Y M
f 14-GR-S-33 Core Spray Torus Room 128 Y
N M
i i
14-GB-S-34 Core Spray Torus Room 128 Y
N M
14-MO-H-57 Core Spray Torus Room 126 Y
N M
l 14-MO-S-42A Core Spray Torus Room 130 Y
N M
14-MO-S-42R Core Spray Torus Room 130 Y
N M
l Notes for Table 3.11.D.1 1)
Yes (Y) or No (N) 2)
flydraulic (H) or Mechanical (M)
-234s-1 i