Confirms 821215 Telcon W/Nrc Clarifying Util Re Reg Guide & QA Program Commitments Per Steam Generator Replacement Project
ML20071Q304
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/22/1982
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
References
TAC-48752, NUDOCS 8212290300
Download: ML20071Q304 (2)


Text

_ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _

9%sconsin Elecinc rowen coursur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 December 22, 1982 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation I U. S. NUCLEAR REGULATORY COMMISSION Washington, D, C. 20555 Attention: Mr. R. A. Clark, Chief Operating Reactors Branch 3 l Gentlemen:

l I

DOCKET NO. 50-2[6 STEAM GENERATOR REPLACEMENT POINT BEACH NUCLEAR PLANT, UNIT 1 This letter provides documentation of the telephone conversation between Messrs. Colburn and Spraul of the NRC staff (NRC) and Messrs. Frieling, Seizert, Krieser, and Stevens of Wisconsin Electric Power Company (Licensee) on December 15, 1982. The purpose of the telephone conversation was to provide ,

clarification to Licensee's letter dated October 27, 1982 I regarding commitments to regulatory guides and the quality assurance program as applicable to the Unit 1 steam generator replacement project.

I The regulatory guide commitments by project. phase are as follows:

1. Fabrication The regulatory guides which are applicable to the fabrication phase are outlined in Section 2.1.4 of the Point Beach Nuclear Plant Unit 1 Steam Generator Repair Report (Repc.ir Report). In addition, commitment was made to Regulatory Guides 1.58, 1.88, 1.144, and 1.146 in our October 27 letter, j 2. Design The regulatory guides which are applicable to the design phase are addressed in Section 3.6.3 of the Repair Report by reference to the governing Westinghouse document, WCAP-8370, Revision 9A, Amendment 1.

8212290300 821222 PDR ADOCK 05000266 P PDR

Mr. H. R. Denton December 22, 1982

3. Installation The regulatory guides which are applicable to the installation phase are addressed in Section 3.6.1 of the Repair Report by reference to Appendix H (currently Section 1.8) of the Point Beach Nuclear Plant Final Safety Analysis Report. In addition, commitment was made to Regulatory Guides 1.39, 1.58, 1.88, 1.94, 1.144, and 1.146 in our October 27 letter.

The reference to Sections 3.6.3 and 3.6.4 of the Repair Report in our October 27 letter as being applicable to installation was in error..

To provide further clarification, regulatory guide

" alternatives" as attached to our October 27 letter, pertain to the Westinghouse implementation of each maspective regulatory guide and are not applicable to the Wisconsin Electric Quality Assurance Program.

Revision of the Repair Report will be made to incorporate this and other additional information requests. Also, as advised during the referenced telephone conversation, NRC review of the supplement to Westinghouse WCAP-9245 is not necessary. Thus, the commitment in our October 27 letter is no longer required.

Please notify us if additional clarification is needed in this regard.